{"id":106093,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/xero\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"xero","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/","title":{"rendered":"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS un Xero: <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Xero papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. No apstiprin\u0101tajiem pied\u0101v\u0101jumiem tas izveido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. Kontakti, preces, r\u0113\u0137ini un gr\u0101matved\u012bbas uzskaite paliek Xero. SkyPlanner pievieno ra\u017eo\u0161anas pl\u0101nu, kura gr\u0101matved\u012bbas programm\u0101 nav, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner un Xero apmain\u0101s ar datiem abos virzienos. SkyPlanner sa\u0146em kontaktus, preces ar kr\u0101jumu uzskaiti, apstiprin\u0101tos pied\u0101v\u0101jumus un iepirkuma pas\u016bt\u012bjumus ar to pieg\u0101des datumiem. Uz Xero tiek nos\u016bt\u012bts pl\u0101notais pabeig\u0161anas datums, r\u0113\u0137inu melnraksti par izpild\u012btajiem pas\u016bt\u012bjumiem un projektos re\u0123istr\u0113tais darba laiks. Darba s\u0101k\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju ar j\u016bsu organiz\u0101ciju Xero.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u0101ns katrai iek\u0101rtai, nevis apstiprin\u0101to pied\u0101v\u0101jumu saraksts.<\/p>\n\n\n<p class=\"fx-pain__b\">Xero apstiprin\u0101tais pied\u0101v\u0101jums gaida r\u0113\u0137ina izrakst\u012b\u0161anu. SkyPlanner pl\u0101no\u0161anas dzinis Arcturus katru pied\u0101v\u0101jumu p\u0101rv\u0113r\u0161 ra\u017eo\u0161anas uzdevumos un interakt\u012bv\u0101 Gantt laika skal\u0101 iepl\u0101no tos konkr\u0113t\u0101 laik\u0101 tajos darba centros, kuros tie tiks izpild\u012bti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, kurus varat iev\u0113rot.<\/p>\n\n\n<p class=\"fx-pain__b\">Katra pas\u016bt\u012bjuma pabeig\u0161anas datumu nosaka visu iesaist\u012bto iek\u0101rtu un darbinieku noslodze. V\u0113l pirms pied\u0101v\u0101juma nos\u016bt\u012b\u0161anas redzat, ka CNC iek\u0101rta ir noslogota divas ned\u0113\u013cas uz priek\u0161u, bet mont\u0101\u017e\u0101 jauda ir pieejama.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai\u0146as atbilsto\u0161i j\u016bsu ceha darbam.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram darba centram un darbiniekam atsevi\u0161\u0137i nosaka mai\u0146as, atva\u013cin\u0101jumus, promb\u016btni un virsstundu mai\u0146as. Pievienojiet vakara mai\u0146u \u0161auraj\u0101 viet\u0101, un datumi uzreiz main\u012bsies.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos virzienos. P\u0101reja no zila uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkana uz zilu \u2014 60. Pl\u0101no\u0161anas dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojamie instrumenti un brig\u0101des ir \u0146emti v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidne, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek taj\u0101 pa\u0161\u0101 laik\u0101 rezerv\u0113ta citai. Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek iepl\u0101noti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un iek\u0101rtu boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Pie\u0161\u0137iriet pas\u016bt\u012bjumam Fast Track vai augst\u0101ku priorit\u0101ti, un pl\u0101no\u0161anas dzinis atbr\u012bvos tam vietu. Kad iek\u0101rta apst\u0101jas, Autopilot p\u0101rpl\u0101no grafiku, bet Running Time Lock saglab\u0101 s\u0101kto ra\u017eo\u0161anas uzdevumu vietu grafik\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner nolasa atlikumus prec\u0113m ar kr\u0101jumu uzskaiti un paredzamo sa\u0146em\u0161anas datumu katr\u0101 Xero iepirkuma pas\u016bt\u012bjum\u0101. Ra\u017eo\u0161anas uzdevuma izpildi iepl\u0101no p\u0113c pre\u010du sa\u0146em\u0161anas, ja tam vajadz\u012bga pieg\u0101de no pieg\u0101d\u0101t\u0101ja.