{"id":103775,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/jobboss\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/","title":{"rendered":"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ JobBOSS\u00b2<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 JobBOSS\u00b2 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot ECI izstr\u0101d\u0101to JobBOSS\u00b2 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar JobBOSS\u00b2, izmantojot pa\u0161a ECI API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em Orders un Order Line Items, Order Routings, Estimates, Routings un materi\u0101lus, Work Centers, Employees, Company Calendar, Job Requirements un iepirkuma pas\u016bt\u012bjumu rindas.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti atpaka\u013c katr\u0101 Order Routing oper\u0101cij\u0101.<\/li>\n\n\n<li>Ja izv\u0113laties, operatoru darba laika ierakstus var nos\u016bt\u012bt atpaka\u013c k\u0101 Time Ticket Details.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu JobBOSS\u00b2 konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). K\u0101ds ASV uz\u0146\u0113mums, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, to jau ir paveicis:<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"jobboss-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ECI public\u0113 ra\u017eo\u0161anai paredz\u0113tos API un to OpenAPI specifik\u0101cijas vietn\u0113 <a href=\"https:\/\/integrations.ecimanufacturing.com\/\">ECI ra\u017eo\u0161anas API dokument\u0101cija<\/a>. Grafiku sast\u0101d\u012b\u0161anai ir svar\u012bgi divi API:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>JobBOSS\u00b2 API (v1).<\/strong> Tie\u0161i JobBOSS\u00b2 paredz\u0113ts API, kas izmanto REST un JSON. Tas nolasa un ieraksta pas\u016bt\u012bjumus, Order Line Items, Order Routings, Estimates, Routings, materi\u0101lus, Job Requirements, Work Centers, Company Calendar, Employees, iepirkuma pas\u016bt\u012bjumus, Time Tickets un Time Ticket Details. ECI nor\u0101da: &#8220;is currently only supported for JobBOSS\u00b2 hosted (Cloud) customers.&#8221; (Pa\u0161laik tas tiek atbalst\u012bts tikai klientiem, kuri izmanto m\u0101kon\u012b mitin\u0101tu JobBOSS\u00b2.)<\/li>\n\n\n<li><strong>ECI ERP API (v2.1).<\/strong> No konkr\u0113ta produkta neatkar\u012bgs REST API, kas paredz\u0113ts Deacom, M1 un JobBOSS\u00b2. JobBOSS\u00b2 gad\u012bjum\u0101 tas aptver ra\u017eo\u0161anas uzdevumus, to oper\u0101cijas un materi\u0101lus, deta\u013cas, deta\u013cu oper\u0101cijas, darba centrus, iepirkuma pas\u016bt\u012bjumu rindas un darba laika uzskaites rindas. ECI nor\u0101da: &#8220;the actual ERP database could be a cloud hosted ERP or on premises install,&#8221; (ERP datub\u0101ze var atrasties gan m\u0101kon\u012b mitin\u0101t\u0101, gan lok\u0101li instal\u0113t\u0101 ERP sist\u0113m\u0101), t\u0101p\u0113c \u0161is ir risin\u0101jums lok\u0101li instal\u0113tam JobBOSS\u00b2.<\/li>\n\n<\/ol>\n\n\n<p>Abi API izmanto vien\u0101dus principus: filtr\u0113\u0161anas izteiksmes, piem\u0113ram, <code>lastModDate[gte]=<\/code>, parametru <code>fields=<\/code>, <code>sort=<\/code> un lapo\u0161anu ar <code>take<\/code> un <code>skip<\/code>. Parametra <code>take<\/code> noklus\u0113juma v\u0113rt\u012bba ir 200. &#8220;All dates submitted to the API are assumed to be in UTC.&#8221; (Visi API iesniegtie datumi tiek uzskat\u012bti par nor\u0101d\u012btiem UTC laika josl\u0101.)<\/p>\n\n\n<p>ECI noteikums abiem API: &#8220;All APIs must be activated by ECI before use.&#8221; (Pirms lieto\u0161anas ECI j\u0101aktiviz\u0113 visi API.) Sazinieties ar savu ECI klientu vad\u012bt\u0101ju laikus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuve<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>API lietot\u0101ji.