{"id":104301,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/sage-200\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/","title":{"rendered":"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sage 200<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Sage 200 integr\u0101cijas rokasgr\u0101mata <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Sage 200 integr\u0101cijas rokasgr\u0101mat\u0101 biznesa partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Sage 200 Professional un t\u0101 ra\u017eo\u0161anas papildmoduli ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Sage 200 nodro\u0161ina datu apmai\u0146u abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Produktu, noliktavas kr\u0101jumu, iepirkuma pas\u016bt\u012bjumu un p\u0101rdo\u0161anas pas\u016bt\u012bjumu dati tiek sa\u0146emti, izmantojot Sage 200 REST API.<\/li>\n\n\n<li>Ra\u017eo\u0161anas pas\u016bt\u012bjumu, oper\u0101ciju, darbasp\u0113ka un iek\u0101rtu resursu dati tiek sa\u0146emti no j\u016bsu ra\u017eo\u0161anas papildmodu\u013ca.<\/li>\n\n\n<li>Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c, lai uzskait\u012btu katrai oper\u0101cijai pat\u0113r\u0113to laiku.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Sage 200 konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c ekspluat\u0101cijas s\u0101kuma. \u0160\u012b rokasgr\u0101mata ir paredz\u0113ta partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"two-sources-inside-one-sage-200-system\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Divi avoti vien\u0101 Sage 200 sist\u0113m\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ra\u017eo\u0161anas uz\u0146\u0113mum\u0101 Sage 200 sist\u0113mai ir divi sl\u0101\u0146i, un integr\u0101cija nolasa datus no abiem.<\/p>\n\n\n<p><strong>1. Sage 200 REST API komercdatiem un kr\u0101jumu datiem.<\/strong> Sage nor\u0101da, ka API &#8220;lets your application read and modify data in a Sage 200 site&#8221; (\u013cauj j\u016bsu lietotnei las\u012bt un main\u012bt datus attiec\u012bgaj\u0101 sist\u0113mas vid\u0113). Tas ietver klientus, pieg\u0101d\u0101t\u0101jus, produktus, p\u0101rdo\u0161anas un iepirkuma pas\u016bt\u012bjumus un virsgr\u0101matas kontus. Sage 200 Professional dokument\u0101cij\u0101 (2025.02) resursi ir iedal\u012bti \u0161\u0101d\u0101s grup\u0101s: Cash Book, Commercials, Financials, General, Nominal, POP, Price Book, Purchases, Sales, SOP un Stock. Grafiku sast\u0101d\u012b\u0161anai b\u016btiskie resursi:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Resurss<\/th><th>Saturs<\/th><\/tr><\/thead><tbody><tr><td><code>products<\/code><\/td><td>Kods, nosaukums, kr\u0101jumu uzskaites m\u0113rvien\u012bba, BOM poz\u012bcijas veids, standarta pa\u0161izmaksa<\/td><\/tr><tr><td><code>warehouse_holdings<\/code><\/td><td><code>quantity_in_stock<\/code>, <code>quantity_on_order<\/code>, <code>quantity_allocated_bom<\/code>, <code>free_stock_available<\/code>, <code>is_default_manufacturing_warehouse<\/code><\/td><\/tr><tr><td><code>pop_orders<\/code>, <code>pop_order_lines<\/code><\/td><td>Atv\u0113rtie iepirkuma pas\u016bt\u012bjumi, <code>line_quantity<\/code>, <code>requested_delivery_dates<\/code><\/td><\/tr><tr><td><code>sop_orders<\/code>, <code>sop_order_lines<\/code><\/td><td>Klientu piepras\u012bjums, <code>requested_delivery_date<\/code>, <code>promised_delivery_date<\/code><\/td><\/tr><tr><td><code>warehouses<\/code>, <code>units<\/code><\/td><td>Atra\u0161an\u0101s vietas un m\u0113rvien\u012bbas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>2. Ra\u017eo\u0161anas papildmodulis ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/strong> Sage 200 API nav galapunktu ra\u017eo\u0161anas pas\u016bt\u012bjumiem, oper\u0101cij\u0101m vai resursiem. Ra\u017eo\u0161anas pas\u016bt\u012bjumi tiek glab\u0101ti Sicon Works Order Processing, Cim200 vai agr\u0101kaj\u0101 Sage 200 Manufacturing modul\u012b. Integr\u0101cija nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un resursus, izmantojot papildmodu\u013ca atbalst\u012btu piek\u013cuves veidu, par kuru tv\u0113ruma noteik\u0161anas laik\u0101 vienojas ar jums un j\u016bsu Sage 200 partneri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage 200 API &#8220;uses OAuth 2.0 with OpenID Connect&#8221; (izmanto OAuth ar OpenID Connect) un autoriz\u0101cijas koda pie\u0161\u0137ir\u0161anas pl\u016bsmu. Pieteik\u0161an\u0101s notiek, izmantojot <strong>Sage ID<\/strong>.