{"id":104417,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/visma-net\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/","title":{"rendered":"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Visma Net ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Visma Net integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Visma Net integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir par\u0101d\u012bts, k\u0101 savienot Visma Net (Visma.net ERP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma Net, izmantojot Visma Net API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em noliktavas preces, Kit specifications, p\u0101rdo\u0161anas pas\u016bt\u012bjumus, kr\u0101jumu atlikumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Grafik\u0101 iepl\u0101notie ra\u017eo\u0161anas uzdevumi k\u013c\u016bst par Kit assemblies dokumentiem, kurus iegr\u0101mato p\u0113c darba pabeig\u0161anas.<\/li>\n\n\n<li>Operatoru nostr\u0101d\u0101t\u0101s stundas tiek nos\u016bt\u012btas atpaka\u013c k\u0101 Employee time cards.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Visma Net konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cij\u0101 vai pa\u0161i izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-net-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma Net integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visma Net ERP API.<\/strong> REST saskarne ar OpenAPI specifik\u0101ciju, kuras nosaukums joproj\u0101m ir &#8220;Visma.net ERP API v1&#8221; un kur\u0101 ir v1 un v2 ce\u013ci. B\u0101zes URL ir <code>https:\/\/api.finance.visma.net<\/code>. Vec\u0101 dom\u0113na <code>integration.visma.net<\/code> piepras\u012bjumu caurlaidsp\u0113ja tiek ierobe\u017eota no 2026. gada 1. febru\u0101ra, un dom\u0113na darb\u012bba tiek izbeigta (<a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/end-of-life-notices\/change-base-url\/\">pazi\u0146ojums<\/a>).<\/li>\n\n\n<li><strong>SalesOrder service v3<\/strong> ir pieejams adres\u0113 <code>https:\/\/salesorder.visma.net<\/code>. P\u0101rdo\u0161anas pas\u016bt\u012bjumu v1 un v2 galapunktu dz\u012bves cikls ir beidzies.<\/li>\n\n\n<li><strong>Webhooks<\/strong> ir pieejami port\u0101l\u0101 Visma Developer Portal.<\/li>\n\n\n<li><strong>Background API.<\/strong> Izmantojot galveni <code>erp-api-background<\/code>, ilgsto\u0161ie izsaukumi tiek ievietoti rind\u0101, atbild\u0113 tiek atgriezts kods 202 ar uzdevuma ID un tiek nos\u016bt\u012bts pazi\u0146ojums, kad rezult\u0101ts ir gatavs.<\/li>\n\n\n<li><strong>Import\u0113\u0161anas un eksport\u0113\u0161anas scen\u0101riji<\/strong> sist\u0113m\u0101 Visma Net izmanto CSV, Excel vai SQL datu nodro\u0161in\u0101t\u0101jus vienreiz\u0113jai pamatdatu iel\u0101dei.<\/li>\n\n<\/ul>\n\n\n<p>API nav galapunktu ra\u017eo\u0161anas pas\u016bt\u012bjumiem, tehnolo\u0123iskajiem procesiem vai darba centriem, jo Visma Net \u0161\u0101du objektu nav. Grafika sast\u0101d\u012b\u0161anai nepiecie\u0161amos datus ieg\u016bst no prec\u0113m, komplektiem, pas\u016bt\u012bjumiem un kr\u0101jumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>GET \/v1\/inventory<\/code>: noliktav\u0101 uzskait\u0101m\u0101s un neuzskait\u0101m\u0101s preces, tostarp komplekta paz\u012bme un preces klase<\/li>\n\n\n<li><code>GET \/v1\/KitSpecifications\/{kitInventoryID}\/{revisionID}<\/code>: katras redakcijas komponentu rindas<\/li>\n\n\n<li><code>GET \/v1\/kitassembly<\/code>: eso\u0161ie komplekt\u0113\u0161anas dokumenti, kurus var filtr\u0113t p\u0113c veida un statusa<\/li>\n\n\n<li>SalesOrder service v3: piepras\u012bjums ar piepras\u012btajiem datumiem un pas\u016bt\u012bjumu rind\u0101m<\/li>\n\n\n<li><code>GET \/v1\/inventorysummary\/{inventoryNumber}<\/code>: faktiskie un pieejamie kr\u0101jumu atlikumi katr\u0101 noliktav\u0101<\/li>\n\n\n<li><code>GET \/v1\/purchaseorder<\/code> un <code>GET \/v2\/PurchaseReceipt<\/code>: gaid\u0101mie materi\u0101li un to sa\u0146em\u0161anas dokumenti<\/li>\n\n<\/ul>\n\n\n<p>Visi sarakstu galapunkti pie\u0146em <code>lastModifiedDateTime<\/code> kop\u0101 ar <code>lastModifiedDateTimeCondition<\/code>, k\u0101 ar\u012b <code>pageNumber<\/code> un <code>pageSize<\/code>, t\u0101p\u0113c katr\u0101 sinhroniz\u0101cij\u0101 var p\u0101rs\u016bt\u012bt tikai izmai\u0146as.