{"id":103564,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/","title":{"rendered":"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? <span class=\"hl\">Shop Order Scheduling, MSO un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">IFS Cloud pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaudas vajadz\u012bbas (CRP), pie\u0146emot, ka jauda ir neierobe\u017eota. Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai ir pieejama k\u0101 atsevi\u0161\u0137a funkcionalit\u0101te: Manufacturing Scheduling and Optimization (MSO), kas izmanto IFS PSO dzini, vai agr\u0101kais Advanced Planning Board (APB). Ra\u017eotnes, kas v\u0113las <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101not ra\u017eo\u0161anu, iev\u0113rojot visus ierobe\u017eojumus<\/a>, bet nepievienot MSO, l\u012bdz\u0101s IFS Cloud izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-ifs-cloud-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 IFS Cloud pl\u0101no jaudu: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darba centri un resursi<\/h3>\n\n\n<p>Jaudu nosaka <strong>Work Center<\/strong> un t\u0101 <strong>Work Center Resources<\/strong> \u2014 iek\u0101rtas vai fiziskas atra\u0161an\u0101s vietas. Katram darba centram ir <strong>Calendar<\/strong>, <strong>Utilization<\/strong>, <strong>Efficiency<\/strong> un <strong>Validity Periods<\/strong>. Lauk\u0101 <strong>Scheduling Capacity<\/strong> iestata v\u0113rt\u012bbu Finite vai Infinite.<\/p>\n\n\n<p>Jaudu apr\u0113\u0137ina dialoglodzi\u0146\u0101 <strong>Calculate Work Center Resource Capacity<\/strong>. Darbiniekus model\u0113 k\u0101 <strong>Labor Classes<\/strong>, kur\u0101m piesaist\u012btas personas. Instrumentus model\u0113 k\u0101 <strong>Manufacturing Tools<\/strong> ar konkr\u0113tiem instrumentu eksempl\u0101riem un instrumentu grup\u0101m. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Izstr\u0101d\u0101jumu strukt\u016bras un tehnolo\u0123iskie procesi<\/h3>\n\n\n<p>Materi\u0101lu specifik\u0101ciju att\u0113lo <strong>Product Structure<\/strong>, kur\u0101 ir strukt\u016bras galvene, alternat\u012bvie varianti un rindas. <strong>Routing<\/strong> ietver tehnolo\u0123isk\u0101 procesa alternat\u012bvos variantus un <strong>Routing Operations<\/strong>. IFS nor\u0101da: &#8220;All time information entered for operations (such as setup time, move time, and efficiency) affects operation scheduling.&#8221; (Visa oper\u0101cij\u0101m ievad\u012bt\u0101 laika inform\u0101cija, piem\u0113ram, p\u0101rregul\u0113\u0161anas laiks, p\u0101rvieto\u0161anas laiks un efektivit\u0101te, ietekm\u0113 oper\u0101ciju pl\u0101no\u0161anu.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutRoutings.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MRP, CRP un ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/h3>\n\n\n<p>MRP un ra\u017eo\u0161anas pamatpl\u0101no\u0161ana izveido pl\u0101notus <strong>Shop Orders<\/strong>. Ra\u017eo\u0161anas pas\u016bt\u012bjums iziet cauri t\u0101diem statusiem k\u0101 Planned, Released, Reserved, Started un Closed. Katr\u0101 <strong>Shop Order Operation<\/strong> ir nor\u0101d\u012bts iek\u0101rtas p\u0101rregul\u0113\u0161anas un darb\u012bbas laiks, darbinieku sagatavo\u0161anas un izpildes darba laiks, brig\u0101des lielums, <strong>Preferred Resource<\/strong>, oper\u0101ciju p\u0101rkl\u0101\u0161an\u0101s un oper\u0101ciju bloki.<\/p>\n\n\n<p>CRP par\u0101da \u0161o pas\u016bt\u012bjumu rad\u012bto darba centru noslodzi, ta\u010du to neierobe\u017eo. IFS to pasaka skaidri: &#8220;Operations scheduled with CRP and shop order are always scheduled infinite.