{"id":104243,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/","title":{"rendered":"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ ProShop ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">ProShop ERP integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 ProShop integr\u0101cijas ce\u013cved\u012b administratoriem, konsultantiem un IT komand\u0101m ir paskaidrots, k\u0101 savienot ProShop ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ProShop, izmantojot ProShop API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>No ProShop tiek sa\u0146emti Work Orders ar to oper\u0101cij\u0101m, Parts, Work Order BOM ieraksti, Work Cells, Users, Tools, Fixtures un Purchase Orders.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumos.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laiku var nos\u016bt\u012bt atpaka\u013c uz ProShop Time Tracking.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu ProShop konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c t\u0101s palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cij\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proshop-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">ProShop integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0100r\u0113jai grafiku sast\u0101d\u012b\u0161anas sist\u0113mai ProShop pied\u0101v\u0101 divus piek\u013cuves veidus, kas aprakst\u012bti ProShop API izstr\u0101d\u0101t\u0101ju dokument\u0101cij\u0101:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ProShop GraphQL API.<\/strong> &#8220;ProShop provides a GraphQL API, available via HTTP(S).&#8221; (ProShop nodro\u0161ina GraphQL API, kas pieejams, izmantojot HTTP(S).) Ir viens galapunkts: katrs izsaukums ir HTTP POST piepras\u012bjums uz <code>&lt;proshop root&gt;\/api\/graphql<\/code>, kura JSON pamatda\u013c\u0101 ir <code>query<\/code>, <code>variables<\/code> un <code>operationName<\/code>. Katram modulim ir vaic\u0101jums vienskait\u013ca form\u0101 viena ieraksta ieg\u016b\u0161anai un vaic\u0101jums daudzskait\u013ca form\u0101 sarakstu ieg\u016b\u0161anai. Saraksti tiek dal\u012bti lap\u0101s, izmantojot <code>pageSize<\/code> (noklus\u0113juma v\u0113rt\u012bba 20) un <code>pageStart<\/code>. Tie atgrie\u017e <code>records<\/code> un <code>totalRecords<\/code> un pie\u0146em <code>filter<\/code> un <code>query<\/code> argumentus, kas atbilst katra modu\u013ca Advanced Search iesp\u0113j\u0101m. Sh\u0113mu var izp\u0113t\u012bt ar introspekciju. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/460554241\/Introduction+to+the+ProShop+API\">Ievads ProShop API<\/a>)<\/li>\n\n\n<li><strong>Recently Updated Records API.<\/strong> &#8220;A simple REST interface allows external integrations to request information between arbitrary points in time.&#8221; (Vienk\u0101r\u0161a REST saskarne \u013cauj \u0101r\u0113j\u0101m integr\u0101cij\u0101m piepras\u012bt inform\u0101ciju par br\u012bvi izv\u0113l\u0113tu laika interv\u0101lu.) Izsauciet <code>&lt;proshop root&gt;\/recentlyupdatedrecords<\/code> ar <code>start<\/code> (ISO 8601) un neoblig\u0101tajiem parametriem <code>end<\/code> un <code>filterby<\/code>, piem\u0113ram, <code>workorders,workcells,purchaseorders,timetracking,deletions<\/code>. Vispirms ProShop komandai j\u0101iesp\u0113jo indekss. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/2214100993\/The+Recently+Updated+Records+API\">Recently Updated Records API<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>Dati tiek rakst\u012bti, izmantojot GraphQL <strong>mut\u0101cijas<\/strong>. Dokument\u0101cij\u0101 k\u0101 piem\u0113rs ir aprakst\u012bts Time Tracking Login, un rakst\u012b\u0161anas piek\u013cuve katram modulim tiek pie\u0161\u0137irta ar piek\u013cuves ties\u012bbu tv\u0113rumiem.