{"id":103594,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/","title":{"rendered":"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">IFS Cloud integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 IFS Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot IFS Cloud ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar IFS Cloud, izmantojot pa\u0161a IFS API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar oper\u0101cij\u0101m un materi\u0101liem, tehnolo\u0123iskos procesus, produktu strukt\u016bras, darba centrus, darbasp\u0113ka kategorijas, instrumentus, datus par kr\u0101jumu vien\u012bbu pieejam\u012bbu un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notais s\u0101kuma un beigu laiks un izv\u0113l\u0113tais darba centra resurss tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101s.<\/li>\n\n\n<li>SkyPlanner nos\u016bta webhook pazi\u0146ojumus par grafika izmai\u0146\u0101m, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu IFS Cloud konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas ekspluat\u0101cij\u0101. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"ifs-cloud-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">IFS Cloud integr\u0101cijas iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">OData projekcijas (RESTful API).<\/p>\n\n\n<p class=\"fx-pain__b\">IFS Cloud nodro\u0161ina piek\u013cuvi savai biznesa lo\u0123ikai ar OData projekcij\u0101m. &#8220;Projections are exposed in the \/ifsapplications\/projection\/ endpoint,&#8221; (projekcijas ir pieejamas galapunkt\u0101 \/ifsapplications\/projection\/) \u2014 atkar\u012bb\u0101 no projekcijas veida tas ir main, int vai b2b galapunkts. Tipisks ce\u013c\u0161 s\u0101kas ar <code>\/main\/ifsapplications\/<\/code>, kam seko projekcijas versija, projekcijas <code>.svc<\/code> serviss un t\u0101 ent\u012btiju kopa. Katra projekcija public\u0113 OData metadatus: &#8220;a machine-readable description of the data model of the APIs.&#8221; (ma\u0161\u012bnlas\u0101mu API datu mode\u013ca aprakstu). (<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/040_tailoring\/300_extensibility\/040_ifs_odata\/\">avots<\/a>)<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">API Explorer.<\/p>\n\n\n<p class=\"fx-pain__b\">IFS Cloud t\u012bmek\u013ca klient\u0101 ir uzskait\u012btas visas projekcijas ar API dokument\u0101ciju un j\u016bsu vides OpenAPI specifik\u0101ciju. Integr\u0101cijai izmantojiet Premium APIs un Entity Service APIs, nevis lietot\u0101ja saskarnes projekcijas, uz kur\u0101m balst\u0101s klienta lapas. Premium APIs ir vers\u0113tas: &#8220;The old version of the projection will still be retained along with the new version till the next release.&#8221; (L\u012bdz n\u0101kamajam laidienam l\u012bdz\u0101s jaunajai versijai tiks saglab\u0101ta ar\u012b vec\u0101 projekcijas versija.) (<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/040_tailoring\/300_extensibility\/020_api_explorer\/030_premium_apis\/\">avots<\/a>)<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">IFS Connect.<\/p>\n\n\n<p class=\"fx-pain__b\">Integr\u0101cijas starpnieks mar\u0161rut\u0113 zi\u0146ojumus uz HTTP\/REST, failu un cit\u0101m adres\u0113m. IFS nor\u0101da: &#8220;Modern integration use web services together with IFS Connect and\/or 3rd party integration tools.&#8221; (M\u016bsdien\u012bg\u0101 integr\u0101cij\u0101 izmanto t\u012bmek\u013ca servisus kop\u0101 ar IFS Connect un\/vai tre\u0161o pu\u0161u integr\u0101cijas r\u012bkiem.) (<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/030_administration\/030_integration\/\">avots<\/a>) IFS dokument\u0113 ar\u012b integr\u0101cijas iesp\u0113jas ar starpprogrammat\u016bru, piem\u0113ram, Boomi.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Faili.<\/p>\n\n\n<p class=\"fx-pain__b\">Lielapjoma iel\u0101dei var izmantot Data Migration Manager, File Migration un Excel Migration uzdevumus. Izm\u0113\u0123in\u0101juma laik\u0101 pietiek ar vienk\u0101r\u0161u Excel eksportu.