{"id":103835,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/katana\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/","title":{"rendered":"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Katana integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Katana integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Katana Cloud Inventory (Katana MRP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Katana, izmantojot publisko Katana API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101ciju rindas, produktu recept\u016bras, ra\u017eo\u0161anas oper\u0101cijas, resursus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Grafik\u0101 noteikt\u0101 sec\u012bba tiek nos\u016bt\u012bta atpaka\u013c uz Katana cilni Schedule kop\u0101 ar katra ra\u017eo\u0161anas pas\u016bt\u012bjuma izpildes termi\u0146u.<\/li>\n\n\n<li>Oper\u0101cijas statuss un faktiskais izpildes laiks tiek ierakst\u012bti atpaka\u013c oper\u0101ciju rind\u0101s.<\/li>\n\n\n<li>Katana t\u012bmek\u013ca aiz\u0137eres zi\u0146o SkyPlanner par izmai\u0146\u0101m, savuk\u0101rt SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Katana konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis paredz\u0113ts konsultantiem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cij\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-katana-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana ir vienots m\u0101ko\u0146produkts ar vair\u0101ku nomnieku arhitekt\u016bru, t\u0101p\u0113c visi klienti izmanto vienu un to pa\u0161u API. Tas ir REST API versij\u0101 v1 ar adresi <code>https:\/\/api.katanamrp.com\/v1<\/code>; OpenAPI 3.0 specifik\u0101cija pieejama adres\u0113 <code>https:\/\/api.katanamrp.com\/v1\/openapi.json<\/code>. Dokument\u0101cija atrodama <a href=\"https:\/\/developer.katanamrp.com\/reference\/api-introduction\">Katana Developer Hub<\/a>.<\/p>\n\n\n<p>Grafiku sast\u0101d\u012b\u0161anai nepiecie\u0161amie galapunkti:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pamatdati:<\/strong> <code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>, <code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>, <code>\/product_operation_rows<\/code>.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumi:<\/strong> <code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>, <code>\/manufacturing_order_recipe_rows<\/code>, <code>\/manufacturing_order_productions<\/code>.<\/li>\n\n\n<li><strong>Sec\u012bba:<\/strong> <code>\/manufacturing_order_rerank<\/code>.<\/li>\n\n\n<li><strong>Pieg\u0101de un piepras\u012bjums:<\/strong> <code>\/inventory<\/code>, <code>\/purchase_orders<\/code>, <code>\/purchase_order_rows<\/code>, <code>\/sales_orders<\/code>, <code>\/sales_order_rows<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Galapunkta <code>\/resources<\/code> nav. Resursi ir nor\u0101d\u012bti produktu oper\u0101ciju rind\u0101s un ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101ciju rind\u0101s laukos <code>resource_id<\/code> un <code>resource_name<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un ierobe\u017eojumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Autentifik\u0101cijai izmanto API atsl\u0113gu k\u0101 bearer pilnvaru: <code>Authorization: Bearer &lt;api key&gt;<\/code>. Izveidojiet atsl\u0113gu sada\u013c\u0101 <strong>Settings &gt; API &gt; Add new API key<\/strong>. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-authentication\">Avots<\/a>)<\/p>\n\n\n<p>Veidojot sinhroniz\u0101ciju, j\u0101\u0146em v\u0113r\u0101 \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>P\u0113c noklus\u0113juma Katana API at\u013cauj 60 piepras\u012bjumus 60 sekund\u0113s (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-rate-limiting\">avots<\/a>)<\/li>\n\n\n<li>P\u0101rsniedzot \u0161o limitu, API atgrie\u017e kodu 429 ar <code>Retry-After<\/code>. <code>X-Ratelimit-Remaining<\/code> nor\u0101da atliku\u0161o at\u013cauto piepras\u012bjumu skaitu.