{"id":103443,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/","title":{"rendered":"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? <span class=\"hl\">Job Scheduling, Planning Optimization un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Tikai da\u013c\u0113ji. Microsoft Dynamics 365 Supply Chain Management pl\u0101no\u0161anas dzinis Planning Optimization iev\u0113ro pieejamo jaudu tikai noteikt\u0101 laika interv\u0101l\u0101. Microsoft nor\u0101da, ka jaudas ierobe\u017eojumus nevajadz\u0113tu izmantot, ja jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">avots<\/a>). Savuk\u0101rt ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana rezerv\u0113 jaudu pa vienam pas\u016bt\u012bjumam, \u0146emot v\u0113r\u0101 jau rezerv\u0113to jaudu. \u0100rpus \u0161\u012bm iesp\u0113j\u0101m D365 veido aptuvenu pl\u0101nu. Ra\u017eotnes, kur\u0101m vis\u0101 pl\u0101no\u0161anas period\u0101 vajadz\u012bgs prec\u012bzs grafiks ar konkr\u0113tiem izpildes laikiem katram pas\u016bt\u012bjumam, iev\u0113rojot iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu pieejam\u012bbu un p\u0101rregul\u0113\u0161anas laiku, l\u012bdztekus Supply Chain Management izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 rakst\u0101 apl\u016bkota Supply Chain Management \u2014 finan\u0161u un oper\u0101ciju p\u0101rvald\u012bbas lietotne, kas aizst\u0101ja Dynamics AX. Business Central ir cits produkts ar at\u0161\u0137ir\u012bgu pl\u0101no\u0161anas modeli. Tas apl\u016bkots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/\">Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot pieejamo jaudu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-d365-scm-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 D365 SCM sast\u0101da ra\u017eo\u0161anas grafiku: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Resursi, resursu grupas un kalend\u0101ri<\/h3>\n\n\n<p>Jaudu nosaka <strong>resursiem<\/strong>. Katram resursam ir tips: Vendor, Human resources, Machine, Tool, Location vai Facility. Lapas <strong>Resources<\/strong> izv\u0113r\u0161amaj\u0101 sada\u013c\u0101 Operation katram resursam ir \u0161\u0101di iestat\u012bjumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Finite capacity<\/strong> un <strong>Bottleneck resource<\/strong><\/li>\n\n\n<li><strong>Exclusive<\/strong> un <strong>Batch capacity<\/strong><\/li>\n\n\n<li><strong>Efficiency percentage<\/strong> un <strong>Operations scheduling percentage<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Resursi pieder <strong>resursu grup\u0101m<\/strong> un ra\u017eo\u0161anas vien\u012bb\u0101m, un tiem ir noteiktas <strong>sp\u0113jas<\/strong>. Darba laika kalend\u0101rus pie\u0161\u0137ir resursu grupai. Efektivit\u0101te maina rezerv\u0113to laiku: &#8220;Scheduling time = Time x 100 \/ Efficiency percentage.&#8221; (Pl\u0101no\u0161anas laiku apr\u0113\u0137ina, kori\u0123\u0113jot laiku atbilsto\u0161i efektivit\u0101tei procentos.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>)<\/p>\n\n\n<p>Ja resursa iestat\u012bjumam Finite capacity ir v\u0113rt\u012bba No, tas &#8220;might therefore be overbooked.&#8221; (t\u0101d\u0113\u013c tam var iepl\u0101not liel\u0101ku slodzi par pieejamo jaudu.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/operations-resources\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Tehnolo\u0123iskie mar\u0161ruti un ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/h3>\n\n\n<p><strong>Tehnolo\u0123iskaj\u0101 mar\u0161rut\u0101<\/strong> ir ietvertas <strong>mar\u0161ruta oper\u0101cijas<\/strong>, kuru parametri noteikti atbilsto\u0161i resursu pras\u012bb\u0101m. Apstiprin\u0101ti pl\u0101notie pas\u016bt\u012bjumi k\u013c\u016bst par <strong>ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/strong>, kas sec\u012bgi p\u0101riet statusos Created, Estimated, Scheduled, Released, Started, Reported as finished un Ended.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Oper\u0101ciju pl\u0101no\u0161ana: aptuvena jaudas rezerv\u0113\u0161ana resursu grup\u0101m<\/h3>\n\n\n<p>Oper\u0101ciju pl\u0101no\u0161ana rezerv\u0113 jaudu resursu grup\u0101m. Microsoft to skaidro \u0161\u0101di: &#8220;Unlike job scheduling, operations scheduling doesn&#8217;t explode the operations&#8230; into jobs.