{"id":103654,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/infor-ln\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/","title":{"rendered":"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor LN<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor LN integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Infor LN integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor LN ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Infor LN nodro\u0161ina datu apmai\u0146u abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Uz SkyPlanner tiek p\u0101rs\u016bt\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjumi, tehnolo\u0123isk\u0101 procesa oper\u0101cijas, darba centri, iek\u0101rtas, preces, kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kuma un beigu datums tiek nos\u016bt\u012bts atpaka\u013c uz LN ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/li>\n\n\n<li>Operatoru laika uzskaites ieraksti tiek nos\u016bt\u012bti atpaka\u013c k\u0101 iek\u0101rtu darba stundas, darbinieku darba stundas un sara\u017eotie daudzumi.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu LN konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Partneri un izstr\u0101d\u0101t\u0101ji var iesaist\u012bties vai pa\u0161i veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloud-or-on-premises-what-shapes-every-ln-integr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">M\u0101kon\u012b vai lok\u0101li: kas nosaka katras LN integr\u0101cijas risin\u0101jumu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>LN ir divas versiju l\u012bnijas, un katrai savienojums tiek veidots at\u0161\u0137ir\u012bgi. Abos gad\u012bjumos SkyPlanner darbojas m\u0101kon\u012b, t\u0101p\u0113c LN vid\u0113 nekas nav j\u0101instal\u0113.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>LN m\u0101kon\u012b (no 2022.x l\u012bdz 2026.x, CloudSuites)<\/th><th>LN 10.x lok\u0101l\u0101 vid\u0113<\/th><\/tr><\/thead><tbody><tr><td>Galven\u0101 saskarne<\/td><td>LN REST API (pakalpojumu grupa LN\/lnapi), izmantojot ION API Gateway<\/td><td>ION ar BOD dokumentiem<\/td><\/tr><tr><td>Autentifik\u0101cija<\/td><td>OAuth 2.0, aizmugursist\u0113mas pakalpojuma piek\u013cuves dati <code>.ionapi<\/code> fail\u0101<\/td><td>ION savienojuma punkti<\/td><\/tr><tr><td>Pazi\u0146o\u0161ana par izmai\u0146\u0101m<\/td><td>ION public\u0113ti BOD dokumenti vai periodiska datu piepras\u012b\u0161ana<\/td><td>ION public\u0113ti BOD dokumenti<\/td><\/tr><tr><td>Liela apjoma datu izg\u016b\u0161ana<\/td><td>ION Data Lake vai datu eksports<\/td><td>Exchange sh\u0113mas, datub\u0101zes skati vai datu eksports no sesij\u0101m<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"ln-interfaces-for-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">LN saskarnes grafiku sast\u0101d\u012b\u0161anai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. LN REST API.<\/strong> Infor public\u0113 LN pakalpojumus ION API Gateway vid\u0113: &#8220;You can review the available documentation for the public services that are part of LN API.&#8221; (Varat skat\u012bt pieejamo dokument\u0101ciju par publiskajiem pakalpojumiem, kas ietilpst LN API.) Grafiku sast\u0101d\u012b\u0161anai svar\u012bg\u0101kais pakalpojums ir <code>tiapi.sfcProductionOrder<\/code>. Tas aptver ra\u017eo\u0161anas pas\u016bt\u012bjumus un iek\u0101rtu oper\u0101cijas ar darb\u012bb\u0101m Get Machine Operations, Register machine quantities, Register machine hours un Finish Machine Operations. Citi <code>tiapi<\/code> un <code>tcapi<\/code> pakalpojumi v\u0101rtej\u0101 ir nor\u0101d\u012bti katrai nomnieka videi atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katram pakalpojumam j\u0101b\u016bt pie\u0161\u0137irt\u0101m lieto\u0161anas ties\u012bb\u0101m un aktiviz\u0113tam. Infor nor\u0101da, ka &#8220;Try it out&#8221; (Izm\u0113\u0123in\u0101t) &#8220;only works if you are entitled for the service and the service has been activated.