{"id":103504,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/fulcrum\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/","title":{"rendered":"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Fulcrum<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? <span class=\"hl\">K\u0101 darbojas Fulcrum Autoschedule<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">J\u0101, iek\u0101rtu l\u012bmen\u012b. Fulcrum Autoschedule katru ra\u017eo\u0161anas uzdevuma oper\u0101ciju iepl\u0101no konkr\u0113tai iek\u0101rtai noda\u013cas mai\u0146u ietvaros, ierobe\u017eojot vienlaikus darbin\u0101mo iek\u0101rtu skaitu. Oper\u0101ciju sec\u012bbu nosaka p\u0113c nepabeigt\u0101s ra\u017eo\u0161anas, ra\u017eo\u0161anas uzdevuma priorit\u0101tes l\u012bme\u0146a un ra\u017eo\u0161anas pabeig\u0161anas termi\u0146a. Darbinieku pieejam\u012bbu model\u0113 ar \u0161o iek\u0101rtu skaitu, nevis katram operatoram atsevi\u0161\u0137i, bet p\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai ir fiks\u0113ts vai noteikts uz vienu vien\u012bbu. Ra\u017eotnes, kur\u0101m vien\u0101 pl\u0101n\u0101 j\u0101iek\u013cauj operatori, no oper\u0101ciju sec\u012bbas atkar\u012bga p\u0101rregul\u0113\u0161ana un koplietojami instrumenti, l\u012bdztekus Fulcrum izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Autoschedule ir da\u013ca no Fulcrum platformas, nevis atsevi\u0161\u0137s modulis. Fulcrum nepublic\u0113 cenr\u0101di. Bie\u017ei uzdoto jaut\u0101jumu sada\u013c\u0101 nor\u0101d\u012bts: &#8220;Pricing is based on company size, scope, and implementation requirements.&#8221; (Cena ir atkar\u012bga no uz\u0146\u0113muma lieluma, risin\u0101juma tv\u0113ruma un ievie\u0161anas pras\u012bb\u0101m.) Turpat piebilsts: &#8220;Fulcrum doesn&#8217;t follow a traditional per-user licensing model.&#8221; (Fulcrum neizmanto tradicion\u0101lo licenc\u0113\u0161anas modeli ar maksu par katru lietot\u0101ju.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-fulcrum-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Fulcrum sast\u0101da ra\u017eo\u0161anas grafiku \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Iek\u0101rtas<\/h3>\n\n\n<p>Jaudas iestat\u012b\u0161ana s\u0101kas sada\u013c\u0101 <strong>Business Setup &gt; System Data &gt; Shop Setup<\/strong>. &#8220;Equipment within Fulcrum is defined as your machinery and workstations.&#8221; (Fulcrum ar iek\u0101rt\u0101m saprot j\u016bsu ma\u0161\u012bnas un darba centrus.) Katrai iek\u0101rtai ir tr\u012bs iestat\u012bjumi, kas ietekm\u0113 grafiku:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Equipment Status.<\/strong> Ja nor\u0101d\u012bts statuss &#8220;Out of Service&#8221; (\u0101rpus ekspluat\u0101cijas), grafiks &#8220;will reorganize jobs based on what equipment remains in an operational status.&#8221; (p\u0101rk\u0101rtos ra\u017eo\u0161anas uzdevumus atbilsto\u0161i tam, kuras iek\u0101rtas joproj\u0101m ir darba k\u0101rt\u012bb\u0101.)<\/li>\n\n\n<li><strong>Can Run Unattended.<\/strong> Iestat\u012bjums iek\u0101rt\u0101m, kuras darbinieks sagatavo darbam un kuras p\u0113c tam pabeidz oper\u0101ciju bez uzraudz\u012bbas vai darbojas \u0101rpus mai\u0146as laika.<\/li>\n\n\n<li><strong>Unlimited Capacity.<\/strong> Iestat\u012bjums iek\u0101rt\u0101m, kuras &#8220;can run simultaneous jobs&#8221; (var vienlaikus veikt vair\u0101kus ra\u017eo\u0161anas uzdevumus), piem\u0113ram, kr\u0101so\u0161anas kamerai vai kr\u0101snij.