{"id":104040,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/mrpeasy\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/","title":{"rendered":"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ MRPeasy<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? <span class=\"hl\">MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">J\u0101, ta\u010du pa vienam pas\u016bt\u012bjumam. Izveidojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, MRPeasy to iepl\u0101no pirmaj\u0101 br\u012bvaj\u0101 laika log\u0101, iev\u0113rojot darba centru pieejamo jaudu. Sist\u0113ma nemaina grafik\u0101 jau iek\u013cauto neizpild\u012bto pas\u016bt\u012bjumu sec\u012bbu, un viena pas\u016bt\u012bjuma p\u0101rcel\u0161ana nep\u0101rce\u013c p\u0101r\u0113jos. Ra\u017eotnes, kur\u0101m j\u0101optimiz\u0113 viss grafiks kopum\u0101, l\u012bdztekus MRPeasy izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy cenu lap\u0101 \u0161\u012b funkcija nosaukta par &#8220;Operations scheduling (MRP II, finite capacity)&#8221; (oper\u0101ciju grafiku sast\u0101d\u012b\u0161ana, iev\u0113rojot pieejamo jaudu, MRP II). T\u0101 ir iek\u013cauta visos \u010detros pl\u0101nos: Starter, Professional, Enterprise un Unlimited.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-mrpeasy-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 MRPeasy sast\u0101da ra\u017eo\u0161anas grafiku: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darba centru grupas un darba centri<\/h3>\n\n\n<p>Jaudas iestat\u012b\u0161ana s\u0101kas sada\u013c\u0101 <strong>Production planning \u2192 Workstation groups<\/strong>. Katrai grupai ir lauks Type:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Active processing<\/strong>: ar ierobe\u017eotu jaudu, &#8220;constrained by capacity (the number of available workstations) and working hours&#8221; (to ierobe\u017eo jauda \u2014 pieejamo darba centru skaits \u2014 un darba laiks).<\/li>\n\n\n<li><strong>Passive processing<\/strong>: bez jaudas ierobe\u017eojumiem, pieejama 24\/7, piem\u0113ram, \u017e\u0101v\u0113\u0161anai vai dzes\u0113\u0161anai.<\/li>\n\n<\/ul>\n\n\n<p>Grupai var iestat\u012bt atsevi\u0161\u0137u darba laiku un br\u012bvdienas. Visam uz\u0146\u0113mumam kop\u012bgos iestat\u012bjumus Work hours un Holidays nor\u0101da sada\u013c\u0101 Settings. (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/work-station-types\/details\/\">avots<\/a>)<\/p>\n\n\n<p>Katrs <strong>Workstation<\/strong> pieder Active processing grupai. Tam ir lauki Hourly rate, <strong>Productivity<\/strong> (attiec\u012bb\u0101 pret pirmo darba centru grup\u0101), Default worker, Maintenance cycle un <strong>Idle time<\/strong>: &#8220;periods when no works can be planned&#8221; (periodi, kuros nevar iepl\u0101not darbus). (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/work-stations\/details\/\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Tehnolo\u0123iskie procesi<\/h3>\n\n\n<p>Katra tehnolo\u0123isk\u0101 procesa oper\u0101cija lauk\u0101 <strong>Workstation group<\/strong> ir piesaist\u012bta darba centru grupai, nevis konkr\u0113tai iek\u0101rtai. MRPeasy skaidro: &#8220;When scheduling the production, the individual workstation from that group with the best availability is chosen.