{"id":103982,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/monitor-erp\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/","title":{"rendered":"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? <span class=\"hl\">Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Monitor ERP pl\u0101no katra darba centra jaudu, ta\u010du nesast\u0101da visas ra\u017eotnes grafiku, kur\u0101 tiktu iev\u0113roti faktisk\u0101s jaudas ierobe\u017eojumi. Monitor G5 sada\u013c\u0101 Loading plan r\u0101da katra darba centra slodzi, bet sada\u013c\u0101 Priority planning apr\u0113\u0137ina katras oper\u0101cijas New finish \u2014 katram darba centram atsevi\u0161\u0137i. P\u0101rslodzi nov\u0113r\u0161 un darbu sec\u012bbu nosaka pl\u0101not\u0101js. Ra\u017eotnes, kuras v\u0113las <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101not ra\u017eo\u0161anu atbilsto\u0161i faktiskajai resursu pieejam\u012bbai<\/a>, \u0146emot v\u0113r\u0101 katru darba centru, darbinieku, instrumentu un materi\u0101lu, l\u012bdztekus Monitor izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-monitor-g5-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Monitor G5 pl\u0101no ra\u017eo\u0161anu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pl\u0101no\u0161ana ir iek\u013cauta modul\u012b Manufacturing vis\u0101s Monitor pakotn\u0113s. Taj\u0101 ir &#8220;procedures for handling manufacturing order\/subcontract including loading plans and priority planning.&#8221; (proced\u016bras ra\u017eo\u0161anas pas\u016bt\u012bjumu un apak\u0161uz\u0146\u0113m\u0113jiem nodoto darbu p\u0101rvald\u012bbai, tostarp slodzes pl\u0101ni un priorit\u0101\u0161u pl\u0101no\u0161ana). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Home.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Darba centri un jauda<\/h3>\n\n\n<p>Katram <strong>darba centram<\/strong> (produktionsgrupp) ir noteikts tips: Machine, Manual work, Subcontract, Pool, Pick vai Staffing. Jaudu apr\u0113\u0137ina \u0161\u0101di: <strong>Basic time<\/strong> x <strong>Number of machines<\/strong> (vai darbinieku skaits) x <strong>Availability factor<\/strong>.<\/p>\n\n\n<p>Monitor \u0161o koeficientu skaidro \u0161\u0101di: &#8220;The availability factor reduces the gross capacity to a net capacity. The default value is 80 % when creating a new work center.&#8221; (Pieejam\u012bbas koeficients samazina bruto jaudu l\u012bdz neto jaudai. Jaunam darba centram s\u0101kotn\u0113ji pie\u0161\u0137ir nor\u0101d\u012bto noklus\u0113juma v\u0113rt\u012bbu.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/WorkCenters\/WorkCenterRegister\/bPlanningInformation.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<p>Katram darba centram atsevi\u0161\u0137i iestata <strong>Time precision<\/strong>:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Day planning:<\/strong> jaudu izsaka k\u0101 pamatlaiku dien\u0101.<\/li>\n\n\n<li><strong>Hourly planning:<\/strong> aktiviz\u0113 sist\u0113mas iestat\u012bjumos; slodzi r\u0101da pa stund\u0101m.<\/li>\n\n\n<li><strong>Capacity via schedule:<\/strong> bruto jaudu nosaka ra\u017eo\u0161anas darba grafika cikls.<\/li>\n\n<\/ul>\n\n\n<p>Kalend\u0101ra iz\u0146\u0113mumi aizst\u0101j atsevi\u0161\u0137\u0101m dien\u0101m noteikto jaudu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. BOM un tehnolo\u0123iskais process<\/h3>\n\n\n<p>Ra\u017eojamai deta\u013cai ir <strong>BOM un tehnolo\u0123iskais process<\/strong> (beredning) ar materi\u0101lu un oper\u0101ciju rind\u0101m. Katr\u0101 oper\u0101cijas rind\u0101 nor\u0101da darba centru, p\u0101rregul\u0113\u0161anas laiku, vien\u012bbas izgatavo\u0161anas laiku, gaid\u012b\u0161anas laiku rind\u0101 un oper\u0101ciju p\u0101rkl\u0101\u0161anos %. Katrai oper\u0101cijas rindai var pievienot alternat\u012bvus darba centrus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Ra\u017eo\u0161anas pas\u016bt\u012bjuma re\u0123istr\u0113\u0161ana<\/h3>\n\n\n<p>Kad re\u0123istr\u0113jat <strong>ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/strong> (tillverkningsorder), Monitor pl\u0101no t\u0101 oper\u0101cijas atpaka\u013cgait\u0101 no p\u0113d\u0113j\u0101s oper\u0101cijas pl\u0101not\u0101 beigu laika. &#8220;The calculation for planned start date takes queue time, setup time, unit time, and overlap of the operations, into consideration.