{"id":106267,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/visma-l7\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-l7","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/","title":{"rendered":"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS Visma L7 sist\u0113mai: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS papildina Visma L7 ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma L7 ir ERP sist\u0113ma, ko izmanto lieli un vid\u0113ji Somijas r\u016bpniec\u012bbas, l\u012bgumdarbu un ener\u0123\u0113tikas uz\u0146\u0113mumi. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek sast\u0101d\u012bts grafiks ar konkr\u0113tiem pulkste\u0146a laikiem, nep\u0101rsniedzot pieejamo jaudu. Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7, izmantojot Visma L7 REST API. No L7 tiek sa\u0146emti darbu numuri (ty\u00f6numero), darbu posmi (ty\u00f6nvaihe), resursi, izstr\u0101d\u0101jumu strukt\u016bras, materi\u0101li, kr\u0101jumu atlikumi un iepirkumu rindas. Uz katru darba karti atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie s\u0101kuma datumi, resursi, priorit\u0101tes, darbinieki un stundu sadal\u012bjums pa dien\u0101m. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu L7 iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katram posmam \u2014 konkr\u0113ts laiks.<\/p>\n\n\n<p class=\"fx-pain__b\">L7 katram darba posmam pl\u0101no stundu skaitu pa dien\u0101m. SkyPlanner iepl\u0101no katru posmu br\u012bv\u0101 darba centr\u0101 ar konkr\u0113tu s\u0101kuma laiku, \u0146emot v\u0113r\u0101 mai\u0146as, br\u012bvdienas, promb\u016btni un virsstundas. Divi posmi nekad netiek iepl\u0101noti vien\u0101 iek\u0101rt\u0101 vienlaikus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai iek\u0101rtai savs grafiks.<\/p>\n\n\n<p class=\"fx-pain__b\">L7 resurs\u0101 darbs tiek sadal\u012bts p\u0113c iek\u0101rtu skaita. SkyPlanner katrai iek\u0101rtai izveido savu darbu rindu un p\u0101rce\u013c posmu uz alternat\u012bvu darba centru, ja pirm\u0101 izv\u0113le ir aiz\u0146emta. Izv\u0113l\u0113tais resurss tiek nos\u016bt\u012bts atpaka\u013c uz L7 darba karti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus rezerv\u0113ta citai. Savuk\u0101rt ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek piesaist\u012bti tr\u012bs darbinieki ar br\u012bvu laiku mai\u0146\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saglab\u0101 p\u0101rregul\u0113\u0161anas laiku starp izstr\u0101d\u0101jumiem sagatavo\u0161anas laiku matric\u0101 \u2014 abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Arcturus iepl\u0101no l\u012bdz\u012bgus ra\u017eo\u0161anas uzdevumus citu aiz cita un izv\u0113las sec\u012bbu ar vismaz\u0101ko sagatavo\u0161anas laiku, vienlaikus \u0146emot v\u0113r\u0101 izpildes termi\u0146us.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbs s\u0101kas, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner prognoz\u0113 kr\u0101jumu atlikumus, izmantojot L7 kr\u0101jumu atlikumus un iepirkumu rindas. Posms, kas gaida pieg\u0101d\u0101t\u0101ja pieg\u0101di, tiek iepl\u0101nots uz materi\u0101la sa\u0146em\u0161anas laiku. Ja pieg\u0101de kav\u0113jas, attiec\u012bgi tiek p\u0101rcelts ar\u012b ra\u017eo\u0161anas uzdevums.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u0101ns saglab\u0101jas ar\u012b p\u0113c ERP mai\u0146as.<\/p>\n\n\n<p class=\"fx-pain__b\">Visma ir p\u0101rtraukusi jaunu L7 funkciju izstr\u0101di. J\u016bsu darba centri, procesa posmi, sagatavo\u0161anas laiku matrica un noteikumi glab\u0101jas SkyPlanner, t\u0101p\u0113c, p\u0101rejot uz jaunu ERP sist\u0113mu, main\u0101s tikai savienojums.