{"id":106296,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/visma-nova\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-nova","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/","title":{"rendered":"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Visma Nova<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS Visma Nova lietot\u0101jiem: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS papildina Visma Nova ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma Nova ir ERP sist\u0113ma, ko izmanto mazie Somijas ra\u017eot\u0101ji un vairumtirgot\u0101ji. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek izveidots grafiks ar konkr\u0113tiem pulkste\u0146a laikiem, nep\u0101rsniedzot pieejamo jaudu. Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Visma Nova nodro\u0161ina datu apmai\u0146u abos virzienos. No Nova tiek sa\u0146emti produkti (nimike) ar to strukt\u016br\u0101m (tuoterakenne) un darba posmiem (ty\u00f6vaiheet), p\u0101rdo\u0161anas pas\u016bt\u012bjumi, iepirkuma pas\u016bt\u012bjumi un kr\u0101jumu atlikumi. Dati par sara\u017eoto produkciju, partij\u0101m un kr\u0101jumu kust\u012bbu re\u0101llaik\u0101 tiek nos\u016bt\u012bti atpaka\u013c uz Nova, bet posmu izpildes apstiprin\u0101jumi tiek re\u0123istr\u0113ti k\u0101 Nova posmu atz\u012bmes (vaihekuittaus). SkyPlanner jau ir integr\u0113ts ar Visma Nova klientu projektos. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Nova konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Grafiks, nevis ieteikts datums.<\/p>\n\n\n<p class=\"fx-pain__b\">Nova iesaka s\u0101kuma datumus, r\u0113\u0137inot atpaka\u013c no pieg\u0101des datuma pa vienam posmam. SkyPlanner iepl\u0101no katru posmu vis\u0101 tehnolo\u0123iskaj\u0101 mar\u0161rut\u0101 br\u012bv\u0101 darba centr\u0101 uz konkr\u0113tu pulkste\u0146a laiku, iev\u0113rojot pieejamo jaudu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai iek\u0101rtai savs grafiks.<\/p>\n\n\n<p class=\"fx-pain__b\">Nova apr\u0113\u0137ina noslodzi iek\u0101rtu grup\u0101m. SkyPlanner katrai iek\u0101rtai izveido savu uzdevumu rindu un p\u0101rce\u013c posmu uz alternat\u012bvu darba centru, ja s\u0101kotn\u0113ji izv\u0113l\u0113tais darba centrs ir aiz\u0146emts.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Faktisk\u0101s mai\u0146as, darbinieki un instrumenti.<\/p>\n\n\n<p class=\"fx-pain__b\">Kalend\u0101r\u0101 ir iek\u013cautas mai\u0146as, br\u012bvdienas, promb\u016btnes un virsstundas. Pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus rezerv\u0113ta citai. Savuk\u0101rt ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek iepl\u0101noti tr\u012bs darbinieki ar br\u012bvu laiku attiec\u012bgaj\u0101s mai\u0146\u0101s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101 laiku, kas vajadz\u012bgs p\u0101rejai starp izstr\u0101d\u0101jumiem abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Arcturus iepl\u0101no l\u012bdz\u012bgus ra\u017eo\u0161anas uzdevumus citu aiz cita un izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku, vienlaikus \u0146emot v\u0113r\u0101 izpildes termi\u0146us.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbs s\u0101kas, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner prognoz\u0113 kr\u0101jumu atlikumus, pamatojoties uz Nova atlikumiem un iepirkuma pas\u016bt\u012bjumiem. Posms, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots uz laiku, kad materi\u0101ls b\u016bs sa\u0146emts.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Izmai\u0146as tiek apstr\u0101d\u0101tas autom\u0101tiski.<\/p>\n\n\n<p class=\"fx-pain__b\">Steidzams pas\u016bt\u012bjums, main\u012bts daudzums vai iek\u0101rtas boj\u0101jums ierosina p\u0101rpl\u0101no\u0161anu. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, un operatori jauno uzdevumu rindu redz t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n\n<p class=\"fx-head__sub\">Piristeel un Opes Corporation izmanto SkyPlanner kop\u0101 ar Visma Nova.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumta dro\u0161\u012bbas sist\u0113mu r\u016bpn\u012bca Kauhav\u0101, skats no aug\u0161as\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis ieraudz\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj p\u0101rskat\u012bt pieejamo jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113tu pl\u0101nu trim m\u0113ne\u0161iem visiem darba centriem var izveidot maz\u0101k nek\u0101 30 min\u016bt\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-nova-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Visma Nova<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Nova nos\u016bta datus par veicamajiem darbiem.