&#8221; (At\u0161\u0137ir\u012bb\u0101 no ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anas oper\u0101ciju pl\u0101no\u0161ana nesadala oper\u0101cijas&#8230; ra\u017eo\u0161anas uzdevumos.) T\u0101 \u0146em v\u0113r\u0101 tikai ilgumu: &#8220;Start times and end times aren&#8217;t scheduled.&#8221; (S\u0101kuma un beigu laiks netiek iepl\u0101nots.) Konkr\u0113ts resurss netiek izv\u0113l\u0113ts. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/operations-scheduling\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana: kur tiek iev\u0113rota pieejam\u0101 jauda<\/h3>\n\n\n<p>Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana sadala katru oper\u0101ciju uzdevumos (p\u0101rregul\u0113\u0161ana, apstr\u0101de, gaid\u012b\u0161ana rind\u0101, transport\u0113\u0161ana) un rezerv\u0113 tiem konkr\u0113tus resursus. Microsoft nor\u0101da: &#8220;Job scheduling is typically used to schedule individual jobs on the shop floor for an immediate or short-term time frame.&#8221; (Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu parasti izmanto, lai iepl\u0101notu atsevi\u0161\u0137us uzdevumus ra\u017eo\u0161anas ceh\u0101 t\u016bl\u012bt\u0113jai izpildei vai \u012bstermi\u0146\u0101.)<\/p>\n\n\n<p>Dialoglodzi\u0146\u0101 <strong>Schedule jobs<\/strong> nosaka \u0161\u0101dus iestat\u012bjumus:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Iestat\u012bjums<\/th><th>Darb\u012bba<\/th><\/tr><\/thead><tbody><tr><td>Scheduling direction<\/td><td>Uz priek\u0161u vai atpaka\u013c no nor\u0101d\u012bta datuma<\/td><\/tr><tr><td>Finite capacity<\/td><td>Slodze &#8220;can&#8217;t be larger than the capacity that&#8217;s available&#8221; (nedr\u012bkst p\u0101rsniegt pieejamo jaudu)<\/td><\/tr><tr><td>Finite materials<\/td><td>Ja \u0161is iestat\u012bjums nav iesl\u0113gts, &#8220;the system assumes that all items are available&#8221; (sist\u0113ma pie\u0146em, ka visas preces ir pieejamas)<\/td><\/tr><tr><td>Primary resource selection<\/td><td>P\u0113c ilguma vai priorit\u0101tes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Finite capacity \u0146em v\u0113r\u0101 citu pas\u016bt\u012bjumu rezerv\u0101cijas: laiks ir pieejams tad, kad resurss ir pieejams &#8220;and there are no other reservations on capacity.&#8221; (un t\u0101 jaudai nav citu rezerv\u0101ciju.) Finite properties nodro\u0161ina, ka resurss atbilst mar\u0161ruta oper\u0101cijai noteiktaj\u0101m \u012bpa\u0161\u012bb\u0101m. Ja iesl\u0113gts Finite materials, &#8220;a production order can&#8217;t be scheduled to start until capacity and materials are available at the same time.&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjuma s\u0101kumu nevar iepl\u0101not, kam\u0113r vienlaikus nav pieejama gan jauda, gan materi\u0101li.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Gantt diagramma ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anai<\/h3>\n\n\n<p>Pl\u0101not\u0101js p\u0101rskata ra\u017eo\u0161anas uzdevumus <strong>Gantt diagramm\u0101<\/strong>, ko var atv\u0113rt no ra\u017eo\u0161anas pas\u016bt\u012bjuma, resursa vai darbvietas <strong>Production floor management<\/strong>. Tai ir pas\u016bt\u012bjumu skats Order view un resursu skats Resource view. Resursu skat\u0101 jaudas josla sarkan\u0101 kr\u0101s\u0101 nor\u0101da p\u0101rslogojumu, savuk\u0101rt materi\u0101lu tr\u016bkumu apz\u012bm\u0113 ikonas. Izv\u0113ln\u0113 Schedule jobs vienu vai vair\u0101kus atlas\u012btus ra\u017eo\u0161anas uzdevumus var iepl\u0101not uz priek\u0161u no pl\u0101no\u0161anas datuma, atpaka\u013c vai uz priek\u0161u no materi\u0101lu pieejam\u012bbas datuma. Pl\u0101not\u0101ji var ar\u012b sak\u0101rtot uzdevumus vienam resursam un p\u0101rcelt tos uz citu resursu. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Pieejam\u0101s jaudas iev\u0113ro\u0161ana ar Planning Optimization<\/h3>\n\n\n<p><strong>Planning Optimization<\/strong> ir Microsoft pl\u0101no\u0161anas dzinis pamatpl\u0101no\u0161anai. Tas darbojas k\u0101 pievienojumprogramma, ko instal\u0113 no Lifecycle Services k\u0101 \u0101r\u0113ju vair\u0101ku nomnieku pakalpojumu. Ieb\u016bv\u0113tais pamatpl\u0101no\u0161anas dzinis m\u0101ko\u0146a vid\u0113s ir atz\u012bts par novecoju\u0161u. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/deprecated-master-planning-overview\">avots<\/a>)<\/p>\n\n\n<p>Pieejam\u0101s jaudas iev\u0113ro\u0161ana j\u0101iesl\u0113dz tr\u012bs viet\u0101s:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Master planning parameters<\/strong> ciln\u0113 Planned orders: iestat\u012bjumam Capacity planning for Production j\u0101nor\u0101da v\u0113rt\u012bba Yes.