<\/li>\n\n\n<li>Sarakstu galapunkti atgrie\u017e rezult\u0101tus pa lap\u0101m un atbalsta filtr\u0113\u0161anu p\u0113c atjaunin\u0101\u0161anas datuma, t\u0101p\u0113c p\u0101rs\u016bt\u0101mo izmai\u0146u apjoms paliek neliels.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">T\u012bmek\u013ca aiz\u0137eres<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Re\u0123istr\u0113jiet t\u012bmek\u013ca aiz\u0137eri ar POST <code>\/webhooks<\/code>, nor\u0101dot HTTPS URL un vajadz\u012bgos notikumus. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/webhooks\">Avots<\/a>) Grafiku sast\u0101d\u012b\u0161anai noder \u0161\u0101di notikumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>manufacturing_order.created<\/code>, <code>.updated<\/code>, <code>.deleted<\/code>, <code>.in_progress<\/code>, <code>.blocked<\/code>, <code>.done<\/code><\/li>\n\n\n<li><code>manufacturing_order_operation_row.created<\/code>, <code>.updated<\/code>, <code>.in_progress<\/code>, <code>.paused<\/code>, <code>.completed<\/code><\/li>\n\n\n<li><code>current_inventory.material_updated<\/code>, <code>.material_out_of_stock<\/code><\/li>\n\n\n<li><code>purchase_order.*<\/code> un <code>purchase_order_row.*<\/code>, tostarp sa\u0146em\u0161anas notikumi<\/li>\n\n\n<li><code>product.*<\/code>, <code>product_recipe_row.*<\/code> un <code>sales_order.*<\/code><\/li>\n\n<\/ul>\n\n\n<p>Pazi\u0146ojumos ir tikai resursa tips, darb\u012bba un <code>href<\/code>. Sa\u0146\u0113m\u0113js ieg\u016bst pilnu objektu no href nor\u0101d\u012bt\u0101s adreses. Katr\u0101 pieg\u0101d\u0113 ir iek\u013cauta galvene <code>x-sha2-signature<\/code> (HMAC SHA-256) p\u0101rbaudei. J\u016bsu galapunktam j\u0101atbild ar 20X kodu 10 sekun\u017eu laik\u0101. Katana veic tr\u012bs atk\u0101rtotus m\u0113\u0123in\u0101jumus: p\u0113c 30 sekund\u0113m, 2 min\u016bt\u0113m un 15 min\u016bt\u0113m.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Produkti, materi\u0101li, varianti (<code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>Katana \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 sa\u0146emot webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Produkta recept\u016bra \/ BOM (<code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti<\/td><td>Katana \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 sa\u0146emot webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas oper\u0101cijas (<code>\/product_operation_rows<\/code>): tips, resurss, laiks<\/td><td>Procesa so\u013ci ar izpildes un sagatavo\u0161anas laiku<\/td><td>Katana \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Resursi (<code>resource_id<\/code>, <code>resource_name<\/code> oper\u0101ciju rind\u0101s)<\/td><td>Darba centri, darba centru grupas<\/td><td>Katana \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de un pievienojot jaunu resursu<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums ar oper\u0101ciju rind\u0101m (<code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma materi\u0101li (<code>\/manufacturing_order_recipe_rows<\/code>)<\/td><td>Katra ra\u017eo\u0161anas uzdevuma materi\u0101li<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Kr\u0101jumi, iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des datumiem (<code>\/inventory<\/code>, <code>\/purchase_order_rows<\/code>)<\/td><td>Kr\u0101jumi un gaid\u0101mie materi\u0101li<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>P\u0101rdo\u0161anas pas\u016bt\u012bjuma lauks <code>delivery_date<\/code> (<code>\/sales_orders<\/code>)<\/td><td>Pas\u016bt\u012bjuma izpildes termi\u0146\u0161, klienta priorit\u0101te<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Re\u0101llaik\u0101 ar t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bba (POST <code>\/manufacturing_order_rerank<\/code>)<\/td><td>Atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bba grafik\u0101<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Mainoties grafikam<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma lauks <code>production_deadline_date<\/code> (PATCH <code>\/manufacturing_orders\/{id}<\/code>)<\/td><td>Pl\u0101not\u0101 pabeig\u0161ana<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Mainoties grafikam<\/td><\/tr><tr><td>Oper\u0101cijas rindas lauki <code>status<\/code>, <code>total_actual_time<\/code> (PATCH <code>\/manufacturing_order_operation_rows\/{id}<\/code>)<\/td><td>Mobile Confirmations, darba laika ieraksti<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Re\u0123istr\u0113jot paveikto darbu<\/td><\/tr><tr><td>Katana nav pieejams<\/td><td>Mai\u0146as, promb\u016btnes, sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvie darba centri<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ieg\u016bstiet produktus, materi\u0101lus, variantus, recept\u016bru rindas un produktu oper\u0101ciju rindas pa lap\u0101m, piel\u0101gojot piepras\u012bjumu bie\u017eumu at\u013cautajam limitam. Izveidojiet SkyPlanner darba centrus no oper\u0101ciju rind\u0101s nor\u0101d\u012btajiem unik\u0101lajiem resursiem un saglab\u0101jiet atsl\u0113gu atbilst\u012bbu 1:1. Katram darba centram iestatiet mai\u0146as, atva\u013cin\u0101jumus un virsstundas SkyPlanner, jo Katana nav resursu kalend\u0101ra.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Abon\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumu, oper\u0101ciju rindu, kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu notikumus. Sa\u0146emot katru notikumu, ieg\u016bstiet objektu no t\u0101 href adreses un atjauniniet ra\u017eo\u0161anas uzdevumu. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjums ir sa\u0146emts. Ik nakti veiciet datu sal\u012bdzin\u0101\u0161anu ar filtriem p\u0113c atjaunin\u0101\u0161anas datuma, lai konstat\u0113tu nepaman\u012btos notikumus.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Pl\u0101nu Katana ieraksta ar diviem izsaukumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>POST <code>\/manufacturing_order_rerank<\/code> &#8220;moves one or more manufacturing orders to an exact place in the production schedule&#8221; (p\u0101rvieto vienu vai vair\u0101kus ra\u017eo\u0161anas pas\u016bt\u012bjumus uz prec\u012bzu vietu ra\u017eo\u0161anas grafik\u0101). Vien\u0101 piepras\u012bjum\u0101 var nor\u0101d\u012bt l\u012bdz 250 atv\u0113rtiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem, izvietojot tos s\u0101kum\u0101, beig\u0101s vai pirms vai p\u0113c noteikta ra\u017eo\u0161anas pas\u016bt\u012bjuma. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/rerankmanufacturingorder\">Avots<\/a>)<\/li>\n\n\n<li>PATCH <code>\/manufacturing_orders\/{id}<\/code> iestata <code>production_deadline_date<\/code>. Katana to pie\u0146em tikai tad, ja attiec\u012bgajai ra\u017eotnes atra\u0161an\u0101s vietai ir izsl\u0113gta autom\u0101tisk\u0101 termi\u0146a apr\u0113\u0137in\u0101\u0161ana. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/updatemanufacturingorder\">Avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Sec\u012bbas mai\u0146a ietekm\u0113 ne tikai sarakstu. Katana sist\u0113m\u0101 &#8220;higher-priority MOs reserve required materials and subassemblies first&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjumi ar augst\u0101ku priorit\u0101ti pirmie rezerv\u0113 vajadz\u012bgos materi\u0101lus un mezglus), t\u0101p\u0113c SkyPlanner noteikt\u0101 sec\u012bba nosaka ar\u012b to, kuram ra\u017eo\u0161anas pas\u016bt\u012bjumam Katana pie\u0161\u0137ir kr\u0101jumus.