&#8221; (darbojas tikai tad, ja jums ir ties\u012bbas izmantot pakalpojumu un tas ir aktiviz\u0113ts). Iek\u013caujiet \u0161o p\u0101rbaudi projekta kontrolsarakst\u0101 jau pirmaj\u0101 dien\u0101.<\/p>\n\n\n<p><strong>2. ION BOD dokumenti.<\/strong> &#8220;Business object documents (BODs) are XML messages used to exchange data between enterprises or enterprise applications.&#8221; (Biznesa objektu dokumenti jeb BOD ir XML zi\u0146ojumi datu apmai\u0146ai starp uz\u0146\u0113mumiem vai uz\u0146\u0113mumu lietojumprogramm\u0101m.) LN tos nos\u016bta uz Infor ION, kas tos novirza abonentiem. <code>Process.ItemMaster<\/code> un <code>Process.BillOfMaterials<\/code> ir min\u0113ti LN 10.8 dokument\u0101cij\u0101, kur\u0101 aprakst\u012bta ar\u012b uz BOD balst\u012bta integr\u0101cija ar lok\u0101li izvietotu LN. Pilns j\u016bsu versijai pieejamo BOD dokumentu saraksts ir atrodams j\u016bsu nomnieka vid\u0113.<\/p>\n\n\n<p><strong>3. Eksports failos.<\/strong> Lok\u0101li izvietots LN var eksport\u0113t tabulas, izmantojot Exchange sh\u0113mas vai datub\u0101zes skatus. Tas ir piem\u0113rots s\u0101kotn\u0113jai datu iel\u0101dei un ra\u017eotn\u0113m, kas dod priek\u0161roku failu apmai\u0146ai p\u0113c noteikta grafika.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ja LN darbojas m\u0101kon\u012b, izmantojiet ION API Gateway ar OAuth 2.0:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Izveidojiet ION API autoriz\u0113tu lietotni ar tipu <strong>Backend Service<\/strong> un lejupiel\u0101d\u0113jiet t\u0101s <code>.ionapi<\/code> failu.<\/li>\n\n\n<li>Fail\u0101 ir klienta ID (<code>ci<\/code>), klienta slepen\u0101 atsl\u0113ga (<code>cs<\/code>), v\u0101rtejas URL (<code>iu<\/code>), autentifik\u0101cijas serveris (<code>pu<\/code>), ce\u013c\u0161 piek\u013cuves pilnvaras sa\u0146em\u0161anai (<code>ot<\/code>) un nomnieks (<code>ti<\/code>).<\/li>\n\n\n<li>Pieprasiet piek\u013cuves pilnvaras, izmantojot OAuth pl\u016bsmu client credentials. Izsaukumi tiek izpild\u012bti pakalpojuma konta v\u0101rd\u0101.<\/li>\n\n\n<li>Pie\u0161\u0137iriet pakalpojuma kontam tikai t\u0101s LN lomas, kas nepiecie\u0161amas integr\u0101cijai.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-webhooks-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi, webhook pazi\u0146ojumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kad notiek izmai\u0146as biznesa procesos, LN public\u0113 BOD dokumentus Infor ION, kas tos novirza abonentiem. Abonents sinhroniz\u0113 main\u012bto preci vai pas\u016bt\u012bjumu. Ja nav piem\u0113rota BOD dokumenta, integr\u0101cija p\u0113c noteikta grafika pieprasa datus no LN REST pakalpojumiem, atlasot tikai atv\u0113rtos pas\u016bt\u012bjumus.<\/p>\n\n\n<p>Kad main\u0101s st\u0101voklis vai grafiks, SkyPlanner nos\u016bta webhook pazi\u0146ojumu, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c LN izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Infor LN objekts (sesija vai pakalpojums)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Items &#8211; General (tcibd0501m000), Items &#8211; Planning (cprpd1100m000), <code>Process.ItemMaster<\/code><\/td><td>Produkti un materi\u0101li<\/td><td>LN \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Bill of Material (tibom1110m000), ra\u017eo\u0161anas materi\u0101lu specifik\u0101cijas, materi\u0101lu un tehnolo\u0123isko procesu saites, <code>Process.BillOfMaterials<\/code><\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katrai oper\u0101cijai nepiecie\u0161amie materi\u0101li<\/td><td>LN \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Routing Operations (tirou1102m000), Tasks (tirou0103m000)<\/td><td>Procesa so\u013ci ar sagatavo\u0161anas un izpildes laiku<\/td><td>LN \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Work Centers (tirou0101m000), Machines (tirou0102m000)<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>LN \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Kalend\u0101ri, Working Time Schedule (tcppl1100m000)<\/td><td>Mai\u0146as un darba laiks<\/td><td>LN \u2192 SkyPlanner<\/td><td>Katru dienu