{"id":106180,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/qad-adaptive-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"qad-adaptive-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/","title":{"rendered":"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai QAD Adaptive ERP: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir QAD Adaptive ERP (agr\u0101k QAD Enterprise Applications un MFG\/PRO) papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiek izpild\u012bta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar QAD Adaptive ERP darbojas abos virzienos. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, nomenklat\u016bras vien\u012bbas, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus. Iepl\u0101notie palai\u0161anas un izpildes datumi tiek nos\u016bt\u012bti atpaka\u013c uz Work Order Maintenance, izmantojot QAD QXtend, savuk\u0101rt re\u0123istr\u0113tais darbs tiek iegr\u0101matots k\u0101 darba izpildes dati un sara\u017eot\u0101s produkcijas sa\u0146em\u0161ana. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu QAD iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai iek\u0101rtai \u2014 izpild\u0101ma darbu sec\u012bba.<\/p>\n\n\n<p class=\"fx-pain__b\">QAD modulis Capacity Requirements Planning par\u0101da katra darba centra slodzi. SkyPlanner katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju iepl\u0101no konkr\u0113tai iek\u0101rtai vai darbiniekam noteikt\u0101 laik\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btni un virsstundas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datumi vairs negaid\u012bti nemain\u0101s.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner uztur darbu sec\u012bbu, un ra\u017eo\u0161anas pas\u016bt\u012bjumu palai\u0161anas un izpildes datumi QAD sist\u0113m\u0101 tai tiek piel\u0101goti. Pl\u0101not\u0101jiem vairs nav atk\u0101rtoti j\u0101ievada oper\u0101ciju datumi p\u0113c katra CRP apr\u0113\u0137ina.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos p\u0101rejas virzienos. P\u0101rejot no gai\u0161as kr\u0101sas uz tum\u0161u, var pietikt ar \u012bsu skalo\u0161anu, bet pret\u0113j\u0101 virzien\u0101 nepiecie\u0161ama piln\u012bga t\u012br\u012b\u0161ana. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus sec\u012bb\u0101, kur\u0101 laika zudumi ir vismaz\u0101kie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b darbinieku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki ar br\u012bvu laiku mai\u0146\u0101. \u0160tance vai veidne, ko izmanto vien\u0101 pres\u0113, nekad netiek vienlaikus iepl\u0101nota cit\u0101. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz citu piem\u0113rotu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darba s\u0101kumu nosaka materi\u0101lu pieejam\u012bba.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katrai nomenklat\u016bras vien\u012bbai p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas pas\u016bt\u012bjums, kas gaida pieg\u0101d\u0101t\u0101ja pieg\u0101di, tiek iepl\u0101nots p\u0113c t\u0101s sa\u0146em\u0161anas datuma, nevis s\u0101kts un p\u0113c tam aptur\u0113ts ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un darba izpildes dati tiek nos\u016bt\u012bti atpaka\u013c uz QAD.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskat\u0101mu inform\u0101ciju par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums iepriek\u0161\u0113jo aptuveni 50% viet\u0101<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad divu meistaru viet\u0101 vajadz\u012bgs viens.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-qad-adaptive-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD nos\u016bta darba datus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, nomenklat\u016bras vien\u012bbas, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus, ra\u017eo\u0161anas kalend\u0101rus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu un p\u0101rpl\u0101no to, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Iepl\u0101notie palai\u0161anas un izpildes datumi tiek ierakst\u012bti katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101, izmantojot QXtend Inbound QDoc un Work Order Maintenance (16.1). Operatoru apstiprin\u0101jumi tiek iegr\u0101matoti, izmantojot Labor Feedback by Work Order (16.20.1) un Work Order Receipt (16.11).