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0100r\u0113j\u0101s integr\u0101cijas autentific\u0113jas ar IFS Identity and Access Manager (IAM), izmantojot OAuth 2.0 un OpenID Connect:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Re\u0123istr\u0113jiet SkyPlanner vajadz\u012bb\u0101m <strong>IAM Client<\/strong> un izmantojiet <strong>Client Credentials<\/strong> pl\u016bsmu. T\u0101 &#8220;allows for a non-interactive authentication of a service account&#8221; (\u013cauj autentific\u0113t servisa kontu bez lietot\u0101ja mijiedarb\u012bbas) un &#8220;yields an access token associated with a service user.&#8221; (izsniedz ar servisa lietot\u0101ju saist\u012btu piek\u013cuves pilnvaru).<\/li>\n\n\n<li>Pieprasiet pilnvaras ar <code>POST https:\/\/&lt;SYSTEM_URL&gt;\/auth\/realms\/&lt;NAMESPACE&gt;\/protocol\/openid-connect\/token<\/code>.<\/li>\n\n\n<li>Pie\u0161\u0137iriet servisa lietot\u0101jam ties\u012bbu kopas tikai t\u0101m projekcij\u0101m, kuras integr\u0101cija lasa un kur\u0101s t\u0101 raksta, un nek\u0101das papildu ties\u012bbas.<\/li>\n\n<\/ul>\n\n\n<p>(<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/030_administration\/010_security\/040_iam_settings\/035_iam_clients\/020_authenticate_external_integration\/300_client_credential_flow\/\">avots<\/a>)<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un API ir dokument\u0113ts Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-detection\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un izmai\u0146u noteik\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>IFS Cloud ir notikumu ietvars: &#8220;Events can be used to automate actions within IFS Cloud.&#8221; (Notikumus var izmantot darb\u012bbu automatiz\u0113\u0161anai IFS Cloud.) Piel\u0101gotie notikumi tiek aktiviz\u0113ti, kad ent\u012btija tiek izveidota, atjaunin\u0101ta vai dz\u0113sta, un to darb\u012bbas tiek izpild\u012btas ar IFS Connect starpniec\u012bbu. (<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/030_administration\/090_automation_optimization\/320_events\/\">avots<\/a>)<\/p>\n\n\n<p>Izejo\u0161os zi\u0146ojumus apstr\u0101d\u0101 <strong>REST Sender<\/strong>: &#8220;Outbound messages can be sent either synchronously or asynchronously,&#8221; (izejo\u0161os zi\u0146ojumus var s\u016bt\u012bt sinhroni vai asinhroni), un mar\u0161rut\u0113\u0161anu konfigur\u0113 IFS Connect. (<a href=\"https:\/\/docs.ifs.com\/techdocs\/26R1\/040_tailoring\/300_extensibility\/090_using_rest_sender\/\">avots<\/a>) Ar\u012b Workflow Manager var izsaukt REST galapunktus.<\/p>\n\n\n<p>Var izmantot divas pieejas:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Notikumu vad\u012bta pieeja.<\/strong> Piel\u0101gots notikums, kas rea\u0123\u0113 uz ra\u017eo\u0161anas pas\u016bt\u012bjumu un to oper\u0101ciju izmai\u0146\u0101m, aktiviz\u0113 REST Sender zi\u0146ojuma nos\u016bt\u012b\u0161anu uz SkyPlanner REST API.<\/li>\n\n\n<li><strong>Periodiska aptauja.<\/strong> SkyPlanner ik p\u0113c da\u017e\u0101m min\u016bt\u0113m nolasa atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no projekcij\u0101m, atlasot tikai main\u012btos ierakstus.<\/li>\n\n<\/ol>\n\n\n<p>S\u0101ciet ar periodisku aptauju un pievienojiet notikumus tiem objektiem, kuri main\u0101s visbie\u017e\u0101k. SkyPlanner nos\u016bta webhook pazi\u0146ojumus, kad main\u0101s st\u0101voklis vai grafiks, t\u0101p\u0113c datu ierakst\u012b\u0161ana atpaka\u013c ir notikumu vad\u012bta.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu sasaiste<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Projekciju nosaukumi da\u017e\u0101dos laidienos at\u0161\u0137iras. Prec\u012bzos nosaukumus \u0146emiet no savas vides API Explorer.