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-scopes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuves ties\u012bbu tv\u0113rumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Piek\u013cuves pilnvara katr\u0101 izsaukum\u0101.<\/strong> Nos\u016btiet to k\u0101 <code>Authorization: Bearer &lt;token&gt;<\/code> vai k\u0101 vaic\u0101juma parametru <code>token<\/code>.<\/li>\n\n\n<li><strong>OAuth 2.0 Client Credentials<\/strong> (ProShop 5.2.3 un jaun\u0101k\u0101s versij\u0101s). ProShop sist\u0113mas administrators atver System Config &gt; Manage Authorizations, izveido Authorization, nor\u0101dot Name un Maximum Scope, un atz\u012bm\u0113 <strong>Direct Login<\/strong> un <strong>Active<\/strong>. Unique ID un Shared Secret tiek izmantoti k\u0101 <code>client_id<\/code> un <code>client_secret<\/code>. Lietotne nos\u016bta <code>grant_type=client_credentials<\/code> ar POST piepras\u012bjumu uz <code>&lt;proshop root&gt;\/home\/member\/oauth\/accesstoken<\/code> un sa\u0146em Bearer pilnvaru ar <code>expires_in<\/code>. Atsvaidzin\u0101\u0161anas pilnvaras nav, t\u0101p\u0113c p\u0113c der\u012bguma termi\u0146a beig\u0101m j\u0101pieprasa jauna pilnvara. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1230209075\/OAuth+2.0+Client+Credentials+Flow\">Client Credentials pl\u016bsma<\/a>)<\/li>\n\n\n<li><strong>OAuth 2.0 Authorization Flow<\/strong> ir paredz\u0113ta izsaukumiem, kuriem nepiecie\u0161ams lietot\u0101ja konteksts, piem\u0113ram, Time Tracking Login.<\/li>\n\n\n<li><strong>Piek\u013cuves ties\u012bbu tv\u0113rumi.<\/strong> Form\u0101ts ir <code>SCOPE_NAME:[{r|w|d|p}]<\/code>, kur burti apz\u012bm\u0113 las\u012b\u0161anu, rakst\u012b\u0161anu, dz\u0113\u0161anu un preferences. Grafiku sast\u0101d\u012b\u0161anas sist\u0113ma parasti pieprasa <code>workorders:rw parts:r purchaseorders:r users:r tools:r<\/code>, k\u0101 ar\u012b Time Tracking, ja darba laiks tiek nos\u016bt\u012bts atpaka\u013c. Kop\u0161 ProShop 5.1.9: &#8220;a scope grant request is now required on all connections to the API.&#8221; (Visiem savienojumiem ar API tagad j\u0101pieprasa piek\u013cuves ties\u012bbu tv\u0113ruma pie\u0161\u0137ir\u0161ana.) (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1444184068\/Authorization+scopes\">Autoriz\u0101cijas ties\u012bbu tv\u0113rumi<\/a>)<\/li>\n\n\n<li><strong>Audita pieraksti.<\/strong> Izsaukumiem, kas veikti ar klienta akredit\u0101cijas datiem, tiek r\u0101d\u012bts lietotnes nosaukums, nevis lietot\u0101js.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifik\u0101cijai izmanto API pilnvaru galven\u0113 <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ProShop izstr\u0101d\u0101t\u0101ju dokument\u0101cij\u0101 nav aprakst\u012bti izejo\u0161ie webhook vai GraphQL abonementi. Dati no ProShop tiek ieg\u016bti ar periodiskiem piepras\u012bjumiem, un Recently Updated Records API \u013cauj to dar\u012bt ar nelielu resursu pat\u0113ri\u0146u: pieprasiet visus kop\u0161 iepriek\u0161\u0113j\u0101s izpildes izveidotos, main\u012btos vai dz\u0113stos ierakstus, atlasot tikai grafikam nepiecie\u0161amos ierakstu tipus. P\u0113c tam ieg\u016bstiet main\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus p\u0113c to numura, izmantojot GraphQL. ProShop nor\u0101da, ka tas ir \u0101tr\u0101k nek\u0101 veikt vaic\u0101jumu p\u0113c <code>lastModifiedTime<\/code>.