<\/li>\n\n<\/ol>\n\n\n<p>QAD paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Nomenklat\u016bras vien\u012bbas, produktu strukt\u016bras, MRP, iepirkumi, kr\u0101jumi, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek turpat, kur l\u012bdz \u0161im. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku katram resursam.<\/p>\n\n\n<p>SkyPlanner nolasa QAD datus, izmantojot QAD QXtend Outbound biznesa objektus (Item, Product Structure, Routing, Work Center, Inventory Transaction) un QAD biznesa dokumentu REST vaic\u0101jumu API. Dati tiek ierakst\u012bti atpaka\u013c, izmantojot QAD QXtend Inbound \u2014 QAD SOAP un XML saskarni ar t\u0101m pa\u0161\u0101m programm\u0101m, ko izmanto pl\u0101not\u0101js. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/p>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 QAD izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu QAD partneris vai izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>QDocs, datu lauku atbilst\u012bba un atpaka\u013cieraksta noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/integracijas-celvedis\/\">QAD Adaptive ERP integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-qad-adaptive-erp-schedules-and-what-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no QAD Adaptive ERP un ko papildus pied\u0101v\u0101 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD labi pl\u0101no materi\u0101lus un ar Line Schedule Workbench p\u0101rvalda atk\u0101rtot\u0101s ra\u017eo\u0161anas l\u012bnijas. Diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumiem jaudu apr\u0113\u0137ina Capacity Requirements Planning. <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">QAD ra\u017eo\u0161anas lietot\u0101ja rokasgr\u0101mat\u0101<\/a> ir noteikti \u0161\u0101di darb\u012bbas principi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CRP pl\u0101no atpaka\u013cgait\u0101 no izpildes datuma.<\/strong> Tas &#8220;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (\u0146em pas\u016bt\u012bjuma vai atk\u0101rtot\u0101s ra\u017eo\u0161anas grafika izpildes datumu un pl\u0101no oper\u0101cijas atpaka\u013cgait\u0101 \u2014 no tehnolo\u0123isk\u0101 procesa p\u0113d\u0113j\u0101s oper\u0101cijas l\u012bdz pirmajai).<\/li>\n\n\n<li><strong>P\u0101rslodzi risina pl\u0101not\u0101js.<\/strong> &#8220;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (Ja darba centrs vai iek\u0101rta ir p\u0101rslogota vai nepietiekami noslogota, var main\u012bt t\u0101s jaudu vai slodzes laiku vai apjomu.)<\/li>\n\n\n<li><strong>Visa slodze tiek pie\u0161\u0137irta vienai dienai.<\/strong> &#8220;The system assigns the entire load for an operation to its scheduled start date.&#8221; (Sist\u0113ma visu oper\u0101cijas slodzi pie\u0161\u0137ir t\u0101s iepl\u0101notajam s\u0101kuma datumam.)<\/li>\n\n\n<li><strong>Atk\u0101rtoti CRP apr\u0113\u0137ini maina datumus.<\/strong> &#8220;When you run CRP, all open operations for selected work orders are rescheduled.&#8221; (Palai\u017eot CRP, tiek p\u0101rpl\u0101notas visas atlas\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjumu nepabeigt\u0101s oper\u0101cijas.)<\/li>\n\n<\/ul>\n\n\n<p>QAD pamatsist\u0113m\u0101 slodzes pl\u0101no\u0161ana pieejam\u0101s jaudas robe\u017e\u0101s ir ietverta modul\u012b Advanced Repetitive, kur Line Schedule Workbench sast\u0101da ra\u017eo\u0161anas l\u012bniju grafikus. Master and Production Scheduling Workbenches ir &#8220;.NET UI-only scheduling tools&#8221; (grafiku sast\u0101d\u012b\u0161anas r\u012bki, kas pieejami tikai .NET saskarn\u0113), un tiem nepiecie\u0161ama akt\u012bva Maintenance licence (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">QAD rokasgr\u0101mata<\/a>). QAD risin\u0101jums darbu sec\u012bbas pl\u0101no\u0161anai ir atsevi\u0161\u0137s produkts \u2014 QAD Advanced Scheduling, kas tika ieviests 2024. gad\u0101 (<a href=\"https:\/\/www.qad.com\/solutions\/supply-chain-planning\/advanced-scheduling\">QAD<\/a>).