&#8221; (Sast\u0101dot ra\u017eo\u0161anas grafiku, no grupas izv\u0113las darba centru, kura pieejamais laiks ir vispiem\u0113rot\u0101kais.) Grafika sast\u0101d\u012b\u0161anu nosaka \u0161\u0101di oper\u0101cijas lauki:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Setup time<\/strong> un <strong>Cycle time<\/strong><\/li>\n\n\n<li><strong>Capacity<\/strong> \u2014 vienlaikus apstr\u0101d\u0101jamo vien\u012bbu skaits, piem\u0113ram, kr\u0101sn\u012b<\/li>\n\n\n<li><strong>Sequence<\/strong> un <strong>Overlap<\/strong> (ar funkciju Overlap and Special Sequences, s\u0101kot no pl\u0101na Professional)<\/li>\n\n\n<li><strong>Parallelize<\/strong> (s\u0101kot no pl\u0101na Professional)<\/li>\n\n<\/ul>\n\n\n<p>Apak\u0161uzdevumi neietekm\u0113 grafika sast\u0101d\u012b\u0161anu. (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/stock\/items\/details\/routings\/\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Ra\u017eo\u0161anas pas\u016bt\u012bjuma izveide<\/h3>\n\n\n<p>J\u016bs izv\u0113laties produktu un daudzumu, un &#8220;the software will calculate the production schedule&#8221; (programmat\u016bra apr\u0113\u0137ina ra\u017eo\u0161anas grafiku). MRPeasy apr\u0113\u0137ina grafiku katrai BOM un katram tehnolo\u0123iskajam procesam: &#8220;For each BOM, the routing with the earliest finish date is selected, by default.&#8221; (Katrai BOM p\u0113c noklus\u0113juma izv\u0113las tehnolo\u0123isko procesu ar agr\u0101ko pabeig\u0161anas datumu.)<\/p>\n\n\n<p>Sast\u0101dot grafiku, sist\u0113ma &#8220;takes into account all limitations in resources&#8221; (\u0146em v\u0113r\u0101 visus resursu ierobe\u017eojumus). Tas ietver citus ra\u017eo\u0161anas uzdevumus, pl\u0101not\u0101s iek\u0101rtu d\u012bkst\u0101ves un, pl\u0101nojot uz priek\u0161u, ar\u012b noliktav\u0101 tr\u016bksto\u0161o materi\u0101lu pieg\u0101des laiku. Lai tas darbotos, precei vajadz\u012bga BOM un Routing. (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/manufacturing-orders\/add\/\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Pl\u0101no\u0161ana uz priek\u0161u vai atpaka\u013c<\/h3>\n\n\n<p>P\u0113c noklus\u0113juma pl\u0101no\u0161ana notiek uz priek\u0161u: &#8220;By default, the software schedules the Manufacturing Order to the first available time.&#8221; (P\u0113c noklus\u0113juma programmat\u016bra iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumu pirmaj\u0101 pieejamaj\u0101 laik\u0101.)<\/p>\n\n\n<p>Pl\u0101no\u0161ana atpaka\u013c ir pieejama pl\u0101n\u0101 Enterprise. T\u0101 &#8220;schedules production operations as late as possible before delivery&#8221; (iepl\u0101no ra\u017eo\u0161anas oper\u0101cijas p\u0113c iesp\u0113jas v\u0113lu pirms pieg\u0101des), balstoties uz Customer Order; p\u0113c izv\u0113les var nor\u0101d\u012bt laika rezervi dien\u0101s. (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/settings\/system\/enterprise-functions\/backward-scheduling\/\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Production schedule<\/h3>\n\n\n<p>Lap\u0101 <strong>Production schedule<\/strong> redzams skats Calendar un Gantt diagramma sadal\u012bjum\u0101 pa ra\u017eo\u0161anas pas\u016bt\u012bjumiem vai darba centriem. T\u0101 pied\u0101v\u0101 &#8220;dynamic drag-and-drop rescheduling of manufacturing orders and operations&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjumu un oper\u0101ciju dinamisku p\u0101rpl\u0101no\u0161anu, tos velkot un nometot), progresa un deta\u013cu kr\u0101su mar\u0137\u0113jumu, k\u0101 ar\u012b &#8220;Rebook parts for planned MOs&#8221; (deta\u013cu rezerv\u0113\u0161anu no jauna pl\u0101notajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem). (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/production-schedule\/\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Darba izpildes re\u0123istr\u0113\u0161ana ra\u017eo\u0161anas ceh\u0101<\/h3>\n\n\n<p>Darbinieki sada\u013c\u0101 <strong>My production plan<\/strong> vai r\u012bk\u0101 Internet-kiosk katrai oper\u0101cijai nospie\u017e pogas Start, Pause un Finish. &#8220;The button press times are recorded and accordingly, the actual labor hours are calculated.