{"id":104011,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/","title":{"rendered":"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Monitor ERP integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Monitor ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Monitor ERP (Monitor G5) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Monitor ERP, izmantojot Monitor ERP API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em datus par ra\u017eo\u0161anas pas\u016bt\u012bjumiem, oper\u0101cij\u0101m, darba centriem, tehnolo\u0123iskajiem procesiem un materi\u0101liem.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas un darba centrs tiek ierakst\u012bti atpaka\u013c Monitor sist\u0113m\u0101.<\/li>\n\n\n<li>Re\u0123istr\u0113tais laiks un daudzumi nodro\u0161ina abu sist\u0113mu datu saska\u0146ot\u012bbu.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Monitor G5 iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c ekspluat\u0101cijas s\u0101kuma. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cijas izveid\u0113 vai pa\u0161i izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-monitor-erp-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor G5 dokument\u0113t\u0101 integr\u0101cijas saskarne ir <strong>Monitor ERP API v1<\/strong>. T\u0101 apvieno CQRS un REST pieeju un p\u0101rs\u016bta JSON datus, izmantojot HTTPS. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/index.html\">Monitor ERP API<\/a>)<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vaic\u0101jumi<\/strong> nolasa datus ar GET. Tie atbalsta OData tipa parametrus: <code>$filter<\/code>, <code>$select<\/code>, <code>$expand<\/code>, <code>$orderby<\/code>, <code>$top<\/code> un <code>$skip<\/code>.<\/li>\n\n\n<li><strong>Komandas<\/strong> ieraksta datus ar POST, piem\u0113ram, <code>Manufacturing\/ManufacturingOrderOperations\/Update<\/code>.<\/li>\n\n\n<li><strong>Batch<\/strong> izpilda vair\u0101kas komandas vien\u0101 transakcij\u0101 p\u0113c principa \u201cvisu vai neko\u201d, izmantojot <code>POST \/api\/v1\/Batch<\/code>. Pievienojiet <code>\/Simulate<\/code> vai <code>\/Validate<\/code>, lai p\u0101rbaud\u012btu komandu pakotni un atsauktu t\u0101s izmai\u0146as. Tas ir dro\u0161s veids, k\u0101 ierakst\u012bt visu grafiku. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/commands\/batch.html\">Batch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>B\u0101zes URL ir <code>https:\/\/{host}:8001\/{languageCode}\/{companyNumber}\/api\/v1\/<\/code>. Uz\u0146\u0113muma numuru veido datub\u0101zes numurs un uz\u0146\u0113muma ID, piem\u0113ram, <code>004.1<\/code>.<\/p>\n\n\n<p>Par licenc\u0113\u0161anu Monitor nor\u0101da: &#8220;It is free to query and extract information from the API for all our customers. However, in order to use commands and write data to the ERP system, you need to purchase Monitor ERP API.&#8221; (Visi m\u016bsu klienti var bez maksas veikt vaic\u0101jumus un ieg\u016bt inform\u0101ciju no API. Ta\u010du, lai izmantotu komandas un ierakst\u012btu datus ERP sist\u0113m\u0101, ir j\u0101ieg\u0101d\u0101jas Monitor ERP API.) Jau no pirm\u0101s dienas paredziet projekt\u0101 licenci datu ierakst\u012b\u0161anai. (<a href=\"https:\/\/api.monitor.se\/\">api.monitor.se<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pieteik\u0161an\u0101s sesij\u0101.<\/strong> Piepras\u012bjums <code>POST \/{languageCode}\/{companyNumber}\/login<\/code> ar Monitor lietot\u0101jv\u0101rdu un paroli atgrie\u017e galveni <code>X-Monitor-SessionId<\/code>, ko izmanto turpm\u0101kajos izsaukumos. Ir pieejama ar\u012b autentifik\u0101cijas pl\u016bsma ar MFA pilnvaru.<\/li>\n\n\n<li><strong>OIDC.<\/strong> S\u0101kot ar Monitor 25.8, var pieteikties ar\u012b ar Microsoft Entra ID, izmantojot Authorization Code un PKCE. (<a href=\"https:\/\/api.monitor.se\/articles\/authentication\/index.html\">Autentifik\u0101cija<\/a>)<\/li>\n\n\n<li><strong>Atsevi\u0161\u0137s API lietot\u0101js.<\/strong> Integr\u0101cijai izveidojiet vienu lietot\u0101ju. Uz to attiecas Monitor piek\u013cuves ties\u012bbas, piem\u0113ram, Show manufacturing orders un Replan existing manufacturing order.