{"id":103715,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/infor-m3\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/","title":{"rendered":"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor M3 integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Infor M3 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor M3 ar SkyPlanner APS. SkyPlanner un Infor M3 apmain\u0101s ar datiem abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em artikulus, produktu strukt\u016bras, darba centrus, ra\u017eo\u0161anas pas\u016bt\u012bjumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notais s\u0101kuma un beigu laiks tiek nos\u016bt\u012bts atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumu (MO) oper\u0101cij\u0101m.<\/li>\n\n\n<li>Operatoru atskaites tiek nos\u016bt\u012btas atpaka\u013c, izmantojot PMS070MI Report operation.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu M3 iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas ekspluat\u0101cij\u0101. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri piedal\u0101s ievie\u0161an\u0101 vai pa\u0161i veido risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-m3-interfaces-skyplanner-uses\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">M3 saskarnes, ko izmanto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Infor M3 pied\u0101v\u0101 \u010detrus integr\u0101cijas sl\u0101\u0146us, un katram \u0161aj\u0101 integr\u0101cij\u0101 ir savs uzdevums.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>M3 API (MI programmas) platform\u0101 ION API Gateway.<\/strong> Katru MI programmu izsauc ar REST piepras\u012bjumu: <code>https:\/\/{ionapi-host}\/{tenant}\/M3\/m3api-rest\/v2\/execute\/{program}\/{transaction}<\/code>. Izmantojiet v2. \u0160aj\u0101 versij\u0101 ir pievienoti uz\u0146\u0113muma, strukt\u016brvien\u012bbas un datuma form\u0101ta parametri, un atgriezto datu strukt\u016bra at\u0161\u0137iras no v1. PMS100MI ir paredz\u0113ts ra\u017eo\u0161anas pas\u016bt\u012bjumiem, bet PMS070MI \u2014 oper\u0101ciju izpildes atskait\u0113m. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/industry_content_fashion\/vmw1731577228531.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>Compass vaic\u0101jumu API platform\u0101 Infor Data Fabric.<\/strong> Ar SQL var nolas\u012bt replic\u0113t\u0101s M3 tabulas, piem\u0113ram, MITMAS, MWOHED un MWOOPE. Compass darbojas asinhroni: iesniedziet uzdevumu, periodiski p\u0101rbaudiet t\u0101 statusu un sa\u0146emiet rezult\u0101tus pa lap\u0101m, katr\u0101 l\u012bdz 100 000 rind\u0101m vai 10 MB. Tas ir piem\u0113rots s\u0101kotn\u0113jai pamatdatu iel\u0101dei, nevis sinhroniz\u0101cijai re\u0101llaik\u0101. (<a href=\"https:\/\/docs.infor.com\/inforos\/2026.x\/en-us\/useradminlib_cloud\/datafabrug\/uan1631199548644.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>ION BODs.<\/strong> M3 BOD Processor public\u0113 iesp\u0113jotos BOD katrai uzskaites vien\u012bbai. Ien\u0101ko\u0161ie BOD ietver Process ProductionOrder, Sync un Process BillOfMaterials, Process ItemMaster un Sync InventoryCount. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/cnw1511966505258.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>M3 Event Hub.<\/strong> Public\u0113\u0161anas un abon\u0113\u0161anas ietvars tabulu l\u012bme\u0146a notikumiem, piem\u0113ram, izmai\u0146\u0101m ra\u017eo\u0161anas pas\u016bt\u012bjumu (MO) galven\u0113s un oper\u0101cij\u0101s. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/szt1602149359647.