{"id":104069,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/","title":{"rendered":"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ MRPeasy<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">MRPeasy integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 MRPeasy integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot MRPeasy ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem abos virzienos, izmantojot MRPeasy REST API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, BOM, darba centru grupas, darba centrus, artikulus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie datumi un izpildes gaita tiek ierakst\u012bti atpaka\u013c katr\u0101 Manufacturing Order objekt\u0101.<\/li>\n\n\n<li>SkyPlanner nos\u016bta webhook pazi\u0146ojumus par grafika izmai\u0146\u0101m, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ir integr\u0113ts ar MRPeasy klientu projektos. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu MRPeasy konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts konsultantiem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-mrpeasy-rest-api-v1-and-v2\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">MRPeasy REST API: v1 un v2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy ir vienots m\u0101ko\u0146produkts bez lok\u0101li instal\u0113jam\u0101m versij\u0101m, t\u0101p\u0113c visi klienti izmanto vienu un to pa\u0161u API. Ir pieejamas divas versijas:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API v1<\/strong> (OpenAPI 1.0, serveris <code>https:\/\/api.mrpeasy.com\/rest\/v1<\/code>) ir API lieto\u0161anai produkcijas vid\u0113. Tas ietver <code>\/items<\/code>, <code>\/boms<\/code>, <code>\/routings<\/code>, <code>\/manufacturing-orders<\/code>, <code>\/work-centers<\/code>, <code>\/work-center-types<\/code>, <code>\/customer-orders<\/code>, <code>\/purchase-orders<\/code>, <code>\/stock\/inventory<\/code>, <code>\/lots<\/code>, <code>\/units<\/code> un ra\u017eo\u0161anas p\u0101rskatus, piem\u0113ram, <code>\/report\/production\/operations<\/code>.<\/li>\n\n\n<li><strong>REST API v2<\/strong> (OpenAPI 2.0.0, serveris <code>https:\/\/api.mrpeasy.com\/rest\/v2<\/code>) ir agr\u012bn\u0101 izstr\u0101des stadij\u0101. Taj\u0101 ir pievienots <code>\/workstation-groups<\/code> ar <code>work_hours<\/code> un <code>holidays<\/code>, <code>\/workstations<\/code> ar <code>productivity<\/code> un <code>idle<\/code>, k\u0101 ar\u012b <code>\/inventory<\/code>, <code>\/stock-movement<\/code> un PATCH. Ra\u017eo\u0161anas pas\u016bt\u012bjumiem joproj\u0101m izmanto v1.<\/li>\n\n<\/ol>\n\n\n<p>Piev\u0113rsiet uzman\u012bbu nosaukumiem. MRPeasy saskarn\u0113 redzamajam <strong>Workstation group<\/strong> v1 atbilst <code>work-center-types<\/code> (<code>type_id<\/code>). <strong>Workstation<\/strong> atbilst <code>work-centers<\/code> (<code>center_id<\/code>). Tehnolo\u0123isk\u0101 procesa oper\u0101cijas ar <code>type_id<\/code> atsaucas uz grupu, nevis uz iek\u0101rtu.<\/p>\n\n\n<p>API ir iek\u013cauts MRPeasy <strong>Unlimited<\/strong> pl\u0101n\u0101 un ir pieejams maksas kontiem. MRPeasy ar\u012b nor\u0101da: &#8220;Our Support Department cannot help you using the API.&#8221; (M\u016bsu atbalsta noda\u013ca nevar pal\u012bdz\u0113t jums izmantot API.) T\u0101p\u0113c par integr\u0101ciju j\u0101atbild SkyPlanner, j\u016bsu MRPeasy konsultantam vai izstr\u0101d\u0101t\u0101jam. Ievie\u0161anas laik\u0101 tie\u0161i \u0161o darbu uz\u0146emas SkyPlanner komanda.