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana un periodiska aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor ERP API uzzi\u0146\u0101 nav dokument\u0113ti webhook meh\u0101nismi vai notikumu abon\u0113\u0161ana. Izmai\u0146as tiek ieg\u016btas, periodiski veicot aptauju:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>Common\/EntityChangeLogs<\/code> (s\u0101kot ar 2.33) atgrie\u017e <code>ChangeType<\/code> (Update, Create, Delete), <code>EntityTypeId<\/code>, <code>EntityId<\/code> un <code>ModifiedTimestamp<\/code>. Veiciet aptauju ik p\u0113c da\u017e\u0101m min\u016bt\u0113m un ieg\u016bstiet tikai main\u012btos ierakstus. (<a href=\"https:\/\/api.monitor.se\/api\/Monitor.API.Common.EntityChangeLog.html\">EntityChangeLog<\/a>)<\/li>\n\n\n<li>Ra\u017eo\u0161anas pas\u016bt\u012bjumu vaic\u0101jumos atlasiet tikai atv\u0113rtos pas\u016bt\u012bjumus un sadaliet rezult\u0101tus lap\u0101s ar <code>$top<\/code> un <code>$skip<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Mainoties st\u0101voklim vai grafikam, SkyPlanner nos\u016bta webhook pazi\u0146ojumus, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c Monitor sist\u0113m\u0101 ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Monitor ERP objekts (API)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Part (<code>Inventory\/Parts<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, turpm\u0101k \u2014 p\u0113c izmai\u0146u \u017eurn\u0101la<\/td><\/tr><tr><td>BOM un tehnolo\u0123iskais process: <code>Manufacturing\/MaterialRows<\/code>, <code>Manufacturing\/OperationRows<\/code><\/td><td>Produkta strukt\u016bra; procesa posmi ar sagatavo\u0161anas laiku un laiku vienas vien\u012bbas apstr\u0101dei<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 rodoties izmai\u0146\u0101m<\/td><\/tr><tr><td><code>Manufacturing\/AlternativeOperationRows<\/code><\/td><td>Alternat\u012bvie darba centri katram posmam<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 rodoties izmai\u0146\u0101m<\/td><\/tr><tr><td>Darba centrs (<code>Manufacturing\/WorkCenters<\/code>): Type, TimePrecision, BasicTime, NumberOfPlanningUnits, AvailabilityFactor<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, turpm\u0101k reti<\/td><\/tr><tr><td><code>Manufacturing\/ProductionCalendarExceptions<\/code>, <code>TimeRecording\/Schedules<\/code><\/td><td>Mai\u0146as un promb\u016btnes<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Katru dienu vai atsevi\u0161\u0137i veidotas mai\u0146as SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code><\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un statusu<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Izmai\u0146u \u017eurn\u0101la aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderOperations<\/code>: Priority, WorkCenterId, PlannedQuantity, RestQuantity, PlannedSetupTime, PlannedUnitTime<\/td><td>Darbi ar ilgumu un atliku\u0161o daudzumu<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Izmai\u0146u \u017eurn\u0101la aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderMaterials<\/code><\/td><td>Materi\u0101lu vajadz\u012bbas katram pas\u016bt\u012bjumam<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Izmai\u0146u \u017eurn\u0101la aptauja<\/td><\/tr><tr><td><code>Inventory\/PartLocations<\/code> (Balance), <code>Purchase\/PurchaseOrderRows<\/code> (DeliveryDate, RestQuantity)<\/td><td>Kr\u0101jumi; ien\u0101ko\u0161ie materi\u0101li to pieg\u0101des datum\u0101<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/Update<\/code>: PlannedStartDate, PlannedFinishDate (24.5+)<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>Mainoties grafikam, ar SkyPlanner webhook<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/SetWorkCenter<\/code><\/td><td>Pl\u0101no\u0161anas dzin\u0113ja izv\u0113l\u0113tais darba centrs<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>Mainoties grafikam<\/td><\/tr><tr><td><code>ReportManufacturingOrderOperation<\/code> \/ <code>ManufacturingOrderOperationReportings<\/code><\/td><td>Laika uzskaites ieraksti un daudzumi<\/td><td>Viens kan\u0101ls, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as<\/td><\/tr><tr><td>Nav Monitor sist\u0113m\u0101<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, darbi ar vair\u0101kiem operatoriem<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet darba centrus, oper\u0101ciju rindas, alternat\u012bvo oper\u0101ciju rindas, materi\u0101lu rindas, nomenklat\u016bras vien\u012bbas un grafikus. R\u016bp\u012bgi nosakiet, kuram SkyPlanner darba centram atbilst katrs Monitor darba centrs. Pool tipa darba centrs k\u013c\u016bst par darba centru grupu, bet taj\u0101 iek\u013cautie darba centri \u2014 par darba centriem, no kuriem izv\u0113las pl\u0101no\u0161anas dzin\u0113js.