<\/p>\n\n\n<p>Parasti ra\u017eo\u0161anas pas\u016bt\u012bjumus un darba laika uzskaiti p\u0101rbauda ik p\u0113c piec\u0101m min\u016bt\u0113m, bet deta\u013cas un iepirkuma pas\u016bt\u012bjumus \u2014 reizi stund\u0101. SkyPlanner nos\u016bta webhook pazi\u0146ojumus, kad main\u0101s st\u0101voklis vai grafiks, t\u0101p\u0113c datu rakst\u012b\u0161anu atpaka\u013c nosaka notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu sasaiste<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>ProShop objekts (API)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Parts, COTS (GraphQL <code>parts<\/code> piek\u013cuves ties\u012bbu tv\u0113rums)<\/td><td>Produkti un materi\u0101li<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Work Order BOM ieraksti<\/td><td>Produkta strukt\u016bra, materi\u0101li katram pas\u016bt\u012bjumam<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Kop\u0101 ar katru ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas: ra\u017eo\u0161anas \u0161\u016bna, paredzamais sagatavo\u0161anas un cikla laiks (normat\u012bvie laiki)<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma laiku<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Kop\u0101 ar katru ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/td><\/tr><tr><td>Work Cells (iek\u0101rta, darbagalds, apr\u012bkojums)<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Cilv\u0113kiem piesaist\u012bt\u0101s Work Cells, Users<\/td><td>Person\u0101ls un operatoru piesaiste<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas \u0161\u016bnu grafiki (pieejam\u0101s stundas, mai\u0146as)<\/td><td>Mai\u0146as un br\u012bvdienas<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137i uztur\u0113tas mai\u0146as SkyPlanner<\/td><\/tr><tr><td>Work Orders (daudzums, izpildes termi\u0146\u0161, statuss)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un priorit\u0101ti<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Tools, Toolpots, Fixtures, RTAs<\/td><td>Instrumenti k\u0101 ierobe\u017eoti koplietojami resursi<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Purchase Orders ar pieg\u0101des termi\u0146iem<\/td><td>Iepirkuma pas\u016bt\u012bjumi, ien\u0101ko\u0161ie materi\u0101li p\u0113c pieg\u0101des datuma<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Periodiski piepras\u012bjumi reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma pl\u0101notais s\u0101kums un beigas (GraphQL mut\u0101cija, <code>workorders:w<\/code>)<\/td><td>Pl\u0101notais s\u0101kums un beigas katram ra\u017eo\u0161anas uzdevumam<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pal\u012bdz\u012bbu<\/td><\/tr><tr><td>Time Tracking: sagatavo\u0161anas un izpildes laiks, pabeigt\u0101s deta\u013cas katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101, ja tas izv\u0113l\u0113ts<\/td><\/tr><tr><td>ProShop nav pieejams<\/td><td>Sagatavo\u0161anas laiku matrica, ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem, alternat\u012bvas iek\u0101rtas un darbinieki<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Tiek konfigur\u0113ts ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ar GraphQL daudzskait\u013ca vaic\u0101jumiem ieg\u016bstiet Parts, Work Cells, Users, Tools un Fixtures datus pa lap\u0101m. S\u0101kotn\u0113jai iel\u0101dei iestatiet lielu <code>pageSize<\/code> v\u0113rt\u012bbu un turpiniet ciklu, vadoties p\u0113c <code>totalRecords<\/code>. Nosakiet ra\u017eo\u0161anas \u0161\u016bnu atbilst\u012bbu: iek\u0101rtu \u0161\u016bnas k\u013c\u016bst par darba centriem, bet cilv\u0113ku \u0161\u016bnas \u2014 par person\u0101lu. T\u0101d\u0113j\u0101di vienai oper\u0101cijai var vienlaikus rezerv\u0113t gan iek\u0101rtu, gan t\u0101s operatoru.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet akt\u012bvos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, normat\u012bvajiem laikiem un BOM ierakstiem, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumu atlikumu, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. Izmai\u0146as tiek noteiktas, izmantojot Recently Updated Records ar <code>filterby=workorders,purchaseorders,deletions<\/code>.