{"id":103684,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/infor-m3\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/","title":{"rendered":"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Infor M3 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? <span class=\"hl\">PDS010, Scheduling Workbench un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Infor M3 nodro\u0161ina aptuvenu ra\u017eo\u0161anas jaudas pl\u0101no\u0161anu, nevis detaliz\u0113tu grafiku sast\u0101d\u012b\u0161anu faktisk\u0101s jaudas robe\u017e\u0101s. M3 pamatfunkcionalit\u0101t\u0113 katram darba centram nor\u0101da, vai t\u0101 jauda ir ierobe\u017eota vai neierobe\u017eota, un katr\u0101 oper\u0101ciju pl\u016bsm\u0101 pl\u0101no\u0161anu pak\u0101rto vienai \u0161aurajai vietai. Detaliz\u0113tu oper\u0101ciju sec\u012bbu nodro\u0161ina papildmodulis M3 Scheduling Workbench. Ta\u010du pat t\u0101 ievie\u0161anai Infor iesaka s\u0101kum\u0101 visiem resursiem iestat\u012bt neierobe\u017eotu jaudu un ierobe\u017eot tikai kritisk\u0101s \u0161aur\u0101s vietas jaudu (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dokument\u0101cija<\/a>). Ra\u017eotnes, kur\u0101m vajadz\u012bgs grafiks ar prec\u012bziem laikiem, iev\u0113rojot katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus, sak\u0101rtotu p\u0101rregul\u0113\u0161anas sec\u012bbu un autom\u0101tisku p\u0101rpl\u0101no\u0161anu, un kuras v\u0113las s\u0101kt darbu da\u017eu ned\u0113\u013cu laik\u0101, l\u012bdz\u0101s M3 izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u0101l\u0101k nor\u0101d\u012btie programmu kodi ir \u0146emti no Infor M3 Business Engine un M3 CloudSuite dokument\u0101cijas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-infor-m3-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Infor M3 pl\u0101no jaudu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darba centri un jauda<\/h3>\n\n\n<p>Darba centrus izveido programm\u0101 <strong>Work Center. Open (PDS010)<\/strong>. Dienas jaudu uztur programm\u0101 <strong>Work Center. Change Capacity (PDS015)<\/strong>, bet gaid\u012b\u0161anas un p\u0101rvieto\u0161anas laikus \u2014 programm\u0101 <strong>PDS020<\/strong>. Pre\u010du datus uztur programm\u0101 <strong>Item. Open (MMS001)<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Oper\u0101cijas ir da\u013ca no produkta strukt\u016bras<\/h3>\n\n\n<p>M3 nav atsevi\u0161\u0137a objekta tehnolo\u0123iskajam procesam. Produkta strukt\u016bras galveni izveido programm\u0101 <strong>PDS001<\/strong>. Gan materi\u0101lus, gan oper\u0101cijas piesaista programm\u0101 <strong>Product. Connect Materials\/Operations (PDS002)<\/strong>, nor\u0101dot oper\u0101cijas numuru, darba centru, p\u0101rregul\u0113\u0161anas laiku un izpildes laiku.<\/p>\n\n\n<p>Infor nor\u0101da ar\u012b nosac\u012bjumu, kas ir svar\u012bgs ikvienam pl\u0101not\u0101jam: &#8220;Note that the structure must have at least one operation.&#8221; (\u0145emiet v\u0113r\u0101, ka strukt\u016br\u0101 j\u0101b\u016bt vismaz vienai oper\u0101cijai.) Bez oper\u0101cijas slodze netiek veidota. (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/cps600.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Materi\u0101lu un apg\u0101des pl\u0101no\u0161ana<\/h3>\n\n\n<p>Supply Chain Planning modu\u013ci ietver Material Planning, Master Production Scheduling, Rough Cut Capacity Planning, DRP un Global CTP. Tie paredz\u0113ti materi\u0101lu un apg\u0101des pl\u0101no\u0161anai. Attiec\u012bb\u0101 uz jaudu produkta p\u0101rskat\u0101 ir min\u0113ta aptuven\u0101 pl\u0101no\u0161ana. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/jpo1586931917083.