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>MI API specifik\u0101cijas ir pieejamas katras nomnieka vides ION API kataloga sada\u013c\u0101 Available APIs, kur katrai programmai ir Swagger dokument\u0101cija. Ja standarta katalog\u0101 tr\u016bkst vajadz\u012bg\u0101s transakcijas, ar XtendM3 var pievienot piel\u0101gotu MI programmu, bet ar Metadata Publisher \u2014 izveidot piel\u0101gotus sarakstu API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Re\u0123istr\u0113jiet SkyPlanner k\u0101 autoriz\u0113tu lietotni ION API, izmantojot OAuth 2.0. Izv\u0113lieties servera puses pakalpojuma lietotni ar pakalpojuma kontu, lai integr\u0101cija darbotos bez konkr\u0113ta lietot\u0101ja sesijas. ION API katram izsaukumam piem\u0113ro nomnieka vid\u0113 noteiktos piepras\u012bjumu bie\u017euma ierobe\u017eojumus un dro\u0161\u012bbas politikas. (<a href=\"https:\/\/developer.infor.com\/?p=1587\">Infor izstr\u0101d\u0101t\u0101ju port\u0101ls<\/a>)<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un API ir dokument\u0113ts Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim par\u0101d\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-event-hub-bods-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana: Event Hub, BOD un periodiski piepras\u012bjumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>M3 var nos\u016bt\u012bt izmai\u0146as autom\u0101tiski, ta\u010du tam nepiecie\u0161ama konfigur\u0113\u0161ana Infor pus\u0113:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Event Hub<\/strong> public\u0113 tikai tos notikumus, kuriem ir akt\u012bvs abonents. ION Enterprise Connector (IEC) tos abon\u0113, izmantojot EventHub Subscriber kan\u0101lu.<\/li>\n\n\n<li><strong>BOD<\/strong> j\u0101iesp\u0113jo katrai uzskaites vien\u012bbai r\u012bk\u0101 BOD Processor. Tam nepiecie\u0161ama loma M3EC-Administrator. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/bka1516953041992.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Ja autom\u0101tiska izmai\u0146u nos\u016bt\u012b\u0161ana v\u0113l nav iestat\u012bta, periodiski izsauciet PMS100MI sarakstu transakcijas vai veiciet Compass vaic\u0101jumus p\u0113c izmai\u0146u laika z\u012bmogiem.<\/p>\n\n\n<p>SkyPlanner webhook nodro\u0161ina uz notikumiem balst\u012btu datu ierakst\u012b\u0161anu atpaka\u013c jau no pirm\u0101s dienas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Infor M3 objekts (saskarne)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Artikuls, MMS001 (MITMAS ar Compass starpniec\u012bbu, artikulu MI programmas)<\/td><td>Produkti un materi\u0101li<\/td><td>M3 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Produkta strukt\u016bras galvene PDS001, materi\u0101li PDS002<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, materi\u0101li<\/td><td>M3 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Oper\u0101cijas PDS002: oper\u0101cijas numurs, darba centrs, p\u0101rregul\u0113\u0161anas un izpildes laiks<\/td><td>Procesa posmi ar p\u0101rregul\u0113\u0161anas un izpildes laiku<\/td><td>M3 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Darba centrs PDS010, dienas jauda PDS015<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>M3 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums PMS100 (MWOHED), PMS100MI<\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un daudzumiem<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub vai periodiski piepras\u012bjumi<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu (MO) oper\u0101cijas (MWOOPE)<\/td><td>Ra\u017eo\u0161anas uzdevumi katrai oper\u0101cijai<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub vai periodiski piepras\u012bjumi<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi<\/td><td>Katra materi\u0101la kr\u0101jumi<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Piepras\u012bjumi reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumu rindas ar pieg\u0101des datumiem<\/td><td>Ien\u0101ko\u0161ie materi\u0101li, kas pieejami pieg\u0101des datum\u0101<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Piepras\u012bjumi reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Katras MO oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td>Gantt diagramm\u0101 iepl\u0101notie