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>IFS Cloud objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Inventory Part (ra\u017eotnes l\u012bmen\u012b)<\/td><td>Produkti un materi\u0101li<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Product Structure (galvene, alternat\u012bva, rindas)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katra produkta materi\u0101li<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Routing, Routing Operations: sagatavo\u0161anas, izpildes un p\u0101rvieto\u0161anas laiks, efektivit\u0101te<\/td><td>Procesa so\u013ci ar ilgumu, sagatavo\u0161anas un nosl\u0113guma darbu laiku<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Work Center, Work Center Resource: kalend\u0101rs, noslodze, efektivit\u0101te<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 reti<\/td><\/tr><tr><td>Labor Class darbinieki; oper\u0101cijai nepiecie\u0161amais darbinieku skaits<\/td><td>Darbinieki un vi\u0146u mai\u0146as; operatoru skaits katram ra\u017eo\u0161anas uzdevumam<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de; mai\u0146as uztur vien\u0101 sist\u0113m\u0101<\/td><\/tr><tr><td>Manufacturing Tool, instrumentu grupas<\/td><td>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><td>IFS \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Shop Order (Released, Reserved, Started) ar Shop Order Operations un materi\u0101liem: Need Date, Earliest Start Date, priorit\u0101te<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem un materi\u0101lu vajadz\u012bb\u0101m<\/td><td>IFS \u2192 SkyPlanner<\/td><td>Notikums vai aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Kr\u0101jumu vien\u012bbu pieejam\u012bba<\/td><td>Kr\u0101jumu atlikumi<\/td><td>IFS \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumu rindas ar pl\u0101noto sa\u0146em\u0161anas laiku<\/td><td>Iepirkuma pas\u016bt\u012bjumi ar paredzamo pieg\u0101des datumu; kr\u0101jumi tiek atjaunin\u0101ti, atz\u012bm\u0113jot statusu Delivered<\/td><td>IFS \u2192 SkyPlanner<\/td><td>Aptauja reizi stund\u0101 vai grafika apr\u0113\u0137ina laik\u0101<\/td><\/tr><tr><td>Shop Order Operation: s\u0101kums, beigas, darba centra resurss<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>SkyPlanner \u2192 IFS<\/td><td>Mainoties grafikam, ar SkyPlanner webhook pazi\u0146ojumu<\/td><\/tr><tr><td>Oper\u0101ciju izpildes uzskaite (iek\u0101rtas laiks, darbasp\u0113ka laiks, daudzums)<\/td><td>Laika uzskaites ieraksti un operatoru apstiprin\u0101jumi<\/td><td>SkyPlanner \u2192 IFS<\/td><td>P\u0113c katra apstiprin\u0101juma vai katras mai\u0146as, ja t\u0101 nolemts tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Konfigur\u0113 SkyPlanner sist\u0113m\u0101<\/td><td>Sagatavo\u0161anas laiku matrica, alternat\u012bv\u0101s iek\u0101rtas un person\u0101ls<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ieg\u016bstiet kr\u0101jumu vien\u012bbas, ra\u017eojamo produktu strukt\u016bras, tehnolo\u0123iskos procesus ar oper\u0101cij\u0101m, darba centrus un to resursus, darbasp\u0113ka kategorijas un instrumentus. P\u0101rdom\u0101ti nosakiet katra darba centra resursa atbilst\u012bbu SkyPlanner darba centram. Izlemiet, vai darba centrs ar trim resursiem k\u013c\u016bs par vienu darba centru grupu vai trim darba centriem.<\/p>\n\n\n<p><strong>2. Ra\u017eo\u0161anas pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet ra\u017eo\u0161anas pas\u016bt\u012bjumus ar statusu Released, Reserved un Started kop\u0101 ar to oper\u0101cij\u0101m un materi\u0101liem. Pas\u016bt\u012bjumus ar statusu Planned atst\u0101jiet MRP p\u0101rzi\u0146\u0101 \u2014 tie main\u0101s katr\u0101 pl\u0101no\u0161anas reiz\u0113. Pievienojiet kr\u0101jumu vien\u012bbu pieejam\u012bbu un atv\u0113rt\u0101s iepirkuma pas\u016bt\u012bjumu rindas, lai grafika apr\u0113\u0137in\u0101 tiktu p\u0101rbaud\u012bti gan kr\u0101jumi, gan gaid\u0101mie iepirkumi. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Katrai oper\u0101cijai, kuru pl\u0101no\u0161anas dzinis ir ievietojis grafik\u0101 vai p\u0101rc\u0113lis, SkyPlanner ieraksta pl\u0101noto s\u0101kumu, beigas un darba centra resursu atbilsto\u0161aj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101. Ierakst\u012b\u0161ana notiek ar j\u016bsu API Explorer nor\u0101d\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas projekciju, t\u0101p\u0113c IFS veic savu valid\u0101ciju. Daudzumi, statuss un izmaksas paliek IFS p\u0101rzi\u0146\u0101.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Katrai ra\u017eotnei izv\u0113lieties vienu kan\u0101lu. Operatori var turpin\u0101t re\u0123istr\u0113t izpildi <strong>Shop Floor Workbench<\/strong>, un SkyPlanner nolas\u012bs darba gaitu. Otra iesp\u0113ja \u2014 operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations un Production Timer, un laika uzskaites ieraksti tiek nos\u016bt\u012bti uz IFS ar oper\u0101ciju izpildes uzskaites projekciju, par kuru pan\u0101kta vieno\u0161an\u0101s tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas ekspluat\u0101cij\u0101:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Kr\u0101jumu vien\u012bbas, produktu strukt\u016bras, tehnolo\u0123iskie procesi, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjuma statuss<\/td><td>IFS Cloud<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, pras\u012bbas instrumentiem un operatoriem, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Oper\u0101ciju izpildes un sa\u0146em\u0161anas uzskaite<\/td><td>IFS Cloud \u2014 no Shop Floor Workbench vai SkyPlanner laika uzskaites ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu avots ir p\u0101rpl\u0101no\u0161ana IFS sist\u0113m\u0101. Ja pl\u0101not\u0101js p\u0101rpl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumu ar Infinite Scheduler, uzskatiet to par jaunu versiju, sinhroniz\u0113jiet v\u0113lreiz un \u013caujiet SkyPlanner p\u0101rpl\u0101not grafiku. Ar Autopilot SkyPlanner autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Ra\u017eotn\u0113s, kur izmanto ar\u012b MSO, j\u0101nosaka, par kuriem darba centriem atbild katra pl\u0101no\u0161anas sist\u0113ma.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiska projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat str\u0101d\u0101t ar saviem datiem: eksport\u0113jiet darba centrus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no IFS Cloud uz Excel un import\u0113jiet tos SkyPlanner.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Vienojieties par datu atbilst\u012bbas tabulu, atbild\u012bbas noteikumiem, sinhroniz\u0101cijas bie\u017eumu un izpildes uzskaites kan\u0101lu.<\/li>\n\n\n<li><strong>IAM un piek\u013cuves ties\u012bbas.<\/strong> Re\u0123istr\u0113jiet IAM klientu, izveidojiet servisa lietot\u0101ju un pie\u0161\u0137iriet projekciju ties\u012bbu kopas. Vispirms smil\u0161kastes vid\u0113, p\u0113c tam produkcijas vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Noliktavas nomenklat\u016bra, izstr\u0101d\u0101jumu strukt\u016bras, tehnolo\u0123iskie procesi, darba centri, darbasp\u0113ka kategorijas un instrumenti.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> S\u0101kum\u0101 izmantojiet periodisku datu piepras\u012b\u0161anu; kur izmai\u0146u ir daudz, pievienojiet piel\u0101gotus notikumus.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Oper\u0101ciju datumus un resursus ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana.<\/strong> Izmantojiet SkyPlanner paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam, sal\u012bdziniet datumus un labojiet pamatdatus.<\/li>\n\n\n<li><strong>Darba s\u0101k\u0161ana produkcijas vid\u0113.<\/strong> Iesl\u0113dziet atpaka\u013crakst\u012b\u0161anu, kad dati sakr\u012bt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-ifs-cloud-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot IFS Cloud integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Iek\u0101rtu laiks un darbasp\u0113ka laiks.