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un ierobe\u017eojumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Visma Net izmanto <strong>Visma Connect<\/strong> (OpenID Connect un OAuth 2.0):<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Re\u0123istr\u0113jiet <strong>Service Integration<\/strong> port\u0101l\u0101 Visma Developer Portal.<\/li>\n\n\n<li>Integr\u0101ciju <strong>apstiprina klienta Visma Net nomnieka administrators<\/strong>.<\/li>\n\n\n<li>Pieprasiet piek\u013cuves pilnvaras adres\u0113 <code>https:\/\/connect.visma.com\/connect\/token<\/code>, izmantojot klienta akredit\u0101cijas datu pl\u016bsmu un nor\u0101dot <code>tenant_id<\/code> un API piek\u013cuves tv\u0113rumus, piem\u0113ram, <code>visma_api:read<\/code>. Piek\u013cuves pilnvaras ir der\u012bgas 3 600 sekundes.<\/li>\n\n<\/ul>\n\n\n<p>Piepras\u012bjumu bie\u017euma ierobe\u017eojumi tiek piem\u0113roti fiks\u0113tos stundas interv\u0101los katram uz\u0146\u0113mumam un klientam. Atbild\u0113s ir galvenes <code>X-RateLimit-Limit<\/code>, <code>X-RateLimit-Remaining<\/code> un <code>X-RateLimit-Reset<\/code>. Ja ierobe\u017eojums ir p\u0101rsniegts, tiek atgriezts kods 429 ar <code>Retry-After<\/code> (<a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/api-reference\/rate-limits\/\">piepras\u012bjumu bie\u017euma ierobe\u017eojumi<\/a>). Galvenes ETag un <code>If-Match<\/code> aizsarg\u0101 datu atjaunin\u0101jumus.<\/p>\n\n\n<p>Partneri veic test\u0113\u0161anu demonstr\u0101cijas uz\u0146\u0113mum\u0101, izmantojot Visma bezmaksas Integrator Programme. SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> ir soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-webhooks-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi, webhooks un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Port\u0101l\u0101 Visma Developer Portal pieejamie <a href=\"https:\/\/docs.vismasoftware.no\/vismanetapi\/webhooks\/event-and-entities\/\">webhooks<\/a> nodro\u0161ina pazi\u0146ojumus par grafiku sast\u0101d\u012b\u0161anai svar\u012bgajiem notikumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Inventory Item Created, Updated un Changed<\/li>\n\n\n<li>Purchase Order Changed un Status Changed<\/li>\n\n\n<li>Sales Order Changed un Status Changed, kuru public\u0113\u0161ana tiek p\u0101rcelta uz SalesOrderService<\/li>\n\n<\/ul>\n\n\n<p>Kit assembly un Kit specifications nav notikumu. SkyPlanner periodiski pieprasa \u0161o objektu datus, izmantojot <code>lastModifiedDateTime<\/code> filtrus. Kr\u0101jumu atlikumi tiek piepras\u012bti grafika apr\u0113\u0137in\u0101\u0161anas laik\u0101. Pret\u0113j\u0101 virzien\u0101 SkyPlanner nos\u016bta webhook pazi\u0146ojumus, mainoties st\u0101voklim vai grafikam.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma Net objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Stock items, Non-stock items (<code>\/v1\/inventory<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam webhook pazi\u0146ojumi<\/td><\/tr><tr><td>Kit specifications (<code>\/v1\/KitSpecifications<\/code>)<\/td><td>Produkta strukt\u016bra un katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiska piepras\u012b\u0161ana<\/td><\/tr><tr><td>P\u0101rdo\u0161anas pas\u016bt\u012bjumi (SalesOrder service v3)<\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un klienta priorit\u0101ti<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Webhook<\/td><\/tr><tr><td>Kit assembly ar statusu On hold (<code>\/v1\/kitassembly<\/code>), ja komplekt\u0113\u0161anas dokumenti tiek veidoti Visma Net<\/td><td>Ra\u017eo\u0161anas uzdevumi<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Periodiska piepras\u012b\u0161ana<\/td><\/tr><tr><td>Inventory summary (<code>\/v1\/inventorysummary<\/code>)<\/td><td>Kr\u0101jumu atlikumi katr\u0101 noliktav\u0101<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Piepras\u012b\u0161ana grafika apr\u0113\u0137in\u0101\u0161anas laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi un sa\u0146em\u0161anas dokumenti (<code>\/v1\/purchaseorder<\/code>, <code>\/v2\/PurchaseReceipt<\/code>)<\/td><td>Gaid\u0101mie materi\u0101li ar pieg\u0101des datumu; kr\u0101jumu atlikumu atjaunin\u0101\u0161ana p\u0113c iepirkuma pas\u016bt\u012bjuma pieg\u0101des<\/td><td>Visma Net \u2192 SkyPlanner<\/td><td>Webhook pazi\u0146ojums, p\u0113c tam datu nolas\u012b\u0161ana<\/td><\/tr><tr><td>Visma Net nav pieejams<\/td><td>Procesa posmi, darba centri, mai\u0146as, sagatavo\u0161anas laiku matrica, instrumenti, alternat\u012bvie resursi<\/td><td>Uztur sist\u0113m\u0101 SkyPlanner<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><tr><td>Kit assembly izveide un atjaunin\u0101\u0161ana (<code>POST<\/code>\/<code>PUT \/v1\/kitassembly<\/code>)<\/td><td>Grafik\u0101 iepl\u0101nots ra\u017eo\u0161anas uzdevums: komplekta prece, daudzums, pl\u0101notais pabeig\u0161anas datums<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>Mainoties grafikam, izmantojot SkyPlanner webhook<\/td><\/tr><tr><td>Kit assembly iegr\u0101mato\u0161ana (<code>\/v1\/kitassembly\/{type}\/{refNo}\/action\/release<\/code>)<\/td><td>Pabeigts ra\u017eo\u0161anas uzdevums: sara\u017eot\u0101 produkcija un komponentu pat\u0113ri\u0146\u0161<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>P\u0113c pabeig\u0161anas<\/td><\/tr><tr><td>Inventory receipt, Inventory issue (<code>\/v1\/inventoryReceipt<\/code>, <code>\/v1\/inventoryissue<\/code>, iegr\u0101mato\u0161ana)<\/td><td>Sara\u017eot\u0101 produkcija un materi\u0101lu pat\u0113ri\u0146\u0161, ja komplekti netiek izmantoti<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>P\u0113c pabeig\u0161anas<\/td><\/tr><tr><td>Employee time card (<code>\/v1\/timeCard<\/code>)<\/td><td>Katra operatora re\u0123istr\u0113t\u0101s stundas<\/td><td>SkyPlanner \u2192 Visma Net<\/td><td>Reizi ned\u0113\u013c\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet noliktavas preces, pre\u010du klases un katra komplekta jaun\u0101ko Kit specification redakciju. Sasaistiet katru komponenta rindu ar SkyPlanner materi\u0101lu. P\u0113c tam izveidojiet datus, kuru Visma Net nav: darba centrus, mai\u0146as, procesa posmus ar sagatavo\u0161anas un izpildes laikiem, sagatavo\u0161anas laiku matricu un instrumentu pras\u012bbas. Import\u0113jiet tos CSV vai Excel form\u0101t\u0101. \u0160\u012b ir apjom\u012bg\u0101k\u0101 projekta da\u013ca.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Izv\u0113lieties vienu piepras\u012bjuma modeli:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0113c p\u0101rdo\u0161anas pas\u016bt\u012bjumiem.<\/strong> Atv\u0113rt\u0101s p\u0101rdo\u0161anas pas\u016bt\u012bjumu rindas komplektu prec\u0113m k\u013c\u016bst par SkyPlanner pas\u016bt\u012bjumiem, kuros piepras\u012btais datums ir izpildes termi\u0146\u0161.<\/li>\n\n\n<li><strong>P\u0113c komplekt\u0113\u0161anas dokumentiem.<\/strong> Visma Net izveidotie Kit assemblies dokumenti ar statusu On hold k\u013c\u016bst par SkyPlanner ra\u017eo\u0161anas uzdevumiem.<\/li>\n\n<\/ul>\n\n\n<p>Atv\u0113rtie iepirkuma pas\u016bt\u012bjumi tiek sa\u0146emti kop\u0101 ar to datumiem. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumu atlikumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Izmantojot ar\u012b kr\u0101jumu kopsavilkumu, grafika sast\u0101d\u012b\u0161an\u0101 tiek p\u0101rbaud\u012bti gan eso\u0161ie kr\u0101jumi, gan gaid\u0101mie iepirkumi.<\/p>\n\n\n<p><strong>3. Grafika datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Ja pl\u0101no\u0161ana balst\u0101s uz p\u0101rdo\u0161anas pas\u016bt\u012bjumiem, SkyPlanner katram grafik\u0101 iepl\u0101notajam ra\u017eo\u0161anas uzdevumam izveido Kit assembly dokumentu ar veidu Production. Taj\u0101 nor\u0101da komplekta preci, redakciju, noliktavu, daudzumu un komponentus un sasaista dokumentu ar p\u0101rdo\u0161anas pas\u016bt\u012bjuma rindu. Komplekt\u0113\u0161anas datums ir pl\u0101notais pabeig\u0161anas datums. Kad Autopilot p\u0101rpl\u0101no uzdevumu, datums pirms iegr\u0101mato\u0161anas tiek atjaunin\u0101ts ar <code>PUT<\/code>.