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzinis iepl\u0101no vai p\u0101rvieto ra\u017eo\u0161anas uzdevumu, SkyPlanner webhook aktiviz\u0113 GraphQL mut\u0101ciju, kas iestata ra\u017eo\u0161anas pas\u016bt\u012bjuma pl\u0101notos datumus, izmantojot Authorization ar <code>workorders:w<\/code>. P\u0113c tam ProShop izpildes savlaic\u012bguma prognoze un datumi, kuros nepiecie\u0161ami iepirktie materi\u0101li, balst\u0101s uz SkyPlanner datumiem.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eotnes.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktisko darba laiku nos\u016bt\u012bt atpaka\u013c uz ProShop Time Tracking, piesaistot to ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai. Ja ne, operatori turpina re\u0123istr\u0113t laiku ProShop t\u0101pat k\u0101 l\u012bdz \u0161im, un SkyPlanner to nolasa ar <code>timetracking<\/code>.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darb\u012bbas uzs\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013cas, oper\u0101cijas, normat\u012bvie laiki, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjuma statuss<\/td><td>ProShop<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, iek\u0101rtas un operatora piesaiste<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, kas izv\u0113l\u0113ta tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Time Tracking, kr\u0101jumi, iepirkumi, ra\u017eo\u0161anas uzdevumu izmaksu apr\u0113\u0137ins<\/td><td>ProShop; dati ievad\u012bti taj\u0101 vai nos\u016bt\u012bti no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas rakst\u012bs ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus. Tikl\u012bdz SkyPlanner sast\u0101da ra\u017eo\u0161anas \u0161\u016bnas grafiku, pl\u0101not\u0101ji vairs nemaina \u0161\u012bs \u0161\u016bnas darbu sec\u012bbu ProShop, lai abi pl\u0101ni nekad nekonkur\u0113tu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiski projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c t\u0101s uzs\u0101k\u0161anas. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot ra\u017eo\u0161anas \u0161\u016bnas, oper\u0101cijas un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas eksport\u0113ti no ProShop CSV vai Excel form\u0101t\u0101.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu sasaiste.<\/strong> Apstipriniet atbilst\u012bbu tabulu, noteikumus par atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un to, vai darba laiks tiks nos\u016bt\u012bts atpaka\u013c.<\/li>\n\n\n<li><strong>Piek\u013cuve ProShop.<\/strong> Administrators izveido Authorization ar saska\u0146oto Maximum Scope un l\u016bdz ProShop komandai iesp\u0113jot Recently Updated Records.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Parts, Work Cells, Users, Tools, Fixtures un ra\u017eo\u0161anas \u0161\u016bnu grafiki.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska izmai\u0146u p\u0101rbaude ar dal\u012bjumu lap\u0101s un atk\u0101rtotiem m\u0113\u0123in\u0101jumiem.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu konfigur\u0113\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits katrai oper\u0101cijai un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Mut\u0101cijas, ko aktiviz\u0113 SkyPlanner webhook, un ar\u012b Time Tracking, ja tas izv\u0113l\u0113ts.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam ProShop grafikam, sal\u012bdziniet datumus un preciz\u0113jiet normlaikus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proshop-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot ProShop integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Normlaiki nosaka visu.<\/strong> ProShop apr\u0113\u0137ina ilgumu no paredz\u0113t\u0101 sagatavo\u0161anas un cikla laika. Ieg\u016bstiet aktu\u0101los normlaikus, nevis s\u0101kotn\u0113jo apl\u0113si, un nodaliet sagatavo\u0161anas laiku no izpildes laika, lai vienu sagatavo\u0161anas laika v\u0113rt\u012bbu var\u0113tu aizst\u0101t ar sagatavo\u0161anas laiku matricu.