<\/li>\n\n<\/ul>\n\n\n<p>Katra p\u0101r\u0113j\u0101 iek\u0101rta vienlaikus veic tikai vienu oper\u0101ciju. (<a href=\"https:\/\/fulcrumpro.notion.site\/Fulcrum-Shop-Setup-e056ae1d1f734fed89f5dbc1b96b09a1\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Noda\u013cas un mai\u0146as<\/h3>\n\n\n<p>&#8220;Departments are best thought of in terms of personnel constraints.&#8221; (Noda\u013cas vislab\u0101k apl\u016bkot no darbinieku pieejam\u012bbas ierobe\u017eojumu viedok\u013ca.) Katrai noda\u013cai ir viena vai vair\u0101kas mai\u0146as, kur\u0101m nor\u0101d\u012bts s\u0101kuma un beigu laiks, darba dienas, mai\u0146\u0101 darbin\u0101m\u0101s iek\u0101rtas un &#8220;how many pieces of equipment can be running at the same time.&#8221; (cik iek\u0101rtu var darboties vienlaikus.) Mai\u0146ai var nor\u0101d\u012bt ar\u012b neierobe\u017eotu jaudu, un API ir pieejams maksim\u0101lais jauno ra\u017eo\u0161anas uzdevumu skaits mai\u0146\u0101. (<a href=\"https:\/\/fulcrumpro.notion.site\/Scheduling-193b6de389828030bc1be5fec3a66cf0\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Darba centri un oper\u0101cijas<\/h3>\n\n\n<p>&#8220;A Fulcrum Work Center is defined as a group of interchangeable equipment with similar capabilities.&#8221; (Fulcrum darba centrs ir savstarp\u0113ji aizst\u0101jamu iek\u0101rtu grupa ar l\u012bdz\u012bg\u0101m iesp\u0113j\u0101m.) Fulcrum skaidri nor\u0101da: &#8220;you will be scheduling to equipment. The Work Center tells the schedule what equipment can be used for a specific operation.&#8221; (Darbs tiks pl\u0101nots konkr\u0113t\u0101m iek\u0101rt\u0101m. Darba centrs nosaka, kuras iek\u0101rtas sist\u0113ma var izmantot konkr\u0113tas oper\u0101cijas pl\u0101no\u0161anai.)<\/p>\n\n\n<p>Oper\u0101cij\u0101m ir noteikti p\u0101rregul\u0113\u0161anas, darbinieku darba un iek\u0101rtu darba normat\u012bvie laiki. API p\u0101rregul\u0113\u0161anas laiks ir vai nu <code>fixed<\/code>, vai <code>perUnit<\/code>. Pieejam\u0101s iesp\u0113jas ietver rezerves laiku, oper\u0101cijas sadal\u012b\u0161anu starp div\u0101m iek\u0101rt\u0101m un vair\u0101ku iek\u0101rtu vienlaic\u012bgu pl\u0101no\u0161anu, kad oper\u0101cijas izpildes laik\u0101 citas iek\u0101rtas nav pieejamas darbam. Tehnolo\u0123iskaj\u0101 proces\u0101 var piesaist\u012bt konkr\u0113tu iek\u0101rtu. (<a href=\"https:\/\/api.fulcrumpro.com\/swagger\/v1\/swagger.json\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Priorit\u0101te un abi algoritmi<\/h3>\n\n\n<p>&#8220;The schedule prioritizes jobs first based on the following: Work In Process, Job Priority Level, Production Due Date.&#8221; (Grafik\u0101 ra\u017eo\u0161anas uzdevumu priorit\u0101ti vispirms nosaka p\u0113c \u0161\u0101diem krit\u0113rijiem: nepabeigt\u0101 ra\u017eo\u0161ana, ra\u017eo\u0161anas uzdevuma priorit\u0101tes l\u012bmenis un ra\u017eo\u0161anas pabeig\u0161anas termi\u0146\u0161.) &#8220;High priority jobs will always be scheduled before moderate to low priority.&#8221; (Augstas priorit\u0101tes ra\u017eo\u0161anas uzdevumus vienm\u0113r iepl\u0101no pirms vid\u0113jas un zemas priorit\u0101tes uzdevumiem.) Nokav\u0113tos zem\u0101kas priorit\u0101tes uzdevumus p\u0113c tam ievieto br\u012bvaj\u0101s viet\u0101s, s\u0101kot ar visvair\u0101k nokav\u0113tajiem.<\/p>\n\n\n<p>Fulcrum pied\u0101v\u0101 divus re\u017e\u012bmus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Greedy.<\/strong> &#8220;When you schedule a job, the schedule will look at the current state of the schedule.