&#8221; (Pogu nospie\u0161anas laiki tiek re\u0123istr\u0113ti, un p\u0113c tiem apr\u0113\u0137ina faktiski nostr\u0101d\u0101t\u0101s stundas.) (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/reporting\/my-production-plan\/details\/\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pirmais ievad\u012bts, pirmais iepl\u0101nots.<\/strong> Katrs pas\u016bt\u012bjums izveides br\u012bd\u012b aiz\u0146em pirmo br\u012bvo laika logu. Izpildes sec\u012bbu ra\u017eo\u0161anas ceh\u0101 nosaka ievad\u012b\u0161anas sec\u012bba, nevis priorit\u0101te vai izpildes termi\u0146\u0161.<\/li>\n\n\n<li><strong>Viss grafiks netiek p\u0101rpl\u0101nots.<\/strong> &#8220;The software will only reschedule the manufacturing order which has been dragged to a new time, other manufacturing orders will not be rescheduled.&#8221; (Programmat\u016bra p\u0101rpl\u0101no tikai to ra\u017eo\u0161anas pas\u016bt\u012bjumu, kas p\u0101rvilkts uz jaunu laiku; p\u0101r\u0113jie ra\u017eo\u0161anas pas\u016bt\u012bjumi netiek p\u0101rpl\u0101noti.) Tas atk\u0101rtots ar\u012b lap\u0101 Manufacturing Orders: viena pas\u016bt\u012bjuma p\u0101rpl\u0101no\u0161ana &#8220;will not automatically reschedule the whole production calendar.&#8221; (autom\u0101tiski nep\u0101rpl\u0101no visu ra\u017eo\u0161anas kalend\u0101ru). (<a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/manufacturing-orders\/\">avots<\/a>)<\/li>\n\n\n<li><strong>P\u0101rvietojot Gantt diagramm\u0101, materi\u0101lus nep\u0101rbauda.<\/strong> &#8220;The software will not check for material availability.&#8221; (Programmat\u016bra nep\u0101rbauda materi\u0101lu pieejam\u012bbu.)<\/li>\n\n\n<li><strong>D\u012bkst\u0101ve nep\u0101rce\u013c iepl\u0101notos darbus.<\/strong> &#8220;Setting an idle time does not reschedule works automatically which were previously planned for the idle time.&#8221; (Iestatot d\u012bkst\u0101ves laiku, darbi, kas iepriek\u0161 iepl\u0101noti \u0161aj\u0101 laik\u0101, netiek autom\u0101tiski p\u0101rpl\u0101noti.)<\/li>\n\n\n<li><strong>Fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks.<\/strong> Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai lauk\u0101 Setup time ir viena v\u0113rt\u012bba neatkar\u012bgi no t\u0101, kas ra\u017eots iepriek\u0161. Turkl\u0101t &#8220;Setup time cannot be defined for an operation in the routing that has &#8216;Parallelize&#8217; or &#8216;Overlap&#8217; enabled.&#8221; (Lauku Setup time nevar aizpild\u012bt tehnolo\u0123isk\u0101 procesa oper\u0101cijai, kurai iesp\u0113jota opcija Parallelize vai Overlap.)<\/li>\n\n\n<li><strong>Pl\u0101nojot atpaka\u013c, materi\u0101lu pieg\u0101des laiku ne\u0146em v\u0113r\u0101.<\/strong> &#8220;Material lead times are ignored when backward scheduling is used.&#8221; (Pl\u0101nojot atpaka\u013c, materi\u0101lu pieg\u0101des laiki tiek ignor\u0113ti.)<\/li>\n\n\n<li><strong>Nepiln\u012bgi materi\u0101lu dati noz\u012bm\u0113 pieg\u0101des laiku ignor\u0113\u0161anu.<\/strong> Ja k\u0101da materi\u0101la pieejam\u012bba nav zin\u0101ma, &#8220;the MO is scheduled ASAP, ignoring material lead times&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjumu iepl\u0101no p\u0113c iesp\u0113jas dr\u012bz, ne\u0146emot v\u0113r\u0101 materi\u0101lu pieg\u0101des laikus).