<\/strong> SkyPlanner sa\u0146em produktus ar to strukt\u016br\u0101m un darba posmiem, p\u0101rdo\u0161anas pas\u016bt\u012bjumus, iepirkuma pas\u016bt\u012bjumus un kr\u0101jumu atlikumus. Katrs p\u0101rdo\u0161anas pas\u016bt\u012bjums k\u013c\u016bst par pas\u016bt\u012bjumu ar izpildes termi\u0146u, bet katrs darba posms \u2014 par ra\u017eo\u0161anas uzdevumu j\u016bsu at\u013cautaj\u0101s iek\u0101rt\u0101s.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017e\u0101s sekund\u0113s optimiz\u0113 visu pl\u0101nu, \u0146emot v\u0113r\u0101 katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot p\u0101rpl\u0101no grafiku.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas dati atgrie\u017eas Nova.<\/strong> Operatori apstiprina paveikto SkyPlanner Mobile Confirmations. Sara\u017eotie daudzumi, partijas, pale\u0161u eti\u0137etes un kr\u0101jumu kust\u012bbas dati re\u0101llaik\u0101 tiek nos\u016bt\u012bti uz Nova, bet posmu s\u0101kuma un beigu laiki tiek re\u0123istr\u0113ti k\u0101 Nova posmu atz\u012bmes.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner savienojas ar Nova, izmantojot t\u0101s integr\u0101cijas saskarnes: Nova WebService datu apmai\u0146ai re\u0101llaik\u0101 un Nova automatiz\u0113tos datu p\u0101rs\u016bt\u012b\u0161anas failus (<a href=\"https:\/\/www.novaerp.fi\/integraatiot\">Visma: Nova integr\u0101cijas<\/a>). J\u016bsu dator\u0101 eso\u0161aj\u0101 Nova klientprogramm\u0101 nekas nav j\u0101instal\u0113. Visma sav\u0101 Nova integr\u0101ciju lap\u0101 ir iek\u013c\u0101vusi Skycode ar SkyPlanner, un Visma partneri ir pal\u012bdz\u0113ju\u0161i Nova klientiem ieviest SkyPlanner. Piem\u0113ram, Piristeel to ieviesa ar sava ERP pieg\u0101d\u0101t\u0101ja Rauhala Group starpniec\u012bbu. SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Nova konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/p>\n\n\n<p>Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nor\u0101d\u0101m jau s\u0101kotn\u0113j\u0101 pied\u0101v\u0101jum\u0101 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu. Ar\u012b j\u016bsu Visma partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>). Saskarnes, lauku atbilst\u012bba un noteikumi par datu p\u0101rvald\u012bbu ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/visma-nova\/integracijas-celvedis\/\">Visma Nova integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-nova-schedules-and-what-skyplanner-ad\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Visma Nova un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Nova ra\u017eo\u0161anas modulis (Tuotanto) p\u0101rvieto p\u0101rdo\u0161anas pas\u016bt\u012bjumus no pas\u016bt\u012bjumu saraksta uz darbu rindu (Ty\u00f6jono) un t\u0101l\u0101k uz ra\u017eo\u0161anu. Tas iesaka s\u0101kuma un beigu datumus, un noslodzes skat\u0101 (Kuormitus) r\u0101da noslodzi pa iek\u0101rtu grup\u0101m. Visma pal\u012bdz\u012bbas dokument\u0101cij\u0101 ir nor\u0101d\u012bti \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atpaka\u013c no termi\u0146a, pa vienam posmam.<\/strong> Nova parasti r\u0113\u0137ina atpaka\u013c no pieg\u0101des datuma pa vienam darba posmam (m\u016bsu tulkojums, <a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832875-asetukset\">avots<\/a>). SkyPlanner pl\u0101no visu tehnolo\u0123isko mar\u0161rutu gan uz priek\u0161u, gan atpaka\u013c, iev\u0113rojot faktisko jaudu.<\/li>\n\n\n<li><strong>Pl\u0101nojot uz priek\u0161u, tiek \u0146emts v\u0113r\u0101 tikai pirmais posms.<\/strong> Pamatojoties uz zin\u0101mo noslodzi, Nova atrod pirmo br\u012bvo laiku pirm\u0101 posma resursam (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832885-tyojono\">avots<\/a>). SkyPlanner p\u0101rbauda katru posmu, iek\u0101rtu un darbinieku.<\/li>\n\n\n<li><strong>Jaudu nosaka ar ned\u0113\u013cas stundu skaitu.<\/strong> Resursa ned\u0113\u013cas stundas tiek vienm\u0113r\u012bgi sadal\u012btas pa darba dien\u0101m (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832996-resurssit\">avots<\/a>). SkyPlanner pl\u0101no p\u0113c mai\u0146\u0101m, \u0146emot v\u0113r\u0101 br\u012bvdienas un promb\u016btnes.