&#8221; (Iepl\u0101nojot ra\u017eo\u0161anas uzdevumu, sist\u0113ma \u0146em v\u0113r\u0101 grafika pa\u0161reiz\u0113jo st\u0101vokli.) P\u0113c tam t\u0101 izvieto \u0161\u012b uzdevuma oper\u0101cijas t\u0101, lai t\u0101s pabeigtu p\u0113c iesp\u0113jas agr\u0101k.<\/li>\n\n\n<li><strong>Just in Time.<\/strong> Iepl\u0101no pabeig\u0161anu &#8220;as close to the due date as possible&#8221; (p\u0113c iesp\u0113jas tuv\u0101k noteiktajam termi\u0146am), bet, ja termi\u0146u nav iesp\u0113jams iev\u0113rot, p\u0101riet uz Greedy re\u017e\u012bmu.<\/li>\n\n<\/ul>\n\n\n<p>Ra\u017eo\u0161anas uzdevumam var nor\u0101d\u012bt ar\u012b agr\u0101ko s\u0101kuma datumu, un &#8220;the job won&#8217;t be scheduled before that date&#8221; (uzdevums netiks iepl\u0101nots pirms \u0161\u012b datuma). (<a href=\"https:\/\/fulcrumpro.com\/product-update\/job-earliest-start-date\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Materi\u0101li<\/h3>\n\n\n<p>Ar ra\u017eo\u0161anas uzdevumu saist\u012bto iepirkuma pas\u016bt\u012bjumu lauk\u0101 Expected Receive nor\u0101d\u012btie datumi nosaka uzdevuma datumus. Ja nav atv\u0113rta iepirkuma pas\u016bt\u012bjuma, pl\u0101no\u0161an\u0101 izmanto preces paredzamo pas\u016bt\u012bjuma izpildes laiku, bet, ja tas nav nor\u0101d\u012bts, \u2014 pieg\u0101d\u0101t\u0101ja noklus\u0113juma pas\u016bt\u012bjuma izpildes laiku. Par tr\u016bksto\u0161iem kr\u0101jumiem Fulcrum nor\u0101da: &#8220;If materials are not in stock, the schedule assumes that you are IMMEDIATELY ordering the material when you hit &#8220;Schedule&#8221; on the job&#8221; (Ja materi\u0101lu nav noliktav\u0101, sist\u0113ma pie\u0146em, ka j\u016bs tos pas\u016bt\u0101t NEKAV\u0112JOTIES, tikl\u012bdz ra\u017eo\u0161anas uzdevum\u0101 nospie\u017eat &#8220;Schedule&#8221;).<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Grafika ekr\u0101ns un Job Tracking<\/h3>\n\n\n<p>&#8220;Each column is a separate piece of equipment.&#8221; (Katra kolonna ir atsevi\u0161\u0137a iek\u0101rta.) Oper\u0101cijas sak\u0101rtotas no aug\u0161as uz leju p\u0113c priorit\u0101tes un izpildes termi\u0146a. Zem katras iek\u0101rtas redzama neizpild\u012bto darbu rinda un n\u0101kamais pieejamais datums. Operatori re\u0123istr\u0113 darba s\u0101kumu sada\u013c\u0101 Job Tracking, kas &#8220;is a reflection of the schedule.&#8221; (atspogu\u013co grafiku.) Grafika fiks\u0113\u0161anas periods \u013cauj pl\u0101not\u0101jiem manu\u0101li main\u012bt tuv\u0101k\u0101 laika darbus, &#8220;but everything further out can still be auto-scheduled.&#8221; (bet visus v\u0113l\u0101kos darbus joproj\u0101m var iepl\u0101not autom\u0101tiski.) (<a href=\"https:\/\/fulcrumpro.com\/article\/maximize-on-time-delivery-with-fulcrums-advanced-autoschedule-a-video-overview\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operatorus atspogu\u013co tikai skaits.<\/strong> Mai\u0146as r\u0101d\u012bt\u0101ju Max Equipment &#8220;is usually determined by how many people you have working in a certain area at that time.&#8221; (parasti nosaka p\u0113c t\u0101, cik cilv\u0113ku attiec\u012bgaj\u0101 laik\u0101 str\u0101d\u0101 konkr\u0113taj\u0101 zon\u0101.) Ja k\u0101ds saslimst, vad\u012bt\u0101js var &#8220;decrement the Max Equipment by 1&#8221; (samazin\u0101t Max Equipment r\u0101d\u012bt\u0101ju). Pl\u0101not\u0101jam pa\u0161am j\u0101patur pr\u0101t\u0101, kur\u0161 veiks uzdevumu un kuram uzdevumam vajadz\u012bgi divi cilv\u0113ki.