{"id":103534,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/fulcrum\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/","title":{"rendered":"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Fulcrum<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Fulcrum integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 Fulcrum integr\u0101cijas ce\u013cved\u012b konsultanti un IT komandas uzzin\u0101s, k\u0101 savienot Fulcrum (Fulcrum Pro) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Fulcrum, izmantojot Fulcrum Public API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas uzdevumus ar izgatavojamaj\u0101m prec\u0113m un oper\u0101cij\u0101m, pre\u010du tehnolo\u0123iskos procesus, darba centrus, iek\u0101rtas, noda\u013cu mai\u0146as, d\u012bkst\u0101ves, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Katras ra\u017eo\u0161anas uzdevuma oper\u0101cijas piel\u0101gotajos laukos tiek ierakst\u012bts pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas un darba centrs.<\/li>\n\n\n<li>Operatoru darba laiks un sara\u017eotais daudzums tiek nos\u016bt\u012bts atpaka\u013c uz Fulcrum k\u0101 taimeru ieraksti un daudzumu atjaunin\u0101jumi.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Fulcrum konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts konsultantiem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties vai pa\u0161i veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-fulcrum-public-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Fulcrum Public API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fulcrum ir vienots m\u0101ko\u0146produkts ar vair\u0101ku nomnieku arhitekt\u016bru, t\u0101p\u0113c visi klienti izmanto vienu un to pa\u0161u API. Izstr\u0101d\u0101t\u0101ju port\u0101l\u0101 tas raksturots k\u0101 publisks API, kas paredz\u0113ts &#8220;REST API calls directly into your Fulcrum site.&#8221; (REST API izsaukumiem tie\u0161i j\u016bsu Fulcrum vid\u0113).<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Specifik\u0101cija.<\/strong> OpenAPI &#8220;Fulcrum PublicAPI&#8221; v1 ir lejupiel\u0101d\u0113jama adres\u0113 <code>https:\/\/api.fulcrumpro.com\/swagger\/v1\/swagger.json<\/code>. Fulcrum iesaka no t\u0101s \u0123ener\u0113t tipiz\u0113tu klientu. Lap\u0101 History ir uzskait\u012btas visas izmai\u0146as ar datumiem.<\/li>\n\n\n<li><strong>Serveri.<\/strong> Standarta vid\u0113m izmanto <code>https:\/\/api.fulcrumpro.com<\/code>. ITAR vid\u0113m izmanto <code>api.fulcrumpro.us<\/code>; ar ITAR mar\u0137ieri .com serveris atgrie\u017e atbildi 401.<\/li>\n\n\n<li><strong>Piepras\u012bjumu strukt\u016bra.<\/strong> Sarakstus ieg\u016bst ar <code>POST ...\/list<\/code>, nor\u0101dot filtru piepras\u012bjuma pamatda\u013c\u0101, lapo\u0161anu ar <code>Skip<\/code> un <code>Take<\/code>, k\u0101 ar\u012b k\u0101rto\u0161anu ar <code>Sort.Field<\/code> \/ <code>Sort.Dir<\/code>. Daudzi objekti atbalsta PUT, bet ra\u017eo\u0161anas uzdevumi atbalsta ar\u012b JSON Patch.<\/li>\n\n<\/ul>\n\n\n<p>Galapunkti, ko izmanto integr\u0101cij\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Joma<\/th><th>Galapunkti<\/th><\/tr><\/thead><tbody><tr><td>Preces un tehnolo\u0123iskie procesi<\/td><td><code>\/api\/items<\/code>, <code>\/api\/items\/{itemId}\/routing<\/code>, <code>\/routing\/operations<\/code>, <code>\/routing\/input-items<\/code>, <code>\/routing\/input-materials<\/code><\/td><\/tr><tr><td>Ra\u017eo\u0161anas ceha