{"id":106209,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/psipenta\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"psipenta","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/","title":{"rendered":"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai PSIpenta: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir PSIpenta papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta. No PSIpenta tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi (Fertigungsauftr\u00e4ge) un to oper\u0101cijas, tehnolo\u0123iskie mar\u0161ruti (Arbeitspl\u00e4ne), materi\u0101lu specifik\u0101cijas (St\u00fccklisten), darba centri, iek\u0101rtas, instrumenti (Betriebsmittel), kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bts katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs, savuk\u0101rt operatoru uzskait\u012bto laiku var nos\u016bt\u012bt k\u0101 BDE apstiprin\u0101jumus (R\u00fcckmeldungen). Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu PSIpenta konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b, un taj\u0101 ir iek\u013cauti 5 darba centri. Katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un ietver l\u012bdz 20 darba centriem un visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai iek\u0101rtai \u2014 darbu sec\u012bba ar prec\u012bzu izpildes laiku.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju konkr\u0113tai iek\u0101rtai konkr\u0113t\u0101 laik\u0101. Jaudu nosaka faktisk\u0101s mai\u0146as, promb\u016btnes un virsstundas, t\u0101p\u0113c izveidoto pl\u0101nu j\u016bsu ra\u017eo\u0161anas cehs sp\u0113j izpild\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Arcturus dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus sec\u012bb\u0101, kur\u0101 tiek zaud\u0113ts vismaz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b cilv\u0113ku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s. Pal\u012bgier\u012bce vai instruments no j\u016bsu PSIpenta Betriebsmittel saraksta nekad netiek iepl\u0101nots div\u0101m iek\u0101rt\u0101m vienlaikus. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz citu iek\u0101rtu vai uztic\u0113ts citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu kav\u0113jumi vairs neizjauc pl\u0101nu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda pieejamos kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Oper\u0101cija, kurai j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nota p\u0113c pieg\u0101des datuma, nevis s\u0101kta un p\u0113c tam aptur\u0113ta ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad apst\u0101jas iek\u0101rta vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie uzdevumi un priorit\u0101tes joproj\u0101m tiek iev\u0113rotas, un Running Time Lock fiks\u0113 tuv\u0101kaj\u0101s stund\u0101s paredz\u0113tos darbus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai uzskait\u012bto laiku nos\u016bt\u012bt atpaka\u013c uz PSIpenta.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-psipenta-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>PSIpenta nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, darba centrus, iek\u0101rtas, instrumentus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Pl\u0101notie laiki un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katras ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs tiek nos\u016bt\u012bti atpaka\u013c uz PSIpenta. Operatoru laika uzskaites ierakstus var nos\u016bt\u012bt k\u0101 BDE apstiprin\u0101jumus.<\/li>\n\n<\/ol>\n\n\n<p>PSIpenta paliek j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, materi\u0101lu vajadz\u012bbu pl\u0101no\u0161ana, iepirkumi, izmaksu apr\u0113\u0137ini un finanses paliek turpat. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku katram resursam.<\/p>\n\n\n<p>PSI izstr\u0101d\u0101 PSIpenta t\u0101, lai \u0161\u0101da veida savienojumi b\u016btu iesp\u0113jami. T\u0101s saskar\u0146u sl\u0101nis PSIintegration savieno PSIpenta modu\u013cus un \u0101r\u0113j\u0101s sist\u0113mas, izmantojot zi\u0146ojumus ar defin\u0113tu datu atbilst\u012bbu. PSI nor\u0101da, ka visus PSIpenta komponentus var integr\u0113t ar RESTful t\u012bmek\u013ca pakalpojumiem. PSI min ar\u012b REST un SOAP API sist\u0113m\u0101m PSIpenta\/ERP un PSIpenta\/BDE (<a href=\"https:\/\/www.messe.de\/apollo\/hannover_messe_2020\/obs\/Binary\/A1002706\/1002706_02134036.pdf\">PSI bro\u0161\u016bra<\/a>). SkyPlanner nolasa ra\u017eo\u0161anas datus un ieraksta oper\u0101ciju pl\u0101notos laikus, izmantojot PSIpenta\/ERP REST API. Apstiprin\u0101jumi tiek nos\u016bt\u012bti caur PSIpenta\/BDE API. Ievie\u0161anas tv\u0113ruma noteik\u0161anas laik\u0101 tiek preciz\u0113ti j\u016bsu instal\u0101cijai nepiecie\u0161amie resursi un lauki. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u uzreiz, kad t\u0101 notiek.