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to mezgliem, oper\u0101cij\u0101m un materi\u0101liem, k\u0101 ar\u012b kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. P\u0113c pirm\u0101s iel\u0101des izmai\u0146as nosaka p\u0113c <code>Common\/EntityChangeLogs<\/code>.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c Monitor sist\u0113m\u0101.<\/strong> Katrai oper\u0101cijai, ko pl\u0101no\u0161anas dzin\u0113js iepl\u0101nojis vai p\u0101rvietojis, SkyPlanner nos\u016bta <code>ManufacturingOrderOperations\/Update<\/code> ar PlannedStartDate un PlannedFinishDate. Ja dzin\u0113js p\u0101rvietojis oper\u0101ciju uz citu grupas iek\u0101rtu, vispirms tiek izpild\u012bts <code>SetWorkCenter<\/code>. Viena pas\u016bt\u012bjuma komandas apvieno vien\u0101 <code>Batch<\/code>, lai Monitor pie\u0146emtu vai nu t\u0101s visas, vai nevienu. Test\u0113\u0161anas laik\u0101 izpildiet pakotni ar <code>\/Validate<\/code>.<\/p>\n\n\n<p>Monitor versij\u0101s pirms 24.5 pl\u0101notos datumus nevar ierakst\u012bt ar Update. T\u0101 viet\u0101 izmantojiet <code>ManufacturingOrders\/ReplanOperation<\/code> (s\u0101kot ar 2.40) ar StartDate un FinishDate un iestatiet RestrictToOrderBounds atbilsto\u0161i saviem noteikumiem.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Izmantojiet vienu uzskaites kan\u0101lu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Uzskaite paliek Monitor sist\u0113m\u0101.<\/strong> Operatori t\u0101pat k\u0101 l\u012bdz \u0161im re\u0123istr\u0113 darbu ar Recording terminal vai iek\u0101rtu integr\u0101cijas pal\u012bdz\u012bbu. SkyPlanner nolasa <code>ManufacturingOrderOperationReportings<\/code> k\u0101 izpildes progresa datus un p\u0101rpl\u0101no grafiku.<\/li>\n\n\n<li><strong>Uzskaiti p\u0101rce\u013c uz SkyPlanner.<\/strong> Operatori re\u0123istr\u0113 darbu ar Mobile Confirmations vai Production Timer, un SkyPlanner nos\u016bta Monitor sist\u0113mai <code>ReportManufacturingOrderOperation<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Ja darbu re\u0123istr\u0113 ab\u0101s sist\u0113m\u0101s, laiks un daudzumi tiek uzskait\u012bti divreiz.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un pretrunu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms ekspluat\u0101cijas s\u0101kuma:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras vien\u012bbas, BOM un tehnolo\u0123iskais process, daudzumi, pas\u016bt\u012bjuma statuss<\/td><td>Monitor<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, pl\u0101notais s\u0101kums un beigas, darba centrs grup\u0101<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Oper\u0101ciju izpildes re\u0123istr\u0113\u0161ana<\/td><td>Viens kan\u0101ls, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu c\u0113lonis ir tas, ka pl\u0101not\u0101ji turpina main\u012bt priorit\u0101\u0161u pl\u0101nu. <strong>Rescheduling according to New finish<\/strong> un rindu vilk\u0161ana sada\u013c\u0101 Priority planning p\u0101rraksta SkyPlanner ierakst\u012btos datumus. Kad sec\u012bbu nosaka SkyPlanner, Priority planning izmanto tikai datu apskatei. Ar Autopilot SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s sagatavo\u0161anas s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat str\u0101d\u0101t ar saviem datiem. Eksport\u0113jiet no Monitor uz Excel atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cijas un darba centrus, import\u0113jiet tos un p\u0101rbaudiet grafiku, pirms s\u0101kat integr\u0101cijas darbus.<\/p>\n\n\n<p>Pats projekts ietver \u0161\u0101dus posmus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Vienojieties par datu atbilst\u012bbas tabulu, noteikumiem par atbild\u012bbu par datiem, aptaujas interv\u0101liem, izpildes re\u0123istr\u0113\u0161anas kan\u0101lu un Monitor versiju.<\/li>\n\n\n<li><strong>Piek\u013cuve.<\/strong> Izveidojiet API lietot\u0101ju, ieg\u0101d\u0101jieties Monitor ERP API licenci ar rakst\u012b\u0161anas ties\u012bb\u0101m un atveriet t\u012bkla piek\u013cuvi portam 8001.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Nomenklat\u016bras vien\u012bbas, darba centri, oper\u0101ciju rindas, alternat\u012bvas, materi\u0101li un grafiki.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija,<\/strong> izmantojot izmai\u0146u \u017eurn\u0101lu.