<\/p>\n\n\n<p>Kit assembly ir viens lauks Date, t\u0101p\u0113c oper\u0101ciju laiki paliek SkyPlanner, bet Visma Net sa\u0146em p\u0101rdo\u0161anai un kr\u0101jumu uzskaitei svar\u012bgo datumu.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu, izmantojot Mobile Confirmations vai Production Timer, un laika uzskaites ieraksti nodro\u0161ina aktu\u0101lu grafiku. Kad p\u0113d\u0113jais posms ir pabeigts, SkyPlanner izsauc Kit assembly iegr\u0101mato\u0161anas darb\u012bbu. T\u0101 iegr\u0101mato sara\u017eoto produkciju un komponentu pat\u0113ri\u0146u, un p\u0113c tam tiek izveidota virsgr\u0101matas gr\u0101matojumu pakete. Stundas tiek apkopotas ikned\u0113\u013cas Employee time cards vai projektu dar\u012bjumos, ja darbs tiek veikts projektu ietvaros.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms ekspluat\u0101cijas s\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Preces, Kit specifications, p\u0101rdo\u0161anas pas\u016bt\u012bjumi, iepirkuma pas\u016bt\u012bjumi, kr\u0101jumi, izmaksas<\/td><td>Visma Net<\/td><\/tr><tr><td>Procesa posmi, darba centri, mai\u0146as, sagatavo\u0161anas darb\u012bbas, instrumenti<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba, s\u0101kuma un beigu laiks, piesaiste darba centriem<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Kit assembly datums pirms iegr\u0101mato\u0161anas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Iegr\u0101matoti Kit assemblies un darba laika uzskaites dokumenti<\/td><td>Visma Net, iegr\u0101mato\u0161anu ierosina SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mainot Kit specification, tiek izveidota jauna versija. Atk\u0101rtoti nolasiet jaun\u0101ko versiju un atjaunojiet datu atbilst\u012bbas, jo komplekt\u0113\u0161anai var izmantot tikai jaun\u0101ko versiju. Manu\u0101li veikt\u0101s komponentu izmai\u0146as komplekt\u0113\u0161anas dokument\u0101 paliek sp\u0113k\u0101 Visma Net sist\u0113m\u0101, t\u0101p\u0113c SkyPlanner pirms iegr\u0101mato\u0161anas atk\u0101rtoti nolasa \u0161o dokumentu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus, kas ieg\u016bti ar Visma Net eksporta scen\u0101riju un import\u0113ti CSV vai Excel form\u0101t\u0101.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Nosakiet piepras\u012bjuma modeli, datu atbilst\u012bbu tabulu, atbild\u012bbas noteikumus un to, kur rakst\u012bt datus atpaka\u013c (Kit assembly vai kr\u0101jumu sa\u0146em\u0161anas dokumentos).<\/li>\n\n\n<li><strong>Visma Connect iestat\u012b\u0161ana.<\/strong> Re\u0123istr\u0113jiet Service Integration un sa\u0146emiet nomnieka administratora apstiprin\u0101jumu. Vispirms veiciet p\u0101rbaudi demonstr\u0101cijas uz\u0146\u0113mum\u0101.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas modelis.<\/strong> Darba centri, mai\u0146as, procesa posmi, sagatavo\u0161anas darb\u012bbas un instrumenti SkyPlanner sist\u0113m\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Noliktavas preces, pre\u010du klases, Kit specifications, noliktavas un kr\u0101jumi.<\/li>\n\n\n<li><strong>P\u0101rdo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> P\u0101rdo\u0161anas pas\u016bt\u012bjumiem, iepirkuma pas\u016bt\u012bjumiem un prec\u0113m izmanto webhook pazi\u0146ojumus, bet komplektiem un kr\u0101jumiem \u2014 periodisku datu piepras\u012b\u0161anu. \u0160aj\u0101 posm\u0101 \u012bsteno ar\u012b pilnvaru atjauno\u0161anu un 429 atbil\u017eu apstr\u0101di.<\/li>\n\n\n<li><strong>Datu rakst\u012b\u0161ana atpaka\u013c.<\/strong> Kit assembly izveide, atjaunin\u0101\u0161ana un iegr\u0101mato\u0161ana, k\u0101 ar\u012b darba laika uzskaites dokumenti.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam un sal\u012bdziniet datumus.<\/li>\n\n\n<li><strong>Ekspluat\u0101cijas s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu rakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-visma-net-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Visma Net integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nav import\u0113jamu tehnolo\u0123isko procesu.