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbs pabeigts \u2014 var izrakst\u012bt r\u0113\u0137inu.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatori re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations vai Production Timer. Kad pas\u016bt\u012bjums ir izpild\u012bts, Xero jau gaida apstiprin\u0101\u0161anai sagatavots r\u0113\u0137ina melnraksts ar pied\u0101v\u0101juma poz\u012bcij\u0101m.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farm\u0101cijas produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rskat\u012bt pieejamo jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidr\u0101k saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-xero-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Xero nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em kontaktus, preces ar kr\u0101jumu uzskaiti un to atlikumiem, apstiprin\u0101tos pied\u0101v\u0101jumus un iepirkuma pas\u016bt\u012bjumus ar paredzamajiem sa\u0146em\u0161anas datumiem. Katrs apstiprin\u0101tais pied\u0101v\u0101jums k\u013c\u016bst par ra\u017eo\u0161anas pas\u016bt\u012bjumu.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Katra produkta tehnolo\u0123isk\u0101s oper\u0101cijas, darba centri un p\u0101rregul\u0113\u0161anas laiki SkyPlanner j\u0101nor\u0101da tikai vienreiz. P\u0113c tam Arcturus dzinis da\u017e\u0101s sekund\u0113s iepl\u0101no visus ra\u017eo\u0161anas uzdevumus katrai iek\u0101rtai un p\u0101rpl\u0101no tos, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Dati par paveikto atgrie\u017eas Xero.<\/strong> SkyPlanner pievieno pl\u0101noto pabeig\u0161anas datumu pied\u0101v\u0101juma v\u0113sturei. Kad pas\u016bt\u012bjums ir izpild\u012bts, tas izveido p\u0101rdo\u0161anas r\u0113\u0137ina melnrakstu ar pied\u0101v\u0101juma poz\u012bcij\u0101m un atsauci un maina pied\u0101v\u0101juma statusu uz Invoiced. Projektu darbiem re\u0123istr\u0113t\u0101s stundas tiek nos\u016bt\u012btas uz Xero Projects k\u0101 laika uzskaites ieraksti.<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto Xero Accounting API un Projects API ar OAuth 2.0, t\u0101p\u0113c Xero nekas nav j\u0101instal\u0113. Xero webhook pazi\u0146ojumi zi\u0146o par jauniem un main\u012btiem kontaktiem un r\u0113\u0137iniem. SkyPlanner nolasa pied\u0101v\u0101jumus, preces un iepirkuma pas\u016bt\u012bjumus, kas main\u012bti kop\u0161 p\u0113d\u0113j\u0101s sinhroniz\u0101cijas, savuk\u0101rt SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Katrs ra\u017eot\u0101js Xero preces, pied\u0101v\u0101jumus un kr\u0101jumus uzskaita at\u0161\u0137ir\u012bgi, t\u0101p\u0113c SkyPlanner komanda darba s\u0101k\u0161anas laik\u0101 nosaka, k\u0101 j\u016bsu Xero dati atbilst SkyPlanner datiem, un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c t\u0101s palai\u0161anas.<\/p>\n\n\n<p>Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesiem un vajadz\u012bb\u0101m. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu Xero konsultants, integr\u0101cijas partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). Galapunkti, lauku atbilst\u012bbas un noteikumi datu ierakst\u012b\u0161anai atpaka\u013c Xero aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/xero\/integracijas-celvedis\/\">Xero integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-xero-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Xero un ko pievieno SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero ir gr\u0101matved\u012bbas programma. T\u0101 p\u0101rvalda pied\u0101v\u0101jumus, p\u0101rdo\u0161anas r\u0113\u0137inus, iepirkuma pas\u016bt\u012bjumus un pieg\u0101d\u0101t\u0101ju r\u0113\u0137inus, nodro\u0161ina bankas dar\u012bjumu sal\u012bdzin\u0101\u0161anu un uzskaita atlikumus prec\u0113m ar kr\u0101jumu uzskaiti. Xero skaidro: &#8220;If an item is tracked it means Xero tracks the available quantity and value of the item.