<\/li>\n\n\n<li><strong>Mezglu BOM izv\u0113las p\u0113c numura.<\/strong> Daudzl\u012bme\u0146u pas\u016bt\u012bjumos &#8220;sub-assembly BOM is automatically selected alphabetically according to its number.&#8221; (mezgla BOM autom\u0101tiski izv\u0113las alfab\u0113tisk\u0101 sec\u012bb\u0101 p\u0113c t\u0101s numura).<\/li>\n\n\n<li><strong>Ilgtermi\u0146a pl\u0101n\u0101 jauda nav ierobe\u017eota.<\/strong> Aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana ir nor\u0101d\u012bta k\u0101 &#8220;RCCP, infinite capacity&#8221; (RCCP, neierobe\u017eota jauda) un pieejama pl\u0101n\u0101 Enterprise. (<a href=\"https:\/\/www.mrpeasy.com\/pricing\/\">avots<\/a>)<\/li>\n\n\n<li><strong>Bez tehnolo\u0123isk\u0101 procesa jaudu nepl\u0101no.<\/strong> Ja nav BOM un Routing, MRPeasy pied\u0101v\u0101 &#8220;basic scheduling without capacity planning&#8221; (vienk\u0101r\u0161u grafika sast\u0101d\u012b\u0161anu bez ra\u017eo\u0161anas jaudas pl\u0101no\u0161anas).<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 tas noz\u012bm\u0113 steidzamus pas\u016bt\u012bjumus, kas iespiesti br\u012bvajos laika logos, pas\u016bt\u012bjumu p\u0101rvilk\u0161anu p\u0113c katra iek\u0101rtas boj\u0101juma un paral\u0113lu pl\u0101nu izkl\u0101jlap\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-mrpeasy-s-own-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar MRPeasy ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy grafiku sast\u0101d\u012b\u0161anas r\u012bks ir pietiekams, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Str\u0101d\u0101jat vien\u0101 mai\u0146\u0101 ar da\u017e\u0101m darba centru grup\u0101m, un pas\u016bt\u012bjumi reti konkur\u0113 par vienu un to pa\u0161u \u0161auro vietu.<\/li>\n\n\n<li>Ra\u017eojat noliktavai, tehnolo\u0123iskie procesi ir stabili, un pas\u016bt\u012bjumus ievad\u0101t t\u0101d\u0101 sec\u012bb\u0101, k\u0101d\u0101 tie j\u0101izpilda.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana ir \u012bsa vai visiem produktiem vien\u0101da, t\u0101p\u0113c fiks\u0113t\u0101 v\u0113rt\u012bba lauk\u0101 Setup time atbilst realit\u0101tei.<\/li>\n\n\n<li>Trauc\u0113jumi ir reti, un da\u017eu pas\u016bt\u012bjumu p\u0101rvilk\u0161ana Gantt diagramm\u0101 katru ned\u0113\u013cu neaiz\u0146em daudz laika.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas raksturo j\u016bsu ra\u017eotni, uzturiet prec\u012bzus tehnolo\u0123isko procesu datus un darba centru kalend\u0101rus, savlaic\u012bgi nor\u0101diet d\u012bkst\u0101ves un turpiniet str\u0101d\u0101t tikai MRPeasy.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro pieejamo jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anas r\u012bku vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem apst\u0101k\u013ciem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Steidzama pas\u016bt\u012bjuma vai jaunas priorit\u0101tes d\u0113\u013c j\u0101p\u0101rce\u013c eso\u0161ie pas\u016bt\u012bjumi, nevis tikai j\u0101aizpilda br\u012bvie laika logi.<\/li>\n\n\n<li>Iek\u0101rtu boj\u0101jumu, materi\u0101lu kav\u0113jumu vai br\u0101\u0137a d\u0113\u013c katru ned\u0113\u013cu manu\u0101li j\u0101p\u0101rvieto daudzi pas\u016bt\u012bjumi.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no t\u0101, k\u0101ds produkts ra\u017eots iepriek\u0161.<\/li>\n\n\n<li>Pl\u0101nu ierobe\u017eo koplietojami instrumenti vai pal\u012bgier\u012bces, darbi, kuriem vajadz\u012bgi vair\u0101ki operatori, vai darbinieku skaits katr\u0101 mai\u0146\u0101.