<\/p>\n\n\n<p>Visi posmi un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/qad-adaptive-erp\/razosanas-planosana\/\">Vai QAD Adaptive ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-adaptive-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QAD CRP un ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/th><th>QAD Adaptive ERP kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>CRP pl\u0101no atpaka\u013cgait\u0101 un par\u0101da slodzi attiec\u012bb\u0101 pret jaudu<\/td><td>Pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bbu un faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>P\u0101rslodze<\/td><td>Pl\u0101not\u0101js maina jaudu vai slodzes laiku<\/td><td>Dzin\u0113js maina darbu sec\u012bbu atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Slodze<\/td><td>Visa oper\u0101cijas slodze t\u0101s s\u0101kuma datum\u0101<\/td><td>Katra oper\u0101cija iepl\u0101nota konkr\u0113t\u0101 diennakts laik\u0101<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Katrs CRP apr\u0113\u0137ins p\u0101rpl\u0101no nepabeigt\u0101s oper\u0101cijas<\/td><td>Autopilot p\u0101rpl\u0101no; Running Time Lock fiks\u0113 tuv\u0101ko stundu grafiku<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Viens p\u0101rregul\u0113\u0161anas laiks katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai; p\u0101rregul\u0113\u0161ana atk\u0101rtot\u0101s ra\u017eo\u0161anas l\u012bnij\u0101s<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica katram darba centram: vismaz\u0101kais kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki un instrumenti<\/td><td>Darba centra jaudu nosaka iek\u0101rtas vai person\u0101ls<\/td><td>Konkr\u0113ti operatori ar sav\u0101m mai\u0146\u0101m, uzdevumi vair\u0101kiem operatoriem, instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>MRP pl\u0101notie pas\u016bt\u012bjumi atsevi\u0161\u0137i no iek\u0101rtu darba laika<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emtas iepirkuma pas\u016bt\u012bjumu pieg\u0101des<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Input\/Output Inquiry un CRP p\u0101rskati; pl\u0101no\u0161anas r\u012bki .NET saskarn\u0113<\/td><td>Interakt\u012bva Gantt diagramma p\u0101rl\u016bk\u0101: p\u0101rvietojiet ra\u017eo\u0161anas uzdevumus, un pl\u0101ns paliek saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba izpildes datus ievada QAD<\/td><td>Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"qad-adaptive-erp-scheduling-software-and-add-ons\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad tas der<\/th><\/tr><\/thead><tbody><tr><td>QAD Advanced Scheduling (kop\u0101 ar QAD DSCP Production Planning un QAD Redzone)<\/td><td>Atsevi\u0161\u0137i QAD produkti pl\u0101no\u0161anai un grafiku sast\u0101d\u012b\u0161anai t\u0101 ERP sist\u0113m\u0101<\/td><td>J\u016bs pl\u0101nojat katru l\u012bniju atsevi\u0161\u0137i un v\u0113laties izmantot tikai QAD produktus<\/td><\/tr><tr><td>Lok\u0101li uzst\u0101d\u012bta APS ar savienojumu ar QAD (piem\u0113ram, Asprova, PlanetTogether)<\/td><td>Dator\u0101 vai server\u012b darbin\u0101mi grafiku sast\u0101d\u012b\u0161anas risin\u0101jumi, kas sa\u0146em QAD datus caur savienojumu vai integr\u0101cijas projekt\u0101 izveidotu risin\u0101jumu<\/td><td>Pl\u0101no\u0161anas komanda uztur atsevi\u0161\u0137u grafiku sast\u0101d\u012b\u0161anas modeli<\/td><\/tr><tr><td>Pl\u0101no\u0161anas un a\u0123entu platformas (piem\u0113ram, b2wise, Zentio)<\/td><td>Pl\u0101no\u0161anas r\u012bki, kas nor\u0101da QAD k\u0101 vienu no atbalst\u012btaj\u0101m ERP sist\u0113m\u0101m<\/td><td>J\u016bs v\u0113laties papildin\u0101t QAD ar kr\u0101jumu vai pl\u0101no\u0161anas anal\u012btiku<\/td><\/tr><tr><td>M\u0101ko\u0146a APS, kas savienota ar QAD (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 darbin\u0101ms pl\u0101not\u0101js, kas iev\u0113ro pieejamo jaudu un abos virzienos sinhroniz\u0113jas ar QAD ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/td><td>Grafikam j\u0101atjaunin\u0101s autom\u0101tiski un j\u0101b\u016bt pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis QAD Advanced Scheduling un grafiku sast\u0101d\u012b\u0161anas r\u012bkus, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>J\u016bs izpild\u0101t diskr\u0113t\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumus, izmantojot iek\u0101rtas un darbiniekus.