{"id":106354,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/global-shop-solutions\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"global-shop-solutions","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Global Shop Solutions<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Global Shop Solutions: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Global Shop Solutions ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai. Uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, un diskr\u0113t\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumiem tas nodro\u0161ina optimiz\u0113tu grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. J\u016bs redzat, uz kuras iek\u0101rtas un cikos tiks veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Global Shop Solutions darbojas abos virzienos. SkyPlanner sa\u0146em Parts, BOMs, Routers un to oper\u0101cijas, Workcenters un darba grupas, jaudas kalend\u0101rus, darbinieku datus, atv\u0113rtos Work Orders un iepirkuma pas\u016bt\u012bjumus. Atpaka\u013c tiek nos\u016bt\u012bts katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kuma un beigu laiks, k\u0101 ar\u012b SkyPlanner izv\u0113l\u0113tais Workcenter. Ar\u012b operatora nostr\u0101d\u0101to laiku var nos\u016bt\u012bt atpaka\u013c, lai to uzskait\u012btu attiec\u012bgaj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Global Shop iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-plant\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eotn\u0113<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbu sec\u012bba veidojas autom\u0101tiski.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru darba oper\u0101ciju uz konkr\u0113tas iek\u0101rtas konkr\u0113t\u0101 laik\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btni un virsstundas. Pl\u0101not\u0101jiem vairs nav manu\u0101li j\u0101p\u0101rk\u0101rto Gantt diagramma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">P\u0101rregul\u0113\u0161ana aiz\u0146em maz\u0101k laika.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram deta\u013cu vai materi\u0101lu p\u0101rim abos p\u0101rejas virzienos. P\u0101rejai no alum\u012bnija uz ner\u016bs\u0113jo\u0161o t\u0113raudu var b\u016bt vajadz\u012bgas 30 min\u016btes, bet pret\u0113j\u0101 virzien\u0101 \u2014 60. Pl\u0101no\u0161anas dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais sagatavo\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Paral\u0113l\u0101s iek\u0101rtas pl\u0101no atsevi\u0161\u0137i.<\/p>\n\n\n<p class=\"fx-pain__b\">Workcenter ar \u010detr\u0101m vien\u0101d\u0101m fr\u0113zma\u0161\u012bn\u0101m tiek sadal\u012bts \u010detr\u0101s darbu rind\u0101s. Darbs tiek pie\u0161\u0137irts br\u012bvajai iek\u0101rtai vai citam pieejamam darbiniekam, un ilgsto\u0161u ra\u017eo\u0161anas uzdevumu var sadal\u012bt starp vair\u0101k\u0101m iek\u0101rt\u0101m.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tas pats pl\u0101ns iev\u0113ro ar\u012b operatoru un instrumentu pieejam\u012bbas ierobe\u017eojumus.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku attiec\u012bgaj\u0101s mai\u0146\u0101s. Instrumentu, ko izmanto uz vienas iek\u0101rtas, nekad vienlaikus nerezerv\u0113 citai.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Steidzamu pas\u016bt\u012bjumu iepl\u0101no\u0161ana aiz\u0146em sekundes, nevis visu p\u0113cpusdienu.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad pien\u0101k steidzams ra\u017eo\u0161anas uzdevums vai saboj\u0101jas iek\u0101rta, Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu, un Autopilot to p\u0101rpl\u0101no. J\u016bsu noteikt\u0101s fiks\u0101cijas un priorit\u0101tes joproj\u0101m tiek iev\u0113rotas, savuk\u0101rt Running Time Lock saglab\u0101 nemain\u012bgu darbu pl\u0101nu ceh\u0101 tuv\u0101kaj\u0101m stund\u0101m.