<\/p>\n\n\n<p>Katr\u0101 r\u016bpn\u012bc\u0101 PSIpenta izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu PSI partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Saskarnes, datu atbilst\u012bbas un atpaka\u013crakst\u012b\u0161anas noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/psipenta\/integracijas-celvedis\/\">PSIpenta integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-psipenta-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no PSIpenta un ko papildus pied\u0101v\u0101 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PSIpenta\/ERP ir modul\u0101ra ERP sist\u0113ma diskr\u0113t\u0101s ra\u017eo\u0161anas uz\u0146\u0113mumiem. PSI nor\u0101da, ka j\u016bs ieg\u0101d\u0101jaties tikai vajadz\u012bg\u0101s funkcijas (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>), un pl\u0101no\u0161ana ir pieejama vair\u0101kos l\u012bme\u0146os:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production modulis.<\/strong> Aptuvena to materi\u0101lu un jaudas pl\u0101no\u0161ana, kas veido \u0161aur\u0101s vietas, un detaliz\u0113ta materi\u0101lu specifik\u0101ciju un tehnolo\u0123isko mar\u0161rutu pl\u0101no\u0161ana vair\u0101kos l\u012bme\u0146os (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/produktion-1\">PSI Produktion<\/a>).<\/li>\n\n\n<li><strong>Leitstand modulis.<\/strong> PSIpenta\/Advanced Scheduling &amp; Monitoring ir pl\u0101no\u0161anas panelis ar fiks\u0113tu grafika posmu, pl\u0101no\u0161anu atbilsto\u0161i ierobe\u017eotai jaudai un simul\u0101ciju. Tas pl\u0101no resursus, \u0146emot v\u0113r\u0101 ierobe\u017eotu vai neierobe\u017eotu jaudu (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/leitstand-1\">PSI Leitstand<\/a>).<\/li>\n\n\n<li><strong>Adaptive Planung.<\/strong> APS modulis, kas rea\u0123\u0113 uz trauc\u0113jumiem. Kav\u0113jumus, kurus tas nesp\u0113j nov\u0113rst, modulis atz\u012bm\u0113 k\u0101 kritiskos ce\u013cus, lai pl\u0101not\u0101js tos risin\u0101tu (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI Adaptive Planung<\/a>).<\/li>\n\n\n<li><strong>PSIpenta\/MES Scheduling.<\/strong> Darbu sec\u012bbas pl\u0101no\u0161ana katram darba centram atbilsto\u0161i pieejamajai jaudai. Tas ietilpst PSIpenta\/MES produktu saim\u0113 un ir savienots ar to, izmantojot standartiz\u0113tus zi\u0146ojumus (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI MES Scheduling<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>T\u0101tad PSIpenta vid\u0113 ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai ir j\u0101izv\u0113las, j\u0101licenc\u0113 un j\u0101ievie\u0161 modulis, k\u0101 ar\u012b vajadz\u012bgs pl\u0101not\u0101js, kur\u0161 ar to str\u0101d\u0101. SkyPlanner pievieno vienotu m\u0101ko\u0146vides grafiku, kur\u0101 kop\u0101 pl\u0101no iek\u0101rtas, cilv\u0113kus, instrumentus, no darbu sec\u012bbas atkar\u012bgo p\u0101rregul\u0113\u0161anu un ien\u0101ko\u0161os materi\u0101lus. Autopilot uztur grafiku aktu\u0101lu, un katram operatoram ir pieejama sava darbu rinda.<\/p>\n\n\n<p>Katrs l\u012bmenis un t\u0101 ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/psipenta\/razosanas-planosana\/\">Vai PSIpenta nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"psipenta-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">PSIpenta pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>PSIpenta pl\u0101no\u0161anas modu\u013ci<\/th><th>PSIpenta kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Tv\u0113rums<\/td><td>Production, Leitstand, Adaptive Planung vai MES Scheduling \u2014 katrs ir atsevi\u0161\u0137s modulis<\/td><td>Vienots m\u0101ko\u0146vides grafiks l\u012bdz\u0101s PSIpenta\/ERP<\/td><\/tr><tr><td>Jauda<\/td><td>\u0160auro vietu aptuven\u0101 pl\u0101no\u0161ana; ierobe\u017eota vai neierobe\u017eota jauda modul\u012b Leitstand<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bba ir ierobe\u017eota; tiek \u0146emtas v\u0113r\u0101 faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Sec\u012bba p\u0113c tehnolo\u0123iskaj\u0101m atkar\u012bb\u0101m modul\u012b MES Scheduling<\/td><td>Sagatavo\u0161anas laiku matrica: maz\u0101kais kop\u0113jais sagatavo\u0161anas laiks, \u0146emot v\u0113r\u0101 abus p\u0101rejas virzienus<\/td><\/tr><tr><td>Darbinieki un instrumenti<\/td><td>Betriebsmittel p\u0101rvald\u012bba sist\u0113m\u0101 PSIpenta<\/td><td>Konkr\u0113ti operatori un vi\u0146u mai\u0146as, uzdevumi vair\u0101kiem operatoriem, instrumenti k\u0101 ierobe\u017eoti koplietojami resursi<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu vajadz\u012bbu pl\u0101no\u0161ana ar iepirkuma priek\u0161likumiem<\/td><td>Oper\u0101cijas s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Kritiskie ce\u013ci tiek atz\u012bm\u0113ti, lai