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pievienojieties Sage 200 API Developer Programme un pieprasiet piek\u013cuves datus.<\/li>\n\n\n<li>Piesaistiet Sage ID t\u0101dam Sage 200 lietot\u0101jam, kuram ir piek\u013cuve uz\u0146\u0113mumam un izmantotajiem galapunktiem nepiecie\u0161amaj\u0101m funkcij\u0101m.<\/li>\n\n\n<li>Pieprasiet piek\u013cuves tv\u0113rumu <code>offline_access<\/code>, cit\u0101di atjauno\u0161anas mar\u0137ieris netiks izsniegts.<\/li>\n\n\n<li>Katr\u0101 datub\u0101zes piepras\u012bjum\u0101 nos\u016btiet <code>Authorization: Bearer &lt;access_token&gt;<\/code>, <code>X-Site<\/code> un <code>X-Company<\/code>. Abus ID ieg\u016bst no <code>\/sites<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Sage 200 Professional b\u0101zes URL: <code>https:\/\/api.columbus.sage.com\/uk\/sage200extra\/accounts\/v1<\/code>. Piepras\u012bjumos izmanto GET, POST, PUT un DELETE metodes, k\u0101 ar\u012b OData vaic\u0101jumu opcijas <code>$filter<\/code>, <code>$select<\/code>, <code>$top<\/code>, <code>$skip<\/code>, <code>$orderby<\/code> un <code>$expand<\/code>.<\/p>\n\n\n<p>Sage 200 Professional API iesp\u0113jo klienta atbalsta pakalpojumu sniedz\u0113js. Sage kontrolsarakst\u0101 tas apstiprina, ka &#8220;the API is enabled&#8221; (API ir iesp\u0113jots) un &#8220;each required user has a Sage ID assigned.&#8221; (katram nepiecie\u0161amajam lietot\u0101jam ir pie\u0161\u0137irts Sage ID). Sage 200 Standard API ir iesp\u0113jots p\u0113c noklus\u0113juma.<\/p>\n\n\n<p>Projekt\u0113jot risin\u0101jumu, j\u0101\u0146em v\u0113r\u0101 mar\u0137ieru der\u012bguma termi\u0146i. Piek\u013cuves mar\u0137ieri ir der\u012bgi 8 stundas. Atjauno\u0161anas mar\u0137ieri ir der\u012bgi no 1 l\u012bdz 90 dien\u0101m, un &#8220;The refresh window is measured from the user&#8217;s initial sign-in, not from the most recent refresh.&#8221; (Atjauno\u0161anas periodu skaita no lietot\u0101ja s\u0101kotn\u0113j\u0101s pieteik\u0161an\u0101s, nevis no p\u0113d\u0113j\u0101s atjauno\u0161anas.) Sage nor\u0101da, ka atk\u0101rtota autentifik\u0101cija &#8220;is unavoidable&#8221; (ir neizb\u0113gama). Iepl\u0101nojiet br\u012bdin\u0101jumu par nepiecie\u0161am\u012bbu atk\u0101rtoti sniegt piekri\u0161anu, pirms \u0161is periods beidzas.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri (SkyPlanner Settings &gt; API), un API ir dokument\u0113ts Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sage 200 API dokument\u0101cij\u0101 nav t\u012bmek\u013ca aiz\u0137eru vai abonementu resursa. Izmai\u0146as tiek noteiktas ar periodiskiem piepras\u012bjumiem. Ierakstos ir lauki <code>date_time_created<\/code> un <code>date_time_updated<\/code>, t\u0101p\u0113c katr\u0101 piepras\u012bjum\u0101 datus filtr\u0113 ar <code>$filter<\/code> p\u0113c <code>date_time_updated<\/code> un sadala lap\u0101s ar <code>$top<\/code> un <code>$skip<\/code>.<\/p>\n\n\n<p>Pieprasiet ra\u017eo\u0161anas pas\u016bt\u012bjumu datus ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, bet kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu rindu datus \u2014 reizi stund\u0101. Kad grafiks main\u0101s, SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bbas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sage 200 objekts (avots)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td><code>products<\/code>, <code>units<\/code> (API)<\/td><td>Produkti un materi\u0101li<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Iel\u0101de, p\u0113c tam periodiski piepras\u012bjumi<\/td><\/tr><tr><td>BOM komponenti (papildmodulis vai BOM modulis)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>P\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td>Darbasp\u0113ka un iek\u0101rtu resursi, resursu grupas (papildmodulis)<\/td><td>Darba centri, darba centru grupas, person\u0101ls<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Resursu pieejam\u012bba: ra\u017eo\u0161anas aptur\u0113\u0161ana, apkope, atva\u013cin\u0101jumi (papildmodulis)<\/td><td>Mai\u0146as, promb\u016btnes<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Katru