<\/li>\n\n\n<li><strong>Noslodze pa iek\u0101rtu grup\u0101m.<\/strong> Noslodze tiek apr\u0113\u0137in\u0101ta katrai iek\u0101rtu grupai un att\u0113lota grafik\u0101 pa dien\u0101m, ned\u0113\u013c\u0101m vai m\u0113ne\u0161iem (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832901-kuormitus\">avots<\/a>). SkyPlanner pl\u0101no katru iek\u0101rtu atsevi\u0161\u0137i un nekad nepie\u0161\u0137ir tai divus darbus vienlaikus.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjuma izmai\u0146as nep\u0101rce\u013c ra\u017eo\u0161anas uzdevumu.<\/strong> Izmai\u0146as p\u0101rdo\u0161anas pas\u016bt\u012bjum\u0101 nemaina ra\u017eo\u0161anas uzdevuma s\u0101kuma un beigu datumus (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832891-tyon-muuttaminen-tuotannon-aikana\">avots<\/a>). Autopilot p\u0101rpl\u0101no grafiku, kad pas\u016bt\u012bjums main\u0101s.<\/li>\n\n<\/ul>\n\n\n<p>Visi iestat\u012bjumi un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/visma-nova\/razosanas-planosana\/\">Vai Visma Nova nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-nova-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma Nova \u0161obr\u012bd un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Visma Nova Tuotanto<\/th><th>Visma Nova ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Datumi<\/td><td>Ieteikti, r\u0113\u0137inot atpaka\u013c no pieg\u0101des datuma pa posmiem<\/td><td>Konkr\u0113ti pulkste\u0146a laiki katram posmam, iek\u0101rtai un darbiniekam<\/td><\/tr><tr><td>Jauda<\/td><td>Katra resursa ned\u0113\u013cas stundas, sadal\u012btas pa darba dien\u0101m<\/td><td>Mai\u0146as, br\u012bvdienas, promb\u016btnes un virsstundas<\/td><\/tr><tr><td>Iek\u0101rtas<\/td><td>Noslodze pa iek\u0101rtu grup\u0101m<\/td><td>Katrai iek\u0101rtai savs grafiks; Arcturus izv\u0113las no j\u016bsu at\u013cautaj\u0101m alternat\u012bv\u0101m<\/td><\/tr><tr><td>P\u0101rslodze<\/td><td>Redzama noslodzes skat\u0101, nov\u0113r\u0161ama, mainot datumus<\/td><td>P\u0101rslodzes nav \u2014 katram resursam tiek iev\u0113rota pieejam\u0101 jauda<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>P\u0101rregul\u0113\u0161anas laiks katram darba posmam<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu, lai p\u0101rregul\u0113\u0161ana aiz\u0146emtu p\u0113c iesp\u0113jas maz\u0101k laika<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Ra\u017eo\u0161anas priek\u0161likumi un rezerv\u0101cijas<\/td><td>Posma s\u0101kumu nosaka prognoz\u0113tie kr\u0101jumi un gaid\u0101m\u0101s iepirkuma pas\u016bt\u012bjumu pieg\u0101des<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js redi\u0123\u0113 uzdevumu rindu<\/td><td>Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Ty\u00f6piste un posmu atz\u012bmes<\/td><td>Mobile Confirmations ar datu nos\u016bt\u012b\u0161anu atpaka\u013c uz Nova re\u0101llaik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"visma-nova-scheduling-software-and-add-ons-compa\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma Nova: k\u0101 at\u0161\u0137iras programmat\u016bra un papildin\u0101jumi ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Ko tas nodro\u0161ina<\/th><th>Kad tas ir piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Visma Nova Tuotanto un Ty\u00f6piste<\/td><td>Uzdevumu rinda, ieteiktie datumi, noslodzes skats un ra\u017eo\u0161anas ceha lietotne Nova vid\u0113<\/td><td>Da\u017ei posmi katram produktam, viens pl\u0101not\u0101js un \u012bss p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>APS risin\u0101jumu komplekti (piem\u0113ram, Delfoi Planner)<\/td><td>Pl\u0101no\u0161anas un simul\u0101cijas programmat\u016bra, kuras integr\u0113to ERP sist\u0113mu sarakst\u0101 ir Nova<\/td><td>Ievie\u0161anas projektu vada \u012bpa\u0161i tam nor\u012bkota pl\u0101no\u0161anas komanda<\/td><\/tr><tr><td>M\u0101ko\u0146vides APS ar API savienojumu (SkyPlanner APS)<\/td><td>Pl\u0101no\u0161anas r\u012bks p\u0101rl\u016bk\u0101, kas sinhroniz\u0113jas ar Nova un par\u0101da darbu rindu operatoru t\u0101lru\u0146os<\/td><td>Neliela komanda v\u0113las autom\u0101tiski pl\u0101not katras iek\u0101rtas un katra darbinieka darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Visma Nova Tuotanto, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums vajadz\u012bgs grafiks, kas nep\u0101rsniedz pieejamo jaudu.