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas pas\u016bt\u012bjumi veido slodzi<\/h3>\n\n\n<p>&#8220;Load is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (Slodze tiek veidota autom\u0101tiski, kad izveido vai p\u0101rpl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumu vai pl\u0101noto ra\u017eo\u0161anas pas\u016bt\u012bjumu.) Slodzes tipu A vai B nor\u0101da ra\u017eo\u0161anas pas\u016bt\u012bjuma tipam programm\u0101 <strong>PMS120<\/strong>. Ra\u017eo\u0161anas pas\u016bt\u012bjumus atver programm\u0101 <strong>PMS100<\/strong>, bet pl\u0101notos ra\u017eo\u0161anas pas\u016bt\u012bjumus \u2014 programm\u0101 <strong>PMS170<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Jaudas ierobe\u017eojuma iestat\u012bjums un \u0161aur\u0101s vietas pl\u0101no\u0161ana<\/h3>\n\n\n<p>Jaudas ierobe\u017eojumus nosaka divi iestat\u012bjumi:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Iestat\u012bjums<\/th><th>Programma<\/th><th>Funkcija<\/th><\/tr><\/thead><tbody><tr><td>Neierobe\u017eota\/ierobe\u017eota jauda<\/td><td>Work Center. Open (PDS010)<\/td><td>Apr\u0113\u0137inot s\u0101kuma un beigu laiku, nosaka &#8220;whether overload can be created for the operation&#8221; (vai oper\u0101cijai dr\u012bkst veidot p\u0101rslodzi)<\/td><\/tr><tr><td>\u0160aur\u0101s vietas pl\u0101no\u0161ana<\/td><td>Settings &#8211; Capacity Planning (CRS786)<\/td><td>Visas vajadz\u012bbas pl\u0101no, pak\u0101rtojot t\u0101s vienai oper\u0101cijai; ja t\u0101 ir pl\u016bsmas s\u0101kum\u0101, pl\u0101no uz priek\u0161u, ja beig\u0101s \u2014 atpaka\u013c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ievadot pas\u016bt\u012bjumu, simul\u0101cija apr\u0113\u0137ina visa ra\u017eo\u0161anas pas\u016bt\u012bjuma s\u0101kuma un pabeig\u0161anas datumus. Ierobe\u017eojums ir skaidri nor\u0101d\u012bts: &#8220;Only one operation in a flow of operations can be set as bottleneck planned.&#8221; (Oper\u0101ciju pl\u016bsm\u0101 tikai vienu oper\u0101ciju var iestat\u012bt k\u0101 pl\u0101nojamu \u0161auro vietu.) (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/crs786.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Slodzes skati un manu\u0101la l\u012bdzsvaro\u0161ana<\/h3>\n\n\n<p>Pl\u0101not\u0101ji uzrauga slodzi programm\u0101s <strong>Load. Display Totals (CPS100)<\/strong>, <strong>Detailed (CPS105)<\/strong>, <strong>per Product (CPS110)<\/strong>, <strong>Over &amp; Under (CPS120)<\/strong> un <strong>Gantt Chart for MOs (CPS130)<\/strong>, k\u0101 ar\u012b <strong>Work Center Schedule (PMS230)<\/strong>. Slodzi vi\u0146i l\u012bdzsvaro manu\u0101li. Infor slodzes l\u012bdzsvaro\u0161anu raksturo k\u0101 &#8220;an ongoing way of working more or less all the time.&#8221; (past\u0101v\u012bgu darba procesu, kas notiek gandr\u012bz nep\u0101rtraukti.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Infor pl\u0101no\u0161anas papildmodu\u013ci<\/h3>\n\n\n<p><strong>M3 Capacity Planning Workbench<\/strong> att\u0113lo darba centrus tabul\u0101 un grafik\u0101 ar &#8220;their current capacity and load situation in M3 ERP,&#8221; (to pa\u0161reiz\u0113jo jaudu un slodzi M3 ERP sist\u0113m\u0101), ar kr\u0101s\u0101m izce\u013cot p\u0101rslodzi un nepietiekamu noslodzi. Tas ir r\u012bks datu apskatei un novir\u017eu apzin\u0101\u0161anai. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/yps1694163159688.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n\n<p><strong>M3 Scheduling Workbench (SWB)<\/strong> ir Infor r\u012bks ra\u017eo\u0161anas pl\u0101no\u0161anai M3 vid\u0113, iev\u0113rojot faktisk\u0101s jaudas ierobe\u017eojumus. Infor to raksturo k\u0101 &#8220;a powerful decision support tool for production planning and the scheduling of manufacturing orders.&#8221; (jaud\u012bgu l\u0113mumu atbalsta r\u012bku ra\u017eo\u0161anas pl\u0101no\u0161anai un ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161anai.) Infor nor\u0101da: &#8220;It takes into consideration finite capacity constraints and material flow from raw materials to finished products.&#8221; (Tas \u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus un materi\u0101lu pl\u016bsmu no izejviel\u0101m l\u012bdz gataviem produktiem.) Tas nodro\u0161ina \u0161auro vietu p\u0101rvald\u012bbu p\u0113c ierobe\u017eojumu teorijas, uz noteikumiem balst\u012btu sec\u012bbas optimiz\u0101ciju un Interactive Scheduling Board. