{"id":106238,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/applus\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"applus","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/","title":{"rendered":"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai APplus: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir APplus papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un person\u0101la jaudu un pl\u0101no katras iek\u0101rtas, operatora, r\u012bka un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija kur un kad tiek veikta, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar APplus darbojas abos virzienos. No APplus tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) ar to oper\u0101cij\u0101m (Arbeitsg\u00e4nge), tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne), materi\u0101lu specifik\u0101cijas (St\u00fccklisten), jaudas vien\u012bbas (Kapazit\u00e4tsstellen un Kapazit\u00e4tseinheiten), r\u012bki (Betriebsmittel), kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bts katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba, savuk\u0101rt operatoru uzskait\u012bto laiku var nos\u016bt\u012bt k\u0101 pas\u016bt\u012bjumam piesaist\u012btus BDE zi\u0146ojumus. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu APplus iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un ietver l\u012bdz 20 darba centriem un visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katras jaudas vien\u012bbas ierobe\u017eojumi tiek \u0146emti v\u0113r\u0101 p\u0113c noklus\u0113juma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru oper\u0101ciju uz konkr\u0113tas iek\u0101rtas konkr\u0113t\u0101 laik\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btni un virsstundas. Nevienam resursam netiek pie\u0146emta neierobe\u017eota jauda, t\u0101p\u0113c izveidoto pl\u0101nu j\u016bsu cehs var izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Arcturus dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus sec\u012bb\u0101, kur\u0101 tiek zaud\u0113ts vismaz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam nepiecie\u0161ami tr\u012bs operatori, tiek nor\u012bkoti tr\u012bs cilv\u0113ki ar pieejamu laiku mai\u0146\u0101s. Viena un t\u0101 pati pal\u012bgier\u012bce vai r\u012bks no j\u016bsu APplus Betriebsmittel nekad netiek rezerv\u0113ts div\u0101m iek\u0101rt\u0101m vienlaikus. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek novirz\u012bts uz alternat\u012bvu iek\u0101rtu vai citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu kav\u0113jumi vairs neizjauc pl\u0101nu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda pieejamos kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Oper\u0101cija, kurai j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nota p\u0113c pieg\u0101des datuma, nevis s\u0101kta un p\u0113c tam aptur\u0113ta ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u0101no\u0161anas panelis atjaunin\u0101s autom\u0101tiski.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad apst\u0101jas iek\u0101rta vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie uzdevumi un priorit\u0101tes joproj\u0101m tiek iev\u0113rotas, un Running Time Lock fiks\u0113 tuv\u0101kaj\u0101s stund\u0101s paredz\u0113tos darbus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai uzskait\u012bto laiku nos\u016bt\u012bt atpaka\u013c uz APplus.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskat\u0101mu inform\u0101ciju par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-applus-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>APplus nos\u016bta ra\u017eo\u0161anas uzdevumus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, jaudas vien\u012bbas, r\u012bkus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tie darba dati tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Uz APplus tiek nos\u016bt\u012bti katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas dati: pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba. Tie tiek piesaist\u012bti attiec\u012bgajai oper\u0101cijai. Operatoru darba laika ierakstus var nos\u016bt\u012bt k\u0101 pas\u016bt\u012bjumam piesaist\u012btus BDE zi\u0146ojumus.