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks ir noteikts katrai oper\u0101cijai.<\/strong> Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai p\u0101rregul\u0113\u0161anas laiks ir fiks\u0113ts vai noteikts uz vienu vien\u012bbu. Laiks p\u0101rejai no viena ra\u017eo\u0161anas uzdevuma uz n\u0101kamo taj\u0101 pa\u0161\u0101 iek\u0101rt\u0101 nav dokument\u0113ts k\u0101 ievades parametrs.<\/li>\n\n\n<li><strong>Instrumenti ir kalibr\u0113\u0161anas uzskaites ieraksti.<\/strong> Fulcrum sada\u013c\u0101 Tools ir &#8220;measurement instrument or gage&#8221; (m\u0113rinstrumentu vai kalibru) ieraksti kalibr\u0113\u0161anas sist\u0113m\u0101. Koplietojamas pal\u012bgier\u012bces un \u0161tances nav grafika sast\u0101d\u012b\u0161an\u0101 izmantojami resursi.<\/li>\n\n\n<li><strong>Pie\u0146em, ka materi\u0101li ir pas\u016bt\u012bti.<\/strong> Tr\u016bksto\u0161os kr\u0101jumus pl\u0101no t\u0101, it k\u0101 tie b\u016btu pas\u016bt\u012bti br\u012bd\u012b, kad ra\u017eo\u0161anas uzdevums tika iepl\u0101nots.<\/li>\n\n\n<li><strong>Priorit\u0101tes l\u012bmenis ir svar\u012bg\u0101ks par termi\u0146u.<\/strong> Augstas priorit\u0101tes ra\u017eo\u0161anas uzdevumus vienm\u0113r iepl\u0101no pirmos, bet nokav\u0113tos uzdevumus ievieto p\u0113c tiem.<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana notiek katru dienu.<\/strong> &#8220;The schedule automatically will pull in scheduled jobs once a day.&#8221; (Grafiks reizi dien\u0101 autom\u0101tiski p\u0101rb\u012bda iepl\u0101notos ra\u017eo\u0161anas uzdevumus uz agr\u0101ku laiku.) Lai \u0146emtu v\u0113r\u0101 izmai\u0146as t\u0101s pa\u0161as dienas laik\u0101, &#8220;you will need to select the Reschedule button in the top right of the schedule.&#8221; (grafika aug\u0161\u0113j\u0101 labaj\u0101 st\u016br\u012b j\u0101nospie\u017e poga Reschedule.)<\/li>\n\n\n<li><strong>Oper\u0101ciju p\u0101rkl\u0101\u0161an\u0101s iesp\u0113jas ir vienk\u0101r\u0161as.<\/strong> Nep\u0101rtraukt\u0101 pl\u016bsma \u013cauj oper\u0101cij\u0101m p\u0101rkl\u0101ties laik\u0101, ta\u010du &#8220;those with fixed run times (not per-unit) will not be allowed to overlap.&#8221; (oper\u0101cijas ar fiks\u0113tu izpildes laiku, nevis laiku uz vienu vien\u012bbu, nedr\u012bkst p\u0101rkl\u0101ties.) Fulcrum to sauc par &#8220;a simple version of continuous flow&#8221; (vienk\u0101r\u0161otu nep\u0101rtraukt\u0101s pl\u016bsmas versiju). (<a href=\"https:\/\/fulcrumpro.com\/product-update\/autoschedule-continuous-flow\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 tas noz\u012bm\u0113, ka meistars cen\u0161as sadal\u012bt darbiniekus pa iek\u0101rt\u0101m, p\u0113c atmi\u0146as grup\u0113 darbus ar l\u012bdz\u012bgu p\u0101rregul\u0113\u0161anu un l\u012bdz\u0101s ekr\u0101nam izmanto t\u0101feli.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-fulcrum-s-own-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Fulcrum ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Fulcrum Autoschedule pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Iek\u0101rtas ir \u0161aur\u0101 vieta, un darbinieki var br\u012bvi p\u0101riet no vienas iek\u0101rtas uz citu, t\u0101p\u0113c darbasp\u0113ka pieejam\u012bbu labi atspogu\u013co viena noda\u013ca un iek\u0101rtu skaits.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana aiz\u0146em aptuveni vien\u0101du laiku neatkar\u012bgi no iepriek\u0161 veikt\u0101 darba.