<\/p>\n\n\n<p><strong>4. Paveikt\u0101 darba apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations, Production Timer vai Quick Log Mode. SkyPlanner ieraksta statusu un faktisko izpildes laiku ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas rind\u0101. Ja ra\u017eotne t\u0101 viet\u0101 turpina izmantot Katana Shop Floor App, SkyPlanner nolasa oper\u0101ciju rindu notikumus. Katrai ra\u017eotnei izv\u0113lieties vienu darba uzskaites kan\u0101lu.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Produkti, recept\u016bras, ra\u017eo\u0161anas oper\u0101cijas, kr\u0101jumi, iepirkumi, p\u0101rdo\u0161anas pas\u016bt\u012bjumi<\/td><td>Katana<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, katras oper\u0101cijas darba centrs<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma vieta ciln\u0113 Schedule un ra\u017eo\u0161anas termi\u0146\u0161<\/td><td>SkyPlanner; datus ieraksta ar\u012b Katana sist\u0113m\u0101<\/td><\/tr><tr><td>Mai\u0146as, promb\u016btnes, sagatavo\u0161anas laiku matrica, instrumenti, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Oper\u0101cijas statuss un re\u0123istr\u0113tais laiks<\/td><td>Viens kan\u0101ls, ko izv\u0113las, nosakot tv\u0113rumu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta so\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c klienta s\u0101kotn\u0113j\u0101s sagatavo\u0161anas uzs\u0101k\u0161anas. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus no Katana CSV eksporta, piem\u0113ram, Tasks sarakstu Make skat\u0101.<\/p>\n\n\n<p>Projekt\u0101 ietilpst \u0161\u0101di so\u013ci:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Abon\u0113\u0161anas pl\u0101ns un atsl\u0113ga.<\/strong> P\u0101rliecinieties, ka Katana pl\u0101n\u0101 ir iek\u013cauts API un Manufacturing Management, un izveidojiet API atsl\u0113gu.<\/li>\n\n\n<li><strong>Termi\u0146u re\u017e\u012bms.<\/strong> Vienojieties par autom\u0101tisko termi\u0146u izsl\u0113g\u0161anu r\u016bpn\u012bcas atra\u0161an\u0101s vietai, lai ra\u017eo\u0161anas termi\u0146us p\u0101rvald\u012btu SkyPlanner.<\/li>\n\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Apstipriniet atbilst\u012bbas tabulu, resursu atsl\u0113gas, noteikumus par atbild\u012bbu par datiem un darba uzskaites kan\u0101lu.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Produkti, varianti, recept\u016bras, ra\u017eo\u0161anas oper\u0101cijas un resursi.<\/li>\n\n\n<li><strong>Notikumu sinhroniz\u0101cija.<\/strong> Webhook pazi\u0146ojumi par pas\u016bt\u012bjumiem, oper\u0101cij\u0101m, kr\u0101jumiem un iepirkuma pas\u016bt\u012bjumiem, k\u0101 ar\u012b datu sal\u012bdzin\u0101\u0161ana un saska\u0146o\u0161ana katru nakti.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Mai\u0146as, p\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie darba centri.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Sec\u012bbas mai\u0146a un termi\u0146i, p\u0113c tam oper\u0101ciju statuss un laiks.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana un palai\u0161ana darb\u0101.<\/strong> Sal\u012bdziniet SkyPlanner datumus ar pa\u0161reiz\u0113jiem datumiem ciln\u0113 Schedule, izlabojiet pamatdatus un tad iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-katana-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, integr\u0113jot Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Termi\u0146u re\u017e\u012bms p\u0101rraksta datumus.<\/strong> &#8220;Once automatic mode is enabled, all manual deadlines will be overwritten and cannot be restored.&#8221; (Iesl\u0113dzot autom\u0101tisko re\u017e\u012bmu, visi manu\u0101li iestat\u012btie termi\u0146i tiks p\u0101rrakst\u012bti, un tos nevar\u0113s atjaunot.) Izv\u0113lieties re\u017e\u012bmu vienreiz \u2014 projekta s\u0101kum\u0101.<\/li>\n\n\n<li><strong>Nav resursu kalend\u0101ra.<\/strong> Neveidojiet mai\u0146as, balstoties tikai uz vienu Weekly throughput v\u0113rt\u012bbu. Iestatiet t\u0101s SkyPlanner katram darba centram atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>Resursi ir tikai oper\u0101ciju rind\u0101s.