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/lko1518614227567.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n\n<p><strong>M3 Planning Workbench (PWB)<\/strong> ir darbvirsmas r\u012bks l\u0113mumu pie\u0146em\u0161anai par jaudu un apak\u0161uz\u0146\u0113m\u0113ju piesaisti vid\u0113j\u0101 termi\u0146\u0101. Macro Orders samazina simul\u0101cij\u0101 apstr\u0101d\u0101jamo pas\u016bt\u012bjumu skaitu. (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/svr1587368598875.html\">Infor dokument\u0101cija<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jaudas ierobe\u017eojumu iestata katram darba centram atsevi\u0161\u0137i.<\/strong> M3 pamatfunkcionalit\u0101te nosaka, vai p\u0101rslodze ir at\u013cauta. T\u0101 neveido savstarp\u0113ji saska\u0146otu darbu sec\u012bbu vair\u0101kiem resursiem.<\/li>\n\n\n<li><strong>Viena \u0161aur\u0101 vieta katr\u0101 pl\u016bsm\u0101.<\/strong> Infor nor\u0101da: &#8220;all requirements planning will occur around this operation.&#8221; (visu vajadz\u012bbu pl\u0101no\u0161ana tiks pak\u0101rtota \u0161ai oper\u0101cijai.)<\/li>\n\n\n<li><strong>Slodzes l\u012bdzsvaro\u0161ana paliek manu\u0101la.<\/strong> Slodzes skatos redzama p\u0101rslodze un nepietiekama noslodze, bet darbus p\u0101rvieto pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>Slodzes datu precizit\u0101te ir atkar\u012bga no izpildes uzskaites.<\/strong> Infor nor\u0101da: &#8220;it is important that every operation is reported.&#8221; (ir svar\u012bgi re\u0123istr\u0113t katras oper\u0101cijas izpildi.) Ja izpilde nav re\u0123istr\u0113ta, skat\u0101 saglab\u0101jas novecojusi slodze.<\/li>\n\n\n<li><strong>SWB ir papildmodulis.<\/strong> Food and Beverage CloudSuite aprakst\u0101 Infor to l\u012bdz\u0101s Factory Track un citiem papildmodu\u013ciem iek\u013cauj sada\u013c\u0101 &#8220;core plus add-ons are recommended,&#8221; (ieteicama pamatfunkcionalit\u0101te kop\u0101 ar papildmodu\u013ciem). (<a href=\"https:\/\/docs.infor.com\/m3csfab\/latest\/en-us\/csfablib\/solution_overview_food-beverage\/nyj1693564666315.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>SWB darbojas k\u0101 atsevi\u0161\u0137a lietotne.<\/strong> Lietot\u0101ji to palai\u017e no RDWeb ar individu\u0101lu RDWeb lietot\u0101ja ID vai no s\u0101kuma izv\u0113lnes. SWB vajadz\u012bb\u0101m j\u0101konfigur\u0113 ION API un M3 BE. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">Infor dokument\u0101cija<\/a>, <a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/wsu1633500923509.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>SWB ievie\u0161anu s\u0101k ar \u0161aur\u0101s vietas pl\u0101no\u0161anu.<\/strong> S\u0101kot darbu, Infor iesaka &#8220;start all resources with infinite capacity,&#8221; (s\u0101kum\u0101 visiem resursiem iestat\u012bt neierobe\u017eotu jaudu), ierobe\u017eot tikai kritisk\u0101s \u0161aur\u0101s vietas jaudu un &#8220;Focus only on the critical bottlenecks before going live.&#8221; (Pirms darba s\u0101k\u0161anas koncentr\u0113ties tikai uz kritiskaj\u0101m \u0161auraj\u0101m viet\u0101m.) Visiem p\u0101r\u0113jiem resursiem jauda paliek neierobe\u017eota. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n\n<li><strong>PWB pas\u016bt\u012bjumi ir pagaidu pas\u016bt\u012bjumi.<\/strong> &#8220;The order number in M3 PWB is temporary until a new order number is inserted by the central system.&#8221; (Pas\u016bt\u012bjuma numurs M3 PWB ir pagaidu numurs, l\u012bdz centr\u0101l\u0101 sist\u0113ma ievieto jaunu pas\u016bt\u012bjuma numuru.) (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/pfa1568180108821.html\">Infor dokument\u0101cija<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Gan M3 pamatfunkcionalit\u0101t\u0113, gan SWB, ja darbu s\u0101k atbilsto\u0161i Infor ieteikumiem, \u0161aurajai vietai pl\u0101nu veido faktisk\u0101s jaudas robe\u017e\u0101s, bet p\u0101r\u0113jiem darba centriem apr\u0113\u0137ina aptuvenu slodzi. Faktisko darbu sec\u012bbu pl\u0101not\u0101ji uztur izkl\u0101jlap\u0101s l\u012bdz\u0101s M3.