<\/strong> Integr\u0101cija izmanto ECI Integration Engine Management Console izveidotu API lietot\u0101ju. API lietot\u0101js nosaka, kuram produktam, klientam un datub\u0101zei tiek adres\u0113ti izsaukumi.<\/li>\n\n\n<li><strong>OAuth 2.0 klienta akredit\u0101cijas dati.<\/strong> Ar klienta ID un klienta slepeno atsl\u0113gu ieg\u016bst piek\u013cuves mar\u0137ieri Authentication API mar\u0137ieru galapunkt\u0101. P\u0113c tam katr\u0101 izsaukum\u0101 tiek nos\u016bt\u012bts <code>Authorization: Bearer [token]<\/code>.<\/li>\n\n\n<li><strong>Piek\u013cuves tv\u0113rums.<\/strong> Pie\u0161\u0137iriet API lietot\u0101jam piek\u013cuvi tikai tiem resursiem, kas nepiecie\u0161ami t\u0101l\u0101k redzamaj\u0101 kart\u0113\u0161anas tabul\u0101.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim izskaidroti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu nolas\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Neviena no abu ECI API dokument\u0101cij\u0101m neapraksta t\u012bmek\u013ca aiz\u0137eres. Dati no JobBOSS\u00b2 tiek nolas\u012bti periodiski: atlasiet Order Line Items, Order Routings un iepirkuma pas\u016bt\u012bjumu rindas p\u0113c <code>lastModDate<\/code> kop\u0161 iepriek\u0161\u0113j\u0101s nolas\u012b\u0161anas un izmantojiet <code>take<\/code> un <code>skip<\/code> lapo\u0161anai. Bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i: no nolas\u012b\u0161anas ik p\u0113c da\u017e\u0101m min\u016bt\u0113m ra\u017eo\u0161anas uzdevumiem l\u012bdz nolas\u012b\u0161anai reizi stund\u0101 kr\u0101jumiem.<\/p>\n\n\n<p>SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres, kad main\u0101s statuss vai grafiks, t\u0101p\u0113c atpaka\u013cieraksti tiek veikti, rea\u0123\u0113jot uz notikumiem.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>JobBOSS\u00b2 objekts (JobBOSS\u00b2 API resurss)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Estimates (<code>\/estimates<\/code>), materi\u0101li (<code>\/materials<\/code>)<\/td><td>Produkti, materi\u0101li, produkta strukt\u016bra<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Routings (<code>\/routings<\/code>): darba centrs, p\u0101rregul\u0113\u0161anas laiks, cikla laiks, komandas lielums, ra\u017eo\u0161anas uzdevumam paredz\u0113t\u0101s iek\u0101rtas<\/td><td>Oper\u0101cijas ar izpildes un p\u0101rregul\u0113\u0161anas laikiem<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Work Centers (<code>\/work-centers<\/code>): stundas mai\u0146\u0101, darbs mai\u0146\u0101s no 1 l\u012bdz 3, darbdienas<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Company Calendar (<code>\/company-calendars<\/code>), Employees (<code>\/employees<\/code>)<\/td><td>Mai\u0146as, br\u012bvdienas, person\u0101ls<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Katru dienu vai mai\u0146u p\u0101rvald\u012bba SkyPlanner<\/td><\/tr><tr><td>Orders un Order Line Items (<code>\/order-line-items<\/code>): ra\u017eo\u0161anas uzdevuma numurs, izpildes termi\u0146\u0161, priorit\u0101te, sara\u017eojamais daudzums<\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un priorit\u0101t\u0113m<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Order Routings (<code>\/order-routings<\/code>): ra\u017eo\u0161anas uzdevuma oper\u0101cijas, statuss, atliku\u0161\u0101s stundas<\/td><td>Ra\u017eo\u0161anas uzdevumi katrai oper\u0101cijai<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Job Requirements (<code>\/job-requirements<\/code>), iepirkuma pas\u016bt\u012bjumu rindas (<code>\/purchase-order-line-items<\/code>)<\/td><td>Materi\u0101lu vajadz\u012bbas, iepirkuma pas\u016bt\u012bjumi p\u0113c pieg\u0101des