dienu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi un to oper\u0101cijas, katras oper\u0101cijas izpildes laiks (papildmodulis)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar posmiem, ilgumu un izpildes termi\u0146iem<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td><code>sop_order_lines<\/code>: <code>requested_delivery_date<\/code>, <code>promised_delivery_date<\/code> (API)<\/td><td>Pieg\u0101des termi\u0146i klientiem<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi<\/td><\/tr><tr><td><code>warehouse_holdings<\/code>: <code>quantity_in_stock<\/code>, <code>free_stock_available<\/code> (API)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Reizi stund\u0101<\/td><\/tr><tr><td><code>pop_order_lines<\/code>: <code>line_quantity<\/code>, <code>requested_delivery_dates<\/code> (API)<\/td><td>Iepirkuma pas\u016bt\u012bjumi ar paredzamo pieg\u0101des datumu<\/td><td>Sage 200 \u2192 SkyPlanner<\/td><td>Reizi stund\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas pl\u0101notais s\u0101kums un beigas, resurss<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>SkyPlanner \u2192 Sage 200<\/td><td>P\u0113c izmai\u0146\u0101m, izmantojot t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Oper\u0101ciju laika uzskaite (papildmodulis)<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 Sage 200<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101<\/td><\/tr><tr><td>SkyPlanner ierobe\u017eojumu dati<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ieg\u016bstiet produktus un m\u0113rvien\u012bbas no API, p\u0113c tam resursus, resursu grupas un BOM oper\u0101cijas no papildmodu\u013ca. Resursu grupu ar trim vien\u0101d\u0101m iek\u0101rt\u0101m var att\u0113lot k\u0101 vienu darba centru grupu vai tr\u012bs darba centrus.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no papildmodu\u013ca, k\u0101 ar\u012b atv\u0113rt\u0101s <code>pop_order_lines<\/code> un <code>warehouse_holdings<\/code> no API. Sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti gan kr\u0101jumi, gan gaid\u0101m\u0101s iepirkumu pieg\u0101des. MRP turpina pied\u0101v\u0101t ra\u017eo\u0161anas pas\u016bt\u012bjumus Sage 200 sist\u0113m\u0101, bet SkyPlanner iek\u013cauj grafik\u0101 tos, kurus izveidojat.<\/p>\n\n\n<p><strong>3. Grafika datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Par katru oper\u0101ciju, kuru pl\u0101no\u0161anas dzin\u0113js ievietojis vai p\u0101rvietojis grafik\u0101, SkyPlanner nos\u016bta pl\u0101noto s\u0101kumu, beigas un resursu atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumu. Papildmodulis saglab\u0101 savus daudzumus, rezerv\u0101cijas un izmaksu apr\u0113\u0137inus.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. Re\u0123istr\u0113tais laiks tiek nos\u016bt\u012bts atpaka\u013c un uzskait\u012bts attiec\u012bgajai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai, lai Sage 200 izmaksu apr\u0113\u0137inos izmantotu faktiski nostr\u0101d\u0101t\u0101s stundas.<\/p>\n\n\n<p>Ja j\u016bsu ra\u017eotn\u0113 laiku jau uzskaita ar Sicon Shop Floor Data Capture vai Cim200 Shop Floor Data Capture, izv\u0113lieties vienu laika uzskaites kan\u0101lu.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Fiks\u0113jiet tos rakstiski pirms ekspluat\u0101cijas s\u0101kuma:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Produkti, BOM, ra\u017eo\u0161anas pas\u016bt\u012bjumu daudzumi, rezerv\u0101cijas, izmaksas<\/td><td>Sage 200 un papildmodulis<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, darba centru pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Darba laika uzskaite<\/td><td>Sage 200, sa\u0146emot SkyPlanner darba laika ierakstus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu avots ir jaudas grafiks. Ja pl\u0101not\u0101ji turpina p\u0101rvietot ra\u017eo\u0161anas pas\u016bt\u012bjumus vai oper\u0101cijas Sicon Rough Cut Capacity Planning vai Cim200 Graphical Scheduler, datumus nosaka divas sist\u0113mas. Uzticiet oper\u0101ciju datumu noteik\u0161anu SkyPlanner. Ar Autopilot SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu CSV vai Excel form\u0101t\u0101. T\u0101l\u0101k projekts norit \u0161\u0101di:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Apstipriniet papildmoduli un t\u0101 versiju, ra\u017eo\u0161anas pas\u016bt\u012bjumu nolas\u012b\u0161anas un datu atpaka\u013cieraksta veidu, sinhroniz\u0101cijas bie\u017eumu un darba laika uzskaites kan\u0101lu.