konfigur\u0101cija<\/td><td><code>\/api\/work-centers<\/code>, <code>\/api\/equipment<\/code>, <code>\/api\/operations<\/code>, <code>\/api\/department-shifts<\/code>, <code>\/api\/equipment-downtimes<\/code><\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevumi<\/td><td><code>\/api\/jobs<\/code>, <code>\/api\/jobs\/{jobId}\/items-to-make\/{itemToMakeId}\/operations<\/code>, <code>\/api\/work-orders<\/code><\/td><\/tr><tr><td>Materi\u0101li<\/td><td><code>\/api\/inventory<\/code>, <code>\/api\/materials<\/code>, <code>\/api\/purchase-orders<\/code>, <code>\/api\/reporting\/material-requirements\/list<\/code><\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td><code>\/api\/job-tracking-timers\/start<\/code> un <code>\/stop<\/code>, <code>\/api\/timers<\/code>, <code>...\/operations\/{operationId}\/add-quantity-completed<\/code>, <code>...\/complete<\/code><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Fulcrum integr\u0101ciju lap\u0101 nepiecie\u0161amais darbs raksturots nep\u0101rprotami: &#8220;Every system is a little bit different and requires some configuration.&#8221; (Katra sist\u0113ma ir nedaudz at\u0161\u0137ir\u012bga, un tai nepiecie\u0161ama zin\u0101ma konfigur\u0113\u0161ana.) Tie\u0161i \u0161o konfigur\u0113\u0161anu ievie\u0161anas laik\u0101 uz\u0146emas SkyPlanner komanda.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fulcrum izmanto Bearer mar\u0137ieri <code>Authorization<\/code> galven\u0113. &#8220;A public API token can be generated within your fulcrum site via Business Setup -&gt; System Data -&gt; Public Api.&#8221; (Publisk\u0101 API mar\u0137ieri var \u0123ener\u0113t sav\u0101 Fulcrum vid\u0113 sada\u013c\u0101 Business Setup -&gt; System Data -&gt; Public Api.) Katram mar\u0137ierim ir nosaukums, apraksts un der\u012bguma termi\u0146\u0161. Varat izveidot tik mar\u0137ieru, cik nepiecie\u0161ams, un atsaukt mar\u0137ieri, to izdz\u0113\u0161ot. SkyPlanner integr\u0101cijai pie\u0161\u0137iriet atsevi\u0161\u0137u mar\u0137ieri un iestatiet atg\u0101din\u0101jumu pirms t\u0101 der\u012bguma termi\u0146a beig\u0101m.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri <code>Authorization-Token<\/code> galven\u0113 (SkyPlanner Settings &gt; API); dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim par\u0101d\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu piepras\u012b\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fulcrum atbalsta t\u012bmek\u013ca aiz\u0137eres, ko konfigur\u0113 administrators. Kop\u0161 2026. gada septembra aiz\u0137eres, kuru izpilde neizdodas, tiek aptur\u0113tas un p\u0101rbaud\u012btas reizi dien\u0101, nevis atk\u0101rtoti izpild\u012btas bezgal\u012bgi. API izmai\u0146u v\u0113stur\u0113 min\u0113ti t\u0101di notikumi k\u0101 <code>PurchaseOrderUpdated<\/code> un <code>ItemUpdated<\/code>.<\/p>\n\n\n<p>Integr\u0101cija nolasa Fulcrum datus \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ik p\u0113c da\u017e\u0101m min\u016bt\u0113m tiek piepras\u012bti nepabeigtie ra\u017eo\u0161anas uzdevumi, atlasot statusus <code>scheduled<\/code> un <code>inProgress<\/code> un nosac\u012bjumu <code>hasIncompleteOperations: true<\/code>. \u0160o filtru iesaka pats Fulcrum, lai atlase atbilstu grafika lap\u0101 redzamajam.<\/li>\n\n\n<li>Iepirkuma pas\u016bt\u012bjumi un kr\u0101jumi tiek nolas\u012bti pirms katras grafika sast\u0101d\u012b\u0161anas vai p\u0113c <code>PurchaseOrderUpdated<\/code> t\u012bmek\u013ca aiz\u0137eres sa\u0146em\u0161anas, ja t\u0101 ir konfigur\u0113ta.<\/li>\n\n\n<li>Preces, tehnolo\u0123iskie procesi, iek\u0101rtas un mai\u0146as tiek nolas\u012btas p\u0113c izmai\u0146\u0101m vai katru nakti.