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums iepriek\u0161\u0113jo aptuveni 50% viet\u0101<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 un vair\u0101k<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anu tagad kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams p\u0101rskats par ra\u017eo\u0161anu re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales pane\u013cu ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012bjums katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT noda\u013cas vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-l7-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>L7 nos\u016bta darba datus.<\/strong> SkyPlanner nolasa darbu posmus ar <code>GET \/manufphases\/<\/code>, resursus ar <code>GET \/manufresources\/<\/code>, deta\u013cas un materi\u0101lus ar <code>GET \/manufcomponents\/<\/code> un <code>GET \/manufmaterials\/<\/code>, k\u0101 ar\u012b izstr\u0101d\u0101jumus, kr\u0101jumu atlikumus, p\u0101rdo\u0161anas rindas un iepirkumu rindas. P\u0113c s\u0101kotn\u0113j\u0101s iel\u0101des \u0161iem nolas\u012bjumiem tiek izmantots <code>modifiedAfter<\/code>, t\u0101p\u0113c tiek sa\u0146emti tikai kop\u0161 iepriek\u0161\u0113j\u0101s izpildes main\u012btie ieraksti.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu, \u0146emot v\u0113r\u0101 katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu, savuk\u0101rt Autopilot p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Grafiks tiek nos\u016bt\u012bts atpaka\u013c uz L7.<\/strong> Ar <code>PUT \/manufphases\/<\/code> L7 darba posm\u0101 tiek ierakst\u012bts katras darba kartes resurss, s\u0101kuma datums, priorit\u0101te, darbinieks un stundu sadal\u012bjums pa dien\u0101m. Ar <code>POST \/resourceupdates\/<\/code> tiek sinhroniz\u0113ta jauda resursu kalend\u0101r\u0101. L7 darbu rind\u0101s ra\u017eo\u0161anas uzdevumi p\u0113c tam redzami SkyPlanner noteiktaj\u0101 sec\u012bb\u0101.<\/li>\n\n\n<li><strong>Tiek sa\u0146emti izpildes dati.<\/strong> L7 darbu rind\u0101s re\u0123istr\u0113tie ra\u017eo\u0161anas notikumi tiek nolas\u012bti ar <code>GET \/manufevents\/<\/code>. Operatori var apstiprin\u0101t darbu ar\u012b SkyPlanner Mobile Confirmations.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner darbojas m\u0101kon\u012b un savienojas ar L7 REST API j\u016bsu Visma LTR server\u012b, t\u0101p\u0113c L7 sist\u0113m\u0101 nekas nav j\u0101instal\u0113. Visma sav\u0101 <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">L7 integr\u0101ciju lap\u0101<\/a> ir iek\u013c\u0101vusi Skycode ar SkyPlanner. SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu L7 iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas.<\/p>\n\n\n<p>Integr\u0101cijas cena tiek pied\u0101v\u0101ta iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu Visma partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). Galapunkti, lauku atbilst\u012bba un noteikumi par to, kura sist\u0113ma p\u0101rvalda datus, ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/visma-l7\/integracijas-celvedis\/\">Visma L7 integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-l7-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Visma L7 un ko papildus sniedz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>L7 ra\u017eo\u0161anas vad\u012bbas modulis (Tuotannonohjaus) pl\u0101no\u0161anai izmanto vajadz\u012bbu apr\u0113\u0137inu (Tarvelaskenta), detaliz\u0113to pl\u0101no\u0161anu (Hienosuunnittelu) un ra\u017eo\u0161anas pl\u0101no\u0161anas re\u017e\u0123i. Detaliz\u0113t\u0101 pl\u0101no\u0161ana izvieto posmus resursa kalend\u0101ra dien\u0101s un par\u0101da katras dienas noslodzi. Visma dokument\u0101cij\u0101 ir nor\u0101d\u012bti \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darbs tiek sadal\u012bts p\u0113c iek\u0101rtu skaita.<\/strong> Resursam ar vair\u0101k\u0101m iek\u0101rt\u0101m nepiecie\u0161am\u0101 jauda tiek dal\u012bta ar iek\u0101rtu skaitu (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">avots<\/a>). SkyPlanner katrai iek\u0101rtai sast\u0101da grafiku k\u0101 atsevi\u0161\u0137am darba centram.<\/li>\n\n\n<li><strong>P\u0101rslodze tiek nor\u0101d\u012bta, nevis nov\u0113rsta.