<\/strong> Nova pied\u0101v\u0101 datumus, apr\u0113\u0137inot tos atpaka\u013c no pieg\u0101des datuma pa posmiem (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832875-asetukset\">avots<\/a>). SkyPlanner pl\u0101no darbu ar prec\u012bzu laiku, nep\u0101rsniedzot nevienas iek\u0101rtas, darbinieka vai instrumenta pieejamo jaudu.<\/li>\n\n\n<li><strong>Vien\u0101 iek\u0101rtu grup\u0101 ir vair\u0101kas iek\u0101rtas.<\/strong> Nova apr\u0113\u0137ina slodzi grupai kopum\u0101 (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832901-kuormitus\">avots<\/a>). SkyPlanner pl\u0101no katras iek\u0101rtas darbu atsevi\u0161\u0137i un izv\u0113las br\u012bvo iek\u0101rtu.<\/li>\n\n\n<li><strong>J\u016bsu mai\u0146as at\u0161\u0137iras.<\/strong> Nova vienm\u0113r\u012bgi sadala ned\u0113\u013cas darba stundas pa darba dien\u0101m (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832996-resurssit\">avots<\/a>). SkyPlanner \u0146em v\u0113r\u0101 faktisk\u0101s mai\u0146as, br\u012bvdienas un virsstundas.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumi main\u0101s p\u0113c nodo\u0161anas ra\u017eo\u0161an\u0101.<\/strong> Nova sist\u0113m\u0101 pas\u016bt\u012bjuma izmai\u0146as nep\u0101rvieto ra\u017eo\u0161anas uzdevumu grafik\u0101 (<a href=\"https:\/\/support.novaerp.fi\/fi\/articles\/832891-tyon-muuttaminen-tuotannon-aikana\">avots<\/a>). Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> SkyPlanner p\u0101rregul\u0113\u0161anas laika matrica nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu t\u0101, lai p\u0101rregul\u0113\u0161anai pat\u0113r\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/li>\n\n\n<li><strong>V\u0113laties sa\u0146emt ra\u017eo\u0161anas datus atpaka\u013c Nova sist\u0113m\u0101 uzreiz.<\/strong> Piristeel kr\u0101jumu kust\u012bbas dati non\u0101k Nova re\u0101llaik\u0101, nevis ar pake\u0161apstr\u0101di n\u0101kamaj\u0101 dien\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet iek\u0101rtas, darbiniekus un mai\u0146as SkyPlanner sist\u0113m\u0101 vai import\u0113jiet tos. Pieejams atbalsts darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pl\u0101nojamos darbus.<\/strong> Eksport\u0113jiet no Nova produktus ar to strukt\u016br\u0101m un darba posmiem, k\u0101 ar\u012b atv\u0113rtos p\u0101rdo\u0161anas pas\u016bt\u012bjumus datu p\u0101rs\u016bt\u012b\u0161anas failos vai Excel form\u0101t\u0101. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo darbu rindu.<\/li>\n\n\n<li><strong>Pievienojiet Visma Nova.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi p\u0113c darba centru skaita. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, bet citas sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>. Pamatus atrad\u012bsiet <a href=\"\/lv\/resursi\/kas-ir-razosanas-planosana\/\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas ce\u013cved\u012b<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Visma Nova papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Visma Nova. Tas sa\u0146em produktu, strukt\u016bru, darba posmu, p\u0101rdo\u0161anas pas\u016bt\u012bjumu, iepirkuma pas\u016bt\u012bjumu un kr\u0101jumu datus. Dati par pabeigto ra\u017eo\u0161anu, partij\u0101m, kr\u0101jumu kust\u012bbu un posmu laika atz\u012bm\u0113m tiek nos\u016bt\u012bti atpaka\u013c uz Nova re\u0101llaik\u0101. Piristeel un Opes Corporation to izmanto kop\u0101 ar Visma Nova. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar Visma Nova, un Visma sav\u0101 Nova integr\u0101ciju lap\u0101 nor\u0101da Skycode un t\u0101 risin\u0101jumu SkyPlanner. Ar\u012b APS risin\u0101jumu komplekts Delfoi Planner nor\u0101da Nova savu integr\u0101ciju sarakst\u0101. SkyPlanner darbojas p\u0101rl\u016bk\u0101, pl\u0101no katras iek\u0101rtas un katra darbinieka darbu un par\u0101da katra operatora darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties Visma Nova Tuotanto vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izmantojiet Nova Tuotanto, ja j\u016bsu produktiem ir maz posmu, pl\u0101not\u0101jam ir laiks redi\u0123\u0113t darbu rindu un pietiek ar ieteiktajiem datumiem. Izmantojiet SkyPlanner, ja vajadz\u012bgs grafiks ar prec\u012bzu laiku, kas nep\u0101rsniedz pieejamo jaudu, katras iek\u0101rtas slodzes pl\u0101no\u0161ana, faktisko mai\u0146u iev\u0113ro\u0161ana, uzdevumu sec\u012bba ar maz\u0101ko p\u0101rregul\u0113\u0161anas laiku vai autom\u0101tiska p\u0101rpl\u0101no\u0161ana.