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101m ir atsevi\u0161\u0137i nor\u0101d\u012bts iek\u0101rtu un darbasp\u0113ka sagatavo\u0161anas un izpildes laiks, k\u0101 ar\u012b brig\u0101des lielums. Nosakiet, kur\u0161 laiks nosaka ilgumu katr\u0101 darba centr\u0101, cit\u0101di ikviena oper\u0101cija b\u016bs iepl\u0101nota nepareizi.<\/li>\n\n\n<li><strong>Noslodzes un efektivit\u0101tes dubulta uzskaite.<\/strong> Darba centra noslodze, oper\u0101cijas efektivit\u0101te un resursa efektivit\u0101te IFS sist\u0113m\u0101 samazina pieejamo laiku. P\u0101rnesot \u0161os r\u0101d\u012bt\u0101jus uz SkyPlanner darba centra efektivit\u0101ti, \u0146emiet tos v\u0113r\u0101 tikai vienu reizi.<\/li>\n\n\n<li><strong>Novecoju\u0161i jaudas dati.<\/strong> Resursu jaudas dati ir pieejami tikai p\u0113c <strong>Calculate Work Center Resource Capacity<\/strong> izpildes. Pirms s\u0101kotn\u0113j\u0101s iel\u0101des p\u0101rbaudiet kalend\u0101rus un der\u012bguma periodus.<\/li>\n\n\n<li><strong>Preferred Resource nor\u0101da tikai v\u0113lamo resursu.<\/strong> Re\u0101li pieejam\u0101s alternat\u012bvas skaidri defin\u0113jiet k\u0101 alternat\u012bvus darba centrus SkyPlanner sist\u0113m\u0101.<\/li>\n\n\n<li><strong>Lietot\u0101ja saskarnes projekcijas main\u0101s.<\/strong> Izmantojiet Premium vai Entity Service API, kas saglab\u0101 iepriek\u0161\u0113jo versiju l\u012bdz n\u0101kamajam laidienam. Atk\u0101rtojiet test\u0113\u0161anu p\u0113c katra laidiena, kas izn\u0101k divreiz gad\u0101.<\/li>\n\n\n<li><strong>Shop Floor Workbench projekcijas ir paredz\u0113tas lietot\u0101ja saskarnes darbpl\u016bsm\u0101m.<\/strong> Shop Floor Workbench pal\u012bgam izveidot\u0101s projekcijas nav paredz\u0113tas tie\u0161ai transakciju integr\u0101cijai. Izv\u0113lieties izpildes uzskaites projekciju tv\u0113ruma noteik\u0161anas laik\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver datu sasaisti ar j\u016bsu tehnolo\u0123iskajiem procesiem, darba centriem un IFS konfigur\u0101ciju. J\u0101konfigur\u0113 ar\u012b ierobe\u017eojumi, kurus SkyPlanner iev\u0113ro, pl\u0101nojot ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai: sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvie resursi.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas produkcijas vid\u0113,<\/strong> aptverot SkyPlanner pusi un saska\u0146ot\u0101s IFS projekcijas. Katr\u0101 ra\u017eotn\u0113 IFS Cloud izmanto cit\u0101di, un tie\u0161i \u0161eit noder \u0161\u012bs zin\u0101\u0161anas.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu IFS partneris.<\/strong> Partneris p\u0101rzina j\u016bsu konfigur\u0101ciju un kop\u0101 ar komandu var iestat\u012bt IAM klientu, ties\u012bbu kopas un notikumus. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu izstr\u0101d\u0101t\u0101ji,<\/strong> izmantojot to pa\u0161u dokument\u0113to REST API un API pilnvaru. Lai s\u0101ktu, pietiek ar API pilnvaru, un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Publisk\u0101 dokument\u0101cija ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner integr\u0101cijas dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu visas izmaksas. Sal\u012bdzin\u0101jumu ar pa\u0161a IFS pl\u0101no\u0161anas iesp\u0113j\u0101m skatiet sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/\">IFS Cloud ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai<\/a>. P\u0101rskats pieejams <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/\">IFS Cloud lap\u0101<\/a>, bet citas ERP sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113tu tr\u012bs m\u0113ne\u0161u pl\u0101nu visiem darba centriem var izveidot maz\u0101k nek\u0101 30 min\u016bt\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir krasi samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru IFS Cloud API izmantot, lai integr\u0113tu ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">OData projekcijas ce\u013c\u0101 <code>\/ifsapplications\/projection\/<\/code>, v\u0113lams Premium vai Entity Service