<\/li>\n\n<\/ul>\n\n\n<p>Pret\u0113j\u0101 virzien\u0101 SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c Fulcrum ierosina notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Fulcrum objekts (galapunkts)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Item, Materials (<code>\/api\/items<\/code>, <code>\/api\/materials<\/code>)<\/td><td>Produkti un materi\u0101li<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam katru nakti<\/td><\/tr><tr><td>Tehnolo\u0123iskaj\u0101 proces\u0101 nepiecie\u0161am\u0101s preces un materi\u0101li (<code>\/routing\/input-items<\/code>, <code>\/input-materials<\/code>)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td>Tehnolo\u0123isk\u0101 procesa oper\u0101cijas (<code>\/routing\/operations<\/code>): <code>setupTime<\/code>, <code>laborTime<\/code>, <code>machineTime<\/code> (fiks\u0113ts vai uz vien\u012bbu), <code>selectedEquipmentIds<\/code><\/td><td>Procesa so\u013ci, sagatavo\u0161anas laiki, ilgumi, at\u013cautie darba centri<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td>Work Center (<code>\/api\/work-centers<\/code>)<\/td><td>Darba centru grupa<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reti<\/td><\/tr><tr><td>Equipment (<code>\/api\/equipment<\/code>): <code>unlimitedCapacity<\/code>, <code>canRunUnattended<\/code>, <code>status<\/code><\/td><td>Darba centri, partiju apstr\u0101des uzdevumi, darbs bez uzraudz\u012bbas<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, statuss \u2014 katru dienu<\/td><\/tr><tr><td>Department Shifts (<code>\/api\/department-shifts<\/code>), Equipment Downtimes<\/td><td>Mai\u0146as un promb\u016btnes<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam katru dienu<\/td><\/tr><tr><td>Job un t\u0101 oper\u0101cijas (<code>\/api\/jobs<\/code>, <code>...\/items-to-make\/{id}\/operations<\/code>): <code>priority<\/code>, <code>productionDueDate<\/code>, <code>earliestStartDate<\/code>, apl\u0113ses<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>Datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Inventory, Purchase Orders ar Expected Receive datumiem<\/td><td>Kr\u0101jumi un gaid\u0101mie materi\u0101li<\/td><td>Fulcrum \u2192 SkyPlanner<\/td><td>Pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevuma oper\u0101cijas <code>customFields<\/code> (POST <code>...\/operations\/{operationId}<\/code>)<\/td><td>Pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas, darba centrs<\/td><td>SkyPlanner \u2192 Fulcrum<\/td><td>P\u0113c grafika izmai\u0146\u0101m, izmantojot SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevuma <code>customFields<\/code> (PUT <code>\/api\/jobs\/{jobId}\/custom-fields<\/code>)<\/td><td>Ra\u017eo\u0161anas uzdevuma pl\u0101not\u0101s beigas<\/td><td>SkyPlanner \u2192 Fulcrum<\/td><td>P\u0113c grafika izmai\u0146\u0101m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevumu laika uzskaites taimeri, <code>\/api\/timers<\/code>, <code>add-quantity-completed<\/code>, <code>complete<\/code><\/td><td>Laika uzskaites ieraksti, sara\u017eotie un br\u0101\u0137\u0113tie daudzumi<\/td><td>SkyPlanner \u2192 Fulcrum<\/td><td>Kad operatori re\u0123istr\u0113 darbu<\/td><\/tr><tr><td>Nav Fulcrum sist\u0113m\u0101<\/td><td>Konkr\u0113ti operatori, sagatavo\u0161anas laiku matrica, ierobe\u017eot\u0101 skait\u0101 pieejamie instrumenti, alternat\u012bvie darba centri<\/td><td>Uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas scen\u0101riji<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ieg\u016bstiet preces, materi\u0101lus, tehnolo\u0123iskos procesus, darba centrus un iek\u0101rtas, p\u0113c tam noda\u013cu mai\u0146as un d\u012bkst\u0101ves. Katrs Fulcrum darba centrs k\u013c\u016bst par SkyPlanner darba centru grupu, kur\u0101 iek\u013cautas t\u0101 iek\u0101rtas. Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai atlas\u012bt\u0101s iek\u0101rtas k\u013c\u016bst par t\u0101s at\u013cautajiem darba centriem. Iek\u0101rtas ar iestat\u012bjumu Unlimited Capacity, piem\u0113ram, kr\u0101snis un kr\u0101so\u0161anas kameras, tiek model\u0113tas k\u0101 partiju apstr\u0101des uzdevumi.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet nepabeigtos ra\u017eo\u0161anas uzdevumus ar izgatavojamaj\u0101m prec\u0113m un oper\u0101cij\u0101m, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus un kr\u0101jumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137irts statuss Delivered. Katr\u0101 grafika p\u0101rpl\u0101no\u0161anas reiz\u0113 tiek p\u0101rbaud\u012bti kr\u0101jumi un gaid\u0101mie iepirkumi.<\/p>\n\n\n<p><strong>3. Grafika datu ierakst\u012b\u0161ana atpaka\u013c Fulcrum.<\/strong> Fulcrum pats apr\u0113\u0137ina <code>scheduledStartUtc<\/code>, <code>scheduledEndUtc<\/code> un <code>scheduledEquipmentId<\/code> un atgrie\u017e tos tikai las\u012b\u0161anai. Oper\u0101cijas atjaunin\u0101\u0161anas piepras\u012bjum\u0101 var nor\u0101d\u012bt <code>customFields<\/code>. SkyPlanner katras ra\u017eo\u0161anas uzdevuma oper\u0101cijas piel\u0101gotajos laukos ieraksta pl\u0101noto s\u0101kumu, pl\u0101not\u0101s beigas un darba centru, bet ra\u017eo\u0161anas uzdevuma piel\u0101gotaj\u0101 lauk\u0101 \u2014 t\u0101 pl\u0101not\u0101s beigas. P\u0101rdo\u0161anas un iepirkumu darbinieki redz SkyPlanner noteiktos datumus ra\u017eo\u0161anas uzdevuma ierakst\u0101 Fulcrum sist\u0113m\u0101.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu SkyPlanner, izmantojot Mobile Confirmations, Production Timer vai Quick Log Mode. SkyPlanner nos\u016bta darba laiku uz Fulcrum, izmantojot <code>\/api\/job-tracking-timers\/start<\/code> un <code>\/stop<\/code>, vai k\u0101 pabeigtu laika interv\u0101lu, izmantojot <code>\/api\/timers<\/code>. Sara\u017eoto daudzumu nos\u016bta ar <code>add-quantity-completed<\/code>, bet gal\u012bgo daudzumu, ieskaitot br\u0101\u0137i, \u2014 ar <code>complete<\/code>. Ra\u017eo\u0161anas uzdevumu izmaksu apr\u0113\u0137ins Fulcrum sist\u0113m\u0101 saglab\u0101jas aktu\u0101ls.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Fulcrum pl\u0101not\u0101js &#8220;dictates the order of operations in Job Tracking.&#8221; (nosaka oper\u0101ciju sec\u012bbu Job Tracking modul\u012b). T\u0101p\u0113c katrai oper\u0101cijai izv\u0113lieties vienu uzdevumu nodo\u0161anas kan\u0101lu: SkyPlanner operatora darba rindu vai Fulcrum Job Tracking. Pirms darb\u012bbas uzs\u0101k\u0161anas dokument\u0113jiet noteikumus:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, tehnolo\u0123iskie procesi, apl\u0113ses, kr\u0101jumi, iepirkumi, izmaksu apr\u0113\u0137ini<\/td><td>Fulcrum<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, darba centra pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Operatori, sagatavo\u0161anas laiku matrica, instrumenti, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un d\u012bkst\u0101ves<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Re\u0123istr\u0113tais darba laiks un sara\u017eotais daudzums<\/td><td>SkyPlanner, ar datu nos\u016bt\u012b\u0161anu uz Fulcrum<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Projekta galvenie posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s sagatavo\u0161anas un konfigur\u0113\u0161anas s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat str\u0101d\u0101t ar saviem datiem. Eksport\u0113jiet artikulus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas uzdevumus no Fulcrum tabul\u0101m CSV form\u0101t\u0101, import\u0113jiet tos un p\u0101rbaudiet grafiku.