&#8221; (Ar CRP un ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anu oper\u0101cijas vienm\u0113r pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas pas\u016bt\u012bjumu Infinite Scheduler<\/h3>\n\n\n<p>Infinite Scheduler nosaka katras oper\u0101cijas datumus. Tas izmanto darba centra kalend\u0101ru un noslodzes koeficientu, oper\u0101cijas un resursa efektivit\u0101ti, gaid\u012b\u0161anas un transport\u0113\u0161anas laiku, p\u0101rkl\u0101\u0161anos, paral\u0113l\u0101s oper\u0101cijas un Preferred Resource. Tas pl\u0101no uz priek\u0161u vai atpaka\u013c un izv\u0113las &#8220;the least loaded resource for the work center.&#8221; (darba centra vismaz\u0101k noslogoto resursu).<\/p>\n\n\n<p>Tas &#8220;always treats each shop order as if it is the only one in the system, with few constraints on resources and capacity.&#8221; (katru ra\u017eo\u0161anas pas\u016bt\u012bjumu vienm\u0113r uzskata par vien\u012bgo sist\u0113m\u0101 un piem\u0113ro tikai nedaudzus resursu un jaudas ierobe\u017eojumus). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSOInfiniteScheduling.htm\">avots<\/a>) Divi ra\u017eo\u0161anas pas\u016bt\u012bjumi var tikt iepl\u0101noti vienai un tai pa\u0161ai iek\u0101rtai vien\u0101 un taj\u0101 pa\u0161\u0101 stund\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Pirmais variants pl\u0101no\u0161anai atbilsto\u0161i jaudai: MSO un Smart Manufacturing Planning Board<\/h3>\n\n\n<p>MSO &#8220;is a solution designed to generate finite production schedules by optimizing the use of manufacturing resource constraints.&#8221; (ir risin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai atbilsto\u0161i faktiskajai jaudai, optimiz\u0113jot ra\u017eo\u0161anas resursu izmanto\u0161anu to ierobe\u017eojumu ietvaros). Tas &#8220;leverages the IFS PSO (Planning, Scheduling, and Optimization) engine.&#8221; (izmanto IFS PSO pl\u0101no\u0161anas, grafiku sast\u0101d\u012b\u0161anas un optimiz\u0101cijas dzini). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">avots<\/a>) Darba centrus, darbinieku kategorijas un instrumentus tas uzskata par pl\u0101no\u0161anas ierobe\u017eojumiem, un oper\u0101ciju iepl\u0101no tikai tad, kad ir pieejams vajadz\u012bgais materi\u0101lu daudzums. Tas \u0146em v\u0113r\u0101 ar\u012b konkr\u0113t\u0101s deta\u013cas p\u0101rregul\u0113\u0161anas laikus, ra\u017eo\u0161anas pas\u016bt\u012bjumu priorit\u0101tes, resursu kalend\u0101rus un apkopes darbus. Re\u017e\u012bm\u0101 Automatic tas p\u0101rpl\u0101no ra\u017eo\u0161anu, kad vien tas nepiecie\u0161ams, piem\u0113ram, izveidojot jaunu ra\u017eo\u0161anas pas\u016bt\u012bjumu.<\/p>\n\n\n<p>\u012asum\u0101 par konfigur\u0113\u0161anu:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Iestat\u012bjums<\/th><th>Ko tas dara<\/th><\/tr><\/thead><tbody><tr><td>Finite Scheduling Basic Data<\/td><td>Iesp\u0113jo funkcionalit\u0101ti ra\u017eotn\u0113; &#8220;the dataset must be activated&#8221; (datu kopai j\u0101b\u016bt aktiviz\u0113tai)<\/td><\/tr><tr><td>Re\u017e\u012bms<\/td><td>Pl\u0101no\u0161ana re\u017e\u012bm\u0101 Manual vai Automatic<\/td><\/tr><tr><td>Time Horizon (Days), Scheduling Start Time<\/td><td>Laika periods, kuram MSO sast\u0101da grafiku<\/td><\/tr><tr><td>Use Setup Matrices for Scheduling<\/td><td>Konkr\u0113t\u0101m deta\u013c\u0101m atbilsto\u0161i p\u0101rregul\u0113\u0161anas laiki<\/td><\/tr><tr><td>Exempt Labor, Exempt Tools, Exempt Shop Order Types<\/td><td>Ierobe\u017eojumi, kurus MSO ignor\u0113<\/td><\/tr><tr><td>MSO Advanced Parameters<\/td><td>Standarta veidne ar p\u0101rbaud\u012bt\u0101m noklus\u0113juma v\u0113rt\u012bb\u0101m; izmai\u0146as \u2014 &#8220;For modification by PSO\/MSO SMEs only&#8221; (dr\u012bkst main\u012bt tikai attiec\u012bgo jomu eksperti)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 <strong>Need Date<\/strong> nosaka termi\u0146u, pret kuru v\u0113rt\u0113 kav\u0113jumu, <strong>Earliest Start Date<\/strong> ir &#8220;a hard time constraint&#8221; (stingrs laika ierobe\u017eojums), bet <strong>Priority Category<\/strong> ietekm\u0113 MSO priorit\u0101tes v\u0113rt\u0113jumu. Pl\u0101not\u0101ji str\u0101d\u0101 <strong>Smart Manufacturing Planning Board<\/strong>, kur pieejamas Resources un Operations Gantt lapas, vilk\u0161ana un nome\u0161ana, oper\u0101ciju sadal\u012b\u0161ana un atlas\u012btu oper\u0101ciju optimiz\u0101cija. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSmartManufacturingPlanningBoard.htm\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Otrais variants pl\u0101no\u0161anai atbilsto\u0161i jaudai: Advanced Planning Board<\/h3>\n\n\n<p>APB, kas paz\u012bstams no IFS Applications 10, izmanto Constraint Based Scheduling (CBS). Tas &#8220;allows you to perform finite scheduling of shop orders on sites that have enabled the use of the APB in scheduling basic data.&#8221; (\u013cauj pl\u0101not ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i faktiskajai jaudai taj\u0101s ra\u017eotn\u0113s, kur\u0101s pl\u0101no\u0161anas pamatdatos ir iesp\u0113jota APB izmanto\u0161ana). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutCBSSchedulingTheory.htm\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0113c noklus\u0113juma jauda ir neierobe\u017eota.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161ana un CRP nekad nep\u0101rbauda, vai jaudas pietiek visiem pas\u016bt\u012bjumiem kop\u0101. Lai pl\u0101notu atbilsto\u0161i faktiskajai jaudai, atsevi\u0161\u0137i j\u0101konfigur\u0113 MSO vai APB (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">par darba centru<\/a>).<\/li>\n\n\n<li><strong>MSO vajadz\u012bga atsevi\u0161\u0137a piek\u013cuve.<\/strong> Tas &#8220;is available for customers with access to Manufacturing Scheduling and Optimization.&#8221; (ir pieejams klientiem, kuriem ir piek\u013cuve Manufacturing Scheduling and Optimization). Hibr\u012bd\u0101 vai mitin\u0101t\u0101 vid\u0113 ra\u017eotn\u0113m nepiecie\u0161ams IFS.ai Activation Pass. M\u0101ko\u0146vid\u0113 ra\u017eotn\u0113m nepiecie\u0161ams &#8220;PSO sizing and purchase of PSO Cloud Service&#8221; (noteikt PSO nepiecie\u0161amo jaudu un ieg\u0101d\u0101ties PSO Cloud Service) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">26R2 MSO<\/a>).<\/li>\n\n\n<li><strong>IFS.ai platformas pakalpojumos MSO darb\u012bbas palai\u017e manu\u0101li, un to pat\u0113ri\u0146\u0161 tiek uzskait\u012bts.<\/strong> &#8220;Automatic scheduling mode is not available for users on the IFS.ai-based platform services.&#8221; (IFS.ai platformas pakalpojumu lietot\u0101jiem autom\u0101tisk\u0101s pl\u0101no\u0161anas re\u017e\u012bms nav pieejams.) Lietot\u0101jiem &#8220;must have a number of dedicated tokens on hand to do a finite schedule or to do a simulation in MSO&#8221; (j\u0101b\u016bt pieejamam noteiktam skaitam \u012bpa\u0161u \u017eetonu, lai MSO sast\u0101d\u012btu grafiku atbilsto\u0161i faktiskajai jaudai vai veiktu simul\u0101ciju) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">26R1 MSO<\/a>). Re\u017e\u012bms Automatic nav pieejams hibr\u012bd\u0101 vai mitin\u0101t\u0101 vid\u0113, kur izmanto IFS.ai Activation Pass (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">26R2 MSO<\/a>).<\/li>\n\n\n<li><strong>Papildu parametri paredz\u0113ti speci\u0101listiem.<\/strong> IFS nodro\u0161ina standarta veidni un stingri iesaka saglab\u0101t t\u0101s noklus\u0113juma v\u0113rt\u012bbas. Izmai\u0146as dr\u012bkst veikt tikai PSO un MSO jomas eksperti.<\/li>\n\n\n<li><strong>Dokument\u0113tie MSO ierobe\u017eojumi.