API, kas nor\u0101d\u012btas j\u016bsu API Explorer. T\u0101m ir katrai videi paredz\u0113tas OpenAPI specifik\u0101cijas, un iepriek\u0161\u0113j\u0101 versija tiek saglab\u0101ta l\u012bdz n\u0101kamajam laidienam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 IFS Cloud integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu IFS konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas produkcijas vid\u0113. Ar\u012b j\u016bsu IFS partneris vai izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to REST API. Lai s\u0101ktu, pietiek ar API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101du autentifik\u0101ciju izmanto integr\u0101cija?<\/summary>\n<p class=\"sp-faq__a\">IFS IAM klientu ar OAuth 2.0 Client Credentials pl\u016bsmu, kas piesaist\u012bts servisa lietot\u0101jam ar nepiecie\u0161amo projekciju ties\u012bbu kop\u0101m. SkyPlanner API izmanto API pilnvaru.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai IFS Cloud var nos\u016bt\u012bt ra\u017eo\u0161anas pas\u016bt\u012bjumu izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, izmantojot piel\u0101gotus notikumus ent\u012btiju izmai\u0146\u0101m un REST Sender; abus konfigur\u0113 IFS Connect. S\u0101ciet ar datu piepras\u012b\u0161anu ik p\u0113c da\u017e\u0101m min\u016bt\u0113m un pievienojiet notikumus tur, kur izmai\u0146u ir daudz. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai \u0161ai integr\u0101cijai ir vajadz\u012bgs MSO vai PSO?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un darba centrus tie\u0161i no IFS projekcij\u0101m un pats izveido grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Nav vajadz\u012bga MSO piek\u013cuve, PSO Cloud Service vai IFS.ai Activation Pass, k\u0101 ar\u012b nav j\u0101pl\u0101no tokenu pat\u0113ri\u0146\u0161. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izstr\u0101des?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem, import\u0113jot datus no IFS Cloud Excel vai CSV form\u0101t\u0101. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ IFS Cloud IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 IFS Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot IFS Cloud ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar IFS Cloud, izmantojot pa\u0161a IFS API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju &#8230; <a title=\"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/\" aria-label=\"Read more about IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102881,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103594","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>IFS Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem<\/title>\n<meta name=\"description\" content=\"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/integracijas-celvedis\\\/\",\"name\":\"IFS Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"IFS Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","description":"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/","name":"IFS Cloud APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafikiem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"IFS Cloud un SkyPlanner APS: OData projekcijas, API Explorer, IAM klienta akredit\u0101cijas dati, notikumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu datu sasaiste, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/"},{"@type":"ListItem","position":5,"name":"IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ IFS Cloud IFS Cloud integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 IFS Cloud integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot IFS Cloud ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar IFS Cloud, izmantojot pa\u0161a IFS API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103594"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103594\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102881"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}