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un ierobe\u017eojumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy izmanto HTTP Basic autentifik\u0101ciju: <code>Authorization: Basic base64(api-key:api-secret)<\/code>. Atsl\u0113gu un slepeno atsl\u0113gu izveido sada\u013c\u0101 <strong>Settings \u2192 Integration \u2192 API access<\/strong>. Dz\u0113\u0161ot atsl\u0113gu, API tiek atsp\u0113jots.<\/p>\n\n\n<p>Veidojot sinhroniz\u0101ciju, j\u0101\u0146em v\u0113r\u0101 \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Katram klientam vienlaikus tiek apstr\u0101d\u0101ts tikai viens piepras\u012bjums: piepras\u012bjumi tiek apstr\u0101d\u0101ti sec\u012bgi.<\/li>\n\n\n<li>Ne vair\u0101k k\u0101 100 piepras\u012bjumu 10 sekund\u0113s. P\u0101rsniedzot \u0161o ierobe\u017eojumu, API atgrie\u017e statusa kodu 429.<\/li>\n\n\n<li>Sarakstos p\u0113c noklus\u0113juma tiek atgriezti 100 ieraksti, bet ar <code>Range<\/code> galveni \u2014 l\u012bdz 1 000. Atbildes galven\u0113 <code>Content-Range<\/code> ir nor\u0101d\u012bts kop\u0113jais skaits.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy cenu lap\u0101 ir nor\u0101d\u012bts &#8220;API, webhooks (for paid accounts)&#8221; (API un webhook pazi\u0146ojumi maksas kontiem), ta\u010du v1 un v2 specifik\u0101cij\u0101s nav dokument\u0113ti ra\u017eo\u0161anas pas\u016bt\u012bjumu webhook notikumi. T\u0101p\u0113c integr\u0101cija periodiski pieprasa MRPeasy datus, ielasot izmai\u0146as:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eo\u0161anas pas\u016bt\u012bjumus filtr\u0113 p\u0113c statusa: Not scheduled (15), Scheduled (20), In progress (30) un Paused (35).<\/li>\n\n\n<li>Iepirkuma pas\u016bt\u012bjumus un kr\u0101jumus pieprasa p\u0113c grafika vai pirms katras grafika sast\u0101d\u012b\u0161anas.<\/li>\n\n\n<li>Pamatdatus pieprasa p\u0113c izmai\u0146\u0101m vai katru nakti.<\/li>\n\n<\/ul>\n\n\n<p>Sec\u012bgi pieprasot filtr\u0113tus datus, piepras\u012bjumu skaits ir krietni maz\u0101ks par at\u013cautajiem 100 piepras\u012bjumiem 10 sekund\u0113s. Pret\u0113j\u0101 virzien\u0101 SkyPlanner nos\u016bta webhook pazi\u0146ojumus par grafika izmai\u0146\u0101m, tikl\u012bdz t\u0101s notiek, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c MRPeasy ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>MRPeasy objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Item, Unit of measurement (<code>\/items<\/code>, <code>\/units<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam katru nakti<\/td><\/tr><tr><td>BOM ar komponentiem (<code>\/boms<\/code>)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katra produkta materi\u0101li<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td>Tehnolo\u0123isk\u0101 procesa oper\u0101cijas (<code>\/routings<\/code>): <code>type_id<\/code>, <code>fixed_time<\/code>, <code>variable_time<\/code>, <code>variable_quantity<\/code><\/td><td>Procesa so\u013ci ar ilgumu, p\u0101rregul\u0113\u0161anas laiku un partijas lielumu<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td>Workstation group (<code>\/work-center-types<\/code>; v2 <code>\/workstation-groups<\/code>)<\/td><td>Darba centru grupas, mai\u0146as<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, turpm\u0101k reti<\/td><\/tr><tr><td>Workstation (<code>\/work-centers<\/code>; v2 <code>\/workstations<\/code>: <code>productivity<\/code>, <code>idle<\/code>)<\/td><td>Darba centri, efektivit\u0101tes r\u0101d\u012bt\u0101ji, nepieejam\u012bbas periodi<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de; d\u012bkst\u0101ves dati \u2014 katru dienu<\/td><\/tr><tr><td>Manufacturing Order ar oper\u0101cij\u0101m un <code>due_date<\/code> (<code>\/manufacturing-orders<\/code>)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Inventory, Stock