<\/p>\n\n\n<p>Pats projekts ietver \u0161\u0101dus posmus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mar\u0137ieris un tv\u0113rums.<\/strong> Izveidojiet Public API mar\u0137ieri un vienojieties par piel\u0101gotajiem laukiem datu ierakst\u012b\u0161anai atpaka\u013c.<\/li>\n\n\n<li><strong>Datu atbilst\u012bba.<\/strong> Apstipriniet atbilst\u012bbas tabulu, atbild\u012bbas noteikumus un uzdevumu nodo\u0161anas kan\u0101lu.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Artikuli, materi\u0101li, tehnolo\u0123iskie procesi, darba centri, iek\u0101rtas, mai\u0146as un d\u012bkst\u0101ves.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Periodiska ra\u017eo\u0161anas uzdevumu izmai\u0146u izg\u016b\u0161ana, k\u0101 ar\u012b iepirkuma pas\u016bt\u012bjumu un kr\u0101jumu datu sinhroniz\u0101cija.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner sist\u0113m\u0101.<\/strong> Operatori un vi\u0146u mai\u0146as, sagatavo\u0161anas laiku matrica, instrumenti un alternat\u012bvie darba centri.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Piel\u0101gotie lauki ra\u017eo\u0161anas uzdevumu oper\u0101cij\u0101s un pa\u0161os uzdevumos.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas ceha datu nos\u016bt\u012b\u0161ana.<\/strong> Laika uzskaites ierakstu un sara\u017eot\u0101 daudzuma nos\u016bt\u012b\u0161ana uz Fulcrum.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 test\u0113\u0161ana un darb\u012bbas uzs\u0101k\u0161ana.<\/strong> Lietojiet SkyPlanner paral\u0113li Fulcrum grafikam, sal\u012bdziniet datumus, labojiet pamatdatus un p\u0113c tam p\u0101rsl\u0113dziet uzdevumu nodo\u0161anu uz jauno sist\u0113mu.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-fulcrum-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot Fulcrum integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darbasp\u0113ku \u0146em v\u0113r\u0101 mai\u0146as iek\u0101rtu skaita ierobe\u017eojum\u0101.<\/strong> Fulcrum parametrs Max Equipment katrai mai\u0146ai &#8220;is usually determined by how many people you have working in a certain area at that time.&#8221; (parasti tiek noteikts p\u0113c t\u0101, cik cilv\u0113ku attiec\u012bgaj\u0101 laik\u0101 str\u0101d\u0101 konkr\u0113taj\u0101 zon\u0101). Konkr\u0113tus operatorus un vi\u0146u mai\u0146as iestata SkyPlanner sist\u0113m\u0101. Operatoru v\u0101rdus ieg\u016bst no lietot\u0101ju datiem <code>\/api\/users<\/code>.<\/li>\n\n\n<li><strong>Darbus pl\u0101no konkr\u0113t\u0101m iek\u0101rt\u0101m.<\/strong> Fulcrum darba centri ir savstarp\u0113ji aizvietojamu iek\u0101rtu grupas. Uzturiet prec\u012bzu tehnolo\u0123iskaj\u0101 proces\u0101 izv\u0113l\u0113to iek\u0101rtu sarakstu, jo t\u0101s k\u013c\u016bst par alternat\u012bv\u0101m, no kur\u0101m izv\u0113las pl\u0101no\u0161anas dzin\u0113js.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumi apvieno uzdevumus.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjums apvieno vair\u0101ku ra\u017eo\u0161anas uzdevumu oper\u0101cijas, piem\u0113ram, vien\u0101 deta\u013cu izkl\u0101jum\u0101. M\u0113\u0123inot palaist grup\u0113tas oper\u0101cijas taimeri, t\u0101 viet\u0101 tiek palaists ra\u017eo\u0161anas pas\u016bt\u012bjuma taimeris, kas aptver visas grup\u0101 iek\u013caut\u0101s uzdevumu oper\u0101cijas.<\/li>\n\n\n<li><strong>Laika uzskaites ierobe\u017eojumi.<\/strong> Retrospekt\u012bvi re\u0123istr\u0113ti <code>\/api\/timers<\/code> laika interv\u0101li &#8220;may not be in the future, older than 30 days, or longer than 7 days.