<\/li>\n\n\n<li>Pal\u012bgier\u012bces un instrumenti ir paredz\u0113ti tikai konkr\u0113taj\u0101m iek\u0101rt\u0101m.<\/li>\n\n\n<li>Materi\u0101li ir noliktav\u0101 vai iepirkuma pas\u016bt\u012bjumu lauk\u0101 Expected Receive nor\u0101d\u012btie datumi tiek regul\u0101ri atjaunin\u0101ti.<\/li>\n\n\n<li>Ar ikdienas p\u0101rr\u0113\u0137inu un pogu Reschedule pietiek, lai \u0146emtu v\u0113r\u0101 izmai\u0146as.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas raksturo j\u016bsu ra\u017eotni, uzturiet prec\u012bzus tehnolo\u0123isk\u0101 procesa laikus, mai\u0146as un d\u012bkst\u0101ves. Izmantojiet priorit\u0101tes, nevis vilk\u0161anu un nome\u0161anu, k\u0101 iesaka ar\u012b Fulcrum pal\u012bdz\u012bbas materi\u0101li, un turpiniet str\u0101d\u0101t tikai Fulcrum vid\u0113.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro re\u0101lo resursu pieejam\u012bbu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anas r\u012bku vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem nosac\u012bjumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Konkr\u0113tu operatoru vai iek\u0101rtu ieregul\u0113t\u0101ju pieejam\u012bba nosaka, kurus darbus var veikt, un da\u017eiem ra\u017eo\u0161anas uzdevumiem vienlaikus vajadz\u012bgi divi vai tr\u012bs cilv\u0113ki.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 izmantot\u0101 materi\u0101la, kr\u0101sas, pal\u012bgier\u012bces vai instrumentu grupas.<\/li>\n\n\n<li>Vair\u0101kas iek\u0101rtas koplieto pal\u012bgier\u012bces, \u0161tances vai instrumentus.<\/li>\n\n\n<li>Materi\u0101lu kav\u0113jumi, iek\u0101rtu boj\u0101jumi un steidzami ra\u017eo\u0161anas uzdevumi liek p\u0101rpl\u0101not vair\u0101kas reizes dien\u0101.<\/li>\n\n\n<li>Jums ir 20 vai vair\u0101k iek\u0101rtu, un meistars katru dienu pavada stundas, izlemjot, kur\u0161 pie kuras str\u0101d\u0101s.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operatori k\u0101 resursi ar ierobe\u017eotu pieejam\u012bbu:<\/strong> katram savas mai\u0146as un promb\u016btnes, k\u0101 ar\u012b iesp\u0113ja pl\u0101not ra\u017eo\u0161anas uzdevumus, kuriem vajadz\u012bgi vair\u0101ki cilv\u0113ki.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica:<\/strong> no sec\u012bbas atkar\u012bgi, asimetriski p\u0101rregul\u0113\u0161anas laiki, ko izmanto kop\u0113j\u0101 p\u0101rregul\u0113\u0161anas laika samazin\u0101\u0161anai l\u012bdz minimumam.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu.<\/strong><\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lu pieejam\u012bbu<\/strong> p\u0113c katras izmai\u0146as, aptverot noliktavas kr\u0101jumus un gaid\u0101m\u0101s iepirkuma pas\u016bt\u012bjumu pieg\u0101des.<\/li>\n\n\n<li><strong>Visa pl\u0101na optimiz\u0113\u0161ana<\/strong> da\u017eu sekun\u017eu laik\u0101 un autom\u0101tiska p\u0101rpl\u0101no\u0161ana, mainoties situ\u0101cijai ra\u017eo\u0161an\u0101.<\/li>\n\n\n<li><strong>Skaidri noteikts veids, k\u0101 ierakst\u012bt datus atpaka\u013c Fulcrum.<\/strong> Fulcrum API pl\u0101notie datumi ir tikai las\u0101mi, bet katrai ra\u017eo\u0161anas uzdevuma oper\u0101cijai var ierakst\u012bt piel\u0101gotus laukus, k\u0101 ar\u012b taimerus un daudzumus. Katram pieg\u0101d\u0101t\u0101jam prec\u012bzi pajaut\u0101jiet, kurus API izsaukumus izmanto t\u0101 grafiku sast\u0101d\u012b\u0161anas risin\u0101jums.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt tr\u012bs grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Fulcrum ieb\u016bv\u0113tais Autoschedule<\/strong> pl\u0101no iek\u0101rtu darbu Fulcrum vid\u0113.