{"id":106064,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/quickbooks-online\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"quickbooks-online","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/","title":{"rendered":"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ QuickBooks Online<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS risin\u0101jumam QuickBooks Online: <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. Tas p\u0101rv\u0113r\u0161 apstiprin\u0101tos cenu pied\u0101v\u0101jumus un pas\u016bt\u012bjumus grafik\u0101, kas aptver katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Klientu, produktu, r\u0113\u0137inu un gr\u0101matved\u012bbas uzskaite paliek QuickBooks. SkyPlanner pievieno ra\u017eo\u0161anas pl\u0101nu, kura gr\u0101matved\u012bbas programmat\u016br\u0101 nav, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar QuickBooks Online darbojas abos virzienos. SkyPlanner sa\u0146em datus par klientiem, produktiem un pakalpojumiem, apstiprin\u0101tajiem cenu pied\u0101v\u0101jumiem, iepirkuma pas\u016bt\u012bjumiem un darbiniekiem. Atpaka\u013c tiek nos\u016bt\u012bts pl\u0101notais nos\u016bt\u012b\u0161anas datums, r\u0113\u0137ini par izpild\u012btajiem pas\u016bt\u012bjumiem, uzskait\u012bt\u0101s darba stundas un kr\u0101jumu izmai\u0146as. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju j\u016bsu uz\u0146\u0113mumam QuickBooks sist\u0113m\u0101.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u0101ns katrai iek\u0101rtai, nevis v\u0113l nenosl\u0113gto cenu pied\u0101v\u0101jumu saraksts.<\/p>\n\n\n<p class=\"fx-pain__b\">QuickBooks sist\u0113m\u0101 apstiprin\u0101ts cenu pied\u0101v\u0101jums ir p\u0101rdo\u0161anas dokuments. SkyPlanner pl\u0101no\u0161anas dzinis Arcturus katru no tiem p\u0101rv\u0113r\u0161 ra\u017eo\u0161anas uzdevumos un izvieto tos interakt\u012bv\u0101 Gantt laika skal\u0101 \u2014 konkr\u0113tos laikos tajos darba centros, kuros \u0161ie uzdevumi tiks izpild\u012bti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Nos\u016bt\u012b\u0161anas termi\u0146i, kurus varat iev\u0113rot.<\/p>\n\n\n<p class=\"fx-pain__b\">Katra pas\u016bt\u012bjuma pabeig\u0161anas datumu nosaka visu iesaist\u012bto iek\u0101rtu un darbinieku noslodze. V\u0113l pirms cenu pied\u0101v\u0101juma nos\u016bt\u012b\u0161anas redzat, ka loc\u012b\u0161anas prese ir aiz\u0146emta divas ned\u0113\u013cas, bet metin\u0101\u0161anas jauda ir br\u012bva.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai\u0146as atbilsto\u0161i j\u016bsu ra\u017eotnei.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram darba centram un darbiniekam ir savs mai\u0146u, atva\u013cin\u0101jumu, promb\u016bt\u0146u un virsstundu mai\u0146u grafiks. Pievienojiet sestdienas mai\u0146u darba centram, kas ir \u0161aur\u0101 vieta, un datumi uzreiz main\u012bsies.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos virzienos. P\u0101reja no zila uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkana uz zilu \u2014 60. Pl\u0101no\u0161anas dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojamie instrumenti un brig\u0101des ir \u0146emti v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek iepl\u0101nota cit\u0101 iek\u0101rt\u0101 taj\u0101 pa\u0161\u0101 laik\u0101. Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki ar br\u012bv\u0101m mai\u0146\u0101m.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un iek\u0101rtu boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Pie\u0161\u0137iriet pas\u016bt\u012bjumam Fast Track vai augst\u0101ku priorit\u0101ti, un pl\u0101no\u0161anas dzinis atbr\u012bvos tam vietu. Kad iek\u0101rta apst\u0101jas, Autopilot p\u0101rpl\u0101no grafiku, bet Running Time Lock saglab\u0101 s\u0101kto ra\u017eo\u0161anas uzdevumu vietu grafik\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner no QuickBooks nolasa kr\u0101jumu datus un neizpild\u012btos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevums, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots p\u0113c materi\u0101lu sa\u0146em\u0161anas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Par pabeigto darbu uzreiz izraksta r\u0113\u0137inu.