<\/li>\n\n\n<li><strong>Darbinieks k\u0101 ra\u017eo\u0161anas \u0161\u016bna.<\/strong> Ra\u017eo\u0161anas \u0161\u016bna var b\u016bt ar\u012b cilv\u0113ks. \u0160\u0101das \u0161\u016bnas sasaistiet ar SkyPlanner person\u0101lu, nevis iek\u0101rt\u0101m, cit\u0101di katrs operators tiks uzskat\u012bts par paral\u0113li pieejamu iek\u0101rtu.<\/li>\n\n\n<li><strong>Time Tracking vajadz\u012bgs lietot\u0101js.<\/strong> Kop\u0161 2026. gada apr\u012b\u013ca uz Time Tracking Login mut\u0101ciju attiecas pras\u012bba \u201crequires user context\u201d (nepiecie\u0161ams lietot\u0101ja konteksts), un t\u0101 nav at\u013cauta ar Client Credentials. Nos\u016btiet operatoru darba laiku, izmantojot OAuth 2.0 Authorization Flow, vai turpiniet re\u0123istr\u0113t laiku ProShop un nolasiet to.<\/li>\n\n\n<li><strong>Aktiviz\u0113jiet izmai\u0146u indeksu.<\/strong> Recently Updated Records darbojas tikai p\u0113c tam, kad to aktiviz\u0113jusi ProShop komanda. Pieprasiet to pirmaj\u0101 ned\u0113\u013c\u0101.<\/li>\n\n\n<li><strong>ITAR ieraksti.<\/strong> ProShop filtr\u0113 ierakstus, uz kuriem attiecas ITAR ierobe\u017eojumi, katram savienojumam atsevi\u0161\u0137i. Developer System Config iestat\u012bjums nosaka, vai tie tiek atgriezti k\u0101 null v\u0113rt\u012bbas vai izlaisti. Vienojieties, kuri ra\u017eo\u0161anas pas\u016bt\u012bjumi integr\u0101cijai b\u016bs pieejami, un katr\u0101 nolas\u012b\u0161anas reiz\u0113 apstr\u0101d\u0101jiet null v\u0113rt\u012bbas.<\/li>\n\n\n<li><strong>\u0100rpakalpojumu oper\u0101cijas.<\/strong> Pieg\u0101d\u0101t\u0101ju veikt\u0101s oper\u0101cijas aiz\u0146em laiku, bet nenoslogo j\u016bsu jaudu. Model\u0113jiet t\u0101s k\u0101 posmus, kuriem \u0146em v\u0113r\u0101 tikai ilgumu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-proshop-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 ProShop integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c t\u0101s palai\u0161anas.<\/strong> Tas ietver saska\u0146otos GraphQL vaic\u0101jumus, mut\u0101cijas un periodisku izmai\u0146u p\u0101rbaudi. Katrs uz\u0146\u0113mums izmanto ProShop at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 \u0161\u012bs \u012bpatn\u012bbas tiek \u0146emtas v\u0113r\u0101.<\/li>\n\n\n<li><strong>Piedal\u0101s ar\u012b j\u016bsu ProShop administrators vai konsultants.<\/strong> Vi\u0146\u0161 izveido Authorization, nosaka piek\u013cuves tv\u0113rumus, pieprasa izmai\u0146u indeksu un p\u0101rzina j\u016bsu ra\u017eo\u0161anas \u0161\u016bnu konfigur\u0101ciju.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API ar API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Nor\u0101d\u012bjumi pieejami <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b par 5 darba centriem. Nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, kop\u0101 ar izv\u0113l\u0113to pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/proshop-erp\/razosanas-planosana\/\">ProShop ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un person\u0101la jaudai<\/a>, <a href=\"\/lv\/integracija\/erp\/proshop-erp\/\">ProShop ERP lapu<\/a>, SkyPlanner <a href=\"\/lv\/funkcijas\/\">iesp\u0113jas<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu p\u0101rvald\u0101m pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek autom\u0101tiski iek\u013cauti grafik\u0101, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ProShop ir API?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. ProShop GraphQL API ir pieejams adres\u0113 <code>&lt;proshop root&gt;\/api\/graphql<\/code> ar OAuth 2.0 vai Basic Authentication un modu\u013cu piek\u013cuves tv\u0113rumiem. REST galapunkts Recently Updated Records atgrie\u017e noteikt\u0101 laika interv\u0101l\u0101 izveidotos, main\u012btos vai dz\u0113stos ierakstus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ProShop atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">ProShop izstr\u0101d\u0101t\u0101ju dokument\u0101cij\u0101 nav aprakst\u012btas izejo\u0161\u0101s t\u012bmek\u013ca aiz\u0137eres. Integr\u0101cija periodiski pieprasa datus no Recently Updated Records API atbilsto\u0161i katram uz\u0146\u0113mumam iestat\u012btajam interv\u0101lam. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c ProShop?<\/summary>\n<p class=\"sp-faq__a\">Ar GraphQL mut\u0101ciju ra\u017eo\u0161anas pas\u016bt\u012bjumam, izmantojot Authorization ar rakst\u012b\u0161anas ties\u012bb\u0101m <code>workorders<\/code> tv\u0113rum\u0101. SkyPlanner to ierosina ar t\u012bmek\u013ca aiz\u0137eri ikreiz, kad grafiks main\u0101s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido ProShop API akredit\u0101cijas datus?<\/summary>\n<p class=\"sp-faq__a\">ProShop sist\u0113mas administrators sada\u013c\u0101 System Config &gt; Manage Authorizations. Direct Login iesp\u0113jo Client Credentials pl\u016bsmu, bet Maximum Scope ierobe\u017eo, ko integr\u0101cija dr\u012bkst nolas\u012bt un ierakst\u012bt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ProShop konsultantam ieteikt grafiku sast\u0101d\u012b\u0161anu ar ProShop vai ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 ja darbu sec\u012bba klienta ra\u017eo\u0161an\u0101 nosaka pieg\u0101des termi\u0146a iev\u0113ro\u0161anu. ProShop grafiks r\u0101da katras ra\u017eo\u0161anas \u0161\u016bnas priorit\u0101tes un prognozi par termi\u0146u iev\u0113ro\u0161anu, savuk\u0101rt pl\u0101not\u0101ji piel\u0101go priorit\u0101tes. SkyPlanner savienojas, izmantojot GraphQL API, autom\u0101tiski optimiz\u0113 visu pl\u0101nu un pl\u0101no p\u0101rregul\u0113\u0161anu, operatorus, instrumentus un materi\u0101lus. Lietot\u0101ju skaits nav ierobe\u017eots, un cena s\u0101kas no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem, import\u0113jot datus no ProShop CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ ProShop ERP ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ProShop integr\u0101cijas ce\u013cved\u012b administratoriem, konsultantiem un IT komand\u0101m ir paskaidrots, k\u0101 savienot ProShop ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ProShop, izmantojot ProShop API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu &#8230; <a title=\"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/\" aria-label=\"Read more about ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103203,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104243","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ProShop ERP APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/integracijas-celvedis\\\/\",\"name\":\"ProShop ERP APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ProShop ERP APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/","name":"ProShop ERP APS ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Savienot ProShop ERP un SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations un tv\u0113rumi, Recently Updated Records, datu sasaiste, atpaka\u013crakst\u012b\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/"},{"@type":"ListItem","position":5,"name":"ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ ProShop ERP ProShop ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ProShop integr\u0101cijas ce\u013cved\u012b administratoriem, konsultantiem un IT komand\u0101m ir paskaidrots, k\u0101 savienot ProShop ERP ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar ProShop, izmantojot ProShop API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104243"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104243\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103203"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}