pl\u0101not\u0101js tos risin\u0101tu<\/td><td>Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Fiks\u0113tie darbi<\/td><td>Fiks\u0113ts grafika posms modul\u012b Leitstand<\/td><td>Running Time Lock fiks\u0113 tuv\u0101ko stundu ra\u017eo\u0161anas uzdevumus<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>BDE termin\u0101\u013ci un apstiprin\u0101jumi<\/td><td>Operatori redz savu darbu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101; laika uzskaiti var nos\u016bt\u012bt k\u0101 BDE apstiprin\u0101jumus<\/td><\/tr><tr><td>Licenc\u0113\u0161ana<\/td><td>Katrs modulis tiek licenc\u0113ts atsevi\u0161\u0137i<\/td><td>No 199 \u20ac m\u0113nes\u012b, neierobe\u017eots lietot\u0101ju skaits<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-psipenta\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties r\u012bku ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai sist\u0113m\u0101 PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Production modulis ir piem\u0113rots r\u016bpn\u012bcai, kurai vajadz\u012bga \u0161auro vietu aptuven\u0101 pl\u0101no\u0161ana un iepirkumu termi\u0146i. R\u016bpn\u012bcai, kas ceha darbu pl\u0101no izkl\u0101jlap\u0101s, vajadz\u012bga darbu sec\u012bba katrai iek\u0101rtai. Tad j\u0101izv\u0113las starp PSI pl\u0101no\u0161anas moduli (Leitstand, Adaptive Planung vai MES Scheduling) un SkyPlanner APS.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis PSIpenta Leitstand un MES Scheduling, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties str\u0101d\u0101jo\u0161u grafiku da\u017eu ned\u0113\u013cu laik\u0101, nevis modu\u013ca ievie\u0161anas projektu.<\/strong> PSIpenta tiek licenc\u0113ta pa modu\u013ciem (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>), savuk\u0101rt MES Scheduling ietilpst PSIpenta\/MES produktu saim\u0113 (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI<\/a>). SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas darbojas l\u012bdz\u0101s PSIpenta\/ERP. 30 dienu izm\u0113\u0123in\u0101jum\u0101 j\u016bs to p\u0101rbaud\u0101t ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas pa\u0161am.<\/strong> Adaptive Planung atz\u012bm\u0113 kav\u0113jumus, kurus tas nesp\u0113j nov\u0113rst, k\u0101 kritiskos ce\u013cus, kuriem pl\u0101not\u0101jam j\u0101piev\u0113r\u0161as (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI<\/a>). Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, un jaunie pl\u0101notie laiki tiek nos\u016bt\u012bti atpaka\u013c uz PSIpenta.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> Sagatavo\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki katram p\u0101rejas virzienam. T\u0101 \u013cauj pl\u0101not kr\u0101su, materi\u0101lu vai instrumentu sec\u012bbu ar maz\u0101ko kop\u0113jo sagatavo\u0161anas laiku.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo gan operatori un instrumenti, gan ien\u0101ko\u0161ie materi\u0101li.<\/strong> Vienot\u0101 grafik\u0101 tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. Uzdevumiem, kam vajadz\u012bgi vair\u0101ki operatori, tiek pie\u0161\u0137irti nepiecie\u0161amie darbinieki, tiek izmantotas alternat\u012bvas iek\u0101rtas, un oper\u0101cijas s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations nodro\u0161ina aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101. Lietot\u0101ju skaits ir neierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>V\u0113laties publiski pieejamu m\u0113ne\u0161a cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b. SkyPlanner komanda iepriek\u0161 sagatavo divvirzienu integr\u0101cijas cenu pied\u0101v\u0101jumu, konfigur\u0113 integr\u0101ciju un nodro\u0161ina tai atbalstu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet iek\u0101rtas, darbiniekus un mai\u0146as sist\u0113m\u0101 SkyPlanner vai import\u0113jiet darba centrus un iek\u0101rtas no PSIpenta. Ir pieejama pal\u012bdz\u012bba ievie\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet neizpild\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no PSIpenta uz Excel, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar PSIpenta.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina tai atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101ds ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums sist\u0113mai PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, darba centru, iek\u0101rtu un instrumentu datus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Katrai oper\u0101cijai pl\u0101notais s\u0101kuma un beigu laiks un darba centrs tiek nos\u016bt\u012bti atpaka\u013c, savuk\u0101rt operatoru darba laiku var re\u0123istr\u0113t k\u0101 BDE apstiprin\u0101jumus. Pl\u0101no\u0161an\u0101 tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta ierobe\u017eot\u0101 pieejam\u012bba un materi\u0101lu ierobe\u017eotais daudzums. Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai PSIpenta nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, atsevi\u0161\u0137os modu\u013cos. Production modulis pl\u0101no materi\u0101lus un jaudu, kas rada \u0161aur\u0101s vietas. Leitstand modulis pl\u0101no ar ierobe\u017eotu vai neierobe\u017eotu jaudu un nodro\u0161ina periodu, kur\u0101 grafiks netiek main\u012bts, savuk\u0101rt PSIpenta\/MES Scheduling pl\u0101no katru darba vietu atbilsto\u0161i t\u0101s ierobe\u017eotajai jaudai. SkyPlanner APS darbojas l\u012bdz\u0101s PSIpenta\/ERP un vienot\u0101 m\u0101ko\u0146vides grafik\u0101 pl\u0101no katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu, \u0146emot v\u0113r\u0101 to re\u0101lo pieejam\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar PSIpenta. Izmantojot PSIpenta\/ERP REST API un PSIintegration, tas nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, materi\u0101lu specifik\u0101cijas, darba centru un instrumentu datus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c, izmantojot PSIpenta\/ERP REST API, savuk\u0101rt operatoru darba laiks tiek re\u0123istr\u0113ts k\u0101 apstiprin\u0101jumi, izmantojot PSIpenta\/BDE API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j PSIpenta materi\u0101lu vajadz\u012bbu pl\u0101no\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina eso\u0161o sist\u0113mu. PSIpenta p\u0101rzi\u0146\u0101 paliek deta\u013cas, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie mar\u0161ruti, materi\u0101lu vajadz\u012bbu pl\u0101no\u0161ana, iepirkumi, pa\u0161izmaksas apr\u0113\u0137ini un finanses. SkyPlanner pl\u0101no j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta pl\u0101notos datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko izv\u0113l\u0113ties \u2014 PSIpenta Leitstand vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt str\u0101d\u0101t ar grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu un autom\u0101tiski atjaunin\u0101s. Leitstand, Adaptive Planung un MES Scheduling ir atsevi\u0161\u0137i PSI modu\u013ci, kuri j\u0101licenc\u0113 un j\u0101ievie\u0161 katrs atsevi\u0161\u0137i. Kav\u0113jumi, ko APS modulis nesp\u0113j nov\u0113rst, tiek nodoti pl\u0101not\u0101jam k\u0101 kritiskie ce\u013ci. SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, un vien\u0101 grafik\u0101 pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus. Katrs operators sav\u0101 t\u0101lrun\u012b redz savu uzdevumu rindu, un lietot\u0101ju skaits nav ierobe\u017eots. Bezmaksas izm\u0113\u0123in\u0101jum\u0101 j\u016bs to p\u0101rbaud\u0101t ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, cen\u0101 iek\u013caujot 5 darba centrus, un papildus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iesniegts kop\u0101 ar izv\u0113l\u0113t\u0101 abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kam darbu ar jums. Komanda sasaista j\u016bsu darba centru, iek\u0101rtu, instrumentu un tehnolo\u0123isko mar\u0161rutu datus, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms sist\u0113mas lieto\u0161anas s\u0101kuma viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 tiek izmantoti j\u016bsu atv\u0113rtie PSIpenta ra\u017eo\u0161anas pas\u016bt\u012bjumi, kas eksport\u0113ti Excel form\u0101t\u0101. V\u0113l pirms jebk\u0101du integr\u0101cijas darbu s\u0101kuma j\u016bs redzat savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101nu, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ PSIpenta SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir PSIpenta papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad &#8230; <a title=\"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106209","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>PSIpenta integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/\",\"name\":\"PSIpenta integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/psipenta\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PSIpenta integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","description":"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/","name":"PSIpenta integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildina PSIpenta: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu, operatoru, instrumentu jaudas un materi\u0101lu pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/psipenta\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ PSIpenta SkyPlanner APS sist\u0113mai PSIpenta: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir PSIpenta papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks veikta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106209"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106209\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}