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-infor-m3-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Infor M3 pl\u0101no\u0161anas iesp\u0113j\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar PDS010 un CRS786 pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Katra produkta ra\u017eo\u0161anas pl\u016bsm\u0101 ir viena skaidri noteikta \u0161aur\u0101 vieta, bet p\u0101r\u0113j\u0101 ra\u017eotn\u0113 ir br\u012bva jauda.<\/li>\n\n\n<li>Produktu strukt\u016bras ir stabilas, un katras oper\u0101cijas izpilde tiek re\u0123istr\u0113ta laikus.<\/li>\n\n\n<li>Pl\u0101not\u0101ji reizi ned\u0113\u013c\u0101 l\u012bdzsvaro slodzi programm\u0101s CPS120 un CPS130, un \u0161\u0101ds bie\u017eums ir pietiekams.<\/li>\n\n\n<li>Galven\u0101 probl\u0113ma ir materi\u0101lu apg\u0101de, t\u0101p\u0113c MRP un MPS ir svar\u012bg\u0101ki par darbu sec\u012bbu pie iek\u0101rt\u0101m.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana, koplietojami instrumenti un operatoru pieejam\u012bba nenosaka, kur\u0161 darbs j\u0101izpilda n\u0101kamais.<\/li>\n\n<\/ul>\n\n\n<p>SWB ir piem\u0113rots ra\u017eotn\u0113m, kur\u0101m ir \u012bpa\u0161i pl\u0101no\u0161anai paredz\u0113ta komanda un kuras ir gatavas \u012bstenot papildmodu\u013ca ievie\u0161anas projektu ar Infor vai partneri, pak\u0101peniski ievie\u0161ot modeli, kas iev\u0113ro faktisk\u0101s jaudas ierobe\u017eojumus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro faktisko jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>M3 pamatfunkcionalit\u0101te vairs nav pietiekama, ja uz j\u016bsu ra\u017eotni attiecas vair\u0101ki no \u0161iem apgalvojumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Mainoties ra\u017eojamo produktu kl\u0101stam, main\u0101s ar\u012b \u0161aur\u0101s vietas, t\u0101p\u0113c modelis ar vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101 nav piem\u0113rots.<\/li>\n\n\n<li>Pieg\u0101des kav\u0113jas, lai gan CPS100 slodze katr\u0101 period\u0101 izskat\u0101s l\u012bdzsvarota.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Vair\u0101ki darba centri izmanto vienas un t\u0101s pa\u0161as lie\u0161anas formas, \u0161tances vai pal\u012bgier\u012bces.<\/li>\n\n\n<li>Darbinieku pieejam\u012bba un mai\u0146as ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas, un da\u017eiem ra\u017eo\u0161anas uzdevumiem vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not darbus mai\u0146as laik\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Viens pl\u0101no\u0161anas dzin\u0113js vienlaikus iev\u0113ro visu resursu ierobe\u017eojumus<\/strong>: iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas laiku matrica<\/strong>, kur\u0101 p\u0101rregul\u0113\u0161anas laiki ir atkar\u012bgi no darbu sec\u012bbas abos virzienos.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong> un <strong>ra\u017eo\u0161anas uzdevumi, kuriem vajadz\u012bgi vair\u0101ki operatori<\/strong>.<\/li>\n\n\n<li><strong>Alternat\u012bvi darba centri un darbinieki<\/strong>, kurus pl\u0101no\u0161anas dzin\u0113js patie\u0161\u0101m izmanto.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lu pieejam\u012bbu<\/strong> noliktav\u0101 un gaid\u0101majos iepirkuma pas\u016bt\u012bjumos.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Skaidri sadal\u012bta datumu p\u0101rvald\u012bba starp pl\u0101no\u0161anas sist\u0113mu un M3.<\/strong> Sast\u0101diet grafikus apstiprin\u0101tiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem, nevis pl\u0101notajiem pas\u016bt\u012bjumiem, kurus MRP \u0123ener\u0113 no jauna. Nosakiet, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus.<\/li>\n\n\n<li><strong>Oper\u0101ciju izpildes datu nodo\u0161ana atpaka\u013c M3<\/strong>, izmantojot PMS070MI, lai M3 slodzes dati atbilstu faktiskajai situ\u0101cijai.