{"id":106151,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/oracle-fusion-cloud\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"oracle-fusion-cloud","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Oracle Fusion Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu vis\u0101s j\u016bsu ra\u017eotn\u0113s. J\u016bs redzat, ar kuru resursu un kad tiks izpild\u012bta katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Oracle Fusion Cloud darbojas abos virzienos. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, darbu defin\u012bcijas, darba centrus, ra\u017eo\u0161anas resursus, preces, pre\u010du strukt\u016bras, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus. Pl\u0101notie oper\u0101ciju s\u0101kuma un beigu datumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem, savuk\u0101rt re\u0123istr\u0113tais darbs tiek iegr\u0101matots k\u0101 oper\u0101ciju un resursu transakcijas. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Oracle Fusion Cloud konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katram resursam \u2014 izpild\u0101ma darbu sec\u012bba.<\/p>\n\n\n<p class=\"fx-pain__b\">Oracle Fusion Cloud Manufacturing nosaka katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumus atsevi\u0161\u0137i. SkyPlanner iepl\u0101no katru oper\u0101ciju konkr\u0113tai iek\u0101rtai vai darbiniekam konkr\u0113t\u0101 laik\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btnes un visu p\u0101r\u0113jo ra\u017eo\u0161anas pas\u016bt\u012bjumu rad\u012bto noslodzi.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Vair\u0101kas ra\u017eotnes vien\u0101 pl\u0101n\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Katra ra\u017eotne veido darba centru grupu, un grafik\u0101 tiek iek\u013cauts ar\u012b p\u0101rvieto\u0161anas laiks starp ra\u017eotn\u0113m. SkyPlanner par\u0101da, kuras ra\u017eotnes darba centros j\u0101veic darbs, t\u0101p\u0113c pl\u0101not\u0101ji redz visu ra\u017eot\u0146u t\u012bklu, nevis tikai vienu organizatorisko vien\u012bbu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai laika zudumi b\u016btu vismaz\u0101kie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b darbinieku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar pieejamu laiku mai\u0146\u0101s. \u0160tance vai lie\u0161anas veidne, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus rezerv\u0113ta citai. Ja resurss ir aiz\u0146emts, darbs tiek p\u0101rcelts uz citu iek\u0101rtu vai pie\u0161\u0137irts citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darba s\u0101kumu nosaka materi\u0101lu pieejam\u012bba.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner katrai precei p\u0101rbauda pieejamos kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des no iepirkuma pas\u016bt\u012bjumiem. Ra\u017eo\u0161anas pas\u016bt\u012bjums, kas gaida pieg\u0101d\u0101t\u0101ja pieg\u0101di, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, nevis s\u0101kts un p\u0113c tam aptur\u0113ts ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaitai var sekot re\u0101llaik\u0101, un dati par pabeigto darbu tiek nos\u016bt\u012bti atpaka\u013c uz Oracle Fusion Cloud.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas norisi re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz piepras\u012bjumiem main\u012bt grafiku tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101, nevis stund\u0101 vai ilg\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-oracle-fusion-cloud-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Oracle Fusion Cloud nos\u016bta darba datus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, darbu defin\u012bcijas, darba centrus, ra\u017eo\u0161anas resursus, kalend\u0101rus un mai\u0146as, preces, pre\u010du strukt\u016bras, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu un p\u0101rpl\u0101no to, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti katr\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101, izmantojot <code>workOrders<\/code> resursu. Operatoru apstiprin\u0101jumi tiek iegr\u0101matoti k\u0101 oper\u0101ciju un resursu transakcijas.<\/li>\n\n<\/ol>\n\n\n<p>Oracle Fusion Cloud paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Preces, darbu defin\u012bcijas, Supply Planning, izmaksu apr\u0113\u0137ini, kr\u0101jumu un finan\u0161u uzskaite paliek turpat, kur l\u012bdz \u0161im. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku katram resursam.<\/p>\n\n\n<p>SkyPlanner nolasa Oracle Fusion Cloud datus, izmantojot Oracle Fusion Cloud SCM REST API resursus: <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> un <code>inventoryOnhandBalances<\/code>. Datu ierakst\u012b\u0161anai atpaka\u013c tas izmanto PATCH piepras\u012bjumu ra\u017eo\u0161anas pas\u016bt\u012bjumam un t\u0101 pak\u0101rtotajam objektam <code>WorkOrderOperation<\/code>, kur\u0101 ir lauki <code>PlannedStartDate<\/code> un <code>PlannedCompletionDate<\/code>, bet darba izpildes datus nos\u016bta uz <code>operationTransactions<\/code> un <code>resourceTransactions<\/code>. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/p>\n\n\n<p>Katra ra\u017eotne izmanto Oracle Fusion Cloud at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu Oracle partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Resursi, datu lauku atbilst\u012bba un atpaka\u013cierakstes noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/integracijas-celvedis\/\">Oracle Fusion Cloud integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-fusion-cloud-schedules-and-what-skyp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Oracle Fusion Cloud un ko pievieno SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud Manufacturing nosaka katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumus, savuk\u0101rt pl\u0101no\u0161anu atbilsto\u0161i faktiskajai resursu jaudai Oracle pied\u0101v\u0101 atsevi\u0161\u0137\u0101 darbviet\u0101. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faumf\/how-work-orders-are-scheduled.html\">Oracle dokument\u0101cij\u0101<\/a> \u0161ie l\u012bme\u0146i ir aprakst\u012bti \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti bez jaudas ierobe\u017eojumiem.<\/strong> &#8220;Oracle Manufacturing uses unconstrained scheduling engine in the background to schedule work orders during create and certain update actions.&#8221; (Veidojot ra\u017eo\u0161anas pas\u016bt\u012bjumus un veicot noteiktas atjaunin\u0101\u0161anas darb\u012bbas, Oracle Manufacturing fon\u0101 izmanto pl\u0101no\u0161anas dzini bez ierobe\u017eojumiem.)<\/li>\n\n\n<li><strong>Citi ra\u017eo\u0161anas pas\u016bt\u012bjumi netiek \u0146emti v\u0113r\u0101.<\/strong> Sast\u0101dot ra\u017eo\u0161anas pas\u016bt\u012bjuma grafiku, &#8220;resources are assumed to have infinite capacity and the scheduling engine disregards loads on the resources from other work orders.&#8221; (Tiek pie\u0146emts, ka resursu jauda ir neierobe\u017eota, un pl\u0101no\u0161anas dzinis ne\u0146em v\u0113r\u0101 citu ra\u017eo\u0161anas pas\u016bt\u012bjumu rad\u012bto resursu noslodzi.)<\/li>\n\n\n<li><strong>Vair\u0101ki ra\u017eo\u0161anas pas\u016bt\u012bjumi var p\u0101rkl\u0101ties uz viena resursa.<\/strong> Ra\u017eo\u0161anas lietotne &#8220;assumes that your resources have unlimited capacity; it then potentially plans to execute production for multiple work orders simultaneously.&#8221; (Pie\u0146em, ka resursu jauda ir neierobe\u017eota, t\u0101p\u0113c t\u0101 var iepl\u0101not vair\u0101ku ra\u017eo\u0161anas pas\u016bt\u012bjumu vienlaic\u012bgu izpildi.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Supply Planning pl\u0101no pa laika interv\u0101liem.<\/strong> Pieg\u0101des pl\u0101ns ar ierobe\u017eojumiem p\u0101rce\u013c pas\u016bt\u012bjumus &#8220;to earlier time buckets,&#8221; (uz agr\u0101kiem laika interv\u0101liem) un &#8220;as a last resort, overloads resource and supplier capacity to meet demands on time.&#8221; (K\u0101 p\u0113d\u0113jo iesp\u0113ju p\u0101rslogo resursu un pieg\u0101d\u0101t\u0101ju jaudu, lai laikus apmierin\u0101tu piepras\u012bjumu.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fausp\/overview-of-constraint-based-supply-planning.html\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Oper\u0101ciju sec\u012bbu atbilsto\u0161i pieejamajai jaudai nosaka Oracle Production Scheduling \u2014 darbvieta, ko iesp\u0113jo Supply Chain Planning, nevis Fusion Manufacturing pied\u0101v\u0101jum\u0101 (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/how-to-enable-the-production-scheduling-work-area.html\">Oracle iestat\u012b\u0161anas nor\u0101d\u012bjumi<\/a>). Pl\u0101not\u0101js katrai pl\u0101no\u0161anas organizatoriskajai vien\u012bbai izveido vienu grafiku un izpilda darb\u012bbas Refresh, Solve, Repair un Release.