&#8221; (Ja precei ir iesl\u0113gta kr\u0101jumu uzskaite, Xero uzskaita t\u0101s pieejamo daudzumu un v\u0113rt\u012bbu.) (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/items\">avots<\/a>)<\/p>\n\n\n<p>Xero neglab\u0101 materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, iek\u0101rtas vai ra\u017eo\u0161anas pas\u016bt\u012bjumus. Gatav\u0101s produkcijas izgatavo\u0161ana no komponent\u0113m pa\u0161laik Xero nav paredz\u0113ta. Sav\u0101 produktu ideju forum\u0101 Xero komanda 2026. gad\u0101 par komplekt\u0113\u0161anas kr\u0101jumu uzskaiti rakst\u012bja: &#8220;hasn&#8217;t been roadmapped at this stage.&#8221; (\u0160aj\u0101 posm\u0101 t\u0101 nav iek\u013cauta att\u012bst\u012bbas pl\u0101n\u0101.) (<a href=\"https:\/\/productideas.xero.com\/forums\/967139-purchase-orders-bills-inventory\/suggestions\/45048400-advanced-inventory-assembly-inventory\">avots<\/a>)<\/p>\n\n\n<p>Sav\u0101 kr\u0101jumu p\u0101rvald\u012bbas lap\u0101 Xero uz\u0146\u0113mumiem, kam vajag vair\u0101k iesp\u0113ju, iesaka lietotnes: &#8220;Apps include Cin7 Core, Unleashed, and ZapInventory&#8221; (Starp lietotn\u0113m ir Cin7 Core, Unleashed un ZapInventory). (<a href=\"https:\/\/www.xero.com\/us\/accounting-software\/manage-inventory\/\">avots<\/a>) \u0160\u012bs lietotnes p\u0101rvalda kr\u0101jumus un pas\u016bt\u012bjumus. SkyPlanner savuk\u0101rt pievieno pl\u0101nu iek\u0101rt\u0101m un darbiniekiem. Katrs solis ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/xero\/razosanas-planosana\/\">Vai Xero nodro\u0161ina ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero \u0161odien un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Xero<\/th><th>Xero ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Pas\u016bt\u012bjumu portfelis<\/td><td>Apstiprin\u0101tie pied\u0101v\u0101jumi un p\u0101rdo\u0161anas r\u0113\u0137ini<\/td><td>Katrs pas\u016bt\u012bjums sadal\u012bts ra\u017eo\u0161anas uzdevumos darba centru laika skal\u0101<\/td><\/tr><tr><td>Jauda<\/td><td>Netiek model\u0113ta<\/td><td>Katrai iek\u0101rtai, darbiniekam un instrumentam savas mai\u0146as<\/td><\/tr><tr><td>Tehnolo\u0123iskie mar\u0161ruti<\/td><td>Netiek glab\u0101ti<\/td><td>Katram produktam tehnolo\u0123isk\u0101s oper\u0101cijas, darba centri un p\u0101rregul\u0113\u0161anas laiki<\/td><\/tr><tr><td>Darbu sec\u012bba<\/td><td>Pl\u0101not\u0101js nosaka sec\u012bbu uz t\u0101feles vai izkl\u0101jlap\u0101<\/td><td>Dzinis sak\u0101rto visus neizpild\u012btos pas\u016bt\u012bjumus p\u0113c priorit\u0101tes un termi\u0146a<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Netiek model\u0113ta<\/td><td>Sagatavo\u0161anas laiku matrica, minim\u0101ls kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>T\u0101lru\u0146a zvani un manu\u0101la p\u0101rpl\u0101no\u0161ana<\/td><td>Autopilot p\u0101rpl\u0101no visa ceha darbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Atlikums katrai precei ar kr\u0101jumu uzskaiti<\/td><td>P\u0113c katr\u0101m izmai\u0146\u0101m tiek p\u0101rbaud\u012bti kr\u0101jumi un iepirkuma pas\u016bt\u012bjumos nor\u0101d\u012btie pre\u010du sa\u0146em\u0161anas datumi<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba kart\u012btes pap\u012bra form\u0101t\u0101<\/td><td>Darbu rinda ar izpildes