{"id":104185,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/proalpha\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/","title":{"rendered":"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">proALPHA integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Proalpha integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Proalpha ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Proalpha notiek abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em artikulus, ra\u017eo\u0161anas pas\u016bt\u012bjumus ar oper\u0101cij\u0101m, resursus, kalend\u0101rus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kuma un beigu laiks tiek nos\u016bt\u012bts atpaka\u013c, izmantojot setWorkOrderOperationDates.<\/li>\n\n\n<li>Resursu izmai\u0146as tiek nos\u016bt\u012btas atpaka\u013c, izmantojot changeWorkOrderOperationResource.<\/li>\n\n\n<li>Operatoru apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c, izmantojot operationDataEntry.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Proalpha videi un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-proalpha-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha ERP darbojas uz Progress OpenEdge platformas, un l\u012bdz ar Release 9 platforma tika p\u0101rcelta uz OpenEdge 12. (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-release-9-integration-is-the-key-to-success\">Proalpha<\/a>) Grafiku sast\u0101d\u012b\u0161anai ir b\u016btiskas \u010detras saskarnes.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha ERP REST APIs.<\/strong> Publiskaj\u0101 <a href=\"https:\/\/api.proalpha.services\/\">Proalpha API Portal<\/a> ir uzskait\u012btas 108 OpenAPI 3.0 specifik\u0101cijas ce\u013c\u0101 <code>api\/web\/v1<\/code>. \u0160\u012bs saskarnes izmanto datu ierakst\u012b\u0161anai atpaka\u013c, k\u0101 ar\u012b artikulu un kr\u0101jumu datu nolas\u012b\u0161anai.<\/li>\n\n\n<li><strong>Integration Workbench (INWB).<\/strong> Proalpha raksturo INWB \u0161\u0101di: &#8220;is a central platform which connects different IT systems, machines, sites&#8221; (t\u0101 ir centr\u0101la platforma, kas savieno da\u017e\u0101das IT sist\u0113mas, iek\u0101rtas un ra\u017eotnes) un &#8220;converts the data into the format of the target system.&#8221; (p\u0101rveido datus m\u0113r\u0137a sist\u0113mas form\u0101t\u0101). (<a href=\"https:\/\/www.proalpha.com\/en\/areas\/business-partners-system-integration\">Proalpha<\/a>) T\u0101 sa\u0146em pAX zi\u0146ojumus, izmantojot <code>POST \/api\/web\/v1\/inwb\/message<\/code>. Izmantojiet to ra\u017eo\u0161anas pas\u016bt\u012bjumu nos\u016bt\u012b\u0161anai no Proalpha un sa\u0146em\u0161anai taj\u0101.<\/li>\n\n\n<li><strong>Proalpha Integration Platform.<\/strong> Par \u0161o uz n8n balst\u012bto platformu tika pazi\u0146ots 2026. gada apr\u012bl\u012b: &#8220;will be available to customers either on-premises or in the cloud.&#8221; (klientiem t\u0101 b\u016bs pieejama lok\u0101li vai m\u0101kon\u012b). Proalpha nor\u0101da: &#8220;will rely on an API-centric reference architecture and REST interfaces.&#8221; (t\u0101s pamat\u0101 b\u016bs API orient\u0113ta references arhitekt\u016bra un REST saskarnes). (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-enters-into-strategic-partnership-with-n8n\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>EDI un failu eksports.<\/strong> INWB apstr\u0101d\u0101 nozarei specifiskus failu form\u0101tus, savuk\u0101rt SkyPlanner izm\u0113\u0123in\u0101jumam pietiek ar failu eksportu.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">Ra\u017eo\u0161anas galapunkti<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Proalpha API<\/th><th>Galapunkts<\/th><th>Lietojums integr\u0101cij\u0101<\/th><\/tr><\/thead><tbody><tr><td>Production Workorder Operation Dates API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/setWorkOrderOperationDates<\/code><\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kuma un beigu laiks (guid, startTimePoint, endTimePoint)<\/td><\/tr><tr><td>Production Workorder Operation Resource API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/changeWorkOrderOperationResource<\/code><\/td><td>Grafik\u0101 izv\u0113l\u0113tais resurss (guid, resourceGUID)<\/td><\/tr><tr><td>Production Workorder Operation API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/operationDataEntry\/{combined, setup, process}<\/code><\/td><td>Apstiprin\u0101jumi: postingQty, scrapQty, finishOperation, employeeID, resourceTime<\/td><\/tr><tr><td>Part API<\/td><td><code>GET\/POST \/api\/web\/v1\/master\/part<\/code><\/td><td>Artikuli ar laukiem partNumber, partType, quantityUnitCode<\/td><\/tr><tr><td>Material API V1<\/td><td><code>GET \/api\/web\/v1\/mawi\/MRPArea\/{mrpAreaGuid}\/part\/{partGuid}\/stock<\/code><\/td><td>Kr\u0101jumi pa MRP zon\u0101m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Public\u0113taj\u0101s Proalpha specifik\u0101cij\u0101s tiek izmantota HTTP Basic autentifik\u0101cija. Galapunkti ir atkar\u012bgi no vides un atrodas j\u016bsu Proalpha server\u012b vai Proalpha Cloud: <code>{schema}:\/\/{host}:{port}\/api\/web\/v1\/...<\/code>. Izveidojiet atsevi\u0161\u0137u tehnisko lietot\u0101ju ar piek\u013cuves ties\u012bb\u0101m tikai datu kart\u0113\u0161anas tabul\u0101 nor\u0101d\u012btajiem objektiem. Kop\u0101 ar IT komandu pl\u0101nojiet t\u012bkla piek\u013cuvi \u0161im galapunktam no SkyPlanner m\u0101ko\u0146a.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. Lai s\u0101ktu, pietiek ar API pilnvaru. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> ir soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha API Portal nav nor\u0101d\u012bta API t\u012bmek\u013ca aiz\u0137eru abon\u0113\u0161anai. Izejo\u0161\u0101s izmai\u0146as tiek sa\u0146emtas \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>ar <strong>INWB zi\u0146ojumu pl\u016bsmu<\/strong>, kas nos\u016bta jaunus un main\u012btus ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m<\/li>\n\n\n<li>ar <strong>n8n darbpl\u016bsmu<\/strong> platform\u0101 Proalpha Integration Platform<\/li>\n\n\n<li>ar <strong>periodiskiem piepras\u012bjumiem<\/strong> Material API kr\u0101jumu datu sa\u0146em\u0161anai<\/li>\n\n<\/ul>\n\n\n<p>Mainoties st\u0101voklim vai grafikam, SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eru pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c Proalpha izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Proalpha objekts vai API<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Part (Part API)<\/td><td>Produkti un materi\u0101li<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Produkta procesa modelis: process, activities; ra\u017eo\u0161anas pas\u016bt\u012bjuma BOM rindas<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, procesa posmi<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums (Fertigungsauftrag) ar daudzumu un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Nos\u016bt\u012b\u0161ana ar INWB vai n8n vai ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas: targetSetupTime, targetProcessTime, resource<\/td><td>Procesa posmi ar p\u0101rregul\u0113\u0161anas laiku un ilgumu<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Kop\u0101 ar ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/td><\/tr><tr><td>Resursi, resursu grupas, alternat\u012bv\u0101s resursu grupas<\/td><td>Darba centri, darba centru grupas, alternat\u012bvie darba centri<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Resursu kalend\u0101ra bloki ar laukiem intensity un overloadIntensity<\/td><td>Mai\u0146as un darba centru efektivit\u0101te<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de; p\u0113c tam atjaunin\u0101\u0161ana katru dienu vai datu uztur\u0113\u0161ana SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td>Kr\u0101jumi pa MRP zon\u0101m<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Ik stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des datumu<\/td><td>Ien\u0101ko\u0161ais materi\u0101ls t\u0101 pieg\u0101des datum\u0101<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Ik stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>Katras oper\u0101cijas grafik\u0101 noteiktais s\u0101kuma un beigu laiks<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Pl\u0101no\u0161anas dzin\u0113ja izv\u0113l\u0113tais darba centrs<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Mainoties grafikam<\/td><\/tr><tr><td>operationDataEntry (setup, process, combined)<\/td><td>Laika uzskaites ieraksti un daudzumi no Mobile Confirmations<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Ar katru apstiprin\u0101jumu vai reizi mai\u0146\u0101<\/td><\/tr><tr><td>SkyPlanner grafiku sast\u0101d\u012b\u0161anas noteikumi<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, operatoru skaits<\/td><td>Tiek uztur\u0113ti SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet artikulus ar Part API un vienreiz iel\u0101d\u0113jiet resursus, resursu grupas un kalend\u0101rus, izmantojot INWB vai failu eksportu. R\u016bp\u012bgi nosakiet, kuram SkyPlanner darba centram atbilst katrs Proalpha resurss. Alternat\u012bv\u0101s resursu grupas k\u013c\u016bst par alternat\u012bvajiem darba centriem.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> INWB zi\u0146ojumu pl\u016bsma vai n8n darbpl\u016bsma nos\u016bta atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m, pl\u0101notajiem laikiem un resursiem. Kr\u0101jumu dati tiek sa\u0146emti no Material API pa MRP apgabaliem, bet atv\u0113rtie iepirkuma pas\u016bt\u012bjumi \u2014 caur INWB. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Katrai oper\u0101cijai, kuru pl\u0101no\u0161anas dzin\u0113js ir ievietojis grafik\u0101 vai p\u0101rvietojis, integr\u0101cija izsauc setWorkOrderOperationDates, nor\u0101dot oper\u0101cijas guid, s\u0101kumu un beigas. Ja dzin\u0113js ir izv\u0113l\u0113jies citu resursu, p\u0113c tam tiek izsaukts changeWorkOrderOperationResource.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer. Darba laika ieraksti uztur grafiku aktu\u0101lu un tiek nos\u016bt\u012bti uz Proalpha caur operationDataEntry. Ja j\u016bsu ra\u017eotn\u0113 izpildi jau apstiprina PDC termin\u0101\u013cos, izmantojiet tikai vienu kan\u0101lu, lai ieraksti nedubl\u0113tos.<\/p>\n\n\n<p><strong>5. Noteikumi par datu p\u0101rvald\u012bbu un konfliktiem.<\/strong> Pirms p\u0101rejas uz ekspluat\u0101ciju dokument\u0113jiet tos:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, procesu mode\u013ci, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu statuss<\/td><td>Proalpha<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, resursu pie\u0161\u0137\u012brums<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, kas izv\u0113l\u0113ta tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Izpildes apstiprin\u0101jumi un kr\u0101jumu kust\u012bbas ieraksti<\/td><td>Proalpha, kas sa\u0146em SkyPlanner darba laika ierakstus vai PDC datus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ja Proalpha APS vai Feinplanung ir akt\u012bvs, izlemiet, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus. Ja divas pl\u0101no\u0161anas sist\u0113mas ieraksta vienus un tos pa\u0161us datumus, t\u0101s p\u0101rraksta viena otras datus. Ar Autopilot SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas ar klientu. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat str\u0101d\u0101t ar saviem datiem. Eksport\u0113jiet no Proalpha atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un resursus CSV vai Excel form\u0101t\u0101, import\u0113jiet tos un p\u0101rbaudiet grafiku.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu kart\u0113\u0161anas darba sesija.<\/strong> Kop\u0101 ar savu Proalpha partneri saska\u0146ojiet datu kart\u0113\u0161anas tabulu, datu p\u0101rvald\u012bbas noteikumus, sinhroniz\u0101cijas bie\u017eumu un izpildes apstiprin\u0101jumu kan\u0101lu.<\/li>\n\n\n<li><strong>Saskar\u0146u iestat\u012b\u0161ana.<\/strong> Iesp\u0113jojiet REST API un INWB pl\u016bsmas, izveidojiet tehnisko lietot\u0101ju un nodro\u0161iniet piek\u013cuvi t\u012bkl\u0101. Vispirms testa sist\u0113m\u0101, p\u0113c tam produkcijas vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Artikuli, resursi, resursu grupas un kalend\u0101ri.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumu, kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumu nos\u016bt\u012b\u0161ana ar INWB vai n8n, kr\u0101jumu periodiska nolas\u012b\u0161ana un atk\u0101rtoti m\u0113\u0123in\u0101jumi k\u013c\u016bmes gad\u012bjum\u0101.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie darba centri.