datuma<\/td><td>JobBOSS\u00b2 \u2192 SkyPlanner<\/td><td>Nolas\u012b\u0161ana reizi stund\u0101 vai grafika sast\u0101d\u012b\u0161anas laik\u0101<\/td><\/tr><tr><td>Order Routing <code>estimatedStartDate<\/code>, <code>estimatedEndDate<\/code>, <code>workCenter<\/code>, <code>employeeCode<\/code> (PATCH)<\/td><td>Pl\u0101notais s\u0101kums un beigas, iek\u0101rta un operators katrai oper\u0101cijai<\/td><td>SkyPlanner \u2192 JobBOSS\u00b2<\/td><td>Mainoties grafikam, ar SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Time Ticket Details (POST): ra\u017eo\u0161anas uzdevums, oper\u0101cija, darba centrs, darbinieks, p\u0101rregul\u0113\u0161anas laiks, cikla laiks, gatavo un br\u0101\u0137\u0113to vien\u012bbu skaits, s\u0101kuma un beigu laiks<\/td><td>Darba laika ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 JobBOSS\u00b2<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as, ja \u0161\u012b iesp\u0113ja izv\u0113l\u0113ta<\/td><\/tr><tr><td>Nav JobBOSS\u00b2<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bvas iek\u0101rtas un person\u0101ls<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Lok\u0101li instal\u0113tam JobBOSS\u00b2 tos pa\u0161us objektus nolasa, izmantojot ERP API resursus <code>\/jobs<\/code>, <code>\/job-operations<\/code>, <code>\/job-materials<\/code>, <code>\/parts<\/code>, <code>\/part-operations<\/code>, <code>\/work-centers<\/code> un <code>\/purchase-order-lines<\/code>, bet darba laika ierakstus nos\u016bta uz <code>\/timecard-lines<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet Estimates, Routings, materi\u0101lus, Work Centers, Company Calendar un Employees. R\u016bp\u012bgi kart\u0113jiet darba centrus: darba centrs ar \u010detr\u0101m virp\u0101m k\u013c\u016bst par vienu darba centru grupu vai \u010detriem darba centriem, lai SkyPlanner sast\u0101d\u012btu darbu sec\u012bbu katrai iek\u0101rtai.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas uzdevumu sinhroniz\u0101cija.<\/strong> Nolasiet atv\u0113rtos Order Line Items kop\u0101 ar to Order Routings, Job Requirements un atv\u0113rtaj\u0101m iepirkuma pas\u016bt\u012bjumu rind\u0101m. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Izlaidiet aptur\u0113tos un sl\u0113gtos ra\u017eo\u0161anas uzdevumus.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Kad pl\u0101no\u0161anas dzin\u0113js iepl\u0101no vai p\u0101rvieto oper\u0101ciju, SkyPlanner t\u012bmek\u013ca aiz\u0137ere ierosina PATCH piepras\u012bjumu uz <code>\/api\/v1\/orders\/{orderNumber}\/order-line-items\/{itemNumber}\/order-routings\/{stepNumber}<\/code>. Tas iestata <code>estimatedStartDate<\/code> un <code>estimatedEndDate<\/code> UTC laika josl\u0101, k\u0101 ar\u012b <code>workCenter<\/code> un <code>employeeCode<\/code>, ja SkyPlanner ir p\u0101rc\u0113lis oper\u0101ciju uz citu iek\u0101rtu vai pie cita darbinieka. Datumi tiek ierakst\u012bti taj\u0101s ra\u017eo\u0161anas uzdevumu oper\u0101cij\u0101s, kuras jau r\u0101da Whiteboard, Planning Board un Scheduling Advisor.<\/p>\n\n\n<p><strong>4. Ra\u017eo\u0161anas izpildes apstiprin\u0101jumi.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer, un darba laika ieraksti uztur grafiku aktu\u0101lu. J\u016bs izv\u0113laties, vai faktiskos laikus nos\u016bt\u012bt atpaka\u013c uz JobBOSS\u00b2. Ja j\u0101, katrs apstiprin\u0101jums k\u013c\u016bst par Time Ticket Detail ar p\u0101rregul\u0113\u0161anas laiku, cikla laiku un vien\u012bbu skaitu. Ja n\u0113, datu v\u0101k\u0161ana paliek JobBOSS\u00b2, un SkyPlanner nolasa izpildes gaitu no Order Routings.