<\/li>\n\n<\/ol>\n\n\n<p>APplus joproj\u0101m ir j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, materi\u0101lu pl\u0101no\u0161ana (Disposition), iepirkumi, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek turpat, kur l\u012bdz \u0161im. Pl\u0101not\u0101js joproj\u0101m nodod pas\u016bt\u012bjumus izpildei APplus sist\u0113m\u0101. SkyPlanner atbild par vienu lietu: k\u0101d\u0101 sec\u012bb\u0101 un kad katr\u0101 resurs\u0101 tiek veiktas oper\u0101cijas.<\/p>\n\n\n<p>APplus pamat\u0101 ir t\u012bmek\u013ca pakalpojumu arhitekt\u016bra. K\u0101 nor\u0101da Asseco, klientu un pieg\u0101d\u0101t\u0101ju IT sist\u0113mas var tie\u0161i internet\u0101 piek\u013c\u016bt vis\u0101m nepiecie\u0161amaj\u0101m grafiku sast\u0101d\u012b\u0161anas funkcij\u0101m (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). Business Integration Framework savieno tre\u0161o pu\u0161u sist\u0113mas bez programm\u0113\u0161anas, izmantojot piel\u0101gojamas datu strukt\u016bras (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>), savuk\u0101rt Universal Cloud Connector savieno partneru risin\u0101jumus un SaaS pakalpojumus ar APplus (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>). Ar \u0161\u012bm saskarn\u0113m SkyPlanner nolasa ra\u017eo\u0161anas datus un ieraksta atpaka\u013c katras oper\u0101cijas pl\u0101noto s\u0101kumu, beigas un jaudas vien\u012bbu. Konkr\u0113to datu apmai\u0146as ce\u013cu j\u016bsu instal\u0101cijai nosaka, ievie\u0161anas s\u0101kum\u0101 veicot tv\u0113ruma noteik\u0161anu. SkyPlanner nos\u016bta webhook pazi\u0146ojumus par katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/p>\n\n\n<p>Katr\u0101 r\u016bpn\u012bc\u0101 APplus izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu APplus partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Saskarnes, datu lauku atbilst\u012bba un atpaka\u013cierakst\u012b\u0161anas noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/applus\/integracijas-celvedis\/\">APplus integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-applus-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no APplus un k\u0101das papildu iesp\u0113jas sniedz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus pl\u0101no ra\u017eo\u0161anu tr\u012bs l\u012bme\u0146os:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>PPS grafiku sast\u0101d\u012b\u0161ana un pl\u0101no\u0161anas panelis.<\/strong> Vien\u0101 apr\u0113\u0137in\u0101 tiek pl\u0101notas iek\u0101rtas, materi\u0101li, person\u0101la jauda un, ja nepiecie\u0161ams, r\u012bki. K\u0101 nor\u0101da Asseco, vienk\u0101r\u0161\u0101kaj\u0101 gad\u012bjum\u0101 grafiks tiek sast\u0101d\u012bts, pie\u0146emot neierobe\u017eotu jaudu. Apr\u0113\u0137inos var \u0146emt v\u0113r\u0101 resursu ierobe\u017eojumus \u0161auraj\u0101m viet\u0101m vai vis\u0101m jaudas vien\u012bb\u0101m. Preciz\u0113jumus un p\u0101rvietojumus veic manu\u0101li pl\u0101no\u0161anas panel\u012b (Plantafel) (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>).<\/li>\n\n\n<li><strong>APplus Feinplanung (detaliz\u0113t\u0101 pl\u0101no\u0161ana).<\/strong> Integr\u0113ts modulis, kas optimiz\u0113 p\u0101rregul\u0113\u0161anas laikus, sec\u012bbu, noslodzi un darba vietu pie\u0161\u0137ir\u0161anu, izmantojot iepriek\u0161 defin\u0113tus optimiz\u0101cijas scen\u0101rijus (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/feinplanung\/\">Asseco Feinplanung<\/a>).<\/li>\n\n\n<li><strong>APplus APS.<\/strong> Sare\u017e\u0123\u012btiem gad\u012bjumiem Asseco ir integr\u0113jis partnera APS produktu ar nosaukumu APplus APS. K\u0101 nor\u0101da Asseco, ERP detaliz\u0113t\u0101 pl\u0101no\u0161ana apmierina liel\u0101ko da\u013cu tirgus vajadz\u012bbu, bet p\u0101r\u0113j\u0101m ir nepiecie\u0161ami \u012bpa\u0161i risin\u0101jumi: detaliz\u0113ta p\u0101rregul\u0113\u0161anas laiku matrica vair\u0101kiem r\u012bkiem un pal\u012bgier\u012bc\u0113m, k\u0101 ar\u012b vair\u0101ku resursu vienlaic\u012bga pl\u0101no\u0161ana (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>To, vai funkcija ir iek\u013cauta standarta komplekt\u0101 vai tai nepiecie\u0161ama atsevi\u0161\u0137a licence, nosaka Asseco cenu un licen\u010du saraksts (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Fakti par APplus<\/a>).