&#8221; (Apr\u0113\u0137inot pl\u0101noto s\u0101kuma datumu, tiek \u0146emts v\u0113r\u0101 gaid\u012b\u0161anas laiks rind\u0101, p\u0101rregul\u0113\u0161anas laiks, vien\u012bbas izgatavo\u0161anas laiks un oper\u0101ciju p\u0101rkl\u0101\u0161an\u0101s.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Orders\/RegisterManufacturingOrder\/bOperations.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<p>Jaudas p\u0101rbaudi nosaka sist\u0113mas iestat\u012bjums <strong>Check capacity during manufacturing order registration<\/strong>. Tam ir divas v\u0113rt\u012bbas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>V\u0113rt\u012bba<\/th><th>Monitor darb\u012bba<\/th><\/tr><\/thead><tbody><tr><td>N\u0113<\/td><td>&#8220;The order is registered as per the requirement date in BOM and routing regardless of the work center&#8217;s capacity.&#8221; (Pas\u016bt\u012bjumu re\u0123istr\u0113 atbilsto\u0161i BOM un tehnolo\u0123iskaj\u0101 proces\u0101 nor\u0101d\u012btajam vajadz\u012bbas datumam neatkar\u012bgi no darba centra jaudas.)<\/td><\/tr><tr><td>J\u0101 (pas\u016bt\u012bjuma ietvaros)<\/td><td>&#8220;The work center&#8217;s capacity is taken into account when the order contains multiple nodes with the same work center.&#8221; (Darba centra jaudu \u0146em v\u0113r\u0101, ja pas\u016bt\u012bjum\u0101 ir vair\u0101ki mezgli ar vienu un to pa\u0161u darba centru.)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Neatkar\u012bgi no izv\u0113l\u0113t\u0101s v\u0113rt\u012bbas citu pas\u016bt\u012bjumu rad\u012bt\u0101 slodze netiek \u0146emta v\u0113r\u0101. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/GeneralRegisters\/BasicSettings\/SystemSettings\/bOrderManufacturing.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loading plan un Master planning<\/h3>\n\n\n<p><strong>Loading plan<\/strong> (bel\u00e4ggningsplan) r\u0101da &#8220;how different work centers&#8217; loading is affected by manufacturing orders over time,&#8221; (k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumi laika gait\u0101 ietekm\u0113 da\u017e\u0101du darba centru slodzi) pa m\u0113ne\u0161iem, ned\u0113\u013c\u0101m vai dien\u0101m. Diagramma ir tikai apskat\u0101ma: &#8220;It is not possible to update the loading chart.&#8221; (Slodzes diagrammu nav iesp\u0113jams redi\u0123\u0113t.) S\u0101kuma un beigu laiku p\u0101rpl\u0101no ciln\u0113 List. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/LoadingPlan\/wLoadingPlan.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<p><strong>Master planning<\/strong> darbojas t\u0101pat. Monitor to raksturo k\u0101 &#8220;a loading plan where any overload might require the entire order to be replanned with regard to quantity and dates.&#8221; (slodzes pl\u0101nu, kur\u0101 p\u0101rslodzes d\u0113\u013c var n\u0101kties p\u0101rpl\u0101not visa pas\u016bt\u012bjuma daudzumu un datumus).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Priority planning un Priority plan chart<\/h3>\n\n\n<p><strong>Priority planning<\/strong> (k\u00f6rplan) &#8220;shows all operations for the work center in all manufacturing orders,&#8221; (r\u0101da visas darba centra oper\u0101cijas visos ra\u017eo\u0161anas pas\u016bt\u012bjumos), sak\u0101rtotas p\u0113c priorit\u0101tes un s\u0101kuma datuma. Pl\u0101not\u0101js maina sec\u012bbu, p\u0101rvelkot rindas.<\/p>\n\n\n<p>P\u0113c tam Monitor apr\u0113\u0137ina <strong>New finish<\/strong>: &#8220;an expected finish date\/time considering capacity and remaining time on the operations and their priority in the priority plan.&#8221; (paredzamo beigu datumu un laiku, \u0146emot v\u0113r\u0101 jaudu, oper\u0101ciju atliku\u0161o laiku un to priorit\u0101ti priorit\u0101\u0161u pl\u0101n\u0101). Pl\u0101not\u0101js to piem\u0113ro ar funkciju <strong>Rescheduling according to New finish<\/strong>. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanning\/bPriorityPlan.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/p>\n\n\n<p><strong>Priority plan chart<\/strong> (k\u00f6rplansgraf) r\u0101da oper\u0101cijas k\u0101 blokus katram darba centram stundu vai dienu skal\u0101. T\u0101s skats Replanning &#8220;shows if operations are overloaded and thereby need to be replanned.&#8221; (r\u0101da, vai oper\u0101cijas rada p\u0101rslodzi un t\u0101d\u0113\u013c ir j\u0101p\u0101rpl\u0101no).<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Pool planning, CDT un Daily management<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pool planning<\/strong> sasaista l\u012bdzv\u0113rt\u012bgas iek\u0101rtas ar Pool tipa darba centru. Funkcija <strong>Suggest new work center<\/strong> iesaka &#8220;the work center that gets the earliest date for New finish,&#8221; (darba centru ar agr\u0101ko New finish datumu), un pl\u0101not\u0101js apstiprina ieteikumu vai p\u0101rvieto katru oper\u0101ciju.<\/li>\n\n\n<li><strong>Check delivery times<\/strong> (CDT, LTK) mekl\u0113 br\u012bvo jaudu vienai pas\u016bt\u012bjuma rindai, p\u0101rbaudot oper\u0101ciju p\u0113c oper\u0101cijas. T\u0101 p\u0101rbauda materi\u0101lu nodro\u0161in\u0101jumu un var ieteikt alternat\u012bvu darba centru.<\/li>\n\n\n<li><strong>Daily management<\/strong> (daglig styrning) att\u0113lo priorit\u0101\u0161u pl\u0101nus koplietojamos sk\u0101rienekr\u0101nos ikdienas darba uzraudz\u012bbai.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas joproj\u0101m j\u0101dara pl\u0101not\u0101jam<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nav vienota apr\u0113\u0137ina visai ra\u017eotnei, iev\u0113rojot jaudas ierobe\u017eojumus.<\/strong> P\u0113c noklus\u0113juma pas\u016bt\u012bjumus re\u0123istr\u0113 &#8220;regardless of the work center&#8217;s capacity&#8221; (neatkar\u012bgi no darba centra jaudas), bet, izv\u0113loties jaudas p\u0101rbaudi tikai attiec\u012bgaj\u0101 pas\u016bt\u012bjum\u0101, neviens cits pas\u016bt\u012bjums netiek \u0146emts v\u0113r\u0101.<\/li>\n\n\n<li><strong>P\u0101rslodze j\u0101nov\u0113r\u0161 pl\u0101not\u0101jam.<\/strong> Master planning nor\u0101da uz p\u0101rslodzi, kas &#8220;might require the entire order to be replanned.&#8221; (var rad\u012bt vajadz\u012bbu p\u0101rpl\u0101not visu pas\u016bt\u012bjumu). Loading plan nevar redi\u0123\u0113t.<\/li>\n\n\n<li><strong>Katrs darba centrs tiek pl\u0101nots atsevi\u0161\u0137i.<\/strong> New finish apr\u0113\u0137ina katram darba centram, pamatojoties uz t\u0101 darbu rindu. Monitor nor\u0101da: &#8220;the new finish date is not always in the same order as the rows.&#8221; (jaunie beigu datumi ne vienm\u0113r atbilst rindu sec\u012bbai).<\/li>\n\n\n<li><strong>Pool tipa darba centrus pl\u0101no atsevi\u0161\u0137i.<\/strong> Pool tipa darba centrs &#8220;must be handled in the Pool planning procedure,&#8221; (j\u0101apstr\u0101d\u0101 proced\u016br\u0101 Pool planning), nevis Priority planning. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PoolPlanning\/wPoolPlanning.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>CDT p\u0101rbauda vienu pas\u016bt\u012bjuma rindu.<\/strong> CDT pl\u0101no vienu pas\u016bt\u012bjuma rindu, un rezult\u0101t\u0101 manu\u0101li veikt\u0101s p\u0101rpl\u0101no\u0161anas izmai\u0146as &#8220;are not saved.&#8221; (netiek saglab\u0101tas). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/CheckDeliveryTimes\/CheckCapacityAvailability.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Regul\u0113t\u0101ju un brig\u0101\u017eu noslodzi p\u0101rbauda diagramm\u0101.<\/strong> Priority plan chart pal\u012bdz paman\u012bt, ka &#8220;two setups should not be planned at the same time if there is only one machine setter.&#8221; (divas p\u0101rregul\u0113\u0161anas nevajadz\u0113tu pl\u0101not vienlaikus, ja ir tikai viens iek\u0101rtu regul\u0113t\u0101js). \u0160o konfliktu nov\u0113r\u0161 pl\u0101not\u0101js. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanChart\/tPriorityPlanChart.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Filtr\u0113\u0161ana pal\u012bdz ietaup\u012bt p\u0101rregul\u0113\u0161anas laiku.<\/strong> Izmantojot opciju Tools &amp; Maintenance, &#8220;you can also filter orders that use the same tool in order to save set-up time.&#8221; (var ar\u012b filtr\u0113t pas\u016bt\u012bjumus, kuros izmanto vienu un to pa\u0161u instrumentu, lai ietaup\u012btu p\u0101rregul\u0113\u0161anas laiku). Pati grup\u0113\u0161ana j\u0101veic manu\u0101li. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Options\/ToolsMaintenance.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Daily management darbojas ar dienas precizit\u0101ti.<\/strong> &#8220;Daily management currently supports day planning.&#8221; (Daily management pa\u0161laik atbalsta pl\u0101no\u0161anu pa dien\u0101m.) Katram datoram, kas att\u0113lo \u0161os pl\u0101nus, nepiecie\u0161ama sava Daily management licence. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/DailyManagement\/wDailyManagement.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 pl\u0101not\u0101js katru r\u012btu p\u0101rvelk rindas un vizu\u0101li p\u0101rbauda regul\u0113t\u0101ju un instrumentu pieejam\u012bbu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-monitor-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar pa\u0161a Monitor pl\u0101no\u0161anas iesp\u0113j\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Priority planning un CDT pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Viens vai divi darba centri ir \u012bst\u0101s \u0161aur\u0101s vietas, bet p\u0101r\u0113jiem ir br\u012bva jauda.<\/li>\n\n\n<li>Par priorit\u0101\u0161u pl\u0101nu atbild pl\u0101not\u0101js, kur\u0161 ar to str\u0101d\u0101 katru dienu.<\/li>\n\n\n<li>L\u012bdzv\u0113rt\u012bgu iek\u0101rtu ir maz, un to pl\u0101no\u0161anai pietiek ar Pool planning.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas sec\u012bba, koplietojamie instrumenti un operatoru pieejam\u012bba reti nosaka, kuru darbu izpild\u012bt n\u0101kamo.<\/li>\n\n\n<li>Galvenok\u0101rt jums vajadz\u012bgi re\u0101listiski pieg\u0101des termi\u0146i atsevi\u0161\u0137\u0101m pas\u016bt\u012bjumu rind\u0101m, ko apr\u0113\u0137ina CDT.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro jaudas ierobe\u017eojumus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor pl\u0101no\u0161anas iesp\u0113jas vairs nav pietiekamas, ja uz jums attiecas vair\u0101ki no \u0161iem apgalvojumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Mainoties ra\u017eojamo produktu kl\u0101stam, \u0161aur\u0101 vieta p\u0101rvietojas no viena darba centra uz citu.<\/li>\n\n\n<li>Pieg\u0101des kav\u0113jas, lai gan katra darba centra priorit\u0101\u0161u pl\u0101ns izskat\u0101s k\u0101rt\u012bb\u0101.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Operatoru, regul\u0113t\u0101ju un mai\u0146u pieejam\u012bba ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>\u0160tances, veidnes vai pal\u012bgier\u012bces izmanto vair\u0101k\u0101m iek\u0101rt\u0101m.<\/li>\n\n\n<li>Materi\u0101lu pien\u0101k\u0161ana nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not darbus vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visu resursu pieejam\u012bbas ierobe\u017eojumus \u0146em v\u0113r\u0101 vienlaikus<\/strong> \u2014 visos darba centros vien\u0101 apr\u0113\u0137in\u0101.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: no darbu sec\u012bbas atkar\u012bgi, asimetriski p\u0101rregul\u0113\u0161anas laiki, kurus apr\u0113\u0137inu dzin\u0113js izmanto, lai samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumentus pl\u0101no k\u0101 koplietojamus resursus ar ierobe\u017eotu pieejam\u012bbu<\/strong>, lai viena pal\u012bgier\u012bce nekad netiktu iepl\u0101nota div\u0101m iek\u0101rt\u0101m vienlaikus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem<\/strong>, kuriem piesaista darbiniekus, \u0146emot v\u0113r\u0101 katra darbinieka mai\u0146u.