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori str\u0101d\u0101 p\u0113c pl\u0101na.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators telefon\u0101 vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un darba gait\u0101 re\u0123istr\u0113 sagatavo\u0161anas un izpildes laiku. Biroj\u0101 darba gaitu redz re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai faktiski pat\u0113r\u0113to laiku nos\u016bt\u012bt atpaka\u013c uz Global Shop.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ji, kas izmanto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosada\u013c\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jauna darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113tu tr\u012bs m\u0113ne\u0161u pl\u0101nu visiem darba centriem var sast\u0101d\u012bt maz\u0101k nek\u0101 30 min\u016bt\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu autom\u0101tiska iepl\u0101no\u0161ana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek sapl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-global-shop-solutions-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Global Shop Solutions<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Global Shop nos\u016bta ra\u017eo\u0161anas datus.<\/strong> SkyPlanner sa\u0146em atv\u0113rtos Work Orders un to Router oper\u0101cijas, Parts un BOMs, Workcenters, darba grupas, jaudas kalend\u0101rus, darbinieku datus, materi\u0101lu vajadz\u012bbas un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Laiki un darba uzskaites dati tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kuma un beigu laiks kop\u0101 ar pie\u0161\u0137irto Workcenter tiek nos\u016bt\u012bts uz Global Shop. Re\u0123istr\u0113to laiku un daudzumus var nos\u016bt\u012bt atpaka\u013c darba uzskaitei. Var ar\u012b turpin\u0101t izmantot Shop Floor Data Collection sist\u0113m\u0101 Global Shop, un SkyPlanner no t\u0101 nolas\u012bs darba izpildes datus.<\/li>\n\n<\/ol>\n\n\n<p>Global Shop paliek j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Pied\u0101v\u0101jumu sagatavo\u0161ana, pas\u016bt\u012bjumu ievade, Parts, BOMs, Routers, iepirkumi, kr\u0101jumu p\u0101rvald\u012bba, kvalit\u0101tes vad\u012bba, ra\u017eo\u0161anas uzdevumu izmaksu apr\u0113\u0137ins un gr\u0101matved\u012bba paliek turpat. SkyPlanner atbild par vienu lietu: katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas sec\u012bbu un laiku uz katra resursa.<\/p>\n\n\n<p>Savienojumu izveido ar pa\u0161a Global Shop papla\u0161in\u0101jumu izstr\u0101des r\u012bku Global Application Builder (GAB) SDK. Global Shop nor\u0101da, ka GAB var &#8220;Integrate with third-party APIs and office software suites&#8221; (integr\u0113ties ar tre\u0161o pu\u0161u API un biroja programmat\u016bras komplektiem), &#8220;Manage data flow&#8221; (p\u0101rvald\u012bt datu pl\u016bsmu) un &#8220;Schedule processes and reports to run at regular intervals&#8221; (iepl\u0101not procesu izpildi un p\u0101rskatu sagatavo\u0161anu regul\u0101ros interv\u0101los) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/pdfs\/product-sheets\/tailored-erp.pdf\">GAB produkta apraksts<\/a>). GAB process nos\u016bta ra\u017eo\u0161anas pas\u016bt\u012bjumus uz SkyPlanner REST API un ieraksta pl\u0101noto s\u0101kuma un beigu laiku atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek. Prec\u012bzu veidu, k\u0101 dati tiek ierakst\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101, un t\u012bkla savienojuma ce\u013cu j\u016bsu izvietojumam \u2014 uz vietas, Global Shop Cloud vai SaaS \u2014 nosaka ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n\n\n<p>Katra ra\u017eotne izmanto Global Shop at\u0161\u0137ir\u012bgi, t\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c palai\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b