<\/strong> Kad slodze p\u0101rsniedz jaudu, L7 iekr\u0101so slodzes r\u0101d\u012bt\u0101jus sarkan\u0101 kr\u0101s\u0101 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">avots<\/a>). Fiks\u0113to posmu pl\u0101no\u0161ana pie\u013cauj p\u0101rslodzi un aptver tikai viena l\u012bme\u0146a strukt\u016bras (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">2024. gada m\u0101c\u012bbu materi\u0101ls<\/a>). SkyPlanner nekad nerezerv\u0113 vienu iek\u0101rtu, darbinieku vai instrumentu diviem darbiem vienlaikus.<\/li>\n\n\n<li><strong>Dienas darbu sec\u012bbu nosaka pl\u0101not\u0101js.<\/strong> Dienas darbi tiek sak\u0101rtoti ar manu\u0101lu darb\u012bbu, bet \u0101r\u0113jas sist\u0113mas iestat\u012bta priorit\u0101te paliek nemain\u012bta (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">avots<\/a>). SkyPlanner nosaka \u0161o priorit\u0101ti j\u016bsu viet\u0101, un L7 to saglab\u0101.<\/li>\n\n\n<li><strong>J\u0101uzman\u0101s no iztr\u016bksto\u0161\u0101m kalend\u0101ra dien\u0101m.<\/strong> Ja r\u016bpn\u012bcas kalend\u0101r\u0101 tr\u016bkst dienu, posmi var tikt iepl\u0101noti pag\u0101tn\u0113 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">avots<\/a>). SkyPlanner izmanto mai\u0146u kalend\u0101rus, kuros \u0146emtas v\u0113r\u0101 br\u012bvdienas un promb\u016btne.<\/li>\n\n\n<li><strong>Nav p\u0101rregul\u0113\u0161anas lo\u0123ikas.<\/strong> L7 detaliz\u0113taj\u0101 pl\u0101no\u0161an\u0101 nav sagatavo\u0161anas laiku matricas. SkyPlanner sagatavo\u0161anas laiku matrica nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu t\u0101, lai sagatavo\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n<\/ul>\n\n\n<p>Katrs iestat\u012bjums un ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/visma-l7\/razosanas-planosana\/\">Vai Visma L7 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7 \u0161odien un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Visma L7 detaliz\u0113t\u0101 pl\u0101no\u0161ana<\/th><th>Visma L7 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Laika detaliz\u0101cija<\/td><td>Stundas pa dien\u0101m katram darba posmam<\/td><td>Konkr\u0113ti pulkste\u0146a laiki katram posmam, iek\u0101rtai un darbiniekam<\/td><\/tr><tr><td>Iek\u0101rtas<\/td><td>Viens resurss; darbs tiek sadal\u012bts p\u0113c iek\u0101rtu skaita<\/td><td>Katra iek\u0101rta ir darba centrs; Arcturus izv\u0113las no j\u016bsu at\u013cautaj\u0101m alternat\u012bv\u0101m<\/td><\/tr><tr><td>P\u0101rslodze<\/td><td>Slodzes r\u0101d\u012bt\u0101ji k\u013c\u016bst sarkani; pl\u0101not\u0101js p\u0101rce\u013c posmus<\/td><td>P\u0101rslodzes nav nekad; tiek iev\u0113rota katra resursa pieejam\u0101 jauda<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Priorit\u0101te un manu\u0101la dienas darbu k\u0101rto\u0161ana<\/td><td>Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Detaliz\u0113taj\u0101 pl\u0101no\u0161an\u0101 nav sagatavo\u0161anas laiku matricas<\/td><td>Sagatavo\u0161anas laiku matrica nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu t\u0101, lai sagatavo\u0161anas laiks b\u016btu vismaz\u0101kais<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Vajadz\u012bbu apr\u0113\u0137ins un rezerv\u0101cijas<\/td><td>Posma s\u0101kumu nosaka prognoz\u0113tie kr\u0101jumi un gaid\u0101m\u0101s pieg\u0101des iepirkumu rind\u0101s<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js atk\u0101rtoti palai\u017e pl\u0101no\u0161anu<\/td><td>Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>L7 darbu rindas un LTR<\/td><td>Mobile Confirmations un ra\u017eo\u0161anas notikumu nolas\u012b\u0161ana no L7<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-visma-l7-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp Visma L7 un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7<\/th><th>Virziens<\/th><th>SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Produkti un produktu strukt\u016bras (tuoterakenne)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Produkti, apak\u0161produkti, materi\u0101li<\/td><\/tr><tr><td>Darbu