&#8221; (nedr\u012bkst attiekties uz n\u0101kotni vai p\u0101rsniegt nor\u0101d\u012btos senuma un ilguma ierobe\u017eojumus). Nos\u016btiet darba laika datus, tikl\u012bdz operatori tos re\u0123istr\u0113.<\/li>\n\n\n<li><strong>Laika form\u0101ti at\u0161\u0137iras.<\/strong> Mai\u0146\u0101m izmanto viet\u0113jo laiku HHmm form\u0101t\u0101, d\u012bkst\u0101v\u0113m un pl\u0101notajiem datumiem \u2014 UTC, bet paredzamo oper\u0101ciju ilgumu sa\u0146em sekund\u0113s.<\/li>\n\n\n<li><strong>Iek\u0101rtas datu atjaunin\u0101jums aizst\u0101j visu ierakstu.<\/strong> Iek\u0101rtas PUT piepras\u012bjums not\u012bra visus laukus, kas taj\u0101 nav iek\u013cauti. SkyPlanner tikai nolasa iek\u0101rtu datus un nekad tajos neieraksta.<\/li>\n\n\n<li><strong>ITAR vides.<\/strong> Izmantojiet <code>.us<\/code> serveri un ITAR piek\u013cuves pilnvaru.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-fulcrum-integration-who-configures-and-suppo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 un uztur Fulcrum integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver j\u016bsu noda\u013cu, darba centru, iek\u0101rtu un tehnolo\u0123isko procesu datu atbilst\u012bbas noteik\u0161anu. J\u0101iestata ar\u012b ierobe\u017eojumi, kurus Fulcrum neuzglab\u0101: konkr\u0113ti operatori, iek\u0101rtu sagatavo\u0161anas laiku matrica, instrumenti un alternat\u012bvie resursi.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/strong> Katrs ra\u017eo\u0161anas uz\u0146\u0113mums izmanto Fulcrum cit\u0101di, un \u0161\u012bs zin\u0101\u0161anas tiek \u0146emtas v\u0113r\u0101 konfigur\u0101cij\u0101.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izveidot j\u016bsu Fulcrum konsultants vai integr\u0101cijas partneris.<\/strong> SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>Risin\u0101jumu var izstr\u0101d\u0101t ar\u012b j\u016bsu programm\u0113t\u0101ji.<\/strong> Lai s\u0101ktu, pietiek ar API piek\u013cuves pilnvaru, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Produkta dokument\u0101cija, tostarp par iepirkuma pas\u016bt\u012bjumiem un produktu un materi\u0101lu API, ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena s\u0101kas no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus un ikm\u0113ne\u0161a nor\u0113\u0137inus. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un Fulcrum pl\u0101not\u0101ja sal\u012bdzin\u0101jumu lap\u0101 <a href=\"\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/\">Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161ana, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un person\u0101la jaudu<\/a>. Kopsavilkums ir pieejams <a href=\"\/lv\/integracija\/erp\/fulcrum\/\">Fulcrum lap\u0101<\/a>, bet citas ERP sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jaun\u0101 darba rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu kombinezonos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 pieaugums no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darbu vad\u012bt\u0101js, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Fulcrum ir API?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Fulcrum Public API ir REST API ar OpenAPI v1 specifik\u0101ciju. Autentifik\u0101cijai izmanto Bearer piek\u013cuves pilnvaru, ko \u0123ener\u0113 sada\u013c\u0101 Business Setup &gt; System Data &gt; Public Api. ITAR vid\u0113m izmanto atsevi\u0161\u0137u <code>.us<\/code> serveri.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var ierakst\u012bt grafiku atpaka\u013c Fulcrum sist\u0113m\u0101?