Global Shop pakalpojumu komanda vai j\u016bsu pa\u0161u GAB izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Datu kart\u0113jums, GAB risin\u0101jumu paraugi un atpaka\u013cierakstes noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/global-shop-solutions\/integracijas-celvedis\/\">Global Shop Solutions integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-global-shop-solutions-schedules-and-what-sk\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Global Shop Solutions un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Global Shop Solutions ERP ietver Advanced Planning &amp; Scheduling (APS) moduli. Global Shop to raksturo \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ar jaudas ierobe\u017eojumiem vai bez tiem, uz priek\u0161u vai atpaka\u013c.<\/strong> &#8220;Use finite\/infinite scheduling to create reliable quotes that reflect real-time data, including what-if scenarios.&#8221; (Izmantojiet pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem vai bez tiem, lai sagatavotu uzticamus pied\u0101v\u0101jumus, kas balst\u012bti re\u0101llaika datos un ietver ar\u012b scen\u0101riju anal\u012bzi.) (<a href=\"https:\/\/www.globalshopsolutions.com\/planning-and-scheduling-software-for-manufacturing\">Global Shop<\/a>) Produkta aprakst\u0101 min\u0113ta darba centru, darba grupu, darbinieku, instrumentu un materi\u0101lu pl\u0101no\u0161ana (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/pdfs\/product-sheets\/planning-and-scheduling.pdf\">APS produkta apraksts<\/a>).<\/li>\n\n\n<li><strong>Katrs ra\u017eo\u0161anas pas\u016bt\u012bjums tiek iepl\u0101nots ievades br\u012bd\u012b.<\/strong> &#8220;Simply enter a work order, click on a few buttons and the system instantly schedules the job.&#8221; (Vienk\u0101r\u0161i ievadiet ra\u017eo\u0161anas pas\u016bt\u012bjumu, noklik\u0161\u0137iniet uz da\u017e\u0101m pog\u0101m, un sist\u0113ma uzreiz iepl\u0101nos ra\u017eo\u0161anas uzdevumu.) (<a href=\"https:\/\/globalshopsolutions.com.mx\/wp-content\/uploads\/2020\/09\/How-to-Make-Your-Life-Easier-with-ERP-Scheduling-for-Manufacturing.pdf\">Global Shop informat\u012bvais materi\u0101ls par grafiku sast\u0101d\u012b\u0161anu<\/a>)<\/li>\n\n\n<li><strong>Pl\u0101not\u0101js p\u0101rstr\u0101d\u0101 pl\u0101nu.<\/strong> &#8220;Easily reschedule or reroute jobs with our drag and drop feature to meet customer deadlines.&#8221; (Ar vilk\u0161anas un nome\u0161anas funkciju varat \u0113rti p\u0101rpl\u0101not ra\u017eo\u0161anas uzdevumus vai main\u012bt to mar\u0161rutu, lai iev\u0113rotu klientu termi\u0146us.)<\/li>\n\n\n<li><strong>Steidzams ra\u017eo\u0161anas uzdevums nob\u012bda p\u0101r\u0113jos.<\/strong> P\u0113c manu\u0101las p\u0101rpl\u0101no\u0161anas &#8220;bump list&#8221; (p\u0101rb\u012bd\u012bto pas\u016bt\u012bjumu saraksts) nor\u0101da: &#8220;we have taken all these work orders and moved them out to the right. You will be late on these orders if you continue with this decision.&#8221; (Visi \u0161ie ra\u017eo\u0161anas pas\u016bt\u012bjumi ir p\u0101rb\u012bd\u012bti pa labi. Ja paliksiet pie \u0161\u012b l\u0113muma, \u0161ie pas\u016bt\u012bjumi kav\u0113sies.) (<a href=\"https:\/\/globalshopsolutions.com.mx\/wp-content\/uploads\/2020\/09\/How-to-Make-Your-Life-Easier-with-ERP-Scheduling-for-Manufacturing.pdf\">Global Shop informat\u012bvais materi\u0101ls par grafiku sast\u0101d\u012b\u0161anu<\/a>)<\/li>\n\n\n<li><strong>Galvenais ir p\u0101rskat\u0101m\u012bba.<\/strong> Pa\u0161a Global Shop informat\u012bvaj\u0101 materi\u0101l\u0101 teikts: &#8220;the real power of the ERP scheduling module lies not so much in what it does for you (automatically schedule jobs) as in what it enables you to do.