<\/strong> Visus procesa posmus, sagatavo\u0161anas un izpildes laikus vispirms defin\u0113 SkyPlanner sist\u0113m\u0101. Iepl\u0101nojiet nepiecie\u0161amo darbu un nosakiet atbild\u012bgo.<\/li>\n\n\n<li><strong>Advanced logistics.<\/strong> Kit assembly izmanto\u0161anai nepiecie\u0161ama Advanced logistics grupa. Ja izmantojat Standard logistics, sara\u017eoto produkciju iegr\u0101matojiet ar Inventory receipt un Inventory issue.<\/li>\n\n\n<li><strong>Blo\u0137\u0113tas versijas.<\/strong> Izmantotu Kit specification versiju nevar redi\u0123\u0113t, un komplekt\u0113\u0161anai var izmantot tikai jaun\u0101ko versiju.<\/li>\n\n\n<li><strong>M\u0113rvien\u012bbas.<\/strong> Kit assembly ir sava m\u0113rvien\u012bba. Import\u0113jot saska\u0146ojiet to ar SkyPlanner daudzumiem.<\/li>\n\n\n<li><strong>Periodiska datu piepras\u012b\u0161ana bez notikumiem.<\/strong> Komplektiem nav t\u012bmek\u013ca aiz\u0137eru. Lai nep\u0101rsniegtu stundas piepras\u012bjumu ierobe\u017eojumu, izmantojiet <code>lastModifiedDateTime<\/code>, lai nolas\u012btu tikai izmai\u0146as, nevis atk\u0101rtoti iel\u0101d\u0113tu visus datus.<\/li>\n\n\n<li><strong>Aktu\u0101lie galapunkti.<\/strong> Integr\u0101cijas izstr\u0101d\u0113 izmantojiet tikai <code>api.finance.visma.net<\/code> un SalesOrder service v3.<\/li>\n\n\n<li><strong>Nomnieka apstiprin\u0101jums.<\/strong> Autentifik\u0101cija ar klienta akredit\u0101cijas datiem nedarbosies, kam\u0113r nomnieka administrators neb\u016bs apstiprin\u0101jis lietotni. Iepl\u0101nojiet \u0161o soli laikus.<\/li>\n\n\n<li><strong>Ned\u0113\u013cas darba laika uzskaite.<\/strong> Darba laika uzskaites dokumentiem nepiecie\u0161ams Advanced financials, un tos veido par ned\u0113\u013cu. Apkopojiet operatoru nostr\u0101d\u0101t\u0101s stundas pa ned\u0113\u013c\u0101m vai iegr\u0101matojiet t\u0101s projektu dar\u012bjumos.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-visma-net-integr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Visma Net integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas.<\/strong> Tas ietver SkyPlanner pusi, ra\u017eo\u0161anas modeli, kura Visma Net nav, un saska\u0146otos Visma Net API izsaukumus. Katr\u0101 r\u016bpn\u012bc\u0101 Visma Net izmanto at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 \u0161\u012bs zin\u0101\u0161anas tiek liktas liet\u0101.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Visma Net partneris.<\/strong> Visma nodro\u0161ina Visma Net kop\u0101 ar Visma sertific\u0113tiem partneriem, kuri p\u0101rzina j\u016bsu konfigur\u0101ciju un var p\u0101rskat\u012bt datu atbilst\u012bbas un Visma Connect lietotni. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Publisk\u0101 dokument\u0101cija ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Kad savienojums ir izveidots, Arcturus dzinis sast\u0101da grafiku, izmantojot aktu\u0101los Visma Net pas\u016bt\u012bjumus, un pabeigtie darbi non\u0101k atpaka\u013c Visma Net k\u0101 iegr\u0101matoti Kit assemblies. Cena ir no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu nosaka iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101da kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma.<\/p>\n\n\n<p>Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a> un uzziniet, k\u0101p\u0113c Visma Net nepiecie\u0161ams grafiku sast\u0101d\u012b\u0161anas r\u012bks, sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/visma-net\/razosanas-planosana\/\">Visma Net ra\u017eo\u0161anas pl\u0101no\u0161ana, iev\u0113rojot re\u0101lo iek\u0101rtu un person\u0101la jaudu<\/a>. P\u0101rskats pieejams <a href=\"\/lv\/integracija\/erp\/visma-net\/\">Visma Net lap\u0101<\/a>, bet inform\u0101cija par cit\u0101m ERP sist\u0113m\u0101m \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel izkl\u0101jlap\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu t\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 \u2014 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, blakus robotiz\u0113tai produkcijas krau\u0161anas \u0161\u016bnai, kur produkciju krauj uz palet\u0113m, Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner rada pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai un nodro\u0161ina t\u0101s uzticam\u012bbu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma Net API ir ra\u017eo\u0161anas pas\u016bt\u012bjumi?