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M3 ieb\u016bv\u0113t\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana<\/strong> \u013cauj M3 vid\u0113 pl\u0101not vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101.<\/li>\n\n\n<li><strong>Infor papildmodu\u013ci<\/strong> SWB un PWB \u013cauj pl\u0101not\u0101jiem noteikt darbu sec\u012bbu atbilsto\u0161i pieejamajai jaudai, izmantojot p\u0101rregul\u0113\u0161anas laiku matricas un uz noteikumiem balst\u012btu optimiz\u0101ciju, k\u0101 ar\u012b veikt vid\u0113ja termi\u0146a simul\u0101ciju.<\/li>\n\n\n<li><strong>Lieliem uz\u0146\u0113mumiem paredz\u0113tas APS sist\u0113mas<\/strong> tiek integr\u0113tas ievie\u0161anas projekta ietvaros, un to darbam nepiecie\u0161ama centr\u0101l\u0101 pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146vides APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner \u2014 darbojas l\u012bdz\u0101s M3, autom\u0101tiski sast\u0101da grafiku katram resursam un nodod to operatoriem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS vienot\u0101 pl\u0101no\u0161anas dzin\u0113j\u0101 sast\u0101da grafiku katram darba centram, darbiniekam, instrumentam un materi\u0101lam, iev\u0113rojot re\u0101lo jaudu un pieejam\u012bbu. Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 izveido oper\u0101ciju l\u012bme\u0146a grafiku un nosaka darbu sec\u012bbu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities. Nevienam vairs nav manu\u0101li j\u0101l\u012bdzsvaro slodze CPS120.<\/p>\n\n\n<p>Sagatavo\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts p\u0101rregul\u0113\u0161anas laiks starp produktiem abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu, kurai nepiecie\u0161ams vismaz\u0101kais p\u0101rregul\u0113\u0161anas laiks. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori. Ja prim\u0101rais darba centrs vai darbinieks nav pieejams, dzin\u0113js p\u0101rce\u013c darbu uz alternat\u012bvu darba centru vai pie cita darbinieka.<\/p>\n\n\n<p>Pl\u0101no\u0161ana p\u0113c materi\u0101lu pieejam\u012bbas simul\u0113 n\u0101kotnes kr\u0101jumus, \u0146emot v\u0113r\u0101 eso\u0161os kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101, t\u0101p\u0113c ra\u017eo\u0161anas pas\u016bt\u012bjums (MO) s\u0101kas tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu noteiktos blo\u0137\u0113jumus un priorit\u0101tes, bet Running Time Lock saglab\u0101 uzs\u0101kto ra\u017eo\u0161anas uzdevumu vietu grafik\u0101. Operatori re\u0123istr\u0113 darbu ar Mobile Confirmations un Production Timer, un izpildes dati tiek nos\u016bt\u012bti atpaka\u013c uz M3, izmantojot PMS070MI.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis M3 Scheduling Workbench, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties pl\u0101not atbilsto\u0161i re\u0101lajai jaudai, nevis str\u0101d\u0101t ar aptuvenu pl\u0101nu.<\/strong> S\u0101kot SWB lieto\u0161anu, Infor iesaka visiem resursiem, iz\u0146emot kritisko \u0161auro vietu, pie\u0146emt neierobe\u017eotu jaudu. SkyPlanner jau no pirm\u0101 grafika vis\u0101 pl\u0101no\u0161anas period\u0101 nosaka prec\u012bzus laikus katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la izmanto\u0161anai, iev\u0113rojot to re\u0101lo jaudu un pieejam\u012bbu.<\/li>\n\n\n<li><strong>V\u0113laties s\u0101kt str\u0101d\u0101t ar grafiku da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> SWB ir lietotne, ko lietot\u0101ji palai\u017e no RDWeb, katrs ar savu RDWeb lietot\u0101ja ID, vai no s\u0101kuma izv\u0113lnes. Pirms tam tai j\u0101konfigur\u0113 ION API un M3 BE (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">Infor dokument\u0101cija<\/a>). SkyPlanner darbojas p\u0101rl\u016bkprogramm\u0101, izm\u0113\u0123in\u0101juma laik\u0101 to p\u0101rbauda ar j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumiem, un pilnv\u0113rt\u012bga lieto\u0161ana s\u0101kas da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas uzs\u0101k\u0161anas.