<\/p>\n\n\n<p>SkyPlanner papildina sist\u0113mu ar vienotu grafiku m\u0101kon\u012b, kur\u0101 katram resursam kop\u012bgi tiek \u0146emta v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laiku matrica, ierobe\u017eota r\u012bku pieejam\u012bba, uzdevumi ar vair\u0101kiem operatoriem un gaid\u0101m\u0101s materi\u0101lu pieg\u0101des. Autopilot uztur grafiku aktu\u0101lu, un katrs operators sav\u0101 t\u0101lrun\u012b redz uzdevumu rindu.<\/p>\n\n\n<p>Katrs l\u012bmenis un t\u0101 ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/applus\/razosanas-planosana\/\">Vai APplus nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus \u0161obr\u012bd un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>APplus PPS un Feinplanung<\/th><th>APplus kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Vienk\u0101r\u0161\u0101kaj\u0101 gad\u012bjum\u0101 \u2014 neierobe\u017eota jauda; ar attiec\u012bgiem iestat\u012bjumiem \u2014 ierobe\u017eojumi \u0161auraj\u0101m viet\u0101m vai vis\u0101m jaudas vien\u012bb\u0101m<\/td><td>Tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, darbinieka un r\u012bka ierobe\u017eojumi un faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>Pl\u0101no\u0161anas panelis ar manu\u0101liem preciz\u0113jumiem<\/td><td>Oper\u0101ciju sec\u012bba katram resursam da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Feinplanung optimiz\u0113 p\u0101rregul\u0113\u0161anu; p\u0101rregul\u0113\u0161anas matrica vair\u0101kiem r\u012bkiem pieejama ar APplus APS<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: maz\u0101kais kop\u0113jais p\u0101rregul\u0113\u0161anas laiks, \u0146emot v\u0113r\u0101 abus virzienus<\/td><\/tr><tr><td>Darbinieki un r\u012bki<\/td><td>Person\u0101la jauda un r\u012bki PPS apr\u0113\u0137in\u0101<\/td><td>Konkr\u0113ti operatori ar mai\u0146\u0101m, uzdevumi ar vair\u0101kiem operatoriem, r\u012bki k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu pl\u0101no\u0161ana (Disposition) ar iepirkuma priek\u0161likumiem<\/td><td>Oper\u0101cijas s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js p\u0101rvieto oper\u0101cijas pl\u0101no\u0161anas panel\u012b<\/td><td>Autopilot p\u0101rpl\u0101no visas r\u016bpn\u012bcas grafiku, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>BDE zi\u0146ojumi tiek re\u0123istr\u0113ti pas\u016bt\u012bjum\u0101, sken\u0113jot sv\u012btrkodu<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101; uzskait\u012bto laiku var nos\u016bt\u012bt k\u0101 BDE zi\u0146ojumus<\/td><\/tr><tr><td>Licenc\u0113\u0161ana<\/td><td>Saska\u0146\u0101 ar Asseco cenu un licen\u010du sarakstu<\/td><td>No 199 \u20ac m\u0113nes\u012b, neierobe\u017eots lietot\u0101ju skaits<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-applus\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas risin\u0101jumu sist\u0113mai APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PPS grafiku sast\u0101d\u012b\u0161ana ir piem\u0113rota r\u016bpn\u012bcai, kur\u0101 \u0161auro vietu jaudas iev\u0113ro\u0161ana un korekcijas pl\u0101no\u0161anas panel\u012b \u013cauj dro\u0161i noteikt izpildes termi\u0146us. R\u016bpn\u012bcai, kur\u0101 katru dienu manu\u0101li maina uzdevumu sec\u012bbu pl\u0101no\u0161anas panel\u012b vai kur\u0101 p\u0101rregul\u0113\u0161ana ir atkar\u012bga no r\u012bkiem un sec\u012bbas, vajag vair\u0101k. Tad izv\u0113le paties\u012bb\u0101 ir starp APplus Feinplanung kop\u0101 ar APplus APS un SkyPlanner APS.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis APplus Feinplanung un APplus APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0101rregul\u0113\u0161ana ir atkar\u012bga no sec\u012bbas un r\u012bkiem.<\/strong> K\u0101 nor\u0101da Asseco, detaliz\u0113tai p\u0101rregul\u0113\u0161anas laiku matricai vair\u0101kiem r\u012bkiem un vair\u0101ku resursu vienlaic\u012bgai pl\u0101no\u0161anai ir nepiecie\u0161ami \u012bpa\u0161i risin\u0101jumi \u0101rpus ERP pl\u0101no\u0161anas iesp\u0113j\u0101m (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). SkyPlanner p\u0101rregul\u0113\u0161anas laiku matrica, ierobe\u017eotas r\u012bku pieejam\u012bbas iev\u0113ro\u0161ana un uzdevumi ar vair\u0101kiem operatoriem ir standarta funkcijas vienot\u0101 grafik\u0101.