<\/strong> &#8220;MSO schedules the first operation on a work center using a setup matrix without a setup time.&#8221; (Darba centr\u0101, kur\u0101 izmanto p\u0101rregul\u0113\u0161anas matricu, MSO pirmo oper\u0101ciju iepl\u0101no bez p\u0101rregul\u0113\u0161anas laika.) &#8220;Parallel shop order operations are not considered for optimization in a compressed manner.&#8221; (Paral\u0113l\u0101s ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cijas netiek optimiz\u0113tas, saspie\u017eot to izpildes grafiku.) Ja iesl\u0113gts Exempt Labor, &#8220;operations that have only labor time and no machine time will remain untouched.&#8221; (oper\u0101cijas, kur\u0101m ir tikai darbinieku darba laiks un nav iek\u0101rtas laika, paliek nemain\u012btas).<\/li>\n\n\n<li><strong>\u012ass pl\u0101no\u0161anas periods.<\/strong> IFS paredz MSO detaliz\u0113tu \u012bstermi\u0146a grafiku sast\u0101d\u012b\u0161anai, bet ilg\u0101kiem periodiem nor\u0101da uz CRP, MRP un ra\u017eo\u0161anas pamatpl\u0101no\u0161anu.<\/li>\n\n\n<li><strong>APB pl\u0101no tikai iel\u0101d\u0113tos datus.<\/strong> Tas &#8220;only considers the constraints placed by shop orders and resources that are actually loaded to the APB at a given time.&#8221; (\u0146em v\u0113r\u0101 tikai to ra\u017eo\u0161anas pas\u016bt\u012bjumu un resursu ierobe\u017eojumus, kuri attiec\u012bgaj\u0101 br\u012bd\u012b ir iel\u0101d\u0113ti APB).<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 ra\u017eotnes, kas izmanto standarta pl\u0101no\u0161anu, sadz\u012bvo ar oper\u0101ciju p\u0101rkl\u0101\u0161anos, manu\u0101li maina to sec\u012bbu un uztur paral\u0113lu Excel pl\u0101nu, kas eksport\u0113ts no IFS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-ifs-cloud-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar IFS Cloud ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anu un CRP pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eotn\u0113 ir br\u012bva jauda, un re\u0101li jaudas ierobe\u017eojumi rodas reti.<\/li>\n\n\n<li>Tehnolo\u0123iskie procesi ir \u012bsi un stabili, un j\u016bs pl\u0101nojat pa ned\u0113\u013c\u0101m.<\/li>\n\n\n<li>Meistars nosaka darbu sec\u012bbu pie iek\u0101rtas.<\/li>\n\n\n<li>Koplietojamie instrumenti, brig\u0101des un materi\u0101lu pien\u0101k\u0161ana nenosaka darbu sec\u012bbu.<\/li>\n\n<\/ul>\n\n\n<p>MSO ir piem\u0113rots ra\u017eotnei, kas ieg\u0101d\u0101jas MSO piek\u013cuvi un t\u0101 izvietojumu PSO vai IFS.ai vid\u0113 un sast\u0101da \u012bstermi\u0146a grafikus IFS sist\u0113m\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bga ra\u017eo\u0161anas pl\u0101no\u0161anas sist\u0113ma, kas iev\u0113ro faktisko jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar standarta pl\u0101no\u0161anu vairs nepietiek, ja uz j\u016bsu ra\u017eotni attiecas vair\u0101ki no \u0161iem punktiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Sol\u012btie termi\u0146i kav\u0113jas, lai gan CRP neuzr\u0101d\u012bja probl\u0113mas.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no t\u0101, k\u0101ds izstr\u0101d\u0101jums ra\u017eots iepriek\u0161.<\/li>\n\n\n<li>Darbinieku pieejam\u012bba, mai\u0146as un promb\u016btne ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>Veidnes, \u0161tances vai pal\u012bgier\u012bces tiek koplietotas starp iek\u0101rt\u0101m.<\/li>\n\n\n<li>Materi\u0101lu pieejam\u012bba nosaka, kuru ra\u017eo\u0161anas pas\u016bt\u012bjumu var s\u0101kt.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not ra\u017eo\u0161anu vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vienlaikus tiek iev\u0113rota visu resursu faktisk\u0101 jauda<\/strong>, nevis tikai to resursu jauda, kas iel\u0101d\u0113ti pl\u0101no\u0161anas panel\u012b.