<\/p>\n\n\n<p>Visi so\u013ci un ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/oracle-fusion-cloud\/razosanas-planosana\/\">Vai Oracle Fusion Cloud pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Grafiku sast\u0101d\u012b\u0161ana ar Oracle Fusion Cloud Manufacturing<\/th><th>Oracle Fusion Cloud ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Neierobe\u017eota: katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumi tiek noteikti, ne\u0146emot v\u0113r\u0101 p\u0101r\u0113jo pas\u016bt\u012bjumu noslodzi<\/td><td>Tiek iev\u0113rota katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bba un faktisk\u0101s mai\u0146as<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumi tiek noteikti p\u0113c resursu izmanto\u0161anas un kalend\u0101riem<\/td><td>Oper\u0101ciju sec\u012bba katram resursam tiek izveidota da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>Ra\u017eotnes<\/td><td>Production Scheduling vienlaikus optimiz\u0113 vienas pl\u0101no\u0161anas organizatorisk\u0101s vien\u012bbas grafiku<\/td><td>Vair\u0101kas ra\u017eotnes vien\u0101 pl\u0101n\u0101, \u0146emot v\u0113r\u0101 p\u0101rvieto\u0161anas laiku starp t\u0101m<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Production Scheduling p\u0101rregul\u0113\u0161anas noteikumi attiecas tikai uz iek\u0101rt\u0101m, kas vienlaikus apstr\u0101d\u0101 vienu vien\u012bbu<\/td><td>Sagatavo\u0161anas laiku matrica katram darba centram: vismaz\u0101kais kop\u0113jais sagatavo\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki un instrumenti<\/td><td>Darbasp\u0113ks un iek\u0101rtas k\u0101 oper\u0101cijai piesaist\u012bti resursi<\/td><td>Konkr\u0113ti operatori ar sav\u0101m mai\u0146\u0101m, ra\u017eo\u0161anas uzdevumi vair\u0101kiem operatoriem, instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Supply Planning pl\u0101no pa laika interv\u0101liem<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami kr\u0101jumos vai sa\u0146emti no iepirkuma pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js izpilda Refresh, Solve, Repair un Release<\/td><td>Autopilot p\u0101rpl\u0101no atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m; Running Time Lock fiks\u0113 tuv\u0101ko stundu ra\u017eo\u0161anas uzdevumus<\/td><\/tr><tr><td>Datu ierakst\u012b\u0161ana atpaka\u013c<\/td><td>Release atjaunina ra\u017eo\u0161anas pas\u016bt\u012bjumus izlai\u0161anas perioda ietvaros<\/td><td>Pl\u0101notie oper\u0101ciju datumi tiek ierakst\u012bti katr\u0101 iepl\u0101notaj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Izpild\u0101mo darbu saraksts Oracle sist\u0113m\u0101<\/td><td>Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu darbu rindu un re\u0123istr\u0113 darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"oracle-fusion-cloud-scheduling-software-and-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad tas ir piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Oracle Production Scheduling un Supply Planning<\/td><td>Oracle pl\u0101no\u0161anas darbvietas Supply Chain Planning pied\u0101v\u0101jum\u0101<\/td><td>J\u016bs jau izmantojat Supply Chain Planning, un par katru pl\u0101no\u0161anas organizatorisko vien\u012bbu atbild centraliz\u0113ta pl\u0101no\u0161anas komanda<\/td><\/tr><tr><td>Ar Fusion savienotas MES un ra\u017eo\u0161anas darbinieku lietotnes (piem\u0113ram, Accevo, Tulip)<\/td><td>Ra\u017eo\u0161anas izpildes un datu iev\u0101k\u0161anas lietotnes, kas nolasa un ieraksta Fusion ra\u017eo\u0161anas pas\u016bt\u012bjumu datus<\/td><td>Projekta m\u0113r\u0137is ir darbu izpilde un datu iev\u0101k\u0161ana ra\u017eo\u0161anas ceh\u0101<\/td><\/tr><tr><td>Atsevi\u0161\u0137i APS un pl\u0101no\u0161anas r\u012bki (piem\u0113ram, PlanetTogether, b2wise)<\/td><td>Pl\u0101no\u0161anas programmat\u016bra, kas savienota ar Oracle integr\u0101cijas projekta ietvaros<\/td><td>Pl\u0101no\u0161anas komanda str\u0101d\u0101s ar atsevi\u0161\u0137u optimiz\u0101cijas modeli<\/td><\/tr><tr><td>M\u0101ko\u0146pakalpojuma APS ar REST savienojumu (SkyPlanner APS)<\/td><td>P\u0101rl\u016bk\u0101 pieejams ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro faktisko resursu jaudu un abos virzienos sinhroniz\u0113 datus ar Fusion ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/td><td>Grafikam pa\u0161am j\u0101atjaunin\u0101s, j\u0101aptver visas ra\u017eotnes un j\u0101b\u016bt pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Oracle Production Scheduling, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>J\u016bs izmantojat Fusion Manufacturing bez Supply Chain Planning.