<\/li>\n\n\n<li><strong>Piek\u013cuve API.<\/strong> Atbalsta pakalpojumu sniedz\u0113js aktiviz\u0113 Sage 200 API, sasaista Sage ID ar Sage 200 lietot\u0101ju un iestata piek\u013cuvi uz\u0146\u0113mumiem un funkcij\u0101m.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Produkti, m\u0113rvien\u012bbas, resursi, resursu grupas, BOM oper\u0101cijas un pieejam\u012bba.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumus, iepirkuma pas\u016bt\u012bjumu rindas un kr\u0101jumus sinhroniz\u0113 ar periodiskiem piepras\u012bjumiem, paredzot br\u012bdin\u0101jumu par atk\u0101rtotas piekri\u0161anas nepiecie\u0161am\u012bbu.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika atpaka\u013cieraksts.<\/strong> Pl\u0101notos oper\u0101ciju datumus ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumos; \u0161aj\u0101 posm\u0101 pievieno ar\u012b darba laika uzskaiti.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana un palai\u0161ana.<\/strong> Sal\u012bdziniet datumus ar pa\u0161reiz\u0113jo pl\u0101nu, izlabojiet pamatdatus un p\u0113c tam iesl\u0113dziet atpaka\u013cierakstu.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-sage-200-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, integr\u0113jot Sage 200<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vecais modulis jaunaj\u0101 versij\u0101.<\/strong> S\u0101kot ar Sage 200 Professional 2025 R2, agr\u0101ko Sage 200 Manufacturing moduli vairs nevar izmantot. Pirms datu atbilst\u012bbu izveides noskaidrojiet, kur\u0161 ra\u017eo\u0161anas risin\u0101jums tiks izmantots sist\u0113mas palai\u0161anas br\u012bd\u012b.<\/li>\n\n\n<li><strong>Oper\u0101ciju laiki no izmaksu datiem.<\/strong> Sicon MRP apr\u0113\u0137ina aptuvenos darbasp\u0113ka un iek\u0101rtu darba laikus, izmantojot Sage 200 BOM izmaksu poz\u012bcijas. Vispirms sal\u012bdziniet \u0161os laikus ar faktiskajiem izpildes laikiem.<\/li>\n\n\n<li><strong>Izmaksu kategoriju neatbilst\u012bbas.<\/strong> Sage br\u012bdina, ka lauku Nominal, Overhead Nominal un Overhead Recovery % v\u0113rt\u012bb\u0101m BOM oper\u0101cij\u0101s un izmaksu kategorij\u0101s j\u0101sakr\u012bt, pret\u0113j\u0101 gad\u012bjum\u0101 &#8220;there will be cost discrepancies.&#8221; (rad\u012bsies izmaksu neatbilst\u012bbas).<\/li>\n\n\n<li><strong>Atjauno\u0161anas termi\u0146\u0161.<\/strong> Maksim\u0101lo 90 dienu termi\u0146u skaita no pirm\u0101s pierakst\u012b\u0161an\u0101s. Ja integr\u0101cijai netiek atk\u0101rtoti dota piekri\u0161ana, t\u0101 katru ceturksni apst\u0101jas vien\u0101 un taj\u0101 pa\u0161\u0101 dien\u0101.<\/li>\n\n\n<li><strong>Vair\u0101ki uz\u0146\u0113mumi vien\u0101 vietn\u0113.<\/strong> Vien\u0101 vietn\u0113 var b\u016bt vair\u0101ki uz\u0146\u0113mumi, t\u0101p\u0113c katr\u0101 piepras\u012bjum\u0101 nos\u016btiet pareizo <code>X-Company<\/code> v\u0113rt\u012bbu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-sage-200-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200 integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong><\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu Sage 200 partneris.<\/strong> Partneris p\u0101rzina j\u016bsu papildmoduli un aktiviz\u0113 API sist\u0113m\u0101 Sage 200 Professional.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var veidot papildu risin\u0101jumus,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s.