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunojas autom\u0101tiski.<\/strong> Autopilot p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, vien\u0101 apr\u0113\u0137in\u0101 \u0146emot v\u0113r\u0101 sagatavo\u0161anas laiku matricu, uzdevumus ar vair\u0101kiem operatoriem, alternat\u012bvos darba centrus un iepirkuma pas\u016bt\u012bjumu pieg\u0101des.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c viena un t\u0101 pa\u0161a grafika.<\/strong> Mobile Confirmations katram operatoram t\u0101lrun\u012b vai plan\u0161etdator\u0101 par\u0101da aktu\u0101lo darbu rindu. Lietot\u0101ju skaits nav ierobe\u017eots, un izpildes dati tiek nos\u016bt\u012bti atpaka\u013c uz M3, izmantojot PMS070MI.<\/li>\n\n<\/ul>\n\n\n<p>S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar CSV vai Excel eksportu no M3 \u2014 l\u012bdz 20 darba centriem, bez kred\u012btkartes. Cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un veicot ikm\u0113ne\u0161a apmaksu. Integr\u0101cijas izmaksu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, kop\u0101 ar j\u016bsu abon\u0113\u0161anas pl\u0101nu.<\/p>\n\n\n<p>Uzziniet, k\u0101 sist\u0113mas savienojas, lap\u0101 <a href=\"\/lv\/integracija\/erp\/infor-m3\/\">SkyPlanner darbam ar Infor M3<\/a> vai skatiet <a href=\"\/lv\/integracija\/erp\/infor-m3\/integracijas-celvedis\/\">Infor M3 integr\u0101cijas rokasgr\u0101matu<\/a>. Citas ERP sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskat\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales pane\u013cu ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadalietaises<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu darba pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par ra\u017eo\u0161anas jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un vis\u0101 uz\u0146\u0113mum\u0101 ir pieejams ra\u017eo\u0161anas p\u0101rskats re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bca Kauhav\u0101, skats no gaisa\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 ik dienu tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Infor M3 ir r\u012bks ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. M3 pamatfunkcijas apr\u0113\u0137ina oper\u0101ciju datumus p\u0113c darba centru jaudas un \u013cauj CRS786 pl\u0101not vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. Papildmodulis M3 Scheduling Workbench \u013cauj noteikt ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu atbilsto\u0161i re\u0101lajai jaudai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp M3 Scheduling Workbench un Planning Workbench?<\/summary>\n<p class=\"sp-faq__a\">Scheduling Workbench nosaka ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu, \u0146emot v\u0113r\u0101 pieejamo jaudu un materi\u0101lu pl\u016bsmu. Planning Workbench ir darbvirsmas r\u012bks vid\u0113ja termi\u0146a l\u0113mumiem par ra\u017eo\u0161anas jaudu un apak\u0161uz\u0146\u0113m\u0113ju piesaisti. Taj\u0101 izveidotie pas\u016bt\u012bjumi paliek pagaidu status\u0101, l\u012bdz M3 tiem pie\u0161\u0137ir numurus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai M3 Scheduling Workbench ir iek\u013cauts M3 CloudSuite?<\/summary>\n<p class=\"sp-faq__a\">Food and Beverage CloudSuite pied\u0101v\u0101jum\u0101 Infor to nor\u0101da k\u0101 ieteicamu papildmoduli, nevis pamatlietotni. Sava CloudSuite abonementa saturu preciz\u0113jiet pie Infor vai sava partnera.