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> setWorkOrderOperationDates un changeWorkOrderOperationResource; \u0161aj\u0101 posm\u0101 pievieno ar\u012b operationDataEntry.<\/li>\n\n\n<li><strong>Paral\u0113la darb\u012bba.<\/strong> Sal\u012bdziniet SkyPlanner datumus ar pa\u0161reiz\u0113jo pl\u0101nu un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>P\u0101reja uz ekspluat\u0101ciju.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proalpha-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Proalpha integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nav tehnolo\u0123isk\u0101 procesa objekta.<\/strong> Proalpha pl\u0101no\u0161ana balst\u0101s uz produktu procesu mode\u013ciem. No SAP vai Business Central projektiem p\u0101r\u0146emti r\u012bki mekl\u0113 tehnolo\u0123iskos procesus un t\u0101d\u0113\u013c neatrod visus datus. No ra\u017eo\u0161anas pas\u016bt\u012bjuma nolasiet oper\u0101cijas un BOM rindas.<\/li>\n\n\n<li><strong>Kalend\u0101ra intensit\u0101te.<\/strong> Kalend\u0101ra blokos ir nor\u0101d\u012bti intensity un overloadIntensity. Piesaistiet tos SkyPlanner mai\u0146\u0101m un efektivit\u0101tes r\u0101d\u012bt\u0101jiem, nevis vienk\u0101r\u0161i kop\u0113jiet stundu skaitu.<\/li>\n\n\n<li><strong>M\u0113rvien\u012bbas.<\/strong> P\u0101rbaudiet quantityUnitCode un to, vai pl\u0101notais p\u0101rregul\u0113\u0161anas laiks attiecas uz pas\u016bt\u012bjumu vai vienu vien\u012bbu. Nepareizas m\u0113rvien\u012bbas izkrop\u013co visus ilgumus.<\/li>\n\n\n<li><strong>Klienta server\u012b izvietoti galapunkti.<\/strong> REST sl\u0101nis darbojas j\u016bsu Proalpha server\u012b. Ugunsm\u016bru, portu un sertifik\u0101tu konfigur\u0101cija nosaka, kad projekts var s\u0101kties, t\u0101p\u0113c sagatavojiet piek\u013cuvi laikus.<\/li>\n\n\n<li><strong>Programmat\u016bras versija.<\/strong> Pirms datu atbilst\u012bbas tabulas apstiprin\u0101\u0161anas noskaidrojiet pie partnera, kuri REST API ir pieejami j\u016bsu Proalpha versij\u0101.<\/li>\n\n\n<li><strong>Dokument\u0101cijai nepiecie\u0161ama pieteik\u0161an\u0101s.<\/strong> Proalpha tie\u0161saistes pal\u012bdz\u012bba ir pieejama Documentation Portal p\u0113c pieteik\u0161an\u0101s. Lauku nosaukumus preciz\u0113jiet pie partnera, nevis miniet.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-proalpha-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Proalpha integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c ekspluat\u0101cijas s\u0101k\u0161anas.<\/strong> Katr\u0101 Proalpha instal\u0101cij\u0101 modelis ir veidots at\u0161\u0137ir\u012bgi, un tie\u0161i \u0161eit \u0161\u012bs zin\u0101\u0161anas tiek liktas liet\u0101.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Proalpha partneris.<\/strong> Partneris p\u0101rzina j\u016bsu procesu mode\u013cus, INWB pl\u016bsmas un programmat\u016bras versiju un var iestat\u012bt API piek\u013cuvi. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot to pa\u0161u REST API un API mar\u0137ieri. SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Produkta dokument\u0101cija ir publiski pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, t\u0101p\u0113c piln\u0101s izmaksas redzat jau pirms darba s\u0101k\u0161anas. Uzziniet, k\u0101 Proalpha pl\u0101no jaudu, rakst\u0101 <a href=\"\/lv\/integracija\/erp\/proalpha\/razosanas-planosana\/\">Vai proALPHA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot faktisko iek\u0101rtu un darbinieku jaudu?<\/a>, skatiet p\u0101rskatu <a href=\"\/lv\/integracija\/erp\/proalpha\/\">proALPHA lap\u0101<\/a> un iepaz\u012bstiet citas sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana ietaupa 2 darba stundas ned\u0113\u013c\u0101, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedzis 99,2%, un grafiku sast\u0101d\u012b\u0161ana ietaupa l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cMums SkyPlanner ir v\u0113rt\u012bgs k\u0101 r\u012bks, kas labi darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuras Proalpha saskarnes izmanto integr\u0101cija?