lots (<code>\/stock\/inventory<\/code>, <code>\/lots<\/code>)<\/td><td>Kr\u0101jumu atlikumi<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>Katru stundu vai katr\u0101 grafika sast\u0101d\u012b\u0161anas reiz\u0113<\/td><\/tr><tr><td>Purchase Order (<code>\/purchase-orders<\/code>)<\/td><td>Gaid\u0101mais materi\u0101ls ar paredzamo pieg\u0101des datumu<\/td><td>MRPeasy \u2192 SkyPlanner<\/td><td>Katru stundu vai katr\u0101 grafika sast\u0101d\u012b\u0161anas reiz\u0113<\/td><\/tr><tr><td>Manufacturing Order lauki <code>due_date<\/code> un <code>custom_&lt;id&gt;<\/code> (PUT <code>\/manufacturing-orders\/{id}<\/code>)<\/td><td>Pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas, izpildes gaita<\/td><td>SkyPlanner \u2192 MRPeasy<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>MRPeasy nav pieejams<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, operatoru skaits, alternat\u012bvi darba centri<\/td><td>Datus uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ielasiet artikulus, m\u0113rvien\u012bbas, BOM un tehnolo\u0123iskos procesus no v1, bet darba centru grupas un darba centrus \u2014 no v1 vai v2. Kalend\u0101rus ieg\u016bstiet no v2 <code>\/workstation-groups<\/code> (<code>work_hours<\/code>, <code>holidays<\/code>) vai iestatiet mai\u0146as tie\u0161i SkyPlanner. Katrai Active processing grupai piesaistiet SkyPlanner darba centru grupu un iek\u013caujiet taj\u0101 attiec\u012bgos darba centrus.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Ielasiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus un kr\u0101jumu datus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjums tiek atz\u012bm\u0113ts ar statusu Delivered. Katr\u0101 p\u0101rpl\u0101no\u0161anas reiz\u0113 tiek p\u0101rbaud\u012bti gan kr\u0101jumi, gan gaid\u0101m\u0101s iepirkumu pieg\u0101des.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> PUT <code>\/manufacturing-orders\/{id}<\/code> atbalsta <code>code<\/code>, <code>quantity<\/code>, <code>due_date<\/code> un <code>assigned_id<\/code>, k\u0101 ar\u012b piel\u0101gotos laukus form\u0101 <code>custom_&lt;id&gt;<\/code>. Ja par to ir pan\u0101kta vieno\u0161an\u0101s, SkyPlanner ieraksta pl\u0101not\u0101s beigas lauk\u0101 <code>due_date<\/code>, bet pl\u0101noto s\u0101kumu, pl\u0101not\u0101s beigas un izpildes gaitu \u2014 MRPeasy piel\u0101gotajos laukos. T\u0101d\u0113j\u0101di p\u0101rdo\u0161anas un iepirkumu darbinieki MRPeasy redz faktisko grafiku. Detaliz\u0113ta oper\u0101ciju sec\u012bba un katrai oper\u0101cijai pie\u0161\u0137irtais darba centrs tiek uztur\u0113ti SkyPlanner, kas kalpo par ra\u017eotnes darbu vad\u012bbas skatu.<\/p>\n\n\n<p><strong>4. \u0100rpus MRPeasy izveidoti pas\u016bt\u012bjumi.<\/strong> Ja pas\u016bt\u012bjumi tiek veidoti ar\u012b ar API, POST <code>\/manufacturing-orders<\/code> pie\u0146em <code>no_scheduling<\/code> un <code>no_bookings<\/code>. Izmantojiet tos, lai MRPeasy nerezerv\u0113tu darba centrus, kurus jau pl\u0101no SkyPlanner.<\/p>\n\n\n<p><strong>5. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations, Production Timer vai Quick Log Mode, un laika uzskaites ieraksti uztur grafiku aktu\u0101lu. Izv\u0113lieties vienu darba uzskaites kan\u0101lu. Ja vien\u0101m un t\u0101m pa\u0161\u0101m oper\u0101cij\u0101m paral\u0113li izmanto MRPeasy Internet-kiosk un SkyPlanner, rodas divas at\u0161\u0137ir\u012bgas datu versijas.