numuri un darba posmi (<code>\/manufphases\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi katram darba centram<\/td><\/tr><tr><td>Resursi (<code>\/manufresources\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Darba centri un grupas<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi un iepirkumu rindas<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Kr\u0101jumi un gaid\u0101mie iepirkumu pas\u016bt\u012bjumi<\/td><\/tr><tr><td>P\u0101rdo\u0161anas pas\u016bt\u012bjumi un to rindas<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Izpildes termi\u0146i un klientu priorit\u0101te<\/td><\/tr><tr><td>Ra\u017eo\u0161anas notikumi (<code>\/manufevents\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Katra ra\u017eo\u0161anas uzdevuma izpildes gaita<\/td><\/tr><tr><td>Resurss, s\u0101kuma datums, priorit\u0101te, darbinieks, stundas dien\u0101 (<code>PUT \/manufphases\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Ra\u017eo\u0161anas grafiks<\/td><\/tr><tr><td>Resursu kalend\u0101r\u0101 nor\u0101d\u012bt\u0101 jauda (<code>POST \/resourceupdates\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Mai\u0146u jauda<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-scheduling-software-and-add-ons-compare\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7: programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad tas ir piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Visma L7 ra\u017eo\u0161anas vad\u012bba<\/td><td>Vajadz\u012bbu apr\u0113\u0137ins, detaliz\u0113ta pl\u0101no\u0161ana un noslodzes skati L7 sist\u0113m\u0101<\/td><td>Viens pl\u0101not\u0101js sak\u0101rto katras dienas darbus, un j\u016bs turpin\u0101t lietot L7 l\u012bdz t\u0101 dz\u012bves cikla beig\u0101m<\/td><\/tr><tr><td>APS programmat\u016bras komplekti (piem\u0113ram, Delfoi Planner)<\/td><td>Pl\u0101no\u0161anas un simul\u0101cijas programmat\u016bra, kuras integr\u0113to ERP sist\u0113mu sarakst\u0101 ir L7<\/td><td>Specializ\u0113ta pl\u0101no\u0161anas komanda vada ievie\u0161anas projektu<\/td><\/tr><tr><td>Jauna ERP sist\u0113ma ar ieb\u016bv\u0113tu pl\u0101no\u0161anu (piem\u0113ram, Monitor ERP vai Odoo ar Collapick Tempo)<\/td><td>L7 un t\u0101 ra\u017eo\u0161anas vad\u012bbas aizst\u0101\u0161ana vien\u0101 projekt\u0101<\/td><td>V\u0113laties vienlaikus nomain\u012bt ERP sist\u0113mu un pl\u0101no\u0161anas r\u012bku<\/td><\/tr><tr><td>M\u0101ko\u0146vides APS ar API savienojumu (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 darbin\u0101ms grafiku sast\u0101d\u012b\u0161anas r\u012bks, kas nolasa darba posmus no L7 un ieraksta grafiku atpaka\u013c<\/td><td>V\u0113laties jau tagad pl\u0101not ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai un saglab\u0101t pl\u0101nu ar\u012b p\u0113c p\u0101rejas uz n\u0101kamo ERP sist\u0113mu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis L7 Hienosuunnittelu, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums vajadz\u012bgi prec\u012bzi s\u0101kuma un beigu laiki.<\/strong> L7 saglab\u0101 posmu k\u0101 stundu skaitu pa dien\u0101m. SkyPlanner katram posmam nosaka s\u0101kuma un beigu laiku faktiskaj\u0101 mai\u0146\u0101.<\/li>\n\n\n<li><strong>Vien\u0101 resurs\u0101 ir apvienotas vair\u0101kas iek\u0101rtas.<\/strong> L7 sadala darbu p\u0113c iek\u0101rtu skaita (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">avots<\/a>). SkyPlanner sast\u0101da grafiku katrai iek\u0101rtai un izv\u0113las br\u012bvo.<\/li>\n\n\n<li><strong>Sarkanie noslodzes r\u0101d\u012bt\u0101ji jums ik ned\u0113\u013cu at\u0146em vair\u0101kas stundas.<\/strong> L7 atz\u012bm\u0113 p\u0101rslodzi (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">avots<\/a>). SkyPlanner jau s\u0101kotn\u0113ji izveido pl\u0101nu bez p\u0101rslodzes.<\/li>\n\n\n<li><strong>J\u016bsu produktiem ir vair\u0101ku l\u012bme\u0146u strukt\u016bras.