<\/li>\n\n\n<li><strong>V\u0113laties aktu\u0101lu grafiku da\u017eu ned\u0113\u013cu laik\u0101, nevis v\u0113l vienu modu\u013ca ievie\u0161anas projektu.<\/strong> APplus APS ir APplus sist\u0113m\u0101 integr\u0113ts partnera produkts, un t\u0101 licenc\u0113\u0161anu nosaka Asseco cenu saraksts (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Fakti par APplus<\/a>). SkyPlanner ir m\u0101ko\u0146programmat\u016bra, ko 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 varat p\u0101rbaud\u012bt ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunin\u0101s autom\u0101tiski.<\/strong> APplus sist\u0113m\u0101 preciz\u0113jumus un p\u0101rvietojumus veic pl\u0101no\u0161anas panel\u012b (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>). Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz APplus.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo gan operatoru un instrumentu pieejam\u012bba, gan materi\u0101lu pieg\u0101des.<\/strong> Vienot\u0101 grafik\u0101 tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. Tiek izmantotas alternat\u012bvas iek\u0101rtas, un oper\u0101cijas s\u0101kas, kad materi\u0101li ir pieejami noliktav\u0101 vai sa\u0146emti saska\u0146\u0101 ar iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations r\u0101da aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161et\u0113. Lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>Jums ir svar\u012bga publiski nor\u0101d\u012bta m\u0113ne\u0161a cena.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas cenu pied\u0101v\u0101jumu sa\u0146emat iepriek\u0161, un SkyPlanner komanda nodro\u0161ina t\u0101s konfigur\u0113\u0161anu un atbalstu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet iek\u0101rtas, darbiniekus un mai\u0146as SkyPlanner sist\u0113m\u0101 vai import\u0113jiet jaudas vien\u012bbas no APplus. Darba uzs\u0101k\u0161anai ir pieejama speci\u0101listu pal\u012bdz\u012bba.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet neizpild\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no APplus uz Excel, import\u0113jiet tos SkyPlanner un sal\u012bdziniet izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101no\u0161anas paneli.<\/li>\n\n\n<li><strong>Pievienojiet APplus.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c ekspluat\u0101cijas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai p\u0101rl\u016bkojiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais APplus papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar APplus. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, jaudas vien\u012bbas, instrumentus, noliktavas atlikumus un iepirkuma pas\u016bt\u012bjumus. Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba tiek nos\u016bt\u012bti atpaka\u013c, un operatoru nostr\u0101d\u0101to laiku var re\u0123istr\u0113t ar BDE zi\u0146ojumiem. Pl\u0101no\u0161an\u0101 tiek iev\u0113roti katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica, kas \u0146em v\u0113r\u0101 p\u0101rejas virzienu, sak\u0101rto uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika, savuk\u0101rt Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai APplus nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo jaudu?<\/summary>\n<p class=\"sp-faq__a\">Da\u013c\u0113ji. Vienk\u0101r\u0161\u0101kaj\u0101 variant\u0101 APplus PPS sast\u0101da grafiku bez jaudas ierobe\u017eojumiem, ta\u010du \u0161auraj\u0101m viet\u0101m vai vis\u0101m jaudas vien\u012bb\u0101m var iestat\u012bt ierobe\u017eotu resursu pieejam\u012bbu. Feinplanung optimiz\u0113 p\u0101rregul\u0113\u0161anu un darbu sec\u012bbu. Sare\u017e\u0123\u012btiem p\u0101rregul\u0113\u0161anas gad\u012bjumiem un vair\u0101ku resursu pl\u0101no\u0161anai Asseco pied\u0101v\u0101 APplus APS \u2014 integr\u0113tu partnera produktu. SkyPlanner APS darbojas l\u012bdz\u0101s APplus un sast\u0101da grafiku, \u0146emot v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar APplus?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar APplus. Tas nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, jaudas vien\u012bbas, instrumentus, noliktavas atlikumus un iepirkuma pas\u016bt\u012bjumus, izmantojot APplus t\u012bmek\u013ca pakalpojumus, Business Integration Framework vai Universal Cloud Connector. Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un jaudas vien\u012bba tiek nos\u016bt\u012bti atpaka\u013c pa datu apmai\u0146as ce\u013cu, kas izv\u0113l\u0113ts, nosakot ievie\u0161anas tv\u0113rumu. Operatoru nostr\u0101d\u0101tais laiks tiek re\u0123istr\u0113ts pas\u016bt\u012bjum\u0101 ar BDE zi\u0146ojumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j APplus PPS?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina APplus PPS. APplus p\u0101rzi\u0146\u0101 paliek deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, materi\u0101lu pl\u0101no\u0161ana, iepirkumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu nodo\u0161ana izpildei, izmaksu apr\u0113\u0137ini un finanses. SkyPlanner sast\u0101da j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties APplus APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt izmantot grafiku, kas iev\u0113ro re\u0101los jaudas ierobe\u017eojumus un pats atjaunin\u0101s. APplus APS ir APplus sist\u0113m\u0101 integr\u0113ts partnera produkts Asseco nor\u0101d\u012btajiem sare\u017e\u0123\u012btajiem gad\u012bjumiem: p\u0101rregul\u0113\u0161anas matric\u0101m vair\u0101kiem instrumentiem un vair\u0101ku resursu pl\u0101no\u0161anai. SkyPlanner tos risina ar p\u0101rregul\u0113\u0161anas laiku matricu, instrumentu pieejam\u012bbas ierobe\u017eojumiem un uzdevumiem, kuros iesaist\u012bti vair\u0101ki operatori. Tas autom\u0101tiski p\u0101rpl\u0101no grafiku un katram operatoram r\u0101da darbu rindu t\u0101lrun\u012b, turkl\u0101t lietot\u0101ju skaits nav ierobe\u017eots. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat par to p\u0101rliecin\u0101ties ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto APplus?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, cen\u0101 iek\u013caujot 5 darba centrus, un papildus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iesniegts kop\u0101 ar izv\u0113l\u0113t\u0101 abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas. Komanda izveido atbilst\u012bbas j\u016bsu jaudas vien\u012bb\u0101m, instrumentiem un tehnolo\u0123iskajiem mar\u0161rutiem, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms ekspluat\u0101cijas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar APplus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 tiek izmantoti j\u016bsu neizpild\u012btie APplus ra\u017eo\u0161anas pas\u016bt\u012bjumi, kas eksport\u0113ti uz Excel. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma varat apskat\u012bt savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">grafiku, kas iev\u0113ro re\u0101los jaudas ierobe\u017eojumus<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ APplus SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir APplus papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un person\u0101la jaudu un pl\u0101no katras iek\u0101rtas, operatora, r\u012bka un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija kur un kad tiek veikta, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad &#8230; <a title=\"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106238","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APplus integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/\",\"name\":\"APplus integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/applus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APplus integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","description":"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/","name":"APplus integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina APplus: divvirzienu integr\u0101cija un pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas katrai iek\u0101rtai, operatoram, r\u012bkam un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/applus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ APplus SkyPlanner APS sist\u0113mai APplus: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir APplus papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un person\u0101la jaudu un pl\u0101no katras iek\u0101rtas, operatora, r\u012bka un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija kur un kad tiek veikta, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106238"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106238\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}