<\/li>\n\n\n<li>Jums ir 20 vai vair\u0101k darba centru un desmitiem neizpild\u012btu pas\u016bt\u012bjumu, un pl\u0101not\u0101js ik dienu pavada stundas, nov\u0113r\u0161ot pas\u016bt\u012bjumu izpildes laiku p\u0101rkl\u0101\u0161anos.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sec\u012bbas noteik\u0161ana visam grafikam<\/strong>, sak\u0101rtojot visus neizpild\u012btos pas\u016bt\u012bjumus p\u0113c priorit\u0101tes un izpildes termi\u0146a.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: no sec\u012bbas atkar\u012bgi, asimetriski p\u0101rregul\u0113\u0161anas laiki, kas \u013cauj samazin\u0101t kop\u0113jo p\u0101rregul\u0113\u0161anas laiku l\u012bdz minimumam.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong> un <strong>ra\u017eo\u0161anas uzdevumi vair\u0101kiem operatoriem<\/strong>.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana<\/strong> grafika sast\u0101d\u012b\u0161an\u0101 p\u0113c katr\u0101m izmai\u0146\u0101m, \u0146emot v\u0113r\u0101 gan kr\u0101jumus, gan gaid\u0101mos iepirkumu pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Alternat\u012bvi darba centri un darbinieki<\/strong>, kurus pl\u0101no\u0161anas dzinis patie\u0161\u0101m izmanto.<\/li>\n\n\n<li><strong>Skaidri noteikta datu ierakst\u012b\u0161ana atpaka\u013c MRPeasy.<\/strong> MRPeasy API atjaunina ra\u017eo\u0161anas pas\u016bt\u012bjuma izpildes termi\u0146u un piel\u0101gotos laukus. Jaut\u0101jiet katram pieg\u0101d\u0101t\u0101jam, kuros MRPeasy laukos t\u0101 risin\u0101jums ieraksta sast\u0101d\u012bt\u0101 grafika datus.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>MRPeasy ieb\u016bv\u0113tais grafiku sast\u0101d\u012b\u0161anas r\u012bks<\/strong> iepl\u0101no pas\u016bt\u012bjumus pa vienam pa\u0161\u0101 MRPeasy.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161anas r\u012bki izkl\u0101jlap\u0101s<\/strong> izmanto CSV eksportus un atdod rezult\u0101tu faila veid\u0101.<\/li>\n\n\n<li><strong>Visp\u0101r\u012bgi automatiz\u0101cijas r\u012bki<\/strong> p\u0101rs\u016bta pazi\u0146ojumus un vienk\u0101r\u0161us ierakstus starp lietotn\u0113m.<\/li>\n\n\n<li><strong>APS m\u0101ko\u0146risin\u0101jumi ar funkcij\u0101m darba izpildei ra\u017eo\u0161anas ceh\u0101<\/strong>, pie kuriem pieder SkyPlanner, darbojas l\u012bdztekus MRPeasy, autom\u0101tiski sast\u0101da grafiku visiem resursiem un nodod to operatoru r\u012bc\u012bb\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus. Arcturus dzinis vien\u0101 reiz\u0113 sak\u0101rto visus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, \u0146emot v\u0113r\u0101 uzdevumu priorit\u0101ti, pabeig\u0161anas datumu, klientu priorit\u0101ti, Fast Track un Dynamic Priorities. Steidzams pas\u016bt\u012bjums sa\u0146em savu vietu grafik\u0101, un Bulldozer p\u0101rb\u012bda turpm\u0101kos ra\u017eo\u0161anas uzdevumus, lai tam atbr\u012bvotu vietu.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos, un dzinis izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja darba centrs vai darbinieks nav pieejams, dzinis izmanto j\u016bsu nor\u0101d\u012bt\u0101s alternat\u012bvas.<\/p>\n\n\n<p>Sast\u0101dot grafiku atbilsto\u0161i materi\u0101lu pieejam\u012bbai, sist\u0113ma model\u0113 kr\u0101jumu apjomu n\u0101kotn\u0113, \u0146emot v\u0113r\u0101 pa\u0161reiz\u0113jos kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Darbu iepl\u0101no tikai tad, kad materi\u0101li ir pieejami. \u0160o nosac\u012bjumu p\u0101rbauda katr\u0101 p\u0101rpl\u0101no\u0161anas reiz\u0113, nevis tikai pas\u016bt\u012bjuma izveides br\u012bd\u012b.