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatori re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations vai Production Timer. Kad pas\u016bt\u012bjums ir pabeigts, r\u0113\u0137ins un darba stundas jau ir QuickBooks.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farm\u0101cijas produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir r\u012bks, kas labi darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir iev\u0113rojami samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-quickbooks-online-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QuickBooks nos\u016bta datus par veicamajiem darbiem.<\/strong> SkyPlanner sa\u0146em datus par klientiem, produktiem un pakalpojumiem ar pieejamajiem kr\u0101jumu daudzumiem, apstiprin\u0101tajiem cenu pied\u0101v\u0101jumiem, neizpild\u012btajiem iepirkuma pas\u016bt\u012bjumiem un darbiniekiem. Katrs apstiprin\u0101tais cenu pied\u0101v\u0101jums k\u013c\u016bst par ra\u017eo\u0161anas pas\u016bt\u012bjumu ar izpildes termi\u0146u.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Katra produkta procesa posmus, darba centrus un p\u0101rregul\u0113\u0161anas laikus j\u016bs nor\u0101d\u0101t SkyPlanner sist\u0113m\u0101 vienu reizi. P\u0113c tam pl\u0101no\u0161anas dzinis Arcturus da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru ra\u017eo\u0161anas uzdevumu katrai iek\u0101rtai un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Dati par pabeigto darbu atgrie\u017eas QuickBooks.<\/strong> SkyPlanner ieraksta pl\u0101noto pabeig\u0161anas datumu pre\u010du nos\u016bt\u012b\u0161anas datuma lauk\u0101 cenu pied\u0101v\u0101jum\u0101. Kad pas\u016bt\u012bjums ir pabeigts, tas izveido ar cenu pied\u0101v\u0101jumu saist\u012btu r\u0113\u0137inu, nos\u016bta re\u0123istr\u0113t\u0101s darba stundas k\u0101 laika uzskaites ierakstus un iegr\u0101mato gatavo produkciju un izlietotos materi\u0101lus k\u0101 kr\u0101jumu korekciju.<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto Intuit QuickBooks Online Accounting API ar OAuth 2.0, t\u0101p\u0113c QuickBooks sist\u0113m\u0101 nekas nav j\u0101instal\u0113. QuickBooks t\u012bmek\u013ca aiz\u0137eres pazi\u0146o par jauniem un main\u012btiem klientiem, cenu pied\u0101v\u0101jumiem, prec\u0113m un iepirkuma pas\u016bt\u012bjumiem, savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Katrs ra\u017eot\u0101js produktus, cenu pied\u0101v\u0101jumus un kr\u0101jumus QuickBooks sist\u0113m\u0101 uzskaita at\u0161\u0137ir\u012bgi, t\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 nosaka, k\u0101 j\u016bsu dati atbilst SkyPlanner datiem, un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/p>\n\n\n<p>Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu QuickBooks ProAdvisor, integr\u0101cijas partneris vai j\u016bsu pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumu, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>). Galapunkti, lauku atbilst\u012bbas un atpaka\u013crakst\u012b\u0161anas noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/quickbooks-online\/integracijas-celvedis\/\">QuickBooks Online integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-quickbooks-online-schedules-and-what-skypla\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no QuickBooks Online un ko pievieno SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QuickBooks Online ir gr\u0101matved\u012bbas programmat\u016bra. T\u0101s abon\u0113\u0161anas pl\u0101ni nodro\u0161ina produktu, cenu pied\u0101v\u0101jumu, r\u0113\u0137inu, iepirkuma pas\u016bt\u012bjumu un darba laika uzskaiti. Plus un Advanced pl\u0101nos kr\u0101jumu prec\u0113m tiek uzskait\u012bts pieejamais daudzums. Nevien\u0101 no pl\u0101niem nav iek\u0101rtu, tehnolo\u0123isko mar\u0161rutu vai ra\u017eo\u0161anas pas\u016bt\u012bjumu uzskaites, t\u0101p\u0113c QuickBooks Online nepl\u0101no darbu ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n\n<p>Intuit pied\u0101v\u0101 ra\u017eo\u0161anas funkcijas vien\u0101 risin\u0101jum\u0101. Intuit pal\u012bdz\u012bbas sada\u013c\u0101 nor\u0101d\u012bts: &#8220;Manufacturing features are currently available in Intuit Enterprise Suite.