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lus<\/strong> \u2014 gan kr\u0101jumus, gan paredzam\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, ko pl\u0101no\u0161anas dzin\u0113js izmanto, ja galvenais resurss ir aiz\u0146emts.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Skaidrs risin\u0101jums datu ierakst\u012b\u0161anai atpaka\u013c Monitor.<\/strong> Pajaut\u0101jiet, k\u0101 pl\u0101notais s\u0101kuma un beigu laiks caur Monitor ERP API non\u0101k ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101 un k\u0101da Monitor versija tam nepiecie\u0161ama.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur noder SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 katru no iepriek\u0161 min\u0113tajiem tr\u016bkumiem. Pl\u0101nojot tiek iev\u0113rota katra darba centra faktisk\u0101 jauda, un Arcturus AI dzin\u0113js da\u017e\u0101s sekund\u0113s sast\u0101da kop\u012bgu grafiku visiem darba centriem. Pl\u0101not\u0101js p\u0101rskata grafiku, nevis p\u0101rvieto rindas katr\u0101 darba centr\u0101 atsevi\u0161\u0137i.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja iek\u0101rta vai darbinieks nav pieejams, dzin\u0113js p\u0101rce\u013c darbu uz j\u016bsu nor\u0101d\u012btajiem alternat\u012bvajiem resursiem, tostarp iek\u0101rt\u0101m j\u016bsu Monitor Pool grup\u0101s.<\/p>\n\n\n<p>Sast\u0101dot grafiku p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 turpm\u0101kos kr\u0101jumus, \u0146emot v\u0113r\u0101 pa\u0161reiz\u0113jos atlikumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101, t\u0101p\u0113c darbs tiek iepl\u0101nots tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, iev\u0113rojot j\u016bsu fiks\u0113tos grafika elementus un priorit\u0101tes. Operatori redz savu darbu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> priorit\u0101\u0161u pl\u0101na veido\u0161ana ik ned\u0113\u013cu aiz\u0146em stundas un \u0161aur\u0101 vieta p\u0101rvietojas no viena darba centra uz citu.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana, regul\u0113t\u0101ju un koplietojamo instrumentu pieejam\u012bba nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rpl\u0101nojat vair\u0101kas reizes ned\u0113\u013c\u0101 un v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt izmantojamu grafiku savai ra\u017eo\u0161anai.<\/p>\n\n\n<p>S\u0101ciet ar savu atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu Excel form\u0101t\u0101 un izm\u0113\u0123iniet SkyPlanner <a href=\"\/lv\/izmeginajums\/\">30 dienas bez maksas<\/a> (l\u012bdz 20 darba centriem, kred\u012btkarte nav nepiecie\u0161ama). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus. Nor\u0113\u0137ini ir ik m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, kop\u0101 ar abon\u0113\u0161anas pl\u0101na pied\u0101v\u0101jumu.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Monitor ERP, izmantojot Monitor ERP API. Pl\u0101notais s\u0101kuma un beigu laiks tiek ierakst\u012bts atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s, un SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101. Skatiet lapu <a href=\"\/lv\/integracija\/erp\/monitor-erp\/\">SkyPlanner risin\u0101jums Monitor ERP lietot\u0101jiem<\/a>, <a href=\"\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/\">Monitor ERP integr\u0101cijas rokasgr\u0101matu<\/a> vai <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektriskie sadales skapji un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bnij\u0101 non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113tu pl\u0101nu trim m\u0113ne\u0161iem visiem darba centriem var sast\u0101d\u012bt maz\u0101k nek\u0101 30 min\u016bt\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas elementi un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums skaidru priek\u0161statu par jaudu un padara pl\u0101no\u0161anu prognoz\u0113jamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor G5 ir pl\u0101no\u0161anas panelis?