<\/p>\n\n\n<p>MRPeasy modeli var tie\u0161i p\u0101rnest uz SkyPlanner. Workstation groups, Productivity un Capacity atbilst SkyPlanner darba centru grup\u0101m, efektivit\u0101tes r\u0101d\u012bt\u0101jiem un partiju uzdevumiem. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, savuk\u0101rt Running Time Lock saglab\u0101 s\u0101kto uzdevumu vietu grafik\u0101. Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> jaunu priorit\u0101\u0161u d\u0113\u013c j\u0101p\u0101rk\u0101rto MRPeasy grafik\u0101 jau iek\u013cautie pas\u016bt\u012bjumi.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana, koplietojamie instrumenti vai brig\u0101des nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rpl\u0101nojat vair\u0101kas reizes ned\u0113\u013c\u0101 un v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt izmantojamu savas ra\u017eo\u0161anas grafiku.<\/p>\n\n\n<p>S\u0101ciet ar CSV eksportu <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, kred\u012btkarte nav vajadz\u012bga). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m kop\u0101 ar j\u016bsu pl\u0101na pied\u0101v\u0101jumu.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar MRPeasy, izmantojot MRPeasy REST API, un \u0161\u0101da integr\u0101cija jau ir \u012bstenota klientu projektos. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus un darba centrus, bet pl\u0101notos datumus un izpildes gaitu nos\u016bta atpaka\u013c uz katru ra\u017eo\u0161anas pas\u016bt\u012bjumu. SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101, vai ar\u012b j\u016bsu MRPeasy konsultants vai izstr\u0101d\u0101t\u0101ji to izveido, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Izlasiet p\u0101rskatu lap\u0101 <a href=\"\/lv\/integracija\/erp\/mrpeasy\/\">SkyPlanner darbam ar MRPeasy<\/a>, atveriet <a href=\"\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/\">MRPeasy integr\u0101cijas rokasgr\u0101matu<\/a> vai sal\u012bdziniet citas sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner mums ir v\u0113rt\u012bgs t\u0101p\u0113c, ka tas ir ikdien\u0101 izmantojams r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c ir k\u013cuvis iev\u0113rojami maz\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy ir r\u012bks ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. MRPeasy izmanto pl\u0101no\u0161anu uz priek\u0161u un iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu pirmaj\u0101 pieejamaj\u0101 laik\u0101, \u0146emot v\u0113r\u0101 darba centru grupas un darba laiku. Rezult\u0101ts ir redzams Calendar skat\u0101 un Gantt diagramm\u0101. Pl\u0101no\u0161ana atpaka\u013c no beigu datuma ir pieejama, s\u0101kot ar Enterprise pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy var autom\u0101tiski p\u0101rpl\u0101not visus pas\u016bt\u012bjumus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Velkot pas\u016bt\u012bjumu Gantt diagramm\u0101, p\u0101rvietojas tikai \u0161is pas\u016bt\u012bjums, bet p\u0101r\u0113jais ra\u017eo\u0161anas kalend\u0101rs paliek nemain\u012bgs. SkyPlanner funkcija Autopilot p\u0101rpl\u0101no visu grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laikus, kas atkar\u012bgi no darbu sec\u012bbas?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai p\u0101rregul\u0113\u0161anas laiks ir fiks\u0113ts. SkyPlanner APS izmanto p\u0101rregul\u0113\u0161anas laiku matricu, kur\u0101 nor\u0101d\u012bts p\u0101rejas laiks starp produktu p\u0101riem (no zila uz sarkanu 30 min\u016btes, no sarkana uz zilu 60), un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai \u0161os laikus samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101das grafiku sast\u0101d\u012b\u0161anas funkcijas ir iek\u013cautas katr\u0101 MRPeasy pl\u0101n\u0101?