&#8221; (Ra\u017eo\u0161anas funkcijas pa\u0161laik ir pieejamas Intuit Enterprise Suite.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/inventory-account\/understand-production-costs-using-manufacturing\/L4FBrL1Ip_US_en_US\">avots<\/a>) \u0160aj\u0101 risin\u0101jum\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjums darbojas \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Produkts un daudzums.<\/strong> J\u016bs izv\u0113laties noliktav\u0101 uzskait\u0101mu salikto izstr\u0101d\u0101jumu un izgatavojamo daudzumu.<\/li>\n\n\n<li><strong>Divi datumi.<\/strong> Dokument\u0101cij\u0101 nor\u0101d\u012bts: &#8220;select a production Start date and Required by date.&#8221; (Izv\u0113lieties ra\u017eo\u0161anas s\u0101kuma datumu un nepiecie\u0161amo pabeig\u0161anas datumu.)<\/li>\n\n\n<li><strong>Komponenti no materi\u0101lu specifik\u0101cijas.<\/strong> Statuss Planned tos rezerv\u0113, un, pabeidzot pas\u016bt\u012bjumu, atveras izgatavo\u0161anas veidlapa, kur\u0101 nor\u0101da gal\u012bgos daudzumus un izmaksas.<\/li>\n\n\n<li><strong>Pakalpojumi k\u0101 izmaksu poz\u012bcija.<\/strong> Pakalpojumu un kr\u0101jumos neuzskait\u0101mu komponentu izmaksas apr\u0113\u0137ina &#8220;based on actual rates entered on the build assembly page.&#8221; (Pamatojoties uz faktiskaj\u0101m likm\u0113m, kas ievad\u012btas salikt\u0101 izstr\u0101d\u0101juma izgatavo\u0161anas lap\u0101.)<\/li>\n\n\n<li><strong>Viens l\u012bmenis.<\/strong> &#8220;Multi level bill of materials with sub assemblies aren&#8217;t supported in Intuit Enterprise Suite.&#8221; (Intuit Enterprise Suite neatbalsta daudzl\u012bme\u0146u materi\u0101lu specifik\u0101cijas ar apak\u0161mezgliem.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/sales-orders\/learn-manufacturing-orders-assemblies\/L7ffspckB_US_en_US\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Tas ir izmaksu apr\u0113\u0137ins un komponentu rezerv\u0113\u0161ana. \u0160aj\u0101 risin\u0101jum\u0101 nav oper\u0101ciju, darba centru vai jaudas uzskaites, t\u0101p\u0113c nekas nep\u0101rbauda, vai s\u0101kuma datum\u0101 iek\u0101rta vai darbinieks ir br\u012bvs. Katrs solis ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/quickbooks-online\/razosanas-planosana\/\">Vai QuickBooks nodro\u0161ina ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QuickBooks Online pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QuickBooks Online<\/th><th>QuickBooks Online ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Pas\u016bt\u012bjumu portfelis<\/td><td>Apstiprin\u0101ti cenu pied\u0101v\u0101jumi un r\u0113\u0137ini<\/td><td>Katrs pas\u016bt\u012bjums sadal\u012bts ra\u017eo\u0161anas uzdevumos darba centru laika skal\u0101<\/td><\/tr><tr><td>Jauda<\/td><td>Netiek model\u0113ta<\/td><td>Katrai iek\u0101rtai, darbiniekam un r\u012bkam savs mai\u0146u grafiks<\/td><\/tr><tr><td>Tehnolo\u0123iskie mar\u0161ruti<\/td><td>Netiek uzskait\u012bti<\/td><td>Katram produktam noteikti procesa posmi, darba centri un p\u0101rregul\u0113\u0161anas laiki<\/td><\/tr><tr><td>Uzdevumu sec\u012bba<\/td><td>Pl\u0101not\u0101js nosaka sec\u012bbu uz pap\u012bra vai izkl\u0101jlap\u0101<\/td><td>Pl\u0101no\u0161anas dzinis sak\u0101rto visus neizpild\u012btos pas\u016bt\u012bjumus p\u0113c priorit\u0101tes un izpildes termi\u0146a<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Netiek model\u0113ta<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica un \u012bs\u0101kais kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>T\u0101fele un t\u0101lru\u0146a zvani<\/td><td>Autopilot p\u0101rpl\u0101no darbu vis\u0101 ra\u017eo\u0161anas ceh\u0101<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Katras preces daudzums noliktav\u0101<\/td><td>Kr\u0101jumu un gaid\u0101mo iepirkuma pas\u016bt\u012bjumu p\u0101rbaude p\u0113c katr\u0101m izmai\u0146\u0101m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Mar\u0161ruta lapas uz