&#8221; (ERP grafiku sast\u0101d\u012b\u0161anas modu\u013ca patiesais sp\u0113ks sl\u0113pjas ne tik daudz taj\u0101, ko tas dara j\u016bsu viet\u0101 \u2014 autom\u0101tiski iepl\u0101no ra\u017eo\u0161anas uzdevumus \u2014, bet gan taj\u0101, ko tas \u013cauj paveikt jums.)<\/li>\n\n<\/ul>\n\n\n<p>Global Shop APS sniedz pl\u0101not\u0101jam skaidru p\u0101rskatu par noslodzi. SkyPlanner papildus optimiz\u0113 visu pl\u0101nu: Arcturus kop\u012bgi nosaka visu ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu uz katras iek\u0101rtas, pl\u0101no p\u0101rregul\u0113\u0161anu, \u0146emot v\u0113r\u0101 p\u0101rejas virzienu, un pats p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<p>Katrs solis un ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/global-shop-solutions\/razosanas-planosana\/\">Vai Global Shop Solutions nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"global-shop-solutions-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Global Shop Solutions \u0161obr\u012bd un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Global Shop APS<\/th><th>Global Shop Solutions ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Pl\u0101no\u0161ana ar darba centru un darba grupu jaudas ierobe\u017eojumiem vai bez tiem, izmantojot jaudas kalend\u0101rus<\/td><td>Tiek iev\u0113roti katras iek\u0101rtas, operatora un instrumenta pieejam\u012bbas ierobe\u017eojumi, faktisk\u0101s mai\u0146as un promb\u016btne<\/td><\/tr><tr><td>Darbu sec\u012bba<\/td><td>Katru ra\u017eo\u0161anas pas\u016bt\u012bjumu iepl\u0101no ievades br\u012bd\u012b; pl\u0101not\u0101js p\u0101rvieto uzdevumus un maina to mar\u0161rutus Gantt diagramm\u0101<\/td><td>Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu<\/td><\/tr><tr><td>Steidzami ra\u017eo\u0161anas uzdevumi<\/td><td>Manu\u0101la p\u0101rpl\u0101no\u0161ana, p\u0113c kuras p\u0101rb\u012bd\u012bto pas\u016bt\u012bjumu saraksts par\u0101da, kuri pas\u016bt\u012bjumi kav\u0113sies<\/td><td>Autopilot p\u0101rpl\u0101no visu cehu, iev\u0113rojot j\u016bsu noteikt\u0101s fiks\u0101cijas un priorit\u0101tes<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Vienas un t\u0101s pa\u0161as preces ra\u017eo\u0161anas uzdevumus sasaista, lai tiem b\u016btu kop\u012bga sagatavo\u0161ana<\/td><td>Sagatavo\u0161anas laiku matrica abiem p\u0101rejas virzieniem: \u012bs\u0101kais kop\u0113jais sagatavo\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki<\/td><td>Darbinieku darba pl\u0101no\u0161ana ar kalend\u0101riem<\/td><td>Uzdevumiem ar vair\u0101kiem operatoriem pie\u0161\u0137ir mai\u0146\u0101s pieejamos darbiniekus; promb\u016btn\u0113 eso\u0161ajiem atrod aizst\u0101j\u0113jus<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu un \u0101rpakalpojum\u0101 veicamo oper\u0101ciju pl\u0101no\u0161ana<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami noliktav\u0101 vai sa\u0146emti saska\u0146\u0101 ar iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Ies\u0101ktie darbi<\/td><td>Shop Floor Data Collection atjaunina ra\u017eo\u0161anas pas\u016bt\u012bjuma datus<\/td><td>Re\u0123istr\u0113tos izpildes datus izmanto pl\u0101n\u0101; Running Time Lock fiks\u0113 pl\u0101nu tuv\u0101kaj\u0101m stund\u0101m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba centru uzdevumu saraksti un datu iev\u0101k\u0161anas termin\u0101\u013ci<\/td><td>Operatori redz optimiz\u0113to darbu rindu un re\u0123istr\u0113 darbu telefon\u0101 vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"global-shop-solutions-scheduling-software-and-ad\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Global Shop Solutions grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Global Shop APS<\/td><td>Global Shop Solutions ERP ieb\u016bv\u0113tais grafiku sast\u0101d\u012b\u0161anas modulis: Gantt diagramma, scen\u0101riju anal\u012bze, vilk\u0161ana un