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: p\u0101rejai starp izstr\u0101d\u0101jumiem laiki ir atkar\u012bgi no sec\u012bbas un nav simetriski; tos izmanto, lai l\u012bdz minimumam samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong>, lai viena veidne nekad netiktu iepl\u0101nota div\u0101m iek\u0101rt\u0101m vienlaikus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem<\/strong>: uzdevumam, kam vajadz\u012bgi vair\u0101ki darbinieki, tie tiek nodro\u0161in\u0101ti, \u0146emot v\u0113r\u0101 katra mai\u0146u.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161ana, kas \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu<\/strong>, p\u0101rbaudot kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem, bez \u017eetonu bud\u017eeta katrai palai\u0161anas reizei.<\/li>\n\n\n<li><strong>Korekta datu ierakst\u012b\u0161ana atpaka\u013c IFS<\/strong>, izmantojot pa\u0161a IFS OData projekcijas, ar skaidri noteiktu atbild\u012bbu par oper\u0101ciju datumiem.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IFS Cloud standarta grafiku sast\u0101d\u012b\u0161ana<\/strong> nosaka ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus IFS sist\u0113m\u0101, ne\u0146emot v\u0113r\u0101 jaudas ierobe\u017eojumus.<\/li>\n\n\n<li><strong>IFS MSO<\/strong> pl\u0101no iek\u0101rtas, darbasp\u0113ku, instrumentus un materi\u0101lus, iev\u0113rojot to pieejam\u012bbas ierobe\u017eojumus. Tas ir modulis ar atsevi\u0161\u0137u piek\u013cuvi, kas darbojas ar PSO dzin\u0113ju.<\/li>\n\n\n<li><strong>Pla\u0161us APS risin\u0101jumu komplektus uz\u0146\u0113mumiem<\/strong> piesl\u0113dz ievie\u0161anas projekt\u0101, un ar tiem str\u0101d\u0101 pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner \u2014 darbojas l\u012bdz\u0101s IFS Cloud, autom\u0101tiski sast\u0101da grafiku katram resursam un nodod to operatoru r\u012bc\u012bb\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur noder SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 \u0161os tr\u016bkumus. Katra darba centra jauda ir ierobe\u017eota, un visi ra\u017eo\u0161anas pas\u016bt\u012bjumi konkur\u0113 par vienu un to pa\u0161u jaudu. Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 izveido grafiku oper\u0101ciju l\u012bmen\u012b un sak\u0101rto t\u0101s atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m un izpildes termi\u0146iem.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja iek\u0101rta vai darbinieks nav pieejams, dzin\u0113js p\u0101rdala darbu j\u016bsu noteiktajiem alternat\u012bvajiem resursiem.<\/p>\n\n\n<p>Sast\u0101dot grafiku p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, \u0146emot v\u0113r\u0101 eso\u0161os kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. T\u0101d\u0113j\u0101di darbs tiek iepl\u0101nots tikai tad, kad materi\u0101li ir pieejami. Running Time Lock ne\u013cauj p\u0101rvietot grafik\u0101 jau s\u0101ktos ra\u017eo\u0161anas uzdevumus.<\/p>\n\n\n<p>Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu fiks\u0113tos uzdevumus un priorit\u0101tes. Pl\u0101not\u0101ji kori\u0123\u0113 ra\u017eo\u0161anas uzdevumus interakt\u012bv\u0101 Gantt laika skal\u0101, savuk\u0101rt operatori re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis IFS MSO, ja<\/strong> atsak\u0101ties no izkl\u0101jlap\u0101m un v\u0113laties grafiku, kas pats atjaunojas un iev\u0113ro re\u0101los jaudas ierobe\u017eojumus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eo\u0161anas pas\u016bt\u012bjumi p\u0101rkl\u0101jas uz koplietojam\u0101m iek\u0101rt\u0101m, un CRP par\u0101da p\u0101rslodzi tikai p\u0113c tam.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana, koplietojami instrumenti vai uzdevumi, kuriem vajadz\u012bgi vair\u0101ki operatori, nosaka, ko var izpild\u012bt n\u0101kamo.