<\/li>\n\n\n<li><strong>Lielo uz\u0146\u0113mumu APS risin\u0101jumu komplekti un grafiku sast\u0101d\u012b\u0161anas r\u012bki, kas izmanto failu apmai\u0146u,<\/strong> savienojas ar piel\u0101gotu saskar\u0146u vai CSV eksporta pal\u012bdz\u012bbu. Datumus bie\u017ei n\u0101kas atk\u0101rtoti ievad\u012bt manu\u0101li.<\/li>\n\n\n<li><strong>M\u0101ko\u0146vides APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> \u2014 grupa, kur\u0101 ietilpst SkyPlanner, \u2014 l\u012bdztekus Fulcrum autom\u0101tiski pl\u0101no katra resursa darbu un nodod pl\u0101nu operatoriem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nodro\u0161ina visu iepriek\u0161 min\u0113to. Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities. Steidzamam ra\u017eo\u0161anas uzdevumam tiek atrasta vieta grafik\u0101, un Bulldozer p\u0101rb\u012bda turpm\u0101kos uzdevumus, lai to atbr\u012bvotu.<\/p>\n\n\n<p>Katra iek\u0101rta, operators, instruments un materi\u0101ls ir resurss ar ierobe\u017eotu pieejam\u012bbu, ko pl\u0101no konkr\u0113t\u0101 laik\u0101. Katram operatoram ir savas mai\u0146as, atva\u013cin\u0101jumi un promb\u016btnes. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki, kuru mai\u0146\u0101s ir br\u012bvs laiks. Instrumentu, ko izmanto vien\u0101 iek\u0101rt\u0101, taj\u0101 pa\u0161\u0101 laik\u0101 nevar iepl\u0101not cit\u0101. Ja iek\u0101rta vai darbinieks nav pieejams, dzin\u0113js izmanto j\u016bsu noteikt\u0101s alternat\u012bvas.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos, piem\u0113ram, no zila uz sarkanu \u2014 30 min\u016btes, bet no sarkana uz zilu \u2014 60. Pl\u0101no\u0161anas dzin\u0113js izv\u0113las sec\u012bbu ar \u012bs\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Pl\u0101nojot p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, \u0146emot v\u0113r\u0101 pa\u0161reiz\u0113jos atlikumus un gaid\u0101mos iepirkumu pas\u016bt\u012bjumus. T\u0101d\u0113j\u0101di darbs tiek iepl\u0101nots tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Fulcrum modeli var tie\u0161i p\u0101rnest uz SkyPlanner. Darba centri k\u013c\u016bst par darba centru grup\u0101m, iek\u0101rtas \u2014 par darba centriem, Unlimited Capacity kr\u0101snis \u2014 par partiju uzdevumiem, bet noda\u013cu mai\u0146as \u2014 par mai\u0146\u0101m. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, savuk\u0101rt Running Time Lock saglab\u0101 s\u0101kto uzdevumu vietu grafik\u0101. Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu ar Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> n\u0101kamo izpild\u0101mo darbu nosaka ne tikai iek\u0101rtas, bet tikpat liel\u0101 m\u0113r\u0101 ar\u012b operatori, p\u0101rregul\u0113\u0161ana un koplietojamie instrumenti.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rpl\u0101nojat vair\u0101kas reizes dien\u0101 un v\u0113laties, lai grafiks piel\u0101gotos autom\u0101tiski.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> da\u017eu ned\u0113\u013cu laik\u0101 v\u0113laties ieg\u016bt savai ra\u017eotnei izmantojamu grafiku un nodot laika un apjomu datus atpaka\u013c uz Fulcrum.