<\/summary>\n<p class=\"sp-faq__a\">Monitor G5 ir pieejami Loading plan, Priority planning ar Priority plan chart, Pool planning un Check delivery times. Mekl\u0113\u0161anas rezult\u0101tos atrodamais \u201cPlanning Board\u201d ir aprakst\u012bts vec\u0101ko MONITOR 8 un 9 versiju pal\u012bdz\u012bb\u0101, nevis G5 dokument\u0101cij\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas ir New finish Monitor priorit\u0101\u0161u pl\u0101no\u0161an\u0101?<\/summary>\n<p class=\"sp-faq__a\">New finish ir Monitor prognoz\u0113tais katras oper\u0101cijas beigu laiks, ko apr\u0113\u0137ina p\u0113c jaudas, atliku\u0161\u0101 laika un oper\u0101cijas vietas darba centra priorit\u0101\u0161u pl\u0101n\u0101. Pl\u0101not\u0101js to piem\u0113ro ar funkciju Rescheduling according to New finish. Apr\u0113\u0137ins notiek katram darba centram atsevi\u0161\u0137i, t\u0101p\u0113c tas nemaina darbu sec\u012bbu citos darba centros.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor var vienlaikus pl\u0101not iek\u0101rtas un operatorus?<\/summary>\n<p class=\"sp-faq__a\">Monitor pl\u0101no katru darba centru atsevi\u0161\u0137i, un darba centr\u0101 uzskaita vai nu iek\u0101rtas, vai darbiniekus. Iek\u0101rtu regul\u0113t\u0101ju un brig\u0101\u017eu noslodzes konflikti tiek par\u0101d\u012bti Priority plan chart, un pl\u0101not\u0101jam tie j\u0101atrisina. SkyPlanner APS sast\u0101da kop\u012bgu grafiku iek\u0101rt\u0101m, darbiniekiem un instrumentiem, tostarp pl\u0101no ra\u017eo\u0161anas uzdevumus, kuru izpildei vajadz\u012bgi vair\u0101ki operatori.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms t\u0101 integr\u0113\u0161anas ar Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet no Monitor uz Excel atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cijas un darba centrus un import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101. Sal\u012bdziniet rezult\u0101tu ar savu priorit\u0101\u0161u pl\u0101nu. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Monitor ERP Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums Monitor ERP pl\u0101no katra darba centra jaudu, ta\u010du nesast\u0101da visas ra\u017eotnes grafiku, kur\u0101 tiktu iev\u0113roti faktisk\u0101s jaudas ierobe\u017eojumi. Monitor G5 sada\u013c\u0101 Loading plan r\u0101da katra darba centra slodzi, bet sada\u013c\u0101 Priority planning &#8230; <a title=\"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/\" aria-label=\"Read more about Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103084,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103982","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Monitor ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i jaudai?<\/title>\n<meta name=\"description\" content=\"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums\" \/>\n<meta property=\"og:description\" content=\"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/razosanas-planosana\\\/\",\"name\":\"Vai Monitor ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Monitor ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i jaudai?","description":"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums","og_description":"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/","name":"Vai Monitor ERP pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor G5: Loading plan r\u0101da slodzi, Priority planning \u2014 New finish. P\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js. K\u0101 tas darbojas un kad vajag APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Monitor ERP Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku jaudai? Priority Planning un SkyPlanner APS sal\u012bdzin\u0101jums Monitor ERP pl\u0101no katra darba centra jaudu, ta\u010du nesast\u0101da visas ra\u017eotnes grafiku, kur\u0101 tiktu iev\u0113roti faktisk\u0101s jaudas ierobe\u017eojumi. Monitor G5 sada\u013c\u0101 Loading plan r\u0101da katra darba centra slodzi, bet sada\u013c\u0101 Priority planning&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103982"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103982\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103084"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}