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darb\u012bbas uzs\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Estimates, Routings, daudzumi, izpildes termi\u0146i, ra\u017eo\u0161anas uzdevuma statuss<\/td><td>JobBOSS\u00b2<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, iek\u0101rta un operators katrai oper\u0101cijai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, kas izv\u0113l\u0113ta tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba laika uzskaites dokumenti, materi\u0101lu izsnieg\u0161ana, sa\u0146em\u0161ana, pa\u0161izmaksas apr\u0113\u0137ins<\/td><td>JobBOSS\u00b2 \u2014 datus ievada taj\u0101 vai nos\u016bta no SkyPlanner darba laika ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izv\u0113lieties vienu sist\u0113mu, kas ierakst\u012bs ra\u017eo\u0161anas uzdevumu oper\u0101ciju datumus. SkyPlanner aizst\u0101j p\u0101rpl\u0101no\u0161anu Whiteboard tiem ra\u017eo\u0161anas uzdevumiem, kurus tas pl\u0101no. T\u0101p\u0113c pl\u0101not\u0101ji p\u0101rvieto darbus SkyPlanner, un datumi tiek nos\u016bt\u012bti uz JobBOSS\u00b2.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiski projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Pirms tam p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, izmantojot Work Centers, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas uzdevumus, kas eksport\u0113ti no JobBOSS\u00b2 CSV vai Excel form\u0101t\u0101.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kart\u0113\u0161ana.<\/strong> Apstipriniet kart\u0113\u0161anas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un to, vai darba laika uzskaites ieraksti tiks nos\u016bt\u012bti atpaka\u013c.<\/li>\n\n\n<li><strong>ECI piek\u013cuve.<\/strong> L\u016bdziet ECI aktiviz\u0113t JobBOSS\u00b2 API vai ERP API un izveidot API lietot\u0101ju. Ja ir pieejams testa uz\u0146\u0113mums, veiciet p\u0101rbaudes taj\u0101.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Estimates, Routings, Work Centers, kalend\u0101rs un darbinieki.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska datu piepras\u012b\u0161ana ar <code>lastModDate<\/code> filtriem, rezult\u0101tu izg\u016b\u0161ana pa lap\u0101m un atk\u0101rtoti m\u0113\u0123in\u0101jumi.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laika matrica, instrumenti, operatoru skaits katram ra\u017eo\u0161anas uzdevumam un alternat\u012bv\u0101s iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> SkyPlanner t\u012bmek\u013ca aiz\u0137eres aktiviz\u0113 Order Routing PATCH izsaukumus; ja izv\u0113l\u0113ts, tiek ierakst\u012bti ar\u012b Time Ticket Details dati.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101no\u0161anas panelim, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-jobboss-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot JobBOSS\u00b2 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Mitin\u0101ts risin\u0101jums vai lok\u0101la instal\u0101cija.<\/strong> JobBOSS\u00b2 API ir paredz\u0113ta klientiem, kuri izmanto mitin\u0101to risin\u0101jumu. Lok\u0101laj\u0101m instal\u0101cij\u0101m izmanto ERP API, kurai ir at\u0161\u0137ir\u012bgs resursu saraksts. Izv\u0113lieties piesl\u0113guma veidu 1. sol\u012b.<\/li>\n\n\n<li><strong>Visur UTC.<\/strong> API nolasa un ieraksta laiku UTC. P\u0101rr\u0113\u0137iniet to uz ra\u017eotnes viet\u0113jo laiku, cit\u0101di s\u0101kums plkst. 7:00 tiks iepl\u0101nots nepareiz\u0101 laik\u0101.<\/li>\n\n\n<li><strong>Kas sl\u0113pjas aiz darba centra.<\/strong> Darba centrs var b\u016bt iek\u0101rta, iek\u0101rtu grupa, ra\u017eo\u0161anas \u0161\u016bna vai cilv\u0113ki. Katr\u0101 tehnolo\u0123isk\u0101 procesa oper\u0101cij\u0101 nor\u0101d\u012btais iek\u0101rtu skaits un brig\u0101des lielums nosaka, cik resursu SkyPlanner tai j\u0101paredz.<\/li>\n\n\n<li><strong>\u0100rpakalpojumi.