<\/strong> QAD raksturo Advanced Scheduling k\u0101 &#8220;a minute-by-minute, line-by-line optimized production schedule for each plant&#8221; (katrai ra\u017eotnei pa min\u016bt\u0113m un katrai l\u012bnijai atsevi\u0161\u0137i optimiz\u0113tu ra\u017eo\u0161anas grafiku) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD emu\u0101rs<\/a>). SkyPlanner pl\u0101no katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju sec\u012bbu katrai iek\u0101rtai, operatoram un instrumentam.<\/li>\n\n\n<li><strong>Jums vajadz\u012bgs ra\u017eo\u0161anas grafiks, nevis pl\u0101no\u0161anas sist\u0113mu komplekts.<\/strong> QAD pied\u0101v\u0101 Advanced Scheduling kop\u0101 ar DSCP Production Planning un Redzone. SkyPlanner ir viens produkts, kas papildina QAD. To varat p\u0101rbaud\u012bt ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem 30 dienu izm\u0113\u0123in\u0101jum\u0101 un s\u0101kt lietot da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas uzs\u0101k\u0161anas.<\/li>\n\n\n<li><strong>Datumi nedr\u012bkst main\u012bties p\u0113c katra CRP apr\u0113\u0137ina.<\/strong> QAD br\u012bdina, ka manu\u0101li piel\u0101gotie oper\u0101ciju datumi, palai\u017eot CRP, &#8220;will probably be changed&#8221; (visticam\u0101k, tiks main\u012bti). SkyPlanner ieraksta savam grafikam atbilsto\u0161us ra\u017eo\u0161anas pas\u016bt\u012bjumu uzs\u0101k\u0161anas un izpildes datumus, lai CRP un pl\u0101ns b\u016btu saska\u0146oti.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram darba centram glab\u0101jas p\u0101rejas laiks katr\u0101 virzien\u0101. T\u0101 \u013cauj sak\u0101rtot darbus p\u0113c kr\u0101sas, gar\u0161as vai materi\u0101la t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Pl\u0101not\u0101ji un operatori str\u0101d\u0101 p\u0101rl\u016bk\u0101.<\/strong> QAD darba pane\u013ci darbojas tikai .NET saskarn\u0113. SkyPlanner darbojas p\u0101rl\u016bk\u0101, lietot\u0101ju skaits nav ierobe\u017eots, un Mobile Confirmations \u013cauj t\u0101lrun\u012b vai plan\u0161etdator\u0101 skat\u012bt aktu\u0101lo darbu rindu.<\/li>\n\n\n<li><strong>J\u016bs v\u0113laties vienu m\u0113ne\u0161a maksu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas izmaksas tiek nor\u0101d\u012btas iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet darba centrus no QAD. Ir pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to tehnolo\u0123iskos procesus no QAD uz Excel, import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet QAD Adaptive ERP.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju, izmantojot QXtend, un nodro\u0161ina t\u0101s atbalstu p\u0113c ekspluat\u0101cijas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, lasiet <a href=\"\/lv\/resursi\/advanced-planning-and-scheduling\/\">APS ce\u013cvedi<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101ds ir lab\u0101kais QAD Adaptive ERP papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, pre\u010du datus, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumu datus un iepirkumu pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta iepl\u0101notos ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus un datus par paveikto darbu. Pl\u0101no\u0161an\u0101 tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta ierobe\u017eot\u0101 pieejam\u012bba, k\u0101 ar\u012b ierobe\u017eotais materi\u0101lu daudzums. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anai vajadz\u0113tu vismaz\u0101k laika. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QAD Adaptive ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Atk\u0101rtotas ra\u017eo\u0161anas l\u012bnij\u0101m \u2014 j\u0101: modu\u013ca Advanced Repetitive r\u012bks Line Schedule Workbench noslogo l\u012bnijas, nep\u0101rsniedzot to jaudu. Diskr\u0113tu ra\u017eo\u0161anas pas\u016bt\u012bjumu gad\u012bjum\u0101 CRP sast\u0101da grafiku atpaka\u013cgait\u0101 no izpildes termi\u0146iem, bet p\u0101rslodzes atst\u0101j pl\u0101not\u0101ja zi\u0146\u0101. Darbu sec\u012bbas pl\u0101no\u0161anai QAD pied\u0101v\u0101 atsevi\u0161\u0137u produktu QAD Advanced Scheduling. SkyPlanner APS papildina QAD, pl\u0101nojot darbus atbilsto\u0161i katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bbai un materi\u0101lu daudzumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar QAD Adaptive ERP. Tas nolasa pre\u010du datus, produktu strukt\u016bras, tehnolo\u0123iskos