vai mai\u0146as tiek uztur\u0113tas SkyPlanner<\/td><\/tr><tr><td>Production Orders (tisfc0501m000), iek\u0101rtu oper\u0101cijas (<code>tiapi.sfcProductionOrder<\/code>)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>LN \u2192 SkyPlanner<\/td><td>BOD notikums vai datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Pieejamie kr\u0101jumi<\/td><td>Kr\u0101jumu atlikumi<\/td><td>LN \u2192 SkyPlanner<\/td><td>Ik stundu vai pirms katras grafika apr\u0113\u0137in\u0101\u0161anas<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumu rindas ar paredzamajiem sa\u0146em\u0161anas datumiem<\/td><td>Gaid\u0101mie materi\u0101li; kr\u0101jumi tiek atjaunin\u0101ti, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered<\/td><td>LN \u2192 SkyPlanner<\/td><td>Ik stundu vai pirms katras grafika apr\u0113\u0137in\u0101\u0161anas<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas: pl\u0101notais s\u0101kums, beigas, iek\u0101rta<\/td><td>Grafik\u0101 iepl\u0101not\u0101s oper\u0101cijas<\/td><td>SkyPlanner \u2192 LN<\/td><td>Mainoties grafikam, izmantojot SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Register machine hours and quantities, Finish Machine Operations; Production Order Hours (bptmm1120m000), Report Operations Completed (tisfc0130m000)<\/td><td>Laika uzskaites ieraksti, daudzumi, pabeigt\u0101s oper\u0101cijas<\/td><td>SkyPlanner \u2192 LN<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as<\/td><\/tr><tr><td>LN nav pieejams<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, operatoru skaits, alternat\u012bvie darba centri<\/td><td>Tiek uztur\u0113ts SkyPlanner<\/td><td>Tiek konfigur\u0113ts ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Iel\u0101d\u0113jiet preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123isk\u0101 procesa oper\u0101cijas, uzdevumus, darba centrus, iek\u0101rtas un kalend\u0101rus. Nosakiet, k\u0101 LN darba centru un iek\u0101rtu l\u012bme\u0146i atbild\u012bs SkyPlanner strukt\u016brai: darba centrs ar \u010detr\u0101m iek\u0101rt\u0101m var k\u013c\u016bt par vienu darba centru grupu ar \u010detriem darba centriem.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101lu rind\u0101m, k\u0101 ar\u012b kr\u0101jumus un atv\u0113rto iepirkuma pas\u016bt\u012bjumu rindas. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101, t\u0101p\u0113c, sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti kr\u0101jumi un gaid\u0101m\u0101s pieg\u0101des.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c LN.<\/strong> Katrai oper\u0101cijai, kuru pl\u0101no\u0161anas dzin\u0113js ir iepl\u0101nojis vai p\u0101rc\u0113lis, SkyPlanner nos\u016bta pl\u0101noto s\u0101kumu, beigas un iek\u0101rtu atpaka\u013c uz attiec\u012bgo LN ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju. Daudzumu, statusa un izmaksu apr\u0113\u0137inu p\u0101rvald\u012bba paliek LN.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu, izmantojot Mobile Confirmations, Production Timer vai Quick Log Mode. Laika uzskaites ieraksti uztur grafiku aktu\u0101lu un tiek nos\u016bt\u012bti atpaka\u013c uz LN k\u0101 iek\u0101rtu darba stundas, daudzumi un pabeigt\u0101s oper\u0101cijas. Izv\u0113lieties vienu re\u0123istr\u0113\u0161anas kan\u0101lu \u2014 SkyPlanner vai LN sesijas \u2014, lai stundas nekad netiktu uzskait\u012btas divreiz.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Vienojieties par tiem pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie procesi, pas\u016bt\u012bjumu daudzumi un statuss, kr\u0101jumi, uzskaites ieraksti<\/td><td>Infor LN<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, pl\u0101notais s\u0101kums un beigas, iek\u0101rtas pie\u0161\u0137\u012brums<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvie darba centri<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las, nosakot tv\u0113rumu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>6. Darbs l\u012bdz\u0101s Infor pl\u0101no\u0161anas r\u012bkiem.