<\/p>\n\n\n<p><strong>6. Atbild\u012bbas sadal\u012bjums un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, BOM, tehnolo\u0123iskie procesi, daudzumi, kr\u0101jumi, iepirkumi<\/td><td>MRPeasy<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, darba centru pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvi resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Pas\u016bt\u012bjuma izpildes gaita un re\u0123istr\u0113tais darbs<\/td><td>SkyPlanner; kopsavilkums Manufacturing Order objekt\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Projekt\u0113\u0161ana p\u0113c pas\u016bt\u012bjuma.<\/strong> Vien\u0101 \u012bstenot\u0101 MRPeasy projekt\u0101 katram klienta projektam tiek izveidots pamatprodukts un no viena l\u012bdz trim pusfabrik\u0101tiem. Katram no tiem MRPeasy ir sava materi\u0101lu specifik\u0101cija (BOM) un tehnolo\u0123iskais process, un Manufacturing Order objekts ir ab\u0101s sist\u0113m\u0101s. Katram pas\u016bt\u012bjumam saglab\u0101jiet nemain\u012bgu, ab\u0101m sist\u0113m\u0101m kop\u012bgu identifikatoru, lai atjaunin\u0101jumi nekad nerad\u012btu dublik\u0101tus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam varat izmantot 30 dienu bezmaksas izm\u0113\u0123in\u0101jumu ar saviem datiem neatkar\u012bgi no MRPeasy pl\u0101na. No MRPeasy sarakstu skatiem eksport\u0113jiet CSV form\u0101t\u0101 preces, materi\u0101lu specifik\u0101cijas (BOM), tehnolo\u0123iskos procesus, darba centrus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, import\u0113jiet tos un p\u0101rbaudiet grafiku.<\/p>\n\n\n<p>Pats projekts ietver \u0161\u0101dus so\u013cus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Pl\u0101na p\u0101rbaude.<\/strong> P\u0101rliecinieties, ka MRPeasy pl\u0101n\u0101 ir iek\u013cauta API piek\u013cuve, un izveidojiet API atsl\u0113gu un slepeno atsl\u0113gu.<\/li>\n\n\n<li><strong>Datu atbilst\u012bbas noteik\u0161ana.<\/strong> Saska\u0146ojiet atbilst\u012bbas tabulu, noteikumus par datu p\u0101rvald\u012bbu, piel\u0101gotos laukus datu ierakst\u012b\u0161anai atpaka\u013c un zi\u0146o\u0161anas kan\u0101lu.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Preces, m\u0113rvien\u012bbas, materi\u0101lu specifik\u0101cijas (BOM), tehnolo\u0123iskie procesi, darba centru grupas, darba centri, kalend\u0101ri.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska izmai\u0146u piepras\u012b\u0161ana p\u0113c statusa, apstr\u0101d\u0101jot ar\u012b 429 atbildes.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie darba centri.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Izpildes termi\u0146i un piel\u0101gotie lauki katr\u0101 Manufacturing Order.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam Production schedule skatam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-mrpeasy-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot MRPeasy integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Laika lauki saskarn\u0113s at\u0161\u0137iras.<\/strong> Lietot\u0101ja saskarnes laukiem Setup time, Cycle time un Capacity API atbilst <code>fixed_time<\/code>, <code>variable_time<\/code> un <code>variable_quantity<\/code>. Ja Capacity ir liel\u0101ks par 1, tas noz\u012bm\u0113 apstr\u0101di partij\u0101s, piem\u0113ram, kr\u0101sn\u012b. Model\u0113jiet to k\u0101 partijas ra\u017eo\u0161anas uzdevumu, nevis gar\u0101ku ciklu.<\/li>\n\n\n<li><strong>Passive processing grupas.<\/strong> \u017d\u0101v\u0113\u0161anas un dzes\u0113\u0161anas grupas darbojas 24\/7 bez jaudas ierobe\u017eojumiem. Model\u0113jiet t\u0101s k\u0101 gaid\u012b\u0161anas laikus, nevis darba centrus ar ierobe\u017eotu jaudu.<\/li>\n\n\n<li><strong>v1 nav kalend\u0101ru.<\/strong> <code>work-centers<\/code> atgrie\u017e tikai <code>center_id<\/code>, <code>type_id<\/code>, <code>code<\/code> un <code>title<\/code>. Izmantojiet v2 vai uzturiet mai\u0146as SkyPlanner.