pap\u012bra<\/td><td>Uzdevumu rinda ar izpildes laikiem, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>R\u0113\u0137inu izrakst\u012b\u0161ana<\/td><td>R\u0113\u0137inu ievada p\u0113c darba pabeig\u0161anas<\/td><td>R\u0113\u0137ins un darba stundu ieraksti tiek izveidoti no pabeigt\u0101 darba datiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-quickbooks-online-and-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp QuickBooks Online un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QuickBooks Online<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Klients<\/td><td>Klients, pieg\u0101des priorit\u0101te<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Item (Inventory, NonInventory, Service) ar QtyOnHand<\/td><td>Produkti un materi\u0101li, kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Estimate (apstiprin\u0101ts) ar poz\u012bcij\u0101m un nos\u016bt\u012b\u0161anas datumu<\/td><td>Pas\u016bt\u012bjums ar izpildes termi\u0146u un ra\u017eo\u0161anas uzdevumiem katrai poz\u012bcijai<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>PurchaseOrder (neizpild\u012bts) ar poz\u012bcij\u0101m<\/td><td>Ien\u0101ko\u0161ie materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Employee<\/td><td>Person\u0101ls<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Estimate ShipDate<\/td><td>Pl\u0101not\u0101 pabeig\u0161ana<\/td><td>Atpaka\u013c<\/td><\/tr><tr><td>Invoice, kas saist\u012bts ar pied\u0101v\u0101jumu<\/td><td>Pabeigts pas\u016bt\u012bjums<\/td><td>Atpaka\u013c<\/td><\/tr><tr><td>TimeActivity (darbinieks, klients, pakalpojuma poz\u012bcija, stundas)<\/td><td>Apstiprin\u0101jumi mobilaj\u0101 ier\u012bc\u0113, laika uzskaites ieraksti<\/td><td>Atpaka\u013c<\/td><\/tr><tr><td>InventoryAdjustment<\/td><td>Gatav\u0101s produkcijas sa\u0146em\u0161ana noliktav\u0101, izlietotie materi\u0101li<\/td><td>Atpaka\u013c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-scheduling-software-and-add-on\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>Tikai QuickBooks vai Intuit Enterprise Suite ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/td><td>Pied\u0101v\u0101jumi, r\u0113\u0137ini un kr\u0101jumi sist\u0113m\u0101 QuickBooks; Intuit Enterprise Suite nodro\u0161ina ar\u012b ra\u017eo\u0161anas pas\u016bt\u012bjumus ar materi\u0101lu specifik\u0101ciju un diviem datumiem<\/td><td>Ir viena vai divas iek\u0101rtas, un viens cilv\u0113ks zina darbu sec\u012bbu<\/td><\/tr><tr><td>Kr\u0101jumu vad\u012bbas un MRP sist\u0113mas, kas sinhroniz\u0113jas ar QuickBooks (piem\u0113ram, Katana, MRPeasy, Fishbowl Manufacturing, Autodesk Fusion Operations)<\/td><td>Atsevi\u0161\u0137a sist\u0113ma kr\u0101jumu, materi\u0101lu specifik\u0101ciju un ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rvald\u012bbai, kas nos\u016bta klientu un pieg\u0101d\u0101t\u0101ju r\u0113\u0137inus un izmaksu datus uz QuickBooks<\/td><td>V\u0113laties p\u0101rcelt kr\u0101jumu un pas\u016bt\u012bjumu p\u0101rvald\u012bbu no QuickBooks uz citu sist\u0113mu<\/td><\/tr><tr><td>M\u0101kon\u012b pieejama APS sist\u0113ma ar API savienojumu (SkyPlanner APS)<\/td><td>Ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu, nolasa pas\u016bt\u012bjumus no QuickBooks un nos\u016bta atpaka\u013c datus par pabeigtajiem darbiem<\/td><td>Turpin\u0101t izmantot QuickBooks ir svar\u012bgi, bet iek\u0101rtu un darbinieku darbam nepiecie\u0161ams re\u0101ls pl\u0101ns<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ja l\u012bdztekus QuickBooks jau izmantojat MRP sist\u0113mu, SkyPlanner sast\u0101da grafiku, izmantojot t\u0101s datus. Skatiet <a href=\"\/lv\/integracija\/erp\/katana\/\">Katana<\/a> un <a href=\"\/lv\/integracija\/erp\/mrpeasy\/\">MRPeasy<\/a> lapas.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner darbam ar QuickBooks Online, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties saglab\u0101t QuickBooks bez izmai\u0146\u0101m.<\/strong> SkyPlanner nodro\u0161ina ra\u017eo\u0161anas pl\u0101nu, bet gr\u0101matved\u012bba, pre\u010du uzskaite un r\u0113\u0137inu izrakst\u012b\u0161ana paliek l\u012bdz\u0161in\u0113j\u0101 sist\u0113m\u0101.