<\/strong> Oracle pied\u0101v\u0101 Production Scheduling sada\u013c\u0101 &#8220;Offering: Supply Chain Planning&#8221;. SkyPlanner papildina jau izmantoto Manufacturing, pl\u0101nojot Fusion ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai.<\/li>\n\n\n<li><strong>Darbu sadala vair\u0101kas ra\u017eotnes.<\/strong> Production Scheduling veido atsevi\u0161\u0137u grafiku katrai pl\u0101no\u0161anas organiz\u0101cijai. SkyPlanner pl\u0101no visas ra\u017eotnes vien\u0101 grafik\u0101 un par\u0101da, kur\u0101 ra\u017eotn\u0113 darbs b\u016btu j\u0101veic.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana vajadz\u012bga ne tikai atsevi\u0161\u0137\u0101m iek\u0101rt\u0101m.<\/strong> Oracle piem\u0113ro p\u0101rregul\u0113\u0161anas noteikumus &#8220;only on resources that have resource type set to equipment and default units available set to 1&#8221; (tikai iek\u0101rtu tipa resursiem, kuriem p\u0113c noklus\u0113juma pieejama viena vien\u012bba) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">avots<\/a>). SkyPlanner sagatavo\u0161anas laiku matric\u0101 katram darba centram ir nor\u0101d\u012bti p\u0101rregul\u0113\u0161anas laiki atkar\u012bb\u0101 no p\u0101rejas virziena.<\/li>\n\n\n<li><strong>Pl\u0101nam pa\u0161am j\u0101atjaunin\u0101s.<\/strong> Oracle br\u012bdina: &#8220;if the schedule isn&#8217;t refreshed after the previous release, changes to the schedule for some work orders might not be released&#8221; (ja p\u0113c iepriek\u0161\u0113j\u0101s nodo\u0161anas izpildei grafiks netiek atsvaidzin\u0101ts, da\u017eu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafika izmai\u0146as var netikt nodotas izpildei) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/release-analysis-and-actions.html\">avots<\/a>). Autopilot p\u0101rpl\u0101no darbu p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da aktu\u0101lo darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101. Lietot\u0101ju skaits nav ierobe\u017eots: cena ir atkar\u012bga no darba centru, nevis lietot\u0101ju skaita.<\/li>\n\n\n<li><strong>V\u0113laties s\u0101kt str\u0101d\u0101t ar aktu\u0101lu grafiku da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat p\u0101rbaud\u012bt SkyPlanner ar saviem Fusion ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s apm\u0101c\u012bbas un iestat\u012b\u0161anas s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izmantojat Oracle NetSuite?<\/strong> NetSuite ir Oracle ERP sist\u0113ma augo\u0161iem uz\u0146\u0113mumiem, savuk\u0101rt Oracle Fusion Cloud ir paredz\u0113ts lieliem ra\u017eot\u0101jiem ar vair\u0101k\u0101m ra\u017eotn\u0113m. Skatiet <a href=\"\/lv\/integracija\/erp\/netsuite\/\">SkyPlanner risin\u0101jumu NetSuite lietot\u0101jiem<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet darba centrus un ra\u017eo\u0161anas resursus no Oracle. Ir pieejama pal\u012bdz\u012bba darba s\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Oracle Fusion Cloud uz Excel neizpild\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas. Import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Oracle Fusion Cloud.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju, izmantojot SCM REST API, un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, lasiet <a href=\"\/lv\/resursi\/advanced-planning-and-scheduling\/\">APS ce\u013cvedi<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, darba defin\u012bcijas, darba centrus, ra\u017eo\u0161anas resursus, preces un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to darbu. Pl\u0101nojot tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. Sagatavo\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai sagatavo\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Oracle Fusion Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Pa\u0161\u0101 Fusion Manufacturing \u2014 n\u0113. Oracle nor\u0101da, ka t\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anas dzin\u0113js ne\u0146em v\u0113r\u0101 ierobe\u017eojumus un pie\u0146em, ka jauda ir neierobe\u017eota. Pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai nodro\u0161ina Oracle Production Scheduling \u2014 Supply Chain Planning pied\u0101v\u0101juma darba vide. SkyPlanner APS papildina Fusion Manufacturing, pl\u0101nojot darbu atbilsto\u0161i katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la ierobe\u017eotajai pieejam\u012bbai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar Oracle Fusion Cloud, izmantojot Oracle Fusion Cloud SCM REST API. Tas nolasa <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code> un kr\u0101jumu atlikumus, ieraksta <code>PlannedStartDate<\/code> un <code>PlannedCompletionDate<\/code> katr\u0101 <code>WorkOrderOperation<\/code> un nos\u016bta izpildes apstiprin\u0101jumus uz <code>operationTransactions<\/code> un <code>resourceTransactions<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izv\u0113l\u0113ties Oracle Production Scheduling vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja v\u0113laties vis\u0101m ra\u017eotn\u0113m vienotu grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo jaudu un autom\u0101tiski atjaunin\u0101s. Oracle Production Scheduling ietilpst Supply Chain Planning pied\u0101v\u0101jum\u0101, pl\u0101no vienu pl\u0101no\u0161anas organiz\u0101ciju vienlaikus, piem\u0113ro p\u0101rregul\u0113\u0161anas noteikumus tikai iek\u0101rt\u0101m ar vienu pieejamo vien\u012bbu un, nododot grafiku izpildei, nos\u016bta tikai tos datumus, kas ietilpst noteiktaj\u0101 nodo\u0161anas period\u0101. SkyPlanner p\u0101rpl\u0101no autom\u0101tiski un katr\u0101 darba centr\u0101 pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus. Katrs operators savu darbu rindu var skat\u012bt t\u0101lrun\u012b, un lietot\u0101ju skaits nav ierobe\u017eots.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Oracle Supply Planning vai Fusion Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, SkyPlanner papildina \u0161os risin\u0101jumus. Preces, darba defin\u012bcijas, Supply Planning, kr\u0101jumu uzskaite, pa\u0161izmaksas apr\u0113\u0137ini un finanses paliek Oracle p\u0101rzi\u0146\u0101. SkyPlanner sast\u0101da j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta oper\u0101ciju datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, k\u0101 ar\u012b 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu pl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m to kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgi notiek ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s apm\u0101c\u012bbas un iestat\u012b\u0161anas s\u0101kuma \u2014 ar\u012b lielos uz\u0146\u0113mumos. Komanda saska\u0146o j\u016bsu darba centru, ra\u017eo\u0161anas resursu un darba defin\u012bciju datus ab\u0101s sist\u0113m\u0101s, savieno ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus neizpild\u012btos Oracle ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas eksport\u0113ti uz Excel. Jau pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir Oracle Fusion Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu vis\u0101s j\u016bsu ra\u017eotn\u0113s. J\u016bs redzat, ar kuru resursu un kad tiks &#8230; <a title=\"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106151","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Fusion: APS integr\u0101cija ra\u017eo\u0161anas pl\u0101no\u0161anai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/\",\"name\":\"Oracle Fusion: APS integr\u0101cija ra\u017eo\u0161anas pl\u0101no\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Fusion: APS integr\u0101cija ra\u017eo\u0161anas pl\u0101no\u0161anai","description":"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/","name":"Oracle Fusion: APS integr\u0101cija ra\u017eo\u0161anas pl\u0101no\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c resursu jaudas, divvirzienu integr\u0101cija: iek\u0101rtas, cilv\u0113ki, instrumenti, materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/oracle-fusion-cloud\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS sist\u0113mai Oracle Fusion Cloud: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir Oracle Fusion Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu vis\u0101s j\u016bsu ra\u017eotn\u0113s. J\u016bs redzat, ar kuru resursu un kad tiks&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106151"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106151\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}