<\/li>\n\n\n<li><strong>D\u012bkst\u0101ve.<\/strong> Darba centra d\u012bkst\u0101ves datos ir nor\u0101d\u012bta apkope un d\u012bkst\u0101ves periodi. Sinhroniz\u0113jiet tos, cit\u0101di SkyPlanner iepl\u0101nos darbu iek\u0101rtai, kas nedarbojas.<\/li>\n\n\n<li><strong>Tehnolo\u0123iskajos procesos ir nor\u0101d\u012btas grupas.<\/strong> MRPeasy izv\u0113las iek\u0101rtu ar lab\u0101ko pieejam\u012bbu. SkyPlanner grupas darba centri k\u013c\u016bst par re\u0101l\u0101m alternat\u012bv\u0101m, no kur\u0101m izv\u0113las pl\u0101no\u0161anas dzin\u0113js.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-mrpeasy-integration-who-configures-and-suppo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">MRPeasy integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver j\u016bsu tehnolo\u0123isko procesu, darba centru grupu un pas\u016bt\u012bjumu pl\u016bsmas sasaisti starp sist\u0113m\u0101m, k\u0101 ar\u012b t\u0101du ierobe\u017eojumu konfigur\u0113\u0161anu, kas netiek glab\u0101ti MRPeasy. Tie ietver p\u0101rregul\u0113\u0161anas laiku matricu, instrumentus, operatoru skaitu un alternat\u012bvos resursus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas.<\/strong> Katr\u0101 ra\u017eotn\u0113 MRPeasy izmanto at\u0161\u0137ir\u012bgi, un \u0161\u012bs zin\u0101\u0161anas tiek \u0146emtas v\u0113r\u0101 konfigur\u0113\u0161an\u0101. MRPeasy atbalsts neaptver darbu ar API, t\u0101p\u0113c ir svar\u012bgi, lai par integr\u0101ciju atbild\u0113tu viena komanda.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izveidot j\u016bsu MRPeasy konsultants vai integr\u0101cijas partneris.<\/strong> Vien\u0101 \u012bstenot\u0101 MRPeasy projekt\u0101 integr\u0101cijas partneris savienoja abas sist\u0113mas, izmantojot abu sist\u0113mu REST API. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju,<\/strong> izmantojot API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Produkta dokument\u0101cija, tostarp inform\u0101cija par iepirkuma pas\u016bt\u012bjumiem un produktu un materi\u0101lu API, ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai pirms darba s\u0101k\u0161anas b\u016btu zin\u0101mas visas izmaksas. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un sal\u012bdzin\u0101jumu ar pa\u0161a MRPeasy pl\u0101not\u0101ju lap\u0101 <a href=\"\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/\">MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu<\/a>. P\u0101rskats ir pieejams <a href=\"\/lv\/integracija\/erp\/mrpeasy\/\">MRPeasy lap\u0101<\/a>, bet citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales pane\u013cu ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide tr\u012bs m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner rada pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai un nodro\u0161ina t\u0101s uzticam\u012bbu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kuru izskat\u012b\u0161ana agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy ir API, un kur\u0161 pl\u0101ns ir nepiecie\u0161ams?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. MRPeasy maksas kontiem ar Unlimited pl\u0101nu pied\u0101v\u0101 REST API: v1 tiek izmantota produkcijas vid\u0113, bet v2 ir izstr\u0101des stadij\u0101. Autentifik\u0101cijai izmanto HTTP Basic ar API atsl\u0113gu un slepeno atsl\u0113gu, kas pieejamas sada\u013c\u0101 Settings \u2192 Integration \u2192 API access.