<\/li>\n\n\n<li><strong>Vair\u0101kas iek\u0101rtas var izpild\u012bt vienus un tos pa\u0161us pas\u016bt\u012bjumus,<\/strong> bet darbu sec\u012bbu k\u0101ds glab\u0101 tikai galv\u0101.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim ir nor\u0101d\u012bts laiks abos p\u0101rejas virzienos. Matrica izv\u0113las darbu sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Operatori, pal\u012bgier\u012bces un materi\u0101li ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/strong> Pl\u0101nojot vienlaikus tiek iev\u0113roti visu resursu pieejam\u012bbas ierobe\u017eojumi, un ra\u017eo\u0161anas uzdevumiem, kuros vajadz\u012bgi vair\u0101ki operatori, tiek pie\u0161\u0137irts nepiecie\u0161amais darbinieku skaits.<\/li>\n\n\n<li><strong>V\u0113laties izrakst\u012bt r\u0113\u0137inus par pabeigtajiem darbiem bez atk\u0101rtotas datu ievades.<\/strong> R\u0113\u0137ini un nostr\u0101d\u0101t\u0101s stundas non\u0101k QuickBooks, tikl\u012bdz operatori apstiprina ra\u017eo\u0161anas uzdevuma izpildi.<\/li>\n\n\n<li><strong>V\u0113laties vienu skaidru cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas cena tiek nor\u0101d\u012bta iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet darba centrus, darbiniekus, mai\u0146as un procesa posmus sist\u0113m\u0101 SkyPlanner vai import\u0113jiet tos. Ir pieejams atbalsts darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet klientus, produktus un atv\u0113rtos pied\u0101v\u0101jumus no QuickBooks Excel vai CSV form\u0101t\u0101, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet QuickBooks Online.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a> vai lasiet <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ce\u013cvedi par ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai<\/a>. Izmantojat ar\u012b citu sist\u0113mu? Skatiet <a href=\"\/lv\/integracija\/erp\/\">visas integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar QuickBooks Online. No QuickBooks Online tiek sa\u0146emti klientu, pre\u010du, apstiprin\u0101to pied\u0101v\u0101jumu, iepirkuma pas\u016bt\u012bjumu un darbinieku dati. Atpaka\u013c tiek nos\u016bt\u012bts pl\u0101notais nos\u016bt\u012b\u0161anas datums, r\u0113\u0137ini par pabeigtajiem pas\u016bt\u012bjumiem, darba laika uzskaites ieraksti un kr\u0101jumu korekcijas. Pl\u0101nojot tiek iev\u0113roti katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp produktiem un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas maz\u0101ks. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar QuickBooks Online, izmantojot Intuit Accounting API, OAuth 2.0 un QuickBooks webhook pazi\u0146ojumus. SkyPlanner komanda konfigur\u0113 integr\u0101ciju darba uzs\u0101k\u0161anas laik\u0101. Ar\u012b kr\u0101jumu vad\u012bbas un MRP sist\u0113mas, piem\u0113ram, Katana, MRPeasy un Fishbowl, sinhroniz\u0113jas ar QuickBooks. Ja izmantojat k\u0101du no t\u0101m, SkyPlanner var sast\u0101d\u012bt grafiku, balstoties uz t\u0101s datiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai QuickBooks Online nodro\u0161ina ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. QuickBooks Online pl\u0101nos nav ne iek\u0101rtu, ne tehnolo\u0123isko mar\u0161rutu, ne ra\u017eo\u0161anas pas\u016bt\u012bjumu. Intuit Enterprise Suite nodro\u0161ina ra\u017eo\u0161anas pas\u016bt\u012bjumus ar materi\u0101lu specifik\u0101ciju, s\u0101kuma datumu un izpildes termi\u0146u, ta\u010du bez oper\u0101cij\u0101m un jaudas uzskaites. SkyPlanner APS nodro\u0161ina <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai QuickBooks j\u0101aizst\u0101j ar ERP sist\u0113mu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas l\u012bdztekus QuickBooks Online. Klientu un pre\u010du dati, pied\u0101v\u0101jumi, r\u0113\u0137ini, iepirkumi un gr\u0101matved\u012bba paliek QuickBooks sist\u0113m\u0101. SkyPlanner sast\u0101da darbu grafiku atbilsto\u0161i faktiskajai jaudai un nos\u016bta atpaka\u013c datus par pabeigtajiem darbiem r\u0113\u0137inu izrakst\u012b\u0161anai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner izmanto\u0161ana l\u012bdztekus QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Ra\u017eotne ar 10 darba centriem maks\u0101 299 \u20ac m\u0113nes\u012b. Integr\u0101cijas cenas pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iesniegts kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai kop\u0113j\u0101s izmaksas b\u016btu zin\u0101mas pirms darba uzs\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 QuickBooks Online pl\u0101ns mums ir vajadz\u012bgs?