<\/strong> Oper\u0101cijas, kur\u0101m darba centra viet\u0101 nor\u0101d\u012bts pieg\u0101d\u0101t\u0101js, ietekm\u0113 pas\u016bt\u012bjuma izpildes laiku, nevis j\u016bsu ra\u017eo\u0161anas jaudu. Model\u0113jiet t\u0101s k\u0101 oper\u0101cijas, kur\u0101m paredz\u0113ts tikai laiks.<\/li>\n\n\n<li><strong>Oper\u0101ciju p\u0101rkl\u0101\u0161an\u0101s un darbs bez uzraudz\u012bbas.<\/strong> Tehnolo\u0123isk\u0101 procesa oper\u0101cij\u0101m var atz\u012bm\u0113t, ka t\u0101s dr\u012bkst p\u0101rkl\u0101ties vai norit\u0113t bez uzraudz\u012bbas. P\u0101rnesiet abas paz\u012bmes, lai darbs bez person\u0101la kl\u0101tb\u016btnes tiktu pl\u0101nots pareizi.<\/li>\n\n\n<li><strong>Laika m\u0113rvien\u012bbas.<\/strong> P\u0101rregul\u0113\u0161anas un cikla laikam ir savas m\u0113rvien\u012bbas, savuk\u0101rt rind\u0101 pavad\u012btais laiks ir gaid\u012b\u0161ana, nevis iek\u0101rtas darba laiks. Import\u0113jot p\u0101rr\u0113\u0137iniet m\u0113rvien\u012bbas, cit\u0101di visi ilgumi b\u016bs nepareizi.<\/li>\n\n\n<li><strong>Izg\u016b\u0161ana pa lap\u0101m.<\/strong> P\u0113c noklus\u0113juma vien\u0101 lap\u0101 ir 200 ieraksti. Katr\u0101 datu las\u012b\u0161anas reiz\u0113 izg\u016bstiet visas lapas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-jobboss-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur JobBOSS\u00b2 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas,<\/strong> iev\u0113rojot saska\u0146otos resursus un periodisko piepras\u012bjumu noteikumus. Katrs ra\u017eo\u0161anas uz\u0146\u0113mums izmanto JobBOSS\u00b2 at\u0161\u0137ir\u012bgi, un konfigur\u0101cij\u0101 tiek \u0146emta v\u0113r\u0101 \u0161\u012b pieredze.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu JobBOSS\u00b2 partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju un kop\u0101 ar SkyPlanner komandu var vienoties ar ECI par API aktiviz\u0113\u0161anu un API lietot\u0101ja izveidi.<\/li>\n\n\n<li><strong>Ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji var papildin\u0101t integr\u0101ciju,<\/strong> izmantojot SkyPlanner REST API ar API pilnvaru. Lai s\u0101ktu darbu, pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Integr\u0101cijas dokument\u0101cija pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b. Cen\u0101 iek\u013cauti 5 darba centri, un nor\u0113\u0137ini notiek katru m\u0113nesi. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar j\u016bsu pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/integracija\/erp\/jobboss\/razosanas-planosana\/\">JobBOSS\u00b2 ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un person\u0101la jaudu<\/a>, <a href=\"\/lv\/integracija\/erp\/jobboss\/\">JobBOSS\u00b2 lapu<\/a>, <a href=\"\/lv\/funkcijas\/\">SkyPlanner iesp\u0113jas<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ji, kas izmanto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadalietaises<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na sagatavo\u0161ana trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, pieaugums no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad nepiecie\u0161ams viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai JobBOSS\u00b2 ir API?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. ECI public\u0113 JobBOSS\u00b2 API un no konkr\u0113ta produkta neatkar\u012bgo ERP API. Abas ir REST saskarnes ar OpenAPI specifik\u0101cij\u0101m. Klientiem, kuri izmanto mitin\u0101to risin\u0101jumu, JobBOSS\u00b2 API \u013cauj las\u012bt un rakst\u012bt pas\u016bt\u012bjumus, Order Routings, Estimates, Work Centers, iepirkuma pas\u016bt\u012bjumus un Time Tickets.