<\/li>\n\n<\/ol>\n\n\n<p>P\u0113c savieno\u0161anas Arcturus dzinis sast\u0101da grafiku, izmantojot aktu\u0101los Sage 200 ra\u017eo\u0161anas pas\u016bt\u012bjumus, un pl\u0101notie datumi tiek ierakst\u012bti \u0161o pas\u016bt\u012bjumu oper\u0101cij\u0101s. SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a> un <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a>, bet sal\u012bdzin\u0101jumu ar pa\u0161a Sage 200 pl\u0101no\u0161anas iesp\u0113j\u0101m lasiet lap\u0101 <a href=\"\/lv\/integracija\/erp\/sage-200\/razosanas-planosana\/\">Sage 200 ra\u017eo\u0161anas pl\u0101no\u0161ana, iev\u0113rojot faktisko iek\u0101rtu un darbinieku jaudu<\/a>. P\u0101rskats pieejams <a href=\"\/lv\/integracija\/erp\/sage-200\/\">Sage 200 lap\u0101<\/a>, bet citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel izkl\u0101jlap\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 stundas darba laika, un jaun\u0101 uzdevumu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu p\u0101rvald\u0101m cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 200 API ietver ra\u017eo\u0161anas pas\u016bt\u012bjumus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Sage 200 Professional API aptver produktus, kr\u0101jumus, p\u0101rdo\u0161anas un iepirkuma pas\u016bt\u012bjumus, finanses un citas jomas, ta\u010du taj\u0101 nav ra\u017eo\u0161anas pas\u016bt\u012bjumu vai oper\u0101ciju resursu. Ra\u017eo\u0161anas pas\u016bt\u012bjumus ieg\u016bst no j\u016bsu ra\u017eo\u0161anas papildmodu\u013ca, piem\u0113ram, Sicon Works Order Processing vai Cim200, t\u0101d\u0101 veid\u0101, par k\u0101du vienojas tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido Sage 200 integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu Sage 200 konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c palai\u0161anas. J\u016bsu Sage 200 partneris aktiviz\u0113 API un var piedal\u012bties ievie\u0161an\u0101. Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API; lai s\u0101ktu darbu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage 200 var nos\u016bt\u012bt izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">Sage 200 API neatbalsta webhook pazi\u0146ojumus. Kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu izmai\u0146as p\u0101rbauda ar periodiskiem piepras\u012bjumiem, izmantojot lauku <code>date_time_updated<\/code>, savuk\u0101rt ra\u017eo\u0161anas pas\u016bt\u012bjumus nolasa no j\u016bsu papildmodu\u013ca ik p\u0113c da\u017e\u0101m min\u016bt\u0113m. Pret\u0113j\u0101 virzien\u0101 SkyPlanner nos\u016bta grafika izmai\u0146as ar saviem webhook pazi\u0146ojumiem, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t ra\u017eo\u0161anas pas\u016bt\u012bjumus CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sage 200 Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Sage 200 integr\u0101cijas rokasgr\u0101mat\u0101 biznesa partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Sage 200 Professional un t\u0101 ra\u017eo\u0161anas papildmoduli ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Sage 200 nodro\u0161ina datu apmai\u0146u abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana &#8230; <a title=\"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/\" aria-label=\"Read more about Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103233,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104301","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 200 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/integracijas-celvedis\\\/\",\"name\":\"Sage 200 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\\\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sage 200: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-200\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 200 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/","name":"Sage 200 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Savienojiet Sage 200 ar SkyPlanner APS: Sage 200 REST API, OAuth 2.0 ar Sage ID, Sicon\/Cim200 ra\u017eo\u0161anas pas\u016bt\u012bjumi, datu sasaiste, atpaka\u013cieraksts, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sage 200: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-200\/"},{"@type":"ListItem","position":5,"name":"Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sage 200 Sage 200 integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Sage 200 integr\u0101cijas rokasgr\u0101mat\u0101 biznesa partneriem un IT komand\u0101m ir izskaidrots, k\u0101 savienot Sage 200 Professional un t\u0101 ra\u017eo\u0161anas papildmoduli ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Sage 200 nodro\u0161ina datu apmai\u0146u abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104301"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104301\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103233"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}