procesus, darba centrus, ra\u017eo\u0161anas pas\u016bt\u012bjumus un kr\u0101jumu datus, izmantojot QXtend Outbound un QAD biznesa dokumentu REST API. Iepl\u0101notie uzs\u0101k\u0161anas un izpildes datumi tiek nos\u016bt\u012bti atpaka\u013c uz Work Order Maintenance ar QXtend Inbound QDoc, bet izpildes apstiprin\u0101jumi tiek re\u0123istr\u0113ti k\u0101 Labor Feedback by Work Order un Work Order Receipt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties QAD Advanced Scheduling vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 ja v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt lietot grafiku, kas \u0146em v\u0113r\u0101 katras iek\u0101rtas un darbinieka pieejamo jaudu. QAD raksturo Advanced Scheduling k\u0101 r\u012bku grafika sast\u0101d\u012b\u0161anai katrai l\u012bnijai katr\u0101 ra\u017eotn\u0113 un pied\u0101v\u0101 to kop\u0101 ar DSCP Production Planning un Redzone. SkyPlanner sak\u0101rto diskr\u0113tus ra\u017eo\u0161anas pas\u016bt\u012bjumus sec\u012bb\u0101, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus, k\u0101 ar\u012b autom\u0101tiski p\u0101rpl\u0101no grafiku. Katrs operators var skat\u012bt savu darbu rindu t\u0101lrun\u012b, un lietot\u0101ju skaits nav ierobe\u017eots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner darbojas ar MFG\/PRO un QAD Enterprise Edition?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. QAD Adaptive ERP ir pa\u0161reiz\u0113jais QAD ERP sist\u0113mas nosaukums, un t\u0101 ietver agr\u0101kos QAD Enterprise Applications Enterprise Edition un QAD Cloud ERP. Integr\u0101ciju nodro\u0161ina t\u0101s pa\u0161as ra\u017eo\u0161anas pas\u016bt\u012bjumu, tehnolo\u0123isko procesu un darba centru programmas un QXtend saskarne.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto QAD?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, cen\u0101 iek\u013caujot 5 darba centrus, un papildus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iesniegts kop\u0101 ar izv\u0113l\u0113t\u0101 abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas. Komanda izveido darba centru, tehnolo\u0123isko procesu un pre\u010du datu atbilst\u012bbas, piesl\u0113dz ra\u017eo\u0161anas un iepirkumu pas\u016bt\u012bjumu apmai\u0146u un nodro\u0161ina iepl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms ekspluat\u0101cijas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar QAD?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto no QAD uz Excel eksport\u0113tus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus. V\u0113l pirms integr\u0101cijas darbu uzs\u0101k\u0161anas j\u016bs redzat savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">grafiku, kas \u0146em v\u0113r\u0101 pieejamo iek\u0101rtu un darbinieku jaudu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir QAD Adaptive ERP (agr\u0101k QAD Enterprise Applications un MFG\/PRO) papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur &#8230; <a title=\"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106180","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD Adaptive ERP integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161anai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/\",\"name\":\"QAD Adaptive ERP integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD Adaptive ERP integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161anai","description":"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/","name":"QAD Adaptive ERP integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS papildin\u0101jums QAD Adaptive ERP: pl\u0101no\u0161ana p\u0113c iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/qad-adaptive-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ QAD Adaptive ERP SkyPlanner APS sist\u0113mai QAD Adaptive ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir QAD Adaptive ERP (agr\u0101k QAD Enterprise Applications un MFG\/PRO) papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas iepl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106180","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106180"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106180\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106180"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}