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma Nova ir tas pats, kas Visma Net vai Visma L7?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Visma Nova ir Visma ERP sist\u0113ma maziem Somijas uz\u0146\u0113mumiem vairumtirdzniec\u012bb\u0101, specializ\u0113taj\u0101 mazumtirdzniec\u012bb\u0101 un ra\u017eo\u0161an\u0101. <a href=\"\/lv\/integracija\/erp\/visma-net\/\">Visma Net<\/a> ir Visma m\u0101ko\u0146vides ERP sist\u0113ma vid\u0113jiem un lieliem uz\u0146\u0113mumiem, savuk\u0101rt <a href=\"\/lv\/integracija\/erp\/visma-l7\/\">Visma L7<\/a> ir paredz\u0113ta lieliem un vid\u0113jiem r\u016bpniec\u012bbas, b\u016bvniec\u012bbas darbuz\u0146\u0113m\u0113ju un ener\u0123\u0113tikas uz\u0146\u0113mumiem. Katrai sist\u0113mai ir sava lapa SkyPlanner vietn\u0113.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma Nova sist\u0113m\u0101 kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">Nova klientprogramm\u0101 papildin\u0101jums nav j\u0101instal\u0113. SkyPlanner darbojas m\u0101kon\u012b. Nova WebService darbojas j\u016bsu server\u012b, bet Nova automatiz\u0113t\u0101 datu p\u0101rs\u016bt\u012b\u0161ana \u2014 j\u016bsu Nova instal\u0101cij\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 uz\u0146\u0113mumam, kas izmanto Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar iek\u013cautiem 5 darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu pl\u0101noto darbu rindu. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu kop\u0113j\u0101s izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta sagatavo\u0161an\u0101s sist\u0113mas lieto\u0161anai. Komanda sist\u0113m\u0101 atspogu\u013co j\u016bsu iek\u0101rtas un darba posmus, savieno pas\u016bt\u012bjumu un materi\u0101lu datus un nos\u016bta ra\u017eo\u0161anas datus atpaka\u013c uz Nova. Pirms sist\u0113mas nodo\u0161anas ekspluat\u0101cij\u0101 visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto no Nova eksport\u0113tus j\u016bsu produktu, darba posmu un atv\u0113rto pas\u016bt\u012bjumu datus. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redzat savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101nu, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Visma Nova SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS papildina Visma Nova ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma Nova ir ERP sist\u0113ma, ko izmanto mazie Somijas ra\u017eot\u0101ji un vairumtirgot\u0101ji. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek izveidots grafiks &#8230; <a title=\"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/\" aria-label=\"Read more about SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106296","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma Nova integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-nova\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-nova\\\/\",\"name\":\"Visma Nova integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-nova\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-nova\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-nova\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma Nova integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/","name":"Visma Nova integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Visma Nova: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai, divvirzienu integr\u0101cija darba posmiem, iek\u0101rt\u0101m, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-nova\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Visma Nova SkyPlanner APS Visma Nova lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS papildina Visma Nova ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma Nova ir ERP sist\u0113ma, ko izmanto mazie Somijas ra\u017eot\u0101ji un vairumtirgot\u0101ji. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek izveidots grafiks&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106296"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106296\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}