<\/p>\n\n\n<p>S\u0101ciet ar CSV eksportu <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, bez kred\u012btkartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavo iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Fulcrum, izmantojot Fulcrum Public API. No Fulcrum tiek sa\u0146emti ra\u017eo\u0161anas uzdevumi, tehnolo\u0123isko procesu oper\u0101cijas, darba centri, iek\u0101rtas un mai\u0146as. Katrai uzdevuma oper\u0101cijai atpaka\u013c tiek nodots pl\u0101notais s\u0101kums, beigas un darba centrs, k\u0101 ar\u012b operatora pat\u0113r\u0113tais laiks un sara\u017eotais daudzums. Integr\u0101ciju ievie\u0161anas laik\u0101 konfigur\u0113 SkyPlanner komanda, vai ar\u012b to izveido j\u016bsu Fulcrum konsultants vai izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Lasiet p\u0101rskatu lap\u0101 <a href=\"\/lv\/integracija\/erp\/fulcrum\/\">SkyPlanner lieto\u0161anai ar Fulcrum<\/a>, atveriet <a href=\"\/lv\/integracija\/erp\/fulcrum\/integracijas-celvedis\/\">Fulcrum integr\u0101cijas ce\u013cvedi<\/a>, apskatiet visas <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> vai sal\u012bdziniet citas sist\u0113mas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu kombinezonos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepako\u0161anai<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz piepras\u012bjumiem par grafika izmai\u0146\u0101m tagad tiek sniegtas da\u017eu sekun\u017eu laik\u0101, lai gan agr\u0101k tas pras\u012bja stundu vai ilg\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Fulcrum ir ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bks?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Fulcrum Autoschedule autom\u0101tiski iepl\u0101no uzdevumu oper\u0101cijas iek\u0101rt\u0101m noda\u013cu mai\u0146u ietvaros, izmantojot Greedy vai Just-in-Time re\u017e\u012bmu. Pl\u0101not\u0101ji vada pl\u0101no\u0161anu, nor\u0101dot uzdevumu priorit\u0101tes, izpildes termi\u0146us un agr\u0101ko s\u0101kuma datumu, un var manu\u0101li veikt izmai\u0146as ar\u012b fiks\u0113taj\u0101 grafika period\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Fulcrum pl\u0101no katra operatora darbu atsevi\u0161\u0137i?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Fulcrum darbasp\u0113ka pieejam\u012bbu izsaka k\u0101 iek\u0101rtu skaitu, kuras mai\u0146\u0101 var darboties vienlaikus. Ja k\u0101ds darbinieks nav darb\u0101, vad\u012bt\u0101js \u0161o skaitu samazina. SkyPlanner APS pl\u0101no katra operatora darbu, \u0146emot v\u0113r\u0101 mai\u0146as un promb\u016btni, ar\u012b uzdevumiem, kuriem vajadz\u012bgi vair\u0101ki cilv\u0113ki.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Fulcrum \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laikus, kas atkar\u012bgi no darbu sec\u012bbas?<\/summary>\n<p class=\"sp-faq__a\">Fulcrum katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai saglab\u0101 p\u0101rregul\u0113\u0161anas laiku k\u0101 fiks\u0113tu ilgumu vai laiku uz vien\u012bbu. SkyPlanner izmanto p\u0101rregul\u0113\u0161anas laiku matricu p\u0101rej\u0101m starp produktu p\u0101riem (no zila uz sarkanu \u2014 30 min\u016btes, no sarkana uz zilu \u2014 60) un sak\u0101rto uzdevumus t\u0101, lai \u0161o laiku samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik bie\u017ei Fulcrum p\u0101rpl\u0101no grafiku?