ra\u017eo\u0161anas uzdevumi<\/td><td>SkyPlanner \u2192 M3<\/td><td>Mainoties grafikam, izmantojot SkyPlanner webhook<\/td><\/tr><tr><td>PMS070MI Report operation: p\u0101rregul\u0113\u0161anas laiks, izpildes laiks, daudzums<\/td><td>Operatoru re\u0123istr\u0113tais laiks un daudzumi<\/td><td>SkyPlanner \u2192 M3<\/td><td>Ar katru apstiprin\u0101jumu vai par katru mai\u0146u<\/td><\/tr><tr><td>SkyPlanner ierobe\u017eojumu dati<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, operatori katram ra\u017eo\u0161anas uzdevumam, alternat\u012bvie darba centri<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Iestata ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ar Compass nolasiet artikulus, produktu strukt\u016bras, oper\u0101cijas un darba centrus lielos apjomos. Apzin\u0101ti izv\u0113lieties, vai katram M3 darba centram atbilst SkyPlanner darba centrs vai darba centru grupa. Ja M3 darba centrs apz\u012bm\u0113 tr\u012bs paral\u0113las iek\u0101rtas un v\u0113laties katrai veidot atsevi\u0161\u0137u grafiku, SkyPlanner sist\u0113m\u0101 izveidojiet tr\u012bs darba centrus.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet ra\u017eo\u0161anai nodotos MO un to oper\u0101cijas no PMS100MI vai MWOOPE, k\u0101 ar\u012b kr\u0101jumus un atv\u0113rto iepirkuma pas\u016bt\u012bjumu rindas. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma (PO) pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad PO sa\u0146em statusu Delivered. Sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti gan kr\u0101jumi, gan pas\u016bt\u012bto materi\u0101lu pieejam\u012bba.<\/p>\n\n\n<p>Grafik\u0101 iek\u013caujiet tikai apstiprin\u0101tus MO. Pl\u0101notos MO (PMS170) MRP \u0123ener\u0113 no jauna, un M3 katr\u0101 p\u0101rpl\u0101no\u0161anas reiz\u0113 no jauna apr\u0113\u0137ina to slodzi.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c M3.<\/strong> Katrai oper\u0101cijai, kuru pl\u0101no\u0161anas dzin\u0113js ir iepl\u0101nojis vai p\u0101rvietojis, SkyPlanner ieraksta pl\u0101noto s\u0101kumu un beigas attiec\u012bgaj\u0101 MO oper\u0101cij\u0101. Izsaukumam izmanto j\u016bsu nomnieka vides katalog\u0101 pieejamu M3 MI transakciju MO oper\u0101cij\u0101m vai XtendM3 MI programmu, ja t\u0101da nepiecie\u0161ama j\u016bsu konfigur\u0101cijai. Daudzumi, statuss un izmaksu apr\u0113\u0137ins paliek M3 p\u0101rzi\u0146\u0101.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu, izmantojot SkyPlanner Mobile Confirmations vai Production Timer. SkyPlanner nos\u016bta p\u0101rregul\u0113\u0161anas laiku, izpildes laiku un daudzumu ar PMS070MI Report operation, bet p\u0113c posma pabeig\u0161anas izmanto Confirm vai Close operation. Infor nor\u0101da: &#8220;it is important that every operation is reported,&#8221; (ir svar\u012bgi zi\u0146ot par katras oper\u0101cijas izpildi), un tas nodro\u0161ina M3 slodzes un SkyPlanner izpildes progresa saska\u0146ot\u012bbu. (<a href=\"https:\/\/developer.infor.com\/pms070mi-740845\/pms070mi-manufacturing-order-report-operation\">PMS070MI<\/a>)<\/p>\n\n\n<p>Katrai oper\u0101cijai izv\u0113lieties vienu atskai\u0161u iesnieg\u0161anas kan\u0101lu. Ja par vienu un to pa\u0161u oper\u0101ciju zi\u0146o gan no SkyPlanner, gan no PMS070 sist\u0113m\u0101 M3, daudzumi dubl\u0113jas.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas ekspluat\u0101cij\u0101:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, produktu strukt\u016bras, daudzumi, MO statuss<\/td><td>Infor M3<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kums un beigas, piesaiste darba centram<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, instrumenti, operatori katram ra\u017eo\u0161anas uzdevumam, alternat\u012bvas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Oper\u0101ciju izpildes atskaites<\/td><td>M3, sa\u0146emot datus no SkyPlanner ar PMS070MI starpniec\u012bbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu c\u0113lonis ir pa\u0161a M3 datumu apr\u0113\u0137ina lo\u0123ika. Par slodzi teikts: &#8220;is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (tiek autom\u0101tiski \u0123ener\u0113ta, kad tiek izveidots vai p\u0101rpl\u0101nots ra\u017eo\u0161anas pas\u016bt\u012bjums vai pl\u0101notais ra\u017eo\u0161anas pas\u016bt\u012bjums). Uztveriet p\u0101rpl\u0101notu MO k\u0101 jaunu versiju, sinhroniz\u0113jiet to atk\u0101rtoti un \u013caujiet SkyPlanner p\u0101rpl\u0101not grafiku. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. SkyPlanner nav nepiecie\u0161ams M3 Scheduling Workbench; ja jums ir SWB licence, atst\u0101jiet oper\u0101ciju datumus SkyPlanner p\u0101rzi\u0146\u0101, lai abas sist\u0113mas nep\u0101rrakst\u012btu viena otras datus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma. Pirms tam varat izmantot 30 dienu bezmaksas izm\u0113\u0123in\u0101jumu ar saviem datiem. Eksport\u0113jiet artikulus, darba centrus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no M3, k\u0101 ierasts izmantojot Excel vai Compass datu izg\u016b\u0161anu, un import\u0113jiet tos CSV vai Excel form\u0101t\u0101.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101kotn\u0113j\u0101 izp\u0113te kop\u0101 ar j\u016bsu M3 administratoru.<\/strong> Preciz\u0113jiet izvietojumu, ION API nomnieku, j\u016bsu katalog\u0101 pieejam\u0101s MI transakcijas, k\u0101 ar\u012b uz\u0146\u0113mumu un strukt\u016brvien\u012bbu.<\/li>\n\n\n<li><strong>Datu atbilst\u012bbu noteik\u0161ana.<\/strong> Apstipriniet datu atbilst\u012bbu tabulu, atbild\u012bbas sadal\u012bjumu par datiem, sinhroniz\u0101cijas bie\u017eumu un atskai\u0161u nodo\u0161anas kan\u0101lu.<\/li>\n\n\n<li><strong>ION API iestat\u012b\u0161ana.<\/strong> Re\u0123istr\u0113jiet autoriz\u0113to lietotni un pakalpojuma kontu, s\u0101kot ar testvides nomnieku.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Iel\u0101d\u0113jiet artikulus, produktu strukt\u016bras, oper\u0101cijas un darba centrus, izmantojot Compass.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Sinhroniz\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus, to oper\u0101cijas, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus ar periodiskiem piepras\u012bjumiem. Kad viss ir gatavs, pievienojiet Event Hub.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Iestatiet p\u0101rregul\u0113\u0161anas laiku matricu, instrumentus, operatorus katram ra\u017eo\u0161anas uzdevumam un alternat\u012bvos darba centrus.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c un atskaites.<\/strong> Nos\u016btiet oper\u0101ciju datumus uz M3 un operatoru atskaites \u2014 caur PMS070MI.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 darb\u012bba un palai\u0161ana.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam pl\u0101nam, sak\u0101rtojiet pamatdatus un p\u0113c tam iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Infor M3 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nav atsevi\u0161\u0137a tehnolo\u0123isk\u0101 procesa objekta.<\/strong> Oper\u0101cijas ir iek\u013cautas produkta strukt\u016br\u0101 (PDS002) un ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 k\u0101 t\u0101 oper\u0101cijas. Nemekl\u0113jiet atsevi\u0161\u0137u tehnolo\u0123isk\u0101 procesa API.<\/li>\n\n\n<li><strong>Strukt\u016bras bez oper\u0101cij\u0101m.<\/strong> Produkta strukt\u016br\u0101 j\u0101b\u016bt vismaz vienai oper\u0101cijai, cit\u0101di M3 neveido noslodzi un SkyPlanner nesa\u0146em ra\u017eo\u0161anas uzdevumu.<\/li>\n\n\n<li><strong>M3 ierobe\u017eotas jaudas iestat\u012bjumi konflikt\u0113 ar \u0101r\u0113jo pl\u0101nu.<\/strong> PDS010 karodzi\u0146\u0161 un CRS786 \u0161auro vietu iestat\u012bjumi maina pa\u0161as M3 sist\u0113mas datumus. Atst\u0101jiet darba centru jaudu M3 sist\u0113m\u0101 neierobe\u017eotu un uzticiet SkyPlanner pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai.<\/li>\n\n\n<li><strong>Katram nomniekam savas API specifik\u0101cijas.<\/strong> v1 un v2 atbildes at\u0161\u0137iras, un transakciju nosaukumi ir atkar\u012bgi no j\u016bsu kataloga un XtendM3 papla\u0161in\u0101jumiem. Izmantojiet v2, skaidri nor\u0101dot uz\u0146\u0113muma un strukt\u016brvien\u012bbas parametrus.<\/li>\n\n\n<li><strong>Izmai\u0146u autom\u0101tiska nos\u016bt\u012b\u0161ana p\u0113c noklus\u0113juma nav iesl\u0113gta.<\/strong> Event Hub ir vajadz\u012bgs abonents, un BOD zi\u0146ojumi j\u0101iesp\u0113jo katrai uzskaites vien\u012bbai. Vienojieties, kur\u0161 konfigur\u0113s ION un IEC, vai s\u0101ciet ar periodiskiem piepras\u012bjumiem.<\/li>\n\n\n<li><strong>Piepras\u012bjumu ierobe\u017eo\u0161ana un dal\u012b\u0161ana lap\u0101s.<\/strong> ION API ierobe\u017eo piepras\u012bjumus atbilsto\u0161i nomnieka politikai, un Compass vien\u0101 lap\u0101 atgrie\u017e ne vair\u0101k k\u0101 100 000 rindu vai 10 MB. Periodiski pieprasiet tikai izmai\u0146as, nevis atk\u0101rtoti iel\u0101d\u0113jiet visus datus.<\/li>\n\n\n<li><strong>M3 nav CloudSuite Industrial.<\/strong> CSI izmanto IDO API, bet M3 \u2014 MI programmas. Katr\u0101 specifik\u0101cij\u0101 nor\u0101diet M3 objektu nosaukumus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Infor M3 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong> Katr\u0101 ra\u017eotn\u0113 M3 izmanto cit\u0101di, un konfigur\u0101cij\u0101 \u0161\u012bs zin\u0101\u0161anas tiek liktas liet\u0101.<\/li>\n\n\n<li><strong>J\u016bsu Infor M3 partneris var izstr\u0101d\u0101t integr\u0101ciju vai piedal\u012bties t\u0101s izstr\u0101d\u0113.<\/strong> Partneris p\u0101rzina j\u016bsu nomnieka vidi, XtendM3 papla\u0161in\u0101jumus un ION konfigur\u0101ciju. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un webhook pazi\u0146ojumus.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu pa\u0161u izstr\u0101d\u0101t\u0101ji,<\/strong> izmantojot to pa\u0161u REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Laboratory &amp; Allied iek\u0161\u0113j\u0101 IT komanda ar SkyPlanner pal\u012bdz\u012bbu liel\u0101koties patst\u0101v\u012bgi izstr\u0101d\u0101ja sava uz\u0146\u0113muma ERP integr\u0101ciju.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un maks\u0101jot katru m\u0113nesi. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nosak\u0101m iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, t\u0101p\u0113c piln\u0101s izmaksas ir zin\u0101mas jau pirms darba s\u0101kuma. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, uzziniet par M3 ieb\u016bv\u0113t\u0101s pl\u0101no\u0161anas iesp\u0113j\u0101m sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/\">Infor M3 ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/a>, izlasiet p\u0101rskatu <a href=\"\/lv\/integracija\/erp\/infor-m3\/\">Infor M3 lap\u0101<\/a> un iepaz\u012bstieties ar cit\u0101m sist\u0113m\u0101m <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 stundas darba laika, un jauna darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farm\u0101cijas produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 \u2014 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir pieaudzis no aptuveni 50% l\u012bdz pat 98%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums skaidru p\u0101rskatu par jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0101 SkyPlanner lieto\u0161anas laik\u0101, kop\u0161 2021. gada, pieg\u0101\u017eu savlaic\u012bgums ir bijis 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru Infor M3 API izmanto SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner izmanto M3 API, kas pieejama ar ION API Gateway starpniec\u012bbu, un izsauc MI programmas, piem\u0113ram, PMS100MI un PMS070MI, izmantojot REST ar OAuth 2.0. Compass platform\u0101 Infor Data Fabric nodro\u0161ina lielapjoma datu nolas\u012b\u0161anu, savuk\u0101rt Event Hub vai ION BOD zi\u0146ojumi nos\u016bta izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 Infor M3 integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu M3 konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c palai\u0161anas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu M3 partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner REST API. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kura M3 API nos\u016bta atpaka\u013c oper\u0101ciju atskaites no ra\u017eo\u0161anas ceha?<\/summary>\n<p class=\"sp-faq__a\">PMS070MI: ar Report operation nos\u016bta p\u0101rregul\u0113\u0161anas laiku, izpildes laiku un daudzumu, bet ar Confirm un Close operation pabeidz oper\u0101ciju. SkyPlanner caur \u0161o API nos\u016bta operatoru atskaites.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar lok\u0101li izvietotu M3?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Lok\u0101li izvietota M3 nodro\u0161ina to pa\u0161u M3 API. Ja nav ION API Gateway, SkyPlanner piesl\u0113dzas caur j\u016bsu lok\u0101lo ION vai Grid galapunktu vai caur starpprogrammat\u016bru. Savienojuma veidu nosaka s\u0101kotn\u0113j\u0101 izp\u0113t\u0113 kop\u0101 ar j\u016bsu M3 administratoru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai M3 partnerim b\u016btu j\u0101iesaka M3 Scheduling Workbench vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klients aptuvena pl\u0101na viet\u0101 v\u0113las re\u0101lu ra\u017eo\u0161anas grafiku, kas atbilst faktiskajai resursu jaudai. Infor pa\u0161u ieteikums SWB palai\u0161anai ir s\u0101kum\u0101 visiem resursiem iestat\u012bt neierobe\u017eotu jaudu un ierobe\u017eot tikai kritisko \u0161auro vietu (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dokument\u0101cija<\/a>). Infor nor\u0101da, ka SWB ir papildin\u0101jums, ko lietot\u0101ji palai\u017e no RDWeb vai s\u0101kuma izv\u0113lnes. SkyPlanner piesl\u0113dzas caur to pa\u0161u M3 API, sast\u0101da grafiku atbilsto\u0161i katra resursa re\u0101lajai jaudai, autom\u0101tiski p\u0101rpl\u0101no un nodro\u0161ina operatoriem Mobile Confirmations \u2014 no 199 \u20ac m\u0113nes\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izstr\u0101des?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no M3 CSV vai Excel form\u0101t\u0101. Kred\u012btkarte nav vajadz\u012bga. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor M3 Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Infor M3 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor M3 ar SkyPlanner APS. SkyPlanner un Infor M3 apmain\u0101s ar datiem abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu &#8230; <a title=\"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/\" aria-label=\"Read more about Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102939,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103715","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/integracijas-celvedis\\\/\",\"name\":\"Infor M3 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor M3: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/","name":"Infor M3 APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor M3\u2013SkyPlanner APS: M3 API ar ION API Gateway, OAuth 2.0, PMS100MI un PMS070MI, Compass, BODs, datu kart\u0113\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor M3: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor M3 Infor M3 integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Infor M3 integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor M3 ar SkyPlanner APS. SkyPlanner un Infor M3 apmain\u0101s ar datiem abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103715"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103715\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102939"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}