<\/strong> Enterprise Planning turpina veidot apg\u0101des priek\u0161likumus, savuk\u0101rt SkyPlanner sast\u0101da ra\u017eo\u0161anas pas\u016bt\u012bjumu grafikus atbilsto\u0161i faktiskajai jaudai. LN 2026 laidienos iestat\u012bjums <strong>External Planner<\/strong> ir paredz\u0113ts \u0161\u0101dam m\u0113r\u0137im: &#8220;The organization can integrate an external planning solution with Infor LN.&#8221; (Organiz\u0101cija var integr\u0113t \u0101r\u0113ju pl\u0101no\u0161anas risin\u0101jumu ar Infor LN.) Ja ir aktiviz\u0113ts Scheduler+, vispirms nosakiet, kura sist\u0113ma p\u0101rvalda datumus: tas pievieno statusu Scheduled un pieprasa sast\u0101d\u012bt grafiku pirms pas\u016bt\u012bjuma nodo\u0161anas izpildei.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadapm\u0101c\u012bbas un s\u0101kotn\u0113j\u0101s iestat\u012b\u0161anas s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus. Eksport\u0113jiet darba centrus, iek\u0101rtas, tehnolo\u0123isk\u0101 procesa oper\u0101cijas un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no LN sesij\u0101m uz Excel, import\u0113jiet tos un p\u0101rbaudiet grafiku.<\/p>\n\n\n<p>Pats projekts ietver \u0161\u0101dus posmus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana.<\/strong> Vienojieties par laidienu saimi, saskarnes veidu, datu atbilst\u012bbas tabulu, datu p\u0101rvald\u012bbas noteikumiem un datu re\u0123istr\u0113\u0161anas kan\u0101lu.<\/li>\n\n\n<li><strong>Piek\u013cuve.<\/strong> Pie\u0161\u0137iriet ties\u012bbas izmantot LN REST pakalpojumus un aktiviz\u0113jiet tos, izveidojiet <code>.ionapi<\/code> aizmugursist\u0113mas pakalpojumu un servisa kontu vai iestatiet BOD abonementus sist\u0113m\u0101 ION. S\u0101ciet ar nomnieka testa vidi.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Iel\u0101d\u0113jiet preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123isk\u0101 procesa oper\u0101cijas, darba centrus, iek\u0101rtas un kalend\u0101rus.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Sinhroniz\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumu rindas, izmantojot BOD notikumus vai periodisku datu piepras\u012b\u0161anu.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana sist\u0113m\u0101 SkyPlanner.<\/strong> Iestatiet sagatavo\u0161anas laiku matricu, instrumentus, operatoru skaitu un alternat\u012bvos darba centrus.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Vispirms ierakstiet pl\u0101notos oper\u0101ciju datumus, p\u0113c tam stundas un daudzumus.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 darb\u012bba.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Palai\u0161ana darba vid\u0113.<\/strong> Kad dati sakr\u012bt, iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-an-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Infor LN integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nepareiza dokument\u0101cijas versija.<\/strong> LN 10.x un ikgad\u0113jie m\u0101ko\u0146versijas laidieni at\u0161\u0137iras. Planner+ un Scheduler+ ir aprakst\u012bti tikai 2026. gada dokument\u0101cij\u0101, savuk\u0101rt Job Shop Scheduler ir pieejams no versijas 10.8. Katr\u0101 dokument\u0101cijas lap\u0101 p\u0101rbaudiet, vai t\u0101 atbilst j\u016bsu laidienam.<\/li>\n\n\n<li><strong>Nepareizs Infor produkts.<\/strong> Infor LN nav CloudSuite Industrial (SyteLine) vai M3. To BOD un API at\u0161\u0137iras, t\u0101p\u0113c izmantojiet tikai LN dokument\u0101ciju.<\/li>\n\n\n<li><strong>Pakalpojums nav aktiviz\u0113ts.<\/strong> LN REST izsaukumi nedarbojas, kam\u0113r nomnieka vid\u0113 nav pie\u0161\u0137irtas pakalpojuma lieto\u0161anas ties\u012bbas un tas nav aktiviz\u0113ts.<\/li>\n\n\n<li><strong>Uzskait\u012bjuma tipa filtri.<\/strong> OrderStatus ir uzskait\u012bjuma tips, t\u0101p\u0113c OData <code>$filter<\/code> filtr\u0101 p\u0113c statusa j\u0101izmanto \u0161im tipam paredz\u0113t\u0101 sintakse, k\u0101 nor\u0101da Infor kopienas lietot\u0101ji.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjuma izpildes laiks un tehnolo\u0123iskais process.