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c sist\u0113m\u0101<\/strong> pa paket\u0113m, p\u0101rbaudot ar <code>\/Validate<\/code>.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Lietojiet SkyPlanner paral\u0113li priorit\u0101\u0161u pl\u0101nam, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c sist\u0113m\u0101, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-monitor-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Monitor ERP integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pieejam\u012bbas koeficients.<\/strong> Monitor apr\u0113\u0137ina neto jaudu no bruto jaudas, izmantojot pieejam\u012bbas koeficientu. Jaunam darba centram tas p\u0113c noklus\u0113juma ir 80 %. Piem\u0113rojiet to tikai vienreiz \u2014 k\u0101 SkyPlanner efektivit\u0101tes r\u0101d\u012bt\u0101ju vai k\u0101 \u012bs\u0101kas mai\u0146as, nekad ab\u0113j\u0101di.<\/li>\n\n\n<li><strong>Laika precizit\u0101te.<\/strong> Darba centriem, kuri izmanto Day planning, jauda ir nor\u0101d\u012bta k\u0101 pamatlaiks dien\u0101 bez mai\u0146u laikiem. Iestatiet SkyPlanner faktisk\u0101s mai\u0146as atbilsto\u0161i ra\u017eo\u0161anas grafikiem, lai darbi tiktu iepl\u0101noti darba laik\u0101.<\/li>\n\n\n<li><strong>Gaid\u012b\u0161anas laiks un p\u0101rkl\u0101\u0161an\u0101s.<\/strong> Oper\u0101ciju rind\u0101s ir nor\u0101d\u012bts gaid\u012b\u0161anas laiks un p\u0101rkl\u0101\u0161an\u0101s %. Tv\u0113ruma noteik\u0161anas laik\u0101 vienojieties, k\u0101 katru no \u0161iem parametriem sasaist\u012bt ar SkyPlanner parametriem, cit\u0101di p\u0113c integr\u0101cijas darb\u012bbas s\u0101k\u0161anas main\u012bsies izpildes laiks.<\/li>\n\n\n<li><strong>Grupas.<\/strong> Grup\u0101s apvienotos darba centrus pl\u0101no sada\u013c\u0101 Pool planning, nevis Priority planning. Nolasiet ar\u012b grup\u0101 iek\u013cautos darba centrus, ne tikai grupas rindu.<\/li>\n\n\n<li><strong>Versiju pras\u012bbas.<\/strong> Pl\u0101noto datumu ierakst\u012b\u0161anai ar Update nepiecie\u0161ama versija 24.5. Darba centru jaudas laukiem API nepiecie\u0161ama versija 24.3, bet OIDC \u2014 25.8. Pirms tv\u0113ruma noteik\u0161anas p\u0101rbaudiet sist\u0113mas laidienu.<\/li>\n\n\n<li><strong>T\u012bkls un sertifik\u0101ts.<\/strong> Lok\u0101li instal\u0113ts Monitor nodro\u0161ina API port\u0101 8001 ar pa\u0161parakst\u012btu sertifik\u0101tu. SkyPlanner darbojas m\u0101kon\u012b, t\u0101p\u0113c iepl\u0101nojiet ugunsm\u016bra k\u0101rtulu vai starpniekserveri un skaidri nor\u0101diet sertifik\u0101tu k\u0101 uzticamu.<\/li>\n\n\n<li><strong>Licences.<\/strong> Katrai tre\u0161\u0101s puses lietotnei, kas ieraksta datus, nepiecie\u0161ami savi lietot\u0101ji ar API licenci. Katr\u0101 sist\u0113m\u0101 ir iek\u013cauts viens API lietot\u0101js tikai ar las\u012b\u0161anas ties\u012bb\u0101m.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-monitor-erp-integration-who-configures-and-s\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver datu sasaisti ar j\u016bsu darba centriem, oper\u0101ciju rind\u0101m un pas\u016bt\u012bjumu pl\u016bsmu, k\u0101 ar\u012b to ierobe\u017eojumu iestat\u012b\u0161anu, kuri netiek glab\u0101ti Monitor: sagatavo\u0161anas laiku matricu, instrumentus, operatoru skaitu un alternat\u012bvos resursus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas.<\/strong> Tas aptver SkyPlanner pusi un saska\u0146otos Monitor ERP API izsaukumus. Katr\u0101 r\u016bpn\u012bc\u0101 Monitor G5 izmanto at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek \u0146emtas v\u0113r\u0101 \u0161\u012bs zin\u0101\u0161anas.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Monitor partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju, versiju un piek\u013cuves ties\u012bbas un var sagatavot API lietot\u0101ju, licenci un piek\u013cuvi t\u012bklam. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot savus risin\u0101jumus,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Publisk\u0101 dokument\u0101cija ir pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>P\u0113c savienojuma izveides Arcturus dzinis sast\u0101da grafiku, balstoties uz aktu\u0101lajiem Monitor pas\u016bt\u012bjumiem, un pl\u0101notie datumi tiek ierakst\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s. SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, Monitor pl\u0101no\u0161anas iesp\u0113ju sal\u012bdzin\u0101jumu sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/\">Monitor ERP ra\u017eo\u0161anas pl\u0101no\u0161ana, iev\u0113rojot re\u0101lo iek\u0101rtu un person\u0101la jaudu<\/a>, p\u0101rskatu <a href=\"\/lv\/integracija\/erp\/monitor-erp\/\">Monitor ERP lap\u0101<\/a> un citas ERP sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied z\u0101\u013cu ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>darba uzdevumu iepl\u0101noti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba uzdevumu tiek iepl\u0101noti autom\u0101tiski, un visa organiz\u0101cija var sekot ra\u017eo\u0161anai re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepakojumam<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor ERP ir API ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Monitor ERP API nodro\u0161ina vaic\u0101jumus <code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code>, <code>ManufacturingOrderOperations<\/code> un <code>ManufacturingOrderMaterials<\/code>. T\u0101das komandas k\u0101 <code>ManufacturingOrderOperations\/Update<\/code> un <code>ReplanOperation<\/code> ieraksta pl\u0101notos datumus atpaka\u013c sist\u0113m\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai datu ierakst\u012b\u0161anai Monitor caur API ir vajadz\u012bga papildu licence?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Datu las\u012b\u0161ana caur API ir bez maksas visiem Monitor klientiem. Komand\u0101m, kas ieraksta datus, nepiecie\u0161ama Monitor ERP API licence, ko p\u0101rdod Monitor. Pied\u0101v\u0101jumu sagatavo j\u016bsu Monitor partneris vai Monitor p\u0101rdo\u0161anas komanda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor ERP API atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">T\u012bmek\u013ca aiz\u0137eres dokument\u0101cij\u0101 nav aprakst\u012btas. Integr\u0101cija ik p\u0113c da\u017e\u0101m min\u016bt\u0113m aptauj\u0101 <code>Common\/EntityChangeLogs<\/code> un izg\u016bst tikai main\u012btos ierakstus. Pret\u0113j\u0101 virzien\u0101 SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da Monitor versija mums nepiecie\u0161ama?<\/summary>\n<p class=\"sp-faq__a\">Pl\u0101not\u0101 s\u0101kuma un beigu ierakst\u012b\u0161anai ar <code>ManufacturingOrderOperations\/Update<\/code> nepiecie\u0161ama Monitor 24.5 vai jaun\u0101ka versija. Vec\u0101ki G5 laidieni, s\u0101kot no 2.40, izmanto <code>ReplanOperation<\/code>. Tv\u0113ruma noteik\u0161anas laik\u0101 apstiprin\u0101m j\u016bsu laidienam piem\u0113roto risin\u0101jumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido Monitor ERP integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu Monitor G5 konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas. Ar\u012b j\u016bsu Monitor partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot l\u012bdz 20 darba centriem, import\u0113jot Monitor datus Excel vai CSV form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Monitor ERP Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Monitor ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Monitor ERP (Monitor G5) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Monitor ERP, izmantojot Monitor ERP API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda &#8230; <a title=\"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/\" aria-label=\"Read more about Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103084,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104011","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/integracijas-celvedis\\\/\",\"name\":\"Monitor ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/","name":"Monitor ERP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Savienojiet Monitor G5 un SkyPlanner APS: Monitor ERP API vaic\u0101jumi, komandas, Batch, oper\u0101ciju datumu atpaka\u013cierakste, aptauja, datu kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Monitor ERP Monitor ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Monitor ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot Monitor ERP (Monitor G5) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Monitor ERP, izmantojot Monitor ERP API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=104011"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/104011\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103084"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=104011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}