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Fulcrum pa\u0161a pl\u0101notie datumi ir tikai las\u0101mi, t\u0101p\u0113c SkyPlanner katra ra\u017eo\u0161anas uzdevuma oper\u0101ciju piel\u0101gotajos laukos ieraksta pl\u0101noto s\u0101kumu, pl\u0101not\u0101s beigas un darba centru, bet pa\u0161\u0101 uzdevum\u0101 \u2014 pl\u0101not\u0101s beigas. Operatoru darba laiku un sara\u017eoto daudzumu nos\u016bta atpaka\u013c k\u0101 laika uzskaites ierakstus un daudzuma atjaunin\u0101jumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Fulcrum nos\u016bta izmai\u0146as re\u0101llaik\u0101?<\/summary>\n<p class=\"sp-faq__a\">Fulcrum pied\u0101v\u0101 administratora konfigur\u0113jamas t\u012bmek\u013ca aiz\u0137eres t\u0101diem notikumiem k\u0101 <code>PurchaseOrderUpdated<\/code>. Atv\u0113rtos ra\u017eo\u0161anas uzdevumus pieprasa ik p\u0113c da\u017e\u0101m min\u016bt\u0113m, izmantojot to pa\u0161u filtru, ko Fulcrum izmanto grafika lap\u0101. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido Fulcrum integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Ar\u012b j\u016bsu Fulcrum konsultants, integr\u0101cijas partneris vai j\u016bsu programm\u0113t\u0101ji var izveidot risin\u0101jumu, izmantojot SkyPlanner dokument\u0113to REST API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t CSV datus no Fulcrum. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Fulcrum Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Fulcrum integr\u0101cijas ce\u013cved\u012b konsultanti un IT komandas uzzin\u0101s, k\u0101 savienot Fulcrum (Fulcrum Pro) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Fulcrum, izmantojot Fulcrum Public API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Fulcrum konfigur\u0101cijai &#8230; <a title=\"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/\" aria-label=\"Read more about Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102852,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103534","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Fulcrum APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/integracijas-celvedis\\\/\",\"name\":\"Fulcrum APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Fulcrum: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pas\u016bt\u012bjuma str\u0101d\u0101jo\u0161iem uz\u0146\u0113mumiem, iev\u0113rojot iek\u0101rtu un darbinieku noslodzi\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Fulcrum APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/","name":"Fulcrum APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Fulcrum\u2013SkyPlanner APS savieno\u0161ana: Public API, Bearer token, uzdevumu un oper\u0101ciju sinhroniz\u0101cija, ierakst\u012b\u0161ana piel\u0101gotajos laukos, taimeri, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Fulcrum: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pas\u016bt\u012bjuma str\u0101d\u0101jo\u0161iem uz\u0146\u0113mumiem, iev\u0113rojot iek\u0101rtu un darbinieku noslodzi","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/"},{"@type":"ListItem","position":5,"name":"Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Fulcrum Fulcrum integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 Fulcrum integr\u0101cijas ce\u013cved\u012b konsultanti un IT komandas uzzin\u0101s, k\u0101 savienot Fulcrum (Fulcrum Pro) ar SkyPlanner APS. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Fulcrum, izmantojot Fulcrum Public API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Fulcrum konfigur\u0101cijai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103534"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103534\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102852"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}