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var ierakst\u012bt grafiku atpaka\u013c MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner atjaunina katru Manufacturing Order ar PUT <code>\/manufacturing-orders\/{id}<\/code>, ierakstot izpildes termi\u0146u un piel\u0101gotos laukus pl\u0101notajam s\u0101kumam, pl\u0101notaj\u0101m beig\u0101m un progresam. Detaliz\u0113t\u0101 oper\u0101ciju sec\u012bba tiek glab\u0101ta SkyPlanner, kur operatori str\u0101d\u0101 p\u0113c savas darbu rindas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy nos\u016bta izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">API specifik\u0101cij\u0101s nav dokument\u0113ti t\u012bmek\u013ca aiz\u0137eru notikumi ra\u017eo\u0161anas pas\u016bt\u012bjumiem, t\u0101p\u0113c SkyPlanner ik p\u0113c da\u017e\u0101m min\u016bt\u0113m pieprasa atv\u0113rtos pas\u016bt\u012bjumus p\u0113c statusa. Pa\u0161a SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as uzreiz, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido MRPeasy integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas. Integr\u0101ciju var izveidot ar\u012b j\u016bsu MRPeasy konsultants, integr\u0101cijas partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to REST API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t CSV datus no MRPeasy neatkar\u012bgi no MRPeasy pl\u0101na. Maks\u0101jumu karte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ MRPeasy MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 MRPeasy integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot MRPeasy ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem abos virzienos, izmantojot MRPeasy REST API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana SkyPlanner ir integr\u0113ts ar MRPeasy klientu projektos. Ievie\u0161anas laik\u0101 SkyPlanner &#8230; <a title=\"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/\" aria-label=\"Read more about MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103113,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104069","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MRPeasy APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"MRPeasy\u2013SkyPlanner APS: REST API v1\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"MRPeasy\u2013SkyPlanner APS: REST API v1\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/integracijas-celvedis\\\/\",\"name\":\"MRPeasy APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"MRPeasy\u2013SkyPlanner APS: REST API v1\\\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MRPeasy APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"MRPeasy\u2013SkyPlanner APS: REST API v1\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"MRPeasy\u2013SkyPlanner APS: REST API v1\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/","name":"MRPeasy APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"MRPeasy\u2013SkyPlanner APS: REST API v1\/v2, autentifik\u0101cija, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija, atpaka\u013cierakste, kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/"},{"@type":"ListItem","position":5,"name":"MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ MRPeasy MRPeasy integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 MRPeasy integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m ir aprakst\u012bts, k\u0101 savienot MRPeasy ar SkyPlanner APS. SkyPlanner apmain\u0101s ar datiem abos virzienos, izmantojot MRPeasy REST API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana SkyPlanner ir integr\u0113ts ar MRPeasy klientu projektos. Ievie\u0161anas laik\u0101 SkyPlanner&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104069"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104069\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103113"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}