<\/strong> L7 fiks\u0113to posmu grafiku sast\u0101d\u012b\u0161ana aptver tikai viena l\u012bme\u0146a strukt\u016bras (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">avots<\/a>). SkyPlanner vien\u0101 pl\u0101n\u0101 iepl\u0101no gan apak\u0161produktus, gan mezglus.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu izlaides apjomu.<\/strong> SkyPlanner sagatavo\u0161anas laiku matrica sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai sagatavo\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/li>\n\n\n<li><strong>J\u016bs dr\u012bzum\u0101 main\u012bsiet ERP sist\u0113mu.<\/strong> Visma ir p\u0101rtraukusi L7 jaunu funkciju izstr\u0101di, un produkta lieto\u0161ana beigsies 2028. gada beig\u0101s (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">Visma pazi\u0146ojums<\/a>). SkyPlanner izveidot\u0101 pl\u0101no\u0161anas sist\u0113ma saglab\u0101jas ar\u012b p\u0101rejas laik\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet iek\u0101rtas, darbiniekus un mai\u0146as SkyPlanner sist\u0113m\u0101 vai import\u0113jiet tos. Ir pieejams atbalsts lieto\u0161anas uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet darbus.<\/strong> Eksport\u0113jiet no L7 nepabeigto darbu numurus, posmus un resursus Excel vai CSV form\u0101t\u0101. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner sast\u0101d\u012bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Visma L7.<\/strong> J\u016bsu LTR administrators izveido API lietot\u0101ju. SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par abon\u0113\u0161anas pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, bet citas sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>. Pamati pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai ir aprakst\u012bti <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anas ce\u013cved\u012b<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Visma L7 papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Visma L7. No L7 tiek sa\u0146emti darba posmi, resursi, produktu strukt\u016bras, materi\u0101li, kr\u0101jumu atlikumi un iepirkumu rindas. Atpaka\u013c tiek nos\u016bt\u012bts katras darba kartes resurss, s\u0101kuma datums, priorit\u0101te, darbinieks un stundu skaits dien\u0101. Tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi, un sagatavo\u0161anas laiku matrica, kas \u0146em v\u0113r\u0101 p\u0101rejas virzienu, sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai sagatavo\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra ir integr\u0113jama ar Visma L7?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar Visma L7, izmantojot Visma L7 REST API. Visma sav\u0101 L7 integr\u0101ciju lap\u0101 ir nor\u0101d\u012bjusi Skycode un SkyPlanner. Ar L7 var savienot ar\u012b t\u0101dus APS programmat\u016bras komplektus k\u0101 Delfoi Planner. SkyPlanner darbojas p\u0101rl\u016bk\u0101, ieraksta grafiku atpaka\u013c L7 darba kart\u0113s un \u013cauj katram operatoram skat\u012bt savu darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties Visma L7 Hienosuunnittelu vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izmantojiet L7 detaliz\u0113to pl\u0101no\u0161anu, ja katrs resurss ir viena iek\u0101rta, produktu strukt\u016bras ir viena l\u012bme\u0146a un pl\u0101not\u0101jam ir laiks sak\u0101rtot katras dienas darbus. Izmantojiet SkyPlanner, ja vajadz\u012bgi prec\u012bzi s\u0101kuma un beigu laiki, vair\u0101kas iek\u0101rtas vien\u0101 resurs\u0101, vair\u0101ku l\u012bme\u0146u strukt\u016bras, uzdevumu sec\u012bba ar p\u0113c iesp\u0113jas \u012bs\u0101ku sagatavo\u0161anas laiku vai autom\u0101tiska p\u0101rpl\u0101no\u0161ana. SkyPlanner ar\u012b saglab\u0101 j\u016bsu pl\u0101no\u0161anas sist\u0113mu, kad aizst\u0101jat L7.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas notiek ar SkyPlanner, kad p\u0101rejam no Visma L7 uz citu sist\u0113mu?