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Visma Net nav ra\u017eo\u0161anas pas\u016bt\u012bjumu, tehnolo\u0123isko procesu vai darba centru objektu, t\u0101p\u0113c to nav ar\u012b API. Ra\u017eo\u0161anas dokuments ir Kit assembly, kas pieejams adres\u0113 <code>\/v1\/kitassembly<\/code>, savuk\u0101rt tehnolo\u0123iskos procesus un darba centrus uztur SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101du autentifik\u0101ciju izmanto integr\u0101cija?<\/summary>\n<p class=\"sp-faq__a\">Integr\u0101cija izmanto Visma Connect ar OAuth 2.0 klienta akredit\u0101cijas datu pl\u016bsmu un ir re\u0123istr\u0113ta k\u0101 Service Integration port\u0101l\u0101 Visma Developer Portal. Integr\u0101ciju apstiprina nomnieka administrators, un pilnvaras ir der\u012bgas vienu stundu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Visma Net var nos\u016bt\u012bt izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">Prec\u0113m, p\u0101rdo\u0161anas pas\u016bt\u012bjumiem un iepirkuma pas\u016bt\u012bjumiem \u2014 j\u0101, izmantojot Visma Developer Portal t\u012bmek\u013ca aiz\u0137eres. Kit assemblies un Kit specifications nav notikumu, t\u0101p\u0113c to izmai\u0146as nolasa ar periodiskiem piepras\u012bjumiem, atlasot tikai main\u012btos datus. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pabeigt\u0101s ra\u017eo\u0161anas dati tiek ierakst\u012bti atpaka\u013c Visma Net?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner izveido Kit assembly katram iepl\u0101notajam ra\u017eo\u0161anas uzdevumam, atjaunina t\u0101 datumu un p\u0113c uzdevuma pabeig\u0161anas izsauc darb\u012bbu release. \u0160\u012b darb\u012bba iegr\u0101mato sara\u017eoto produkciju un komponentu pat\u0113ri\u0146u. Ja komplektus neizmanto, to pa\u0161u paveic Inventory receipt un Inventory issue.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izstr\u0101des?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t Visma Net datus CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Visma Net ERP Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Visma Net integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir par\u0101d\u012bts, k\u0101 savienot Visma Net (Visma.net ERP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma Net, izmantojot Visma Net API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 &#8230; <a title=\"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/\" aria-label=\"Read more about Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103293,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104417","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma Net APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/integracijas-celvedis\\\/\",\"name\":\"Visma Net APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Visma Net: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/visma-net\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma Net APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/","name":"Visma Net APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Visma Net\u2013SkyPlanner APS: Visma Net API, Visma Connect autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana, Kit assembly ieraksts atpaka\u013c un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Visma Net: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/visma-net\/"},{"@type":"ListItem","position":5,"name":"Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Visma Net ERP Visma Net integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Visma Net integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m ir par\u0101d\u012bts, k\u0101 savienot Visma Net (Visma.net ERP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Visma Net, izmantojot Visma Net API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104417"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104417\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103293"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}