nome\u0161ana, uzdevumu saraksti<\/td><td>Pl\u0101not\u0101ji labpr\u0101t pa\u0161i p\u0101rk\u0101rto Gantt diagrammu, un iek\u0101rtu sagatavo\u0161ana nav atkar\u012bga no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki, kas \u0146em v\u0113r\u0101 faktisko jaudu un izmanto eksport\u0113tus datus (piem\u0113ram, User Solutions izstr\u0101d\u0101tais EDGEBIC)<\/td><td>No Global Shop eksport\u0113tos Excel, CSV un datub\u0101zes datus ielasa atsevi\u0161\u0137\u0101 pl\u0101no\u0161anas r\u012bk\u0101<\/td><td>Pl\u0101not\u0101js sast\u0101da grafiku atsevi\u0161\u0137\u0101s pl\u0101no\u0161anas sesij\u0101s, izmantojot eksport\u0113tus failus<\/td><\/tr><tr><td>M\u0101kon\u012b pieejama APS sist\u0113ma, kas savienota ar Global Shop (SkyPlanner APS)<\/td><td>Autom\u0101tiska ra\u017eo\u0161anas pl\u0101no\u0161ana, \u0146emot v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la faktisko pieejam\u012bbu, ar divvirzienu datu apmai\u0146u ar Global Shop<\/td><td>Pieg\u0101des datumus nosaka darbu sec\u012bba, un pl\u0101ns main\u0101s katru dienu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ra\u017eot\u0101ji, kas str\u0101d\u0101 p\u0113c individu\u0101liem pas\u016bt\u012bjumiem un sal\u012bdzina ERP sist\u0113mas, apsver ar\u012b JobBOSS\u00b2 un ProShop. Skatiet <a href=\"\/lv\/integracija\/erp\/jobboss\/\">SkyPlanner risin\u0101jumu JobBOSS\u00b2 lietot\u0101jiem<\/a> un <a href=\"\/lv\/integracija\/erp\/proshop-erp\/\">SkyPlanner risin\u0101jumu ProShop ERP lietot\u0101jiem<\/a>.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Global Shop APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties optimiz\u0113t visu pl\u0101nu, nevis tikai ievietot katru uzdevumu grafik\u0101 t\u0101 ievades br\u012bd\u012b.<\/strong> Global Shop iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumu, tikl\u012bdz tas ir ievad\u012bts, un pl\u0101not\u0101js nov\u0113r\u0161 p\u0101rkl\u0101\u0161anos Gantt diagramm\u0101. Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visus ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101, savuk\u0101rt Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Steidzami pas\u016bt\u012bjumi ir ikdiena.<\/strong> Global Shop pl\u0101not\u0101js p\u0101rk\u0101rto grafiku ap steidzamo uzdevumu, un nob\u012bd\u012bto pas\u016bt\u012bjumu saraksts par\u0101da, kuri ra\u017eo\u0161anas pas\u016bt\u012bjumi kav\u0113sies. SkyPlanner p\u0101rk\u0101rto visa ceha darbu sec\u012bbu, \u0146emot v\u0113r\u0101 steidzamo pas\u016bt\u012bjumu, un ar Running Time Lock saglab\u0101 jau s\u0101kto darbu grafiku nemain\u012bgu.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka izlaides apjomu.<\/strong> Sagatavo\u0161anas laiku matric\u0101 katram deta\u013cu p\u0101rim ir nor\u0101d\u012bts at\u0161\u0137ir\u012bgs laiks katr\u0101 p\u0101rejas virzien\u0101, un darbu sec\u012bba tiek veidota t\u0101, lai kop\u0113jais sagatavo\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Svar\u012bga ir iek\u0101rtu un brig\u0101\u017eu paral\u0113la darb\u012bba.<\/strong> SkyPlanner rezerv\u0113 katru Workcenter iek\u0101rtu atsevi\u0161\u0137i, sadala ilgsto\u0161us ra\u017eo\u0161anas uzdevumus starp iek\u0101rt\u0101m un nor\u012bko darbiniekus uzdevumiem, kuriem vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da optimiz\u0113to darbu rindu t\u0101lrun\u012b vai plan\u0161et\u0113, un re\u0123istr\u0113tais laiks tiek nos\u016bt\u012bts atpaka\u013c uz Global Shop.<\/li>\n\n\n<li><strong>V\u0113laties vienu skaidru cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas izmaksu pied\u0101v\u0101jumu sa\u0146emat iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet Global Shop Workcenters un darbiniekus. Ir pieejama pal\u012bdz\u012bba darba s\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Global Shop uz Excel atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to Router oper\u0101ciju sec\u012bbas, import\u0113jiet tos SkyPlanner un sal\u012bdziniet SkyPlanner grafiku ar pa\u0161reiz\u0113jo APS pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Global Shop.