<\/strong> Nemainiet resursu nosaukumus Katana, jo tie kalpo par atsl\u0113gu sasaistei ar SkyPlanner darba centriem.<\/li>\n\n\n<li><strong>Laika m\u0113rvien\u012bbas.<\/strong> <code>planned_time_parameter<\/code> tiek nor\u0101d\u012bts sekund\u0113s: per-unit oper\u0101cij\u0101m \u2014 uz vienu vien\u012bbu, bet process, setup un fixed tipiem \u2014 kop\u0101. Pareizi sasaistiet oper\u0101ciju tipus, cit\u0101di apr\u0113\u0137in\u0101tais ilgums b\u016bs k\u013c\u016bdaini reizin\u0101ts vai dal\u012bts ar daudzumu.<\/li>\n\n\n<li><strong>Grupas ra\u017eo\u0161anai p\u0113c pas\u016bt\u012bjuma.<\/strong> Mainot sec\u012bbu, ra\u017eo\u0161anas pas\u016bt\u012bjumi (MO), kas saist\u012bti ar vienu un to pa\u0161u p\u0101rdo\u0161anas pas\u016bt\u012bjumu, paliek kop\u0101, t\u0101p\u0113c pl\u0101nojiet tos k\u0101 vienu grupu.<\/li>\n\n\n<li><strong>Main\u012bts sec\u012bbas p\u0101rk\u0101rto\u0161anas princips.<\/strong> Kop\u0161 2026. gada 7. oktobra sec\u012bbas mai\u0146as galapunkti ievieto pas\u016bt\u012bjumus tie\u0161i nor\u0101d\u012btaj\u0101 viet\u0101. Integr\u0101cijas, kas izstr\u0101d\u0101tas, \u0146emot v\u0113r\u0101 iepriek\u0161\u0113jo darb\u012bbas principu, j\u0101p\u0101rbauda atk\u0101rtoti. (<a href=\"https:\/\/developer.katanamrp.com\/changelog\/breaking-change-order-rerank-endpoints-place-orders-exactly-where-asked\">avots<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-katana-integration-who-configures-and-suppor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs aptver j\u016bsu resursus, ra\u017eo\u0161anas oper\u0101cijas, pas\u016bt\u012bjumu pl\u016bsmu un termi\u0146u re\u017e\u012bmu. Tiek pievienots ar\u012b tas, ko Katana neglab\u0101: mai\u0146as, p\u0101rregul\u0113\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie resursi.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas darb\u0101.<\/strong> Katr\u0101 r\u016bpn\u012bc\u0101 Katana resursi un oper\u0101cijas ir iestat\u012bti at\u0161\u0137ir\u012bgi, un konfigur\u0113\u0161an\u0101 tiek izmantotas zin\u0101\u0161anas par \u0161\u012bm \u012bpatn\u012bb\u0101m.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izveidot j\u016bsu Katana konsultants vai integr\u0101cijas partneris.<\/strong> SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un webhook pazi\u0146ojumus.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot savus risin\u0101jumus,<\/strong> izmantojot API piek\u013cuves pilnvaru. Ar API piek\u013cuves pilnvaru pietiek, lai s\u0101ktu darbu, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Produkta dokument\u0101cija, tostarp par iepirkuma pas\u016bt\u012bjumiem un produktu un materi\u0101lu API, ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un maks\u0101jot katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un sal\u012bdzin\u0101jumu ar Katana grafiku sast\u0101d\u012b\u0161anas iesp\u0113j\u0101m rakst\u0101 <a href=\"\/lv\/integracija\/erp\/katana\/razosanas-planosana\/\">Ra\u017eo\u0161anas pl\u0101no\u0161ana ar Katana, iev\u0113rojot iek\u0101rtu un darbinieku faktisko jaudu<\/a>. P\u0101rskats ir pieejams <a href=\"\/lv\/integracija\/erp\/katana\/\">Katana lap\u0101<\/a>, bet citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana no Excel izkl\u0101jlap\u0101m ir p\u0101rg\u0101jusi uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj katru ned\u0113\u013cu ietaup\u012bt 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska slodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>darba pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Katana ir API, un kur\u0161 pl\u0101ns man nepiecie\u0161ams?