<\/summary>\n<p class=\"sp-faq__a\">J\u016bsu darba centri, procesa posmi, sagatavo\u0161anas laiku matrica, mai\u0146as un noteikumi paliek SkyPlanner sist\u0113m\u0101. Integr\u0101cija tiek p\u0101rsl\u0113gta uz jauno ERP sist\u0113mu, piem\u0113ram, <a href=\"\/lv\/integracija\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/lv\/integracija\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/lv\/integracija\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/lv\/integracija\/erp\/monitor-erp\/\">Monitor ERP<\/a> vai <a href=\"\/lv\/integracija\/erp\/odoo\/\">Odoo<\/a>. P\u0101rejas laik\u0101 ra\u017eo\u0161ana turpin\u0101s p\u0113c t\u0101 pa\u0161a pl\u0101na.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma L7 ir tas pats, kas Visma Net vai Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Visma L7 ir Visma ERP sist\u0113ma darbuz\u0146\u0113m\u0113jiem, ener\u0123\u0113tikas un r\u016bpniec\u012bbas uz\u0146\u0113mumiem \u2014 parasti lieliem un vid\u0113jiem. <a href=\"\/lv\/integracija\/erp\/visma-net\/\">Visma Net<\/a> ir Visma m\u0101ko\u0146vides ERP sist\u0113ma vid\u0113jiem un lieliem uz\u0146\u0113mumiem, savuk\u0101rt <a href=\"\/lv\/integracija\/erp\/visma-nova\/\">Visma Nova<\/a> ir paredz\u0113ta maziem uz\u0146\u0113mumiem. Katrai sist\u0113mai ir savs datu modelis un sava lapa SkyPlanner vietn\u0113.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma L7 sist\u0113m\u0101 kaut kas ir j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b un veic L7 REST API izsaukumus j\u016bsu Visma LTR server\u012b. J\u016bsu LTR administrators izveido API lietot\u0101ju un piek\u013cuves mar\u0137ierus, un j\u016bs ieg\u0101d\u0101jaties licences integr\u0101cij\u0101 izmantotajiem REST galapunktiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 uz\u0146\u0113mumam, kas izmanto Visma L7?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b par 5 iek\u013cautajiem darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, iek\u013caujot ar\u012b abon\u0113\u0161anas pl\u0101nu, lai pilnas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgi notiek ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu uzs\u0101k\u0161anas. Komanda izveido j\u016bsu resursu un darba posmu atbilst\u012bbas, savieno darbu numurus un materi\u0101lus un ieraksta grafiku atpaka\u013c L7 sist\u0113m\u0101. Pirms darb\u012bbas uzs\u0101k\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Visma L7 SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS papildina Visma L7 ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma L7 ir ERP sist\u0113ma, ko izmanto lieli un vid\u0113ji Somijas r\u016bpniec\u012bbas, l\u012bgumdarbu un ener\u0123\u0113tikas uz\u0146\u0113mumi. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek &#8230; <a title=\"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/\" aria-label=\"Read more about SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106267","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/\",\"name\":\"Visma L7 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-l7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","og_description":"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/","name":"Visma L7 integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina Visma L7: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija posmiem, resursiem, cilv\u0113kiem, materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-l7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Visma L7 SkyPlanner APS Visma L7 sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS papildina Visma L7 ar ra\u017eo\u0161anas pl\u0101no\u0161anu, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. Visma L7 ir ERP sist\u0113ma, ko izmanto lieli un vid\u0113ji Somijas r\u016bpniec\u012bbas, l\u012bgumdarbu un ener\u0123\u0113tikas uz\u0146\u0113mumi. Katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam tiek&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106267"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106267\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}