<\/strong> Iestat\u012bjums Operations Horizon sada\u013c\u0101 Items &#8211; Planning nosaka, vai pl\u0101notajiem pas\u016bt\u012bjumiem izmanto tehnolo\u0123isk\u0101 procesa datus vai fiks\u0113tu Order Lead Time. Ilgumus nolasiet no tehnolo\u0123isk\u0101 procesa oper\u0101cij\u0101m, nevis no pas\u016bt\u012bjumu izpildes laikiem.<\/li>\n\n\n<li><strong>Darba centru sesijas.<\/strong> Ja ir aktiviz\u0113ts Job Shop by Site, LN izmanto sesiju Work Center (tirou0601m000), nevis Work Centers (tirou0101m000). Datu atbilst\u012bbu noteik\u0161anai izmantojiet to sesiju, kuru izmanto j\u016bsu uz\u0146\u0113mums.<\/li>\n\n\n<li><strong>Iek\u0101rtu stundas un darbasp\u0113ka stundas.<\/strong> Sada\u013c\u0101 Production Order Hours iek\u0101rtu stundu rind\u0101s lauks Employee ir tuk\u0161s. Sasaistiet SkyPlanner iek\u0101rtu laiku un operatoru laiku ar pareizaj\u0101m rind\u0101m.<\/li>\n\n\n<li><strong>Kalend\u0101ri katrai uz\u0146\u0113muma vien\u012bbai.<\/strong> Katram darba centram iel\u0101d\u0113jiet t\u0101 uz\u0146\u0113muma vien\u012bbas kalend\u0101ru, nevis vienu kop\u012bgu r\u016bpn\u012bcas kalend\u0101ru.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Infor LN integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda to konfigur\u0113 s\u0101kotn\u0113j\u0101s ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c ekspluat\u0101cijas s\u0101kuma.<\/strong> Katr\u0101 r\u016bpn\u012bc\u0101 LN izmanto at\u0161\u0137ir\u012bgi: at\u0161\u0137iras pl\u0101no\u0161anas vien\u012bbas, darba centru strukt\u016bra, pas\u016bt\u012bjumu nodo\u0161ana izpildei un datu re\u0123istr\u0113\u0161anas prakse. Tie\u0161i \u0161o elementu atbilst\u012bbu veido\u0161an\u0101 ir vajadz\u012bga pieredze.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu Infor LN partneris.<\/strong> Partneris p\u0101rzina j\u016bsu nomnieka vidi, lieto\u0161anas ties\u012bbas un ION konfigur\u0101ciju un var uz\u0146emties atbild\u012bbu par LN pusi, savuk\u0101rt SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izveidot ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz\u0113s. Produkta dokument\u0101cija ir publiski pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai j\u016bs zin\u0101tu visas izmaksas v\u0113l pirms darba s\u0101k\u0161anas. Skatiet sal\u012bdzin\u0101jumu ar LN pl\u0101no\u0161anas iesp\u0113j\u0101m rakst\u0101 <a href=\"\/lv\/integracija\/erp\/infor-ln\/razosanas-planosana\/\">Infor LN ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai<\/a>, p\u0101rskatu <a href=\"\/lv\/integracija\/erp\/infor-ln\/\">Infor LN lap\u0101<\/a> un citas sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikties demonstr\u0101cijai<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na sagatavo\u0161ana trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu skaidr\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz pat \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir iev\u0113rojami samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 savienot APS ar Infor LN?<\/summary>\n<p class=\"sp-faq__a\">LN m\u0101ko\u0146versij\u0101 \u2014 izmantojot LN REST API caur ION API Gateway ar OAuth 2.0 un ION BOD k\u0101 izmai\u0146u notikumus. Lok\u0101li izvietotaj\u0101 LN 10.x \u2014 izmantojot ION BOD vai failu eksportu. Abos variantos SkyPlanner integr\u0101cija ar Infor LN darbojas abos virzienos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 LN API nodro\u0161ina darbu ar ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">LN REST API pakalpojums <code>tiapi.sfcProductionOrder<\/code>. Tas nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus un iek\u0101rtu oper\u0101cijas un re\u0123istr\u0113 iek\u0101rtu stundas, daudzumus un pabeigt\u0101s oper\u0101cijas. P\u0101r\u0113jie pakalpojumi katram nomniekam ir uzskait\u012bti ION API Gateway.