<\/summary>\n<p class=\"sp-faq__a\">Visos pl\u0101nos var pl\u0101not oper\u0101cijas un ra\u017eo\u0161anas jaudu, izmantot Gantt diagrammas un vilk\u0161anas un nome\u0161anas funkciju. Overlap, Parallelize un grafik\u0101 neiek\u013cauti pas\u016bt\u012bjumi ir pieejami, s\u0101kot ar Professional, savuk\u0101rt pl\u0101no\u0161ana atpaka\u013c no beigu datuma, MPS un RCCP \u2014 s\u0101kot ar Enterprise. REST API ir iek\u013cauts Unlimited pl\u0101n\u0101, kura cena MRPeasy cenu lap\u0101 ir $149 par lietot\u0101ju m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner ar saviem MRPeasy datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet tehnolo\u0123iskos procesus, darba centrus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no MRPeasy CSV form\u0101t\u0101, import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ MRPeasy Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS J\u0101, ta\u010du pa vienam pas\u016bt\u012bjumam. Izveidojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, MRPeasy to iepl\u0101no pirmaj\u0101 br\u012bvaj\u0101 laika log\u0101, iev\u0113rojot darba centru pieejamo jaudu. Sist\u0113ma nemaina grafik\u0101 jau iek\u013cauto neizpild\u012bto pas\u016bt\u012bjumu sec\u012bbu, un viena pas\u016bt\u012bjuma p\u0101rcel\u0161ana nep\u0101rce\u013c &#8230; <a title=\"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/\" aria-label=\"Read more about Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103113,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104040","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai MRPeasy pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/title>\n<meta name=\"description\" content=\"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/razosanas-planosana\\\/\",\"name\":\"Vai MRPeasy pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai MRPeasy pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?","description":"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS","og_description":"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/","name":"Vai MRPeasy pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamajai jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"MRPeasy iepl\u0101no pa vienam ra\u017eo\u0161anas pas\u016bt\u012bjumam pirmaj\u0101 br\u012bvaj\u0101 darba centra laika log\u0101. K\u0101 tas darbojas, kur ir robe\u017eas un kad vajadz\u012bga APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/"},{"@type":"ListItem","position":5,"name":"Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ MRPeasy Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161ana sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS J\u0101, ta\u010du pa vienam pas\u016bt\u012bjumam. Izveidojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, MRPeasy to iepl\u0101no pirmaj\u0101 br\u012bvaj\u0101 laika log\u0101, iev\u0113rojot darba centru pieejamo jaudu. Sist\u0113ma nemaina grafik\u0101 jau iek\u013cauto neizpild\u012bto pas\u016bt\u012bjumu sec\u012bbu, un viena pas\u016bt\u012bjuma p\u0101rcel\u0161ana nep\u0101rce\u013c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104040"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104040\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103113"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}