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, iepaz\u012bstieties ar <a href=\"\/lv\/funkcijas\/\">vis\u0101m funkcij\u0101m<\/a>, izlasiet m\u016bsu ce\u013cvedi par <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko jaudu<\/a>, vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums Global Shop Solutions lietot\u0101jiem?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Global Shop Solutions. SkyPlanner sa\u0146em Parts, BOMs, Routers, Workcenters, darbiniekus, atv\u0113rtos Work Orders un iepirkuma pas\u016bt\u012bjumus, savuk\u0101rt atpaka\u013c nos\u016bta katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101noto s\u0101kuma un beigu laiku. Pl\u0101no\u0161an\u0101 tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. Sagatavo\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, nosaka uzdevumu sec\u012bbu t\u0101, lai kop\u0113jais sagatavo\u0161anas laiks b\u016btu vismaz\u0101kais. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Global Shop Solutions pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Global Shop APS modulis \u013cauj pl\u0101not darba centrus, darba grupas, darbiniekus, instrumentus un materi\u0101lus ar jaudas ierobe\u017eojumiem vai bez tiem, uz priek\u0161u vai atpaka\u013c laik\u0101, izmantojot Gantt diagrammas un scen\u0101riju anal\u012bzi. Pl\u0101not\u0101ji p\u0101rvieto ra\u017eo\u0161anas uzdevumus, tos velkot un nometot, un nob\u012bd\u012bto pas\u016bt\u012bjumu saraksts par\u0101da, kuri ra\u017eo\u0161anas pas\u016bt\u012bjumi p\u0101rpl\u0101no\u0161anas d\u0113\u013c kav\u0113sies. SkyPlanner APS darbojas l\u012bdz\u0101s Global Shop un autom\u0101tiski optimiz\u0113 darbu sec\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties Global Shop APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Turpiniet lietot Global Shop APS, ja pl\u0101not\u0101ji labpr\u0101t pa\u0161i p\u0101rk\u0101rto Gantt diagrammu un iek\u0101rtu sagatavo\u0161ana nav atkar\u012bga no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma. Izv\u0113lieties SkyPlanner, ja v\u0113laties, lai darbu sec\u012bba tiktu optimiz\u0113ta j\u016bsu viet\u0101: vien\u0101 grafik\u0101 tiek \u0146emts v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laiks katr\u0101 p\u0101rejas virzien\u0101, paral\u0113las iek\u0101rtas, uzdevumi ar vair\u0101kiem operatoriem un materi\u0101lu pien\u0101k\u0161ana, k\u0101 ar\u012b nodro\u0161in\u0101ta autom\u0101tiska p\u0101rpl\u0101no\u0161ana. SkyPlanner darbojas l\u012bdz\u0101s Global Shop, un bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat p\u0101rbaud\u012bt t\u0101 iesp\u0113jas ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Global Shop Solutions?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Global Shop Solutions. Global Application Builder (GAB) process nos\u016bta Work Orders, Router oper\u0101ciju sec\u012bbas, Workcenters un iepirkuma pas\u016bt\u012bjumus uz SkyPlanner REST API un ieraksta pl\u0101noto s\u0101kuma un beigu laiku atpaka\u013c katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101. SkyPlanner t\u012bmek\u013ca aiz\u0137eres aktiviz\u0113 datu ierakst\u012b\u0161anu atpaka\u013c, tikl\u012bdz grafiks main\u0101s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai tas darbojas ar Global Shop Cloud un SaaS?