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 integr\u0101cija autentific\u0113jas JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">Ar OAuth 2.0 klienta akredit\u0101cijas datiem. ECI aktiviz\u0113 API, API lietot\u0101js tiek izveidots Integration Engine Management Console, un katram izsaukumam tiek pievienota Bearer pilnvara.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai JobBOSS\u00b2 atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">ECI API dokument\u0101cij\u0101 t\u012bmek\u013ca aiz\u0137eres nav aprakst\u012btas, t\u0101p\u0113c integr\u0101cija periodiski pieprasa JobBOSS\u00b2 datus ar <code>lastModDate<\/code> filtriem atbilsto\u0161i katram uz\u0146\u0113mumam iestat\u012btajam grafikam. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">Katrai ra\u017eo\u0161anas uzdevuma oper\u0101cijai atsevi\u0161\u0137i. SkyPlanner ar PATCH piepras\u012bjumu atjaunina katra Order Routing laukus <code>estimatedStartDate<\/code> un <code>estimatedEndDate<\/code>, k\u0101 ar\u012b <code>workCenter<\/code> un <code>employeeCode<\/code>, ja oper\u0101cija p\u0101rcelta uz citu iek\u0101rtu vai pie cita operatora.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai JobBOSS\u00b2 partnerim pied\u0101v\u0101t ECI APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klients v\u0113las da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kt ra\u017eo\u0161anas pl\u0101no\u0161anu ar vair\u0101kiem resursiem, iev\u0113rojot re\u0101lo iek\u0101rtu un person\u0101la jaudu. ECI APS ir atsevi\u0161\u0137s papildin\u0101jums, kura pamat\u0101 ir LYNQ. SkyPlanner savienojas ar ECI nodro\u0161in\u0101to JobBOSS\u00b2 API, pl\u0101no p\u0101rregul\u0113\u0161anu, brig\u0101des, pal\u012bgier\u012bces un materi\u0101lus un autom\u0101tiski p\u0101rpl\u0101no darbus. Cena ir no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t JobBOSS\u00b2 datus CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ JobBOSS\u00b2 JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 JobBOSS\u00b2 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot ECI izstr\u0101d\u0101to JobBOSS\u00b2 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar JobBOSS\u00b2, izmantojot pa\u0161a ECI API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu JobBOSS\u00b2 konfigur\u0101cijai &#8230; <a title=\"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/\" aria-label=\"Read more about JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102968,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103775","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>JobBOSS\u00b2 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/integracijas-celvedis\\\/\",\"name\":\"JobBOSS\u00b2 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"JobBOSS\u00b2 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/","name":"JobBOSS\u00b2 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Savienojiet JobBOSS\u00b2 ar SkyPlanner APS: JobBOSS\u00b2 API, ECI ERP API, OAuth 2.0, Order Routing datumu atpaka\u013cierakste, Time Tickets, datu kart\u0113\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/"},{"@type":"ListItem","position":5,"name":"JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ JobBOSS\u00b2 JobBOSS\u00b2 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 JobBOSS\u00b2 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m skaidrots, k\u0101 savienot ECI izstr\u0101d\u0101to JobBOSS\u00b2 ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar JobBOSS\u00b2, izmantojot pa\u0161a ECI API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu JobBOSS\u00b2 konfigur\u0101cijai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103775"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103775\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102968"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}