<\/summary>\n<p class=\"sp-faq__a\">Fulcrum pal\u012bdz\u012bbas materi\u0101los nor\u0101d\u012bts, ka iepl\u0101notie uzdevumi grafik\u0101 tiek ielas\u012bti reizi dien\u0101. Lai redz\u0113tu izmai\u0146as taj\u0101 pa\u0161\u0101 dien\u0101, pl\u0101not\u0101ji nospie\u017e Reschedule. SkyPlanner Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner ar saviem Fulcrum datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet artikulus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas uzdevumus no Fulcrum CSV form\u0101t\u0101, import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Fulcrum Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule J\u0101, iek\u0101rtu l\u012bmen\u012b. Fulcrum Autoschedule katru ra\u017eo\u0161anas uzdevuma oper\u0101ciju iepl\u0101no konkr\u0113tai iek\u0101rtai noda\u013cas mai\u0146u ietvaros, ierobe\u017eojot vienlaikus darbin\u0101mo iek\u0101rtu skaitu. Oper\u0101ciju sec\u012bbu nosaka p\u0113c nepabeigt\u0101s ra\u017eo\u0161anas, ra\u017eo\u0161anas uzdevuma priorit\u0101tes l\u012bme\u0146a un ra\u017eo\u0161anas pabeig\u0161anas termi\u0146a. Darbinieku pieejam\u012bbu &#8230; <a title=\"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/\" aria-label=\"Read more about Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102852,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103504","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro pieejamo jaudu?<\/title>\n<meta name=\"description\" content=\"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule\" \/>\n<meta property=\"og:description\" content=\"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/razosanas-planosana\\\/\",\"name\":\"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro pieejamo jaudu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Fulcrum: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pas\u016bt\u012bjuma str\u0101d\u0101jo\u0161iem uz\u0146\u0113mumiem, iev\u0113rojot iek\u0101rtu un darbinieku noslodzi\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/fulcrum\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro pieejamo jaudu?","description":"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule","og_description":"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/","name":"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro pieejamo jaudu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Fulcrum Autoschedule pl\u0101no oper\u0101cijas iek\u0101rt\u0101m mai\u0146u robe\u017e\u0101s. K\u0101 tas darbojas, kas paliek pl\u0101not\u0101ja zi\u0146\u0101 un kad vajadz\u012bga APS sist\u0113ma.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Fulcrum: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c pas\u016bt\u012bjuma str\u0101d\u0101jo\u0161iem uz\u0146\u0113mumiem, iev\u0113rojot iek\u0101rtu un darbinieku noslodzi","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/fulcrum\/"},{"@type":"ListItem","position":5,"name":"Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Fulcrum Vai Fulcrum ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku pieejam\u012bbu? K\u0101 darbojas Fulcrum Autoschedule J\u0101, iek\u0101rtu l\u012bmen\u012b. Fulcrum Autoschedule katru ra\u017eo\u0161anas uzdevuma oper\u0101ciju iepl\u0101no konkr\u0113tai iek\u0101rtai noda\u013cas mai\u0146u ietvaros, ierobe\u017eojot vienlaikus darbin\u0101mo iek\u0101rtu skaitu. Oper\u0101ciju sec\u012bbu nosaka p\u0113c nepabeigt\u0101s ra\u017eo\u0161anas, ra\u017eo\u0161anas uzdevuma priorit\u0101tes l\u012bme\u0146a un ra\u017eo\u0161anas pabeig\u0161anas termi\u0146a. Darbinieku pieejam\u012bbu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103504"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103504\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102852"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}