<\/li>\n\n\n<li>Pl\u0101ns j\u0101atjauno p\u0113c katras izmai\u0146as. Autopilot to dara autom\u0101tiski \u2014 bez \u017eetonu bud\u017eeta katrai p\u0101rpl\u0101no\u0161anas reizei un bez ierobe\u017eojuma str\u0101d\u0101t tikai manu\u0101laj\u0101 re\u017e\u012bm\u0101.<\/li>\n\n\n<li>P\u0101rdo\u0161anas komandai vajadz\u012bgi jaudai atbilsto\u0161i izpildes datumi vair\u0101kus m\u0113ne\u0161us uz priek\u0161u, nevis tikai \u012bstermi\u0146a pl\u0101ns, uz ko koncentr\u0113jas MSO.<\/li>\n\n\n<li>V\u0113laties, lai viens dzin\u0113js iev\u0113rotu visus ierobe\u017eojumus par publiski nor\u0101d\u012btu cenu \u2014 bez papildu MSO piek\u013cuves, PSO Cloud Service vai IFS.ai Activation Pass un bez parametriem, kas pieejami tikai PSO speci\u0101listiem.<\/li>\n\n<\/ul>\n\n\n<p>Jau izm\u0113\u0123in\u0101juma laik\u0101 redz\u0113siet savu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, kur\u0101 iev\u0113roti jaudas ierobe\u017eojumi, un da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma s\u0101ksiet darbu ar sist\u0113mu.<\/p>\n\n\n<p>S\u0101ciet ar savu ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu Excel form\u0101t\u0101 <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, kred\u012btkarte nav vajadz\u012bga). Cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar IFS Cloud, izmantojot IFS OData projekcijas. SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darba s\u0101k\u0161anas. Skatiet lapu <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/\">SkyPlanner risin\u0101jums IFS Cloud lietot\u0101jiem<\/a>, <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/\">IFS Cloud integr\u0101cijas ce\u013cvedi<\/a> vai citas sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jauna darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alaherm\u0113 eso\u0161aj\u0101 ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, pieaugums no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai divu darbu vad\u012bt\u0101ju viet\u0101 pietiek ar vienu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner sniedz mums p\u0101rskat\u0101mu inform\u0101ciju par jaudu un padara pl\u0101no\u0161anu prognoz\u0113jamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% visu SkyPlanner lieto\u0161anas laiku \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp IFS MSO un PSO?<\/summary>\n<p class=\"sp-faq__a\">PSO (Planning and Scheduling Optimization) ir IFS grafiku sast\u0101d\u012b\u0161anas dzin\u0113js, ko p\u0101rdod ar\u012b izbraukuma servisa darbu pl\u0101no\u0161anai. MSO (Manufacturing Scheduling and Optimization) ir ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas risin\u0101jums, kas darbojas ar PSO dzin\u0113ju. 26R2 dokument\u0101cij\u0101 t\u0101 nosaukums ir IFS.ai Manufacturing Scheduling and Optimization.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MSO ir iek\u013cauts IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">IFS dokument\u0101cij\u0101 nor\u0101d\u012bts, ka MSO ir pieejams klientiem, kuriem pie\u0161\u0137irta piek\u013cuve tam. Ievie\u0161anai hibr\u012bdvid\u0113 vai mitin\u0101t\u0101 vid\u0113 nepiecie\u0161ams IFS.ai Activation Pass, savuk\u0101rt m\u0101ko\u0146vid\u0113 j\u0101nosaka vajadz\u012bg\u0101 PSO jauda un j\u0101ieg\u0101d\u0101jas PSO Cloud Service. IFS.ai platformas pakalpojumos MSO darbojas manu\u0101laj\u0101 re\u017e\u012bm\u0101 un pat\u0113r\u0113 \u017eetonus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai IFS Cloud var pl\u0101not darbasp\u0113ku un instrumentus, iev\u0113rojot to pieejam\u012bbas ierobe\u017eojumus?