<\/summary>\n<p class=\"sp-faq__a\">K\u0101 nor\u0101d\u012bts <a href=\"https:\/\/quickbooks.intuit.com\/pricing\/\">Intuit cenu lap\u0101<\/a>, kr\u0101jumu atlikumu uzskaite ir pieejama QuickBooks Online Plus un Advanced pl\u0101nos. Tajos ir pieejami ar\u012b <a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/purchase-orders\/create-send-purchase-orders-quickbooks-online\/L2mVpjOoq_US_en_US\">iepirkuma pas\u016bt\u012bjumi<\/a>. Lai pievienotu SkyPlanner, pierakstieties QuickBooks un apstipriniet piek\u013cuvi Intuit OAuth 2.0 log\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas. Komanda iestata darba centrus un procesa posmus, pievieno pied\u0101v\u0101jumu un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un iesl\u0113dz r\u0113\u0137inu un darba laika datu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai vispirms varam izm\u0113\u0123in\u0101t SkyPlanner ar saviem QuickBooks datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Izm\u0113\u0123in\u0101juma laik\u0101 import\u0113jiet produktus un atv\u0113rtos pied\u0101v\u0101jumus no QuickBooks eksporta faila. Jau pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eo\u0161anas grafiku, kas veidots atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ QuickBooks Online SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem SkyPlanner APS ir QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. Tas p\u0101rv\u0113r\u0161 apstiprin\u0101tos cenu pied\u0101v\u0101jumus un pas\u016bt\u012bjumus grafik\u0101, kas aptver katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Klientu, produktu, r\u0113\u0137inu un gr\u0101matved\u012bbas uzskaite paliek QuickBooks. &#8230; <a title=\"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/\" aria-label=\"Read more about SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106064","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QuickBooks integr\u0101cija: APS ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/quickbooks-online\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/quickbooks-online\\\/\",\"name\":\"QuickBooks integr\u0101cija: APS ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/quickbooks-online\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/quickbooks-online\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/quickbooks-online\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QuickBooks integr\u0101cija: APS ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem","og_description":"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/","name":"QuickBooks integr\u0101cija: APS ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. Divvirzienu integr\u0101cija: katra iek\u0101rta, cilv\u0113ks un r\u012bks. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/quickbooks-online\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ QuickBooks Online SkyPlanner APS risin\u0101jumam QuickBooks Online: ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana ra\u017eot\u0101jiem SkyPlanner APS ir QuickBooks Online papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu. Tas p\u0101rv\u0113r\u0161 apstiprin\u0101tos cenu pied\u0101v\u0101jumus un pas\u016bt\u012bjumus grafik\u0101, kas aptver katru iek\u0101rtu, operatoru, r\u012bku un materi\u0101lu. Klientu, produktu, r\u0113\u0137inu un gr\u0101matved\u012bbas uzskaite paliek QuickBooks.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=106064"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/106064\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=106064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}