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izmantot M3 Scheduling Workbench vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja v\u0113laties grafiku, kas atbilst re\u0101lajai jaudai, nevis aptuvenu pl\u0101nu. S\u0101kot SWB lieto\u0161anu, Infor iesaka visiem resursiem pie\u0146emt neierobe\u017eotu jaudu un ierobe\u017eot tikai kritisk\u0101s \u0161aur\u0101s vietas jaudu. Turkl\u0101t SWB ir papildmodulis, kas darbojas k\u0101 atsevi\u0161\u0137a lietotne, izmantojot RDWeb. SkyPlanner pl\u0101no katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la izmanto\u0161anu ar prec\u012bzu s\u0101kuma un beigu laiku, iev\u0113rojot re\u0101lo jaudu un pieejam\u012bbu. Tas \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laikus atkar\u012bb\u0101 no p\u0101rejas virziena, uzdevumus ar vair\u0101kiem operatoriem un alternat\u012bvos darba centrus. Autopilot p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, un pilnv\u0113rt\u012bgu lieto\u0161anu varat s\u0101kt da\u017eu ned\u0113\u013cu laik\u0101 \u2014 no 199 \u20ac m\u0113nes\u012b, ar 30 dienu izm\u0113\u0123in\u0101jumu, izmantojot savus datus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai M3 MRP sast\u0101da grafiku atbilsto\u0161i pieejamajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">M3 MRP un MPS pl\u0101no materi\u0101lus un pieg\u0101des, savuk\u0101rt Infor pl\u0101no\u0161anas p\u0101rskat\u0101 min\u0113ta aptuven\u0101 ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana. PDS010 jaudas ierobe\u017eojuma iestat\u012bjums st\u0101jas sp\u0113k\u0101 v\u0113l\u0101k, kad pas\u016bt\u012bjumam tiek apr\u0113\u0137in\u0101ts oper\u0101ciju s\u0101kuma un beigu laiks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Infor M3?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet no M3 preces, darba centrus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, import\u0113jiet tos CSV vai Excel form\u0101t\u0101 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor M3 Vai Infor M3 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS Infor M3 nodro\u0161ina aptuvenu ra\u017eo\u0161anas jaudas pl\u0101no\u0161anu, nevis detaliz\u0113tu grafiku sast\u0101d\u012b\u0161anu faktisk\u0101s jaudas robe\u017e\u0101s. M3 pamatfunkcionalit\u0101t\u0113 katram darba centram nor\u0101da, vai t\u0101 jauda ir ierobe\u017eota vai neierobe\u017eota, un katr\u0101 oper\u0101ciju pl\u016bsm\u0101 pl\u0101no\u0161anu &#8230; <a title=\"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/\" aria-label=\"Read more about Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102939,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103684","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3 ra\u017eo\u0161anas pl\u0101no\u0161ana: ko nodro\u0161ina SWB?<\/title>\n<meta name=\"description\" content=\"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/razosanas-planosana\\\/\",\"name\":\"Infor M3 ra\u017eo\u0161anas pl\u0101no\u0161ana: ko nodro\u0161ina SWB?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor M3: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3 ra\u017eo\u0161anas pl\u0101no\u0161ana: ko nodro\u0161ina SWB?","description":"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS","og_description":"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/","name":"Infor M3 ra\u017eo\u0161anas pl\u0101no\u0161ana: ko nodro\u0161ina SWB?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor M3 katram darba centram iestata ierobe\u017eotu jaudu un pl\u0101no vienu \u0161auro vietu katr\u0101 pl\u016bsm\u0101. PDS010, CRS786 un Scheduling Workbench iesp\u0113jas un robe\u017eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor M3: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Vai Infor M3 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor M3 Vai Infor M3 pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? PDS010, Scheduling Workbench un SkyPlanner APS Infor M3 nodro\u0161ina aptuvenu ra\u017eo\u0161anas jaudas pl\u0101no\u0161anu, nevis detaliz\u0113tu grafiku sast\u0101d\u012b\u0161anu faktisk\u0101s jaudas robe\u017e\u0101s. M3 pamatfunkcionalit\u0101t\u0113 katram darba centram nor\u0101da, vai t\u0101 jauda ir ierobe\u017eota vai neierobe\u017eota, un katr\u0101 oper\u0101ciju pl\u016bsm\u0101 pl\u0101no\u0161anu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103684"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103684\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102939"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}