<\/summary>\n<p class=\"sp-faq__a\">MSO modul\u012b \u2014 j\u0101: tas \u0146em v\u0113r\u0101 darba centru, darbasp\u0113ka kategoriju un instrumentu ierobe\u017eojumus, ja vien nav iesl\u0113gts Exempt Labor vai Exempt Tools. Standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161ana neierobe\u017eo darbasp\u0113ka kategoriju vai instrumentu izmanto\u0161anu starp pas\u016bt\u012bjumiem. SkyPlanner katr\u0101 grafika apr\u0113\u0137in\u0101 \u0146em v\u0113r\u0101 darbinieku, mai\u0146u un koplietojamo instrumentu pieejam\u012bbu, k\u0101 ar\u012b darbinieku promb\u016btni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai IFS Cloud \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgus p\u0101rregul\u0113\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">MSO to sp\u0113j, izmantojot p\u0101rregul\u0113\u0161anas laiku matricas, ta\u010du pirmo oper\u0101ciju darba centr\u0101 tas iepl\u0101no bez p\u0101rregul\u0113\u0161anas laika. Standarta grafiku sast\u0101d\u012b\u0161ana izmanto tehnolo\u0123isk\u0101 procesa oper\u0101cij\u0101 nor\u0101d\u012bto p\u0101rregul\u0113\u0161anas laiku. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas laiki p\u0101rejai starp produktu p\u0101riem, piem\u0113ram, no zila uz sarkanu \u2014 30 min\u016btes, bet no sarkana uz zilu \u2014 60.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un darba centrus no IFS Cloud uz Excel, import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ IFS Cloud Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS IFS Cloud pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaudas vajadz\u012bbas (CRP), pie\u0146emot, ka jauda ir neierobe\u017eota. Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai ir pieejama k\u0101 atsevi\u0161\u0137a funkcionalit\u0101te: Manufacturing Scheduling and Optimization (MSO), kas &#8230; <a title=\"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/\" aria-label=\"Read more about Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102881,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103564","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai IFS Cloud pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/title>\n<meta name=\"description\" content=\"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/razosanas-planosana\\\/\",\"name\":\"Vai IFS Cloud pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i faktiskajai jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai IFS Cloud pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i faktiskajai jaudai?","description":"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS","og_description":"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/","name":"Vai IFS Cloud pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i faktiskajai jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"IFS Cloud pl\u0101no pas\u016bt\u012bjumus un CRP bez jaudas ierobe\u017eojumiem. Faktisko jaudu iev\u0113ro MSO ar PSO vai APB. To iesp\u0113jas un robe\u017eas; kad vajag APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/"},{"@type":"ListItem","position":5,"name":"Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ IFS Cloud Vai IFS Cloud atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai? Shop Order Scheduling, MSO un SkyPlanner APS IFS Cloud pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus un jaudas vajadz\u012bbas (CRP), pie\u0146emot, ka jauda ir neierobe\u017eota. Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai ir pieejama k\u0101 atsevi\u0161\u0137a funkcionalit\u0101te: Manufacturing Scheduling and Optimization (MSO), kas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103564","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103564"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103564\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102881"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}