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido Infor LN integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda s\u0101kotn\u0113j\u0101s ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu LN konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c ekspluat\u0101cijas s\u0101kuma. Integr\u0101ciju var izveidot ar\u012b j\u016bsu Infor LN partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to REST API. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner lieto\u0161anai ir vajadz\u012bgs Scheduler+ vai Planner+?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner sast\u0101da LN ra\u017eo\u0161anas pas\u016bt\u012bjumu grafikus ar savu pl\u0101no\u0161anas dzin\u0113ju neatkar\u012bgi no LN laidiena. LN 2026 laidienos iestat\u012bjums External Planner ir dokument\u0101cij\u0101 paredz\u0113tais veids, k\u0101 l\u012bdz\u0101s LN izmantot \u0101r\u0113ju pl\u0101no\u0161anas risin\u0101jumu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101p\u0113c pievienot SkyPlanner, nevis ieviest Scheduler+?<\/summary>\n<p class=\"sp-faq__a\">Scheduler+ ir papildmodulis, kas &#8220;may require a commercial component&#8221; (var b\u016bt nepiecie\u0161ams komerci\u0101ls komponents) (<a href=\"https:\/\/docs.infor.com\/ln\/2026.10\/en-us\/lnolh\/plschug\/plom005.html\">avots<\/a>). Tas ir aprakst\u012bts LN dokument\u0101cij\u0101, s\u0101kot ar 2026 laidieniem, un pl\u0101not\u0101js iel\u0101d\u0113 grafiku, palai\u017e t\u0101 apr\u0113\u0137inu un p\u0113c tam to apstiprina (<a href=\"https:\/\/docs.infor.com\/lncs\/2026.x\/en-us\/lncslib\/lncspov\/ijr1757604049666.html\">avots<\/a>). SkyPlanner savienojas ar LN, ko izmantojat jau \u0161odien, un ir gatavs darbam da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s ievie\u0161anas s\u0101kuma. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as. SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu, savuk\u0101rt j\u016bsu LN partneris var uz\u0146emties atbild\u012bbu par LN pusi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot l\u012bdz 20 darba centriem un no LN eksport\u0113tus CSV vai Excel failus. Kred\u012btkarte nav vajadz\u012bga. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor LN Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Infor LN integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor LN ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Infor LN nodro\u0161ina datu apmai\u0146u abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i &#8230; <a title=\"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/\" aria-label=\"Read more about Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102910,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103654","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor LN APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/integracijas-celvedis\\\/\",\"name\":\"Infor LN APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor LN: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu jaudai un darbinieku pieejam\u012bbai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-ln\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor LN APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/","name":"Infor LN APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor LN\u2013SkyPlanner APS: LN REST API caur ION API Gateway, OAuth 2.0, ION BOD, ra\u017eo\u0161anas pas\u016bt\u012bjumu sasaiste, grafika atgrie\u0161ana un projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor LN: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu jaudai un darbinieku pieejam\u012bbai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-ln\/"},{"@type":"ListItem","position":5,"name":"Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor LN Infor LN integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Infor LN integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot Infor LN ar SkyPlanner APS. SkyPlanner integr\u0101cija ar Infor LN nodro\u0161ina datu apmai\u0146u abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103654"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103654\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102910"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}