laikiem, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>R\u0113\u0137inu izrakst\u012b\u0161ana<\/td><td>R\u0113\u0137inu ievada p\u0113c darba pabeig\u0161anas<\/td><td>R\u0113\u0137ina melnraksts tiek izveidots no pabeigt\u0101 darba datiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-xero-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati p\u0101rvietojas starp Xero un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Contact (klients)<\/td><td>Klients, pieg\u0101des priorit\u0101te<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Item (ar kr\u0101jumu uzskaiti un bez t\u0101s) ar QuantityOnHand<\/td><td>Produkti un materi\u0101li, kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Quote (Accepted) ar poz\u012bcij\u0101m<\/td><td>Pas\u016bt\u012bjums ar izpildes termi\u0146u, ra\u017eo\u0161anas uzdevumi katrai poz\u012bcijai<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>PurchaseOrder ar ExpectedArrivalDate un DeliveryDate<\/td><td>Ien\u0101ko\u0161ie materi\u0101li ar sa\u0146em\u0161anas datumu<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Piez\u012bme Quote v\u0113stur\u0113<\/td><td>Pl\u0101notais pabeig\u0161anas datums<\/td><td>Atpaka\u013c uz Xero<\/td><\/tr><tr><td>Invoice (ACCREC, Draft) ar pied\u0101v\u0101juma poz\u012bcij\u0101m un atsauci<\/td><td>Izpild\u012bts pas\u016bt\u012bjums<\/td><td>Atpaka\u013c uz Xero<\/td><\/tr><tr><td>Quote statuss Invoiced<\/td><td>Izpild\u012bts pas\u016bt\u012bjums<\/td><td>Atpaka\u013c uz Xero<\/td><\/tr><tr><td>Laika uzskaites ieraksts modul\u012b Projects<\/td><td>Mobile Confirmations, laika uzskaites ieraksti<\/td><td>Atpaka\u013c uz Xero<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ar Xero saist\u012bto pl\u0101no\u0161anas programmu un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Tikai Xero<\/td><td>Pied\u0101v\u0101jumi, r\u0113\u0137ini, iepirkuma pas\u016bt\u012bjumi un kr\u0101jumu uzskaite Xero, bet pl\u0101ns \u2014 uz t\u0101feles<\/td><td>Ir viena vai divas iek\u0101rtas, un viens cilv\u0113ks zina darbu sec\u012bbu<\/td><\/tr><tr><td>Kr\u0101jumu p\u0101rvald\u012bbas un MRP lietotnes, kas sinhroniz\u0113jas ar Xero (piem\u0113ram, Katana, MRPeasy, Fishbowl Manufacturing, Cin7 Core, Unleashed)<\/td><td>Otra sist\u0113ma kr\u0101jumiem, materi\u0101lu specifik\u0101cij\u0101m un pas\u016bt\u012bjumiem, kas nos\u016bta p\u0101rdo\u0161anas r\u0113\u0137inus, pieg\u0101d\u0101t\u0101ju r\u0113\u0137inus un izmaksas uz Xero<\/td><td>V\u0113laties p\u0101rcelt kr\u0101jumu un pas\u016bt\u012bjumu p\u0101rvald\u012bbu \u0101rpus Xero<\/td><\/tr><tr><td>M\u0101ko\u0146pakalpojuma APS ar API savienojumu (SkyPlanner APS)<\/td><td>Ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu, nolasa Xero pied\u0101v\u0101jumus un nos\u016bta atpaka\u013c datus par pabeigtajiem darbiem<\/td><td>J\u016bs turpin\u0101t izmantot Xero, bet iek\u0101rt\u0101m un darbiniekiem vajadz\u012bgs re\u0101ls darba pl\u0101ns<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ja l\u012bdztekus Xero jau izmantojat MRP sist\u0113mu, SkyPlanner sast\u0101da grafiku, balstoties uz t\u0101s datiem. Skatiet <a href=\"\/lv\/integracija\/erp\/katana\/\">Katana<\/a> un <a href=\"\/lv\/integracija\/erp\/mrpeasy\/\">MRPeasy<\/a> lapas.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner darbam ar Xero, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties turpin\u0101t lietot Xero bez izmai\u0146\u0101m.<\/strong> SkyPlanner pievieno ra\u017eo\u0161anas pl\u0101nu, savuk\u0101rt gr\u0101matved\u012bba, pre\u010du uzskaite un r\u0113\u0137inu izrakst\u012b\u0161ana paliek turpat, kur l\u012bdz \u0161im.