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Katana pied\u0101v\u0101 publisku REST API v1 ar OpenAPI 3.0 specifik\u0101ciju. Cenu lap\u0101 API piek\u013cuve ir nor\u0101d\u012bta Free un Advantage pl\u0101niem. Autentifik\u0101cijai izmanto bearer API atsl\u0113gu, kas pieejama sada\u013c\u0101 Settings &gt; API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var ierakst\u012bt grafiku atpaka\u013c Katana?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Izmantojot <code>\/manufacturing_order_rerank<\/code>, SkyPlanner sak\u0101rto atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus sav\u0101 noteiktaj\u0101 sec\u012bb\u0101 Katana ciln\u0113 Schedule un ieraksta katra MO lauk\u0101 <code>production_deadline_date<\/code> t\u0101 termi\u0146u. Oper\u0101cijas statuss un faktiskais laiks tiek ierakst\u012bti MO oper\u0101ciju rind\u0101s. Katra darba centra grafiks ar konkr\u0113tiem laikiem tiek glab\u0101ts SkyPlanner, kur operatori str\u0101d\u0101 p\u0113c savas uzdevumu rindas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Katana nos\u016bta izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Katana webhook pazi\u0146ojumi aptver ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101ciju rindas, kr\u0101jumus, iepirkuma pas\u016bt\u012bjumus un p\u0101rdo\u0161anas pas\u016bt\u012bjumus. SkyPlanner izg\u016bst katru main\u012bto objektu un katru nakti sal\u012bdzina un saska\u0146o datus, t\u0101p\u0113c ar\u012b nepieg\u0101d\u0101ta notikuma d\u0113\u013c ra\u017eo\u0161anas uzdevum\u0101 nekad nepaliek novecoju\u0161i dati.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 Katana resursi k\u013c\u016bst par SkyPlanner darba centriem?<\/summary>\n<p class=\"sp-faq__a\">Katrs at\u0161\u0137ir\u012bgais resurss Katana oper\u0101ciju rind\u0101s k\u013c\u016bst par SkyPlanner darba centru ar atsl\u0113gu, kas nodro\u0161ina 1:1 atbilst\u012bbu. P\u0113c tam SkyPlanner sist\u0113m\u0101 iestata mai\u0146as, promb\u016btnes un alternat\u012bvos darba centrus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem, import\u0113jot CSV datus no Katana. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Katana Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Katana integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Katana Cloud Inventory (Katana MRP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Katana, izmantojot publisko Katana API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu &#8230; <a title=\"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/\" aria-label=\"Read more about Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102997,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103835","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/integracijas-celvedis\\\/\",\"name\":\"Katana MRP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Katana: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/katana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/","name":"Katana MRP un APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Katana un SkyPlanner APS savieno\u0161ana: API v1, API atsl\u0113gas, webhooks, piepras\u012bjumu limiti, ra\u017eo\u0161anas pas\u016bt\u012bjumu p\u0101rk\u0101rto\u0161ana, datu kart\u0113\u0161ana, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Katana: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/katana\/"},{"@type":"ListItem","position":5,"name":"Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Katana Katana integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Katana integr\u0101cijas ce\u013cved\u012b konsultantiem un IT komand\u0101m skaidrots, k\u0101 savienot Katana Cloud Inventory (Katana MRP) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Katana, izmantojot publisko Katana API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103835"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103835\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102997"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}