<\/summary>\n<p class=\"sp-faq__a\">Proalpha REST API izmanto deta\u013cu un kr\u0101jumu datiem, k\u0101 ar\u012b datumu, resursu un izpildes apstiprin\u0101jumu ierakst\u012b\u0161anai atpaka\u013c. INWB zi\u0146ojumu pl\u016bsmas vai uz n8n balst\u012bt\u0101 Integration Platform p\u0101rs\u016bta ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m. Izm\u0113\u0123in\u0101jumam un datu lielapjoma iel\u0101dei izmanto failu eksportu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur Proalpha tiek ierakst\u012bti pl\u0101notie datumi?<\/summary>\n<p class=\"sp-faq__a\">Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101, izmantojot setWorkOrderOperationDates un nor\u0101dot s\u0101kuma un beigu laiku. Ja pl\u0101no\u0161anas dzin\u0113js ir p\u0101rvietojis ra\u017eo\u0161anas uzdevumu uz citu iek\u0101rtu, changeWorkOrderOperationResource atjaunina resursu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Proalpha atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Proalpha API Portal nav nor\u0101d\u012bts API t\u012bmek\u013ca aiz\u0137eru abon\u0113\u0161anai. Izmai\u0146as non\u0101k SkyPlanner caur INWB zi\u0146ojumu pl\u016bsm\u0101m, n8n darbpl\u016bsm\u0101m vai periodisku datu nolas\u012b\u0161anu. Pa\u0161a SkyPlanner t\u012bmek\u013ca aiz\u0137eres nodro\u0161ina notikumu vad\u012btu datu ierakst\u012b\u0161anu atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai operatoru izpildes apstiprin\u0101jumus var nos\u016bt\u012bt uz Proalpha?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner Mobile Confirmations darba laika ieraksti tiek nos\u016bt\u012bti caur operationDataEntry kop\u0101 ar daudzumu, darbinieka laiku un resursa laiku. Ja izmantojat ar\u012b PDC termin\u0101\u013cus, saglab\u0101jiet tikai vienu izpildes apstiprin\u0101jumu kan\u0101lu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums nepiecie\u0161ams Proalpha APS, un ko dar\u012bt, ja to jau izmantojam?<\/summary>\n<p class=\"sp-faq__a\">Tas nav nepiecie\u0161ams. SkyPlanner pats izveido grafiku no j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumiem, oper\u0101cij\u0101m un resursiem, iev\u0113rojot faktisko iek\u0101rtu un darbinieku jaudu, savuk\u0101rt Autopilot uztur to aktu\u0101lu. Ja Proalpha APS ir akt\u012bvs, tv\u0113ruma noteik\u0161anas laik\u0101 izlemiet, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus. SkyPlanner tad ieraksta tikai tos datumus, par kuriem tas atbild, t\u0101p\u0113c abi pl\u0101ni nekad nep\u0101rraksta viens otra datus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jums atbalsta l\u012bdz 20 darba centriem, izmantojot j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ proALPHA ERP proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Proalpha integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Proalpha ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Proalpha notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Proalpha videi &#8230; <a title=\"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/\" aria-label=\"Read more about proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103173,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104185","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>proALPHA APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/integracijas-celvedis\\\/\",\"name\":\"proALPHA APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"proALPHA APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/","name":"proALPHA APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"proALPHA\u2013SkyPlanner APS: REST API, Integration Workbench, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, setWorkOrderOperationDates atpaka\u013cierakste un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/"},{"@type":"ListItem","position":5,"name":"proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ proALPHA ERP proALPHA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Proalpha integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Proalpha ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un Proalpha notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Proalpha videi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104185"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104185\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103173"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}