<\/li>\n\n\n<li><strong>Vienus un tos pa\u0161us pas\u016bt\u012bjumus var izpild\u012bt vair\u0101kas iek\u0101rtas,<\/strong> bet darbu sec\u012bba ir tikai k\u0101dam galv\u0101.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim ir nor\u0101d\u012bts laiks abos p\u0101rejas virzienos, un sist\u0113ma izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Operatoru, pal\u012bgier\u012b\u010du un materi\u0101lu pieejam\u012bba ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/strong> Visu resursu ierobe\u017eojumi tiek \u0146emti v\u0113r\u0101 vienlaikus, un uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori, tiek pie\u0161\u0137irts nepiecie\u0161amais darbinieku skaits.<\/li>\n\n\n<li><strong>V\u0113laties izrakst\u012bt r\u0113\u0137inus par paveikto, neievadot datus atk\u0101rtoti.<\/strong> Tikl\u012bdz pas\u016bt\u012bjuma izpilde ir apstiprin\u0101ta, Xero sa\u0146em r\u0113\u0137ina melnrakstu.<\/li>\n\n\n<li><strong>V\u0113laties vienu skaidru cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b; divvirzienu integr\u0101cijas cena tiek nor\u0101d\u012bta iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner darba centrus, darbiniekus, mai\u0146as un procesa so\u013cus vai import\u0113jiet tos. Pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Xero kontaktus, produktus un pakalpojumus, k\u0101 ar\u012b atv\u0113rtos pied\u0101v\u0101jumus CSV form\u0101t\u0101. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar Xero.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai lasiet <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ce\u013cvedi par ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 pieejamo jaudu<\/a>. Izmantojat ar\u012b citu sist\u0113mu? Skatiet <a href=\"\/lv\/integracija\/erp\/\">visas integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Xero. No Xero tiek sa\u0146emti kontakti, preces, kuru kr\u0101jumi tiek uzskait\u012bti, apstiprin\u0101tie pied\u0101v\u0101jumi un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bts pl\u0101notais pabeig\u0161anas datums, r\u0113\u0137inu melnraksti par pabeigtajiem pas\u016bt\u012bjumiem un projektu laika uzskaites ieraksti. Tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp produktiem un sak\u0101rto uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar Xero?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar Xero, izmantojot Xero Accounting API un Projects API, k\u0101 ar\u012b OAuth 2.0 un Xero webhook pazi\u0146ojumus. SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101. Ar\u012b kr\u0101jumu uzskaites un MRP lietotnes, piem\u0113ram, Katana, MRPeasy un Fishbowl, sinhroniz\u0113 datus ar Xero. Ja izmantojat k\u0101du no t\u0101m, SkyPlanner var sast\u0101d\u012bt grafiku, balstoties uz t\u0101s datiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Xero var sast\u0101d\u012bt ra\u017eo\u0161anas grafikus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Xero nav materi\u0101lu specifik\u0101ciju, tehnolo\u0123isko mar\u0161rutu, iek\u0101rtu vai ra\u017eo\u0161anas pas\u016bt\u012bjumu, un komplekt\u0113jamo pre\u010du kr\u0101jumu uzskaite nav iek\u013cauta t\u0101 att\u012bst\u012bbas pl\u0101n\u0101. SkyPlanner APS papildina Xero ar <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai Xero j\u0101aizst\u0101j ar ERP sist\u0113mu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas l\u012bdztekus Xero. Kontakti, preces, pied\u0101v\u0101jumi, r\u0113\u0137ini, iepirkumi un gr\u0101matved\u012bba paliek Xero. SkyPlanner sast\u0101da darbu grafiku atbilsto\u0161i faktiskajai jaudai un nos\u016bta atpaka\u013c datus par pabeigtajiem darbiem r\u0113\u0137inu izrakst\u012b\u0161anai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner izmanto\u0161ana l\u012bdztekus Xero?