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner ir m\u0101ko\u0146pakalpojums (SaaS), un to var savienot ar Global Shop gan lok\u0101l\u0101 instal\u0101cij\u0101, gan Global Shop Cloud, gan SaaS vid\u0113. Nosakot ievie\u0161anas tv\u0113rumu, kop\u0101 ar jums un Global Shop vienojas par risin\u0101jumu Global Shop pus\u0113 \u2014 GAB procesu vai Global Shop pakalpojumu komandas darbu \u2014 un t\u012bkla savienojumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto Global Shop?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas izmaksu pied\u0101v\u0101jumu sagatavo iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai pirms darba s\u0101k\u0161anas b\u016btu zin\u0101mas visas izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Komanda nosaka j\u016bsu Workcenters, iek\u0101rtu un Routers datu atbilst\u012bbu ab\u0101s sist\u0113m\u0101s, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un nos\u016bta pl\u0101notos datumus atpaka\u013c. Pirms darba s\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Global Shop?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto no Global Shop uz Excel eksport\u0113tos atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus. V\u0113l pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savas ra\u017eotnes <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101nu, kur\u0101 \u0146emta v\u0113r\u0101 faktisk\u0101 jauda<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Global Shop Solutions SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai SkyPlanner APS ir Global Shop Solutions ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai. Uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, un diskr\u0113t\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumiem tas nodro\u0161ina optimiz\u0113tu grafiku katrai iek\u0101rtai, operatoram, instrumentam un &#8230; <a title=\"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106354","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Global Shop integr\u0101cija: APS pl\u0101no\u0161anai p\u0113c re\u0101l\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\/m\u0113n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\/m\u0113n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/\",\"name\":\"Global Shop integr\u0101cija: APS pl\u0101no\u0161anai p\u0113c re\u0101l\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\\\/m\u0113n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/global-shop-solutions\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Global Shop integr\u0101cija: APS pl\u0101no\u0161anai p\u0113c re\u0101l\u0101s jaudas","description":"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\/m\u0113n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai","og_description":"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\/m\u0113n.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/","name":"Global Shop integr\u0101cija: APS pl\u0101no\u0161anai p\u0113c re\u0101l\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildin\u0101jums Global Shop Solutions: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija; katra iek\u0101rta, operators, instruments. No 199 \u20ac\/m\u0113n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/global-shop-solutions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Global Shop Solutions SkyPlanner APS sist\u0113mai Global Shop Solutions: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai SkyPlanner APS ir Global Shop Solutions ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i iek\u0101rtu un darbinieku re\u0101lajai jaudai. Uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, un diskr\u0113t\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumiem tas nodro\u0161ina optimiz\u0113tu grafiku katrai iek\u0101rtai, operatoram, instrumentam un&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106354"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106354\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}