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b par 5 darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Ra\u017eotne ar 10 darba centriem maks\u0101 299 \u20ac m\u0113nes\u012b. J\u016bsu procesiem un vajadz\u012bb\u0101m atbilsto\u0161a integr\u0101cijas cena tiek nor\u0101d\u012bta iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, t\u0101p\u0113c kop\u0113j\u0101s izmaksas zin\u0101siet pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Xero kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdztekus Xero. Xero administrators vienreiz piesak\u0101s un apstiprina piek\u013cuvi Xero OAuth 2.0 log\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113jo sagatavo\u0161anas darbu s\u0101kuma. Komanda izveido darba centrus un procesa so\u013cus, piesl\u0113dz pied\u0101v\u0101jumu un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un iesl\u0113dz r\u0113\u0137inu nos\u016bt\u012b\u0161anu atpaka\u013c uz Xero. Pirms darba uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai vispirms varam izm\u0113\u0123in\u0101t SkyPlanner ar saviem Xero datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Izm\u0113\u0123in\u0101juma laik\u0101 import\u0113jiet produktus un atv\u0113rtos pied\u0101v\u0101jumus no Xero eksport\u0113ta CSV faila. Jau pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eo\u0161anas grafiku, kas \u0146em v\u0113r\u0101 faktisko pieejamo jaudu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Xero SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem SkyPlanner APS ir Xero papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. No apstiprin\u0101tajiem pied\u0101v\u0101jumiem tas izveido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. Kontakti, preces, r\u0113\u0137ini un gr\u0101matved\u012bbas uzskaite paliek Xero. SkyPlanner pievieno ra\u017eo\u0161anas pl\u0101nu, kura gr\u0101matved\u012bbas programm\u0101 &#8230; <a title=\"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/\" aria-label=\"Read more about SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106093","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Xero ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana: APS papildin\u0101jums<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/\",\"name\":\"Xero ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana: APS papildin\u0101jums\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/xero\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Xero ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana: APS papildin\u0101jums","description":"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem","og_description":"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/","name":"Xero ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana: APS papildin\u0101jums","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: Xero papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, operators, r\u012bks un materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/xero\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Xero SkyPlanner APS un Xero: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem SkyPlanner APS ir Xero papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. No apstiprin\u0101tajiem pied\u0101v\u0101jumiem tas izveido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. Kontakti, preces, r\u0113\u0137ini un gr\u0101matved\u012bbas uzskaite paliek Xero. SkyPlanner pievieno ra\u017eo\u0161anas pl\u0101nu, kura gr\u0101matved\u012bbas programm\u0101&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106093"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106093\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}