<\/li>\n\n\n<li><strong>Master plans<\/strong> izv\u0113r\u0161amaj\u0101 sada\u013c\u0101 General: iestat\u012bjumam Finite capacity j\u0101nor\u0101da v\u0113rt\u012bba Yes un j\u0101nosaka <strong>Finite capacity time fence<\/strong>.<\/li>\n\n\n<li><strong>Katram resursam<\/strong> izv\u0113r\u0161amaj\u0101 sada\u013c\u0101 Operation: iestat\u012bjumam Finite capacity j\u0101nor\u0101da v\u0113rt\u012bba Yes.<\/li>\n\n<\/ol>\n\n\n<p>Noteiktaj\u0101 laika interv\u0101l\u0101 &#8220;if there isn&#8217;t enough capacity on the resources, the delivery date is pushed out.&#8221; (ja resursiem nepietiek jaudas, pieg\u0101des datums tiek p\u0101rcelts uz v\u0113l\u0101ku laiku.) Pl\u0101notie ra\u017eo\u0161anas pas\u016bt\u012bjumi &#8220;are backward-scheduled from the requirement date.&#8221; (tiek pl\u0101noti atpaka\u013c no vajadz\u012bbas datuma.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pamatpl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem nav paredz\u0113ta gad\u012bjumiem, kad jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m.<\/strong> &#8220;If your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality, because the calculated processing times won&#8217;t be correct.&#8221; (Ja jauda var main\u012bties l\u012bdz ar vajadz\u012bb\u0101m, piem\u0113ram, str\u0101d\u0101jot mai\u0146\u0101s, nevajadz\u0113tu izmantot funkciju, kas pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus, jo apr\u0113\u0137in\u0101tie apstr\u0101des laiki neb\u016bs pareizi.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">avots<\/a>)<\/li>\n\n\n<li><strong>Jaudu iev\u0113ro tikai noteiktaj\u0101 laika interv\u0101l\u0101.<\/strong> \u0100rpus Finite capacity time fence pl\u0101no\u0161an\u0101 pie\u0146em, ka jauda ir neierobe\u017eota. Microsoft nor\u0101da: &#8220;a single-day time fence is probably too low for most manufacturers.&#8221; (vienas dienas laika interv\u0101ls liel\u0101kajai da\u013cai ra\u017eot\u0101ju, visticam\u0101k, ir p\u0101r\u0101k \u012bss.)<\/li>\n\n\n<li><strong>\u0160auraj\u0101m viet\u0101m nav atsevi\u0161\u0137a pl\u0101no\u0161anas perioda.<\/strong> Planning Optimization &#8220;doesn&#8217;t use the Bottleneck time fence parameter&#8230; bottleneck resources are always scheduled by using the same time fence as non-bottleneck resources.&#8221; (neizmanto parametru Bottleneck time fence&#8230; resursi, kas veido \u0161aur\u0101s vietas, vienm\u0113r tiek pl\u0101noti taj\u0101 pa\u0161\u0101 laika interv\u0101l\u0101 k\u0101 p\u0101r\u0113jie resursi.)<\/li>\n\n\n<li><strong>Vair\u0101kpavedienu izpild\u0113 jaudas ierobe\u017eojumus ne\u0146em v\u0113r\u0101.<\/strong> &#8220;If you&#8217;re using multi-threaded master planning and operations scheduling, finite capacity will not be considered.&#8221; (Ja izmantojat vair\u0101kpavedienu pamatpl\u0101no\u0161anu un oper\u0101ciju pl\u0101no\u0161anu, pieejam\u0101s jaudas ierobe\u017eojumi netiek \u0146emti v\u0113r\u0101.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/operations-scheduling\">avots<\/a>)<\/li>\n\n\n<li><strong>Pa vienam pas\u016bt\u012bjumam.<\/strong> Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu uz priek\u0161u vai atpaka\u013c, \u0146emot v\u0113r\u0101 jau rezerv\u0113to jaudu, un izv\u0113las resursus p\u0113c ilguma vai priorit\u0101tes. Agr\u0101k iepl\u0101notie pas\u016bt\u012bjumi saglab\u0101 savus laika interv\u0101lus.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai.<\/strong> P\u0101rregul\u0113\u0161anas laiku nosaka mar\u0161ruta oper\u0101cijai. Pamatpl\u0101no\u0161an\u0101 pl\u0101notos pas\u016bt\u012bjumus sak\u0101rto sec\u012bb\u0101 p\u0113c produkta \u012bpa\u0161\u012bb\u0101m, piem\u0113ram, kr\u0101sas un izm\u0113ra (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">avots<\/a>).<\/li>\n\n\n<li><strong>Ar vilk\u0161anu un nome\u0161anu p\u0101rvieto vienu ra\u017eo\u0161anas uzdevumu.<\/strong> Par vilk\u0161anu un nome\u0161anu nor\u0101d\u012bts: &#8220;You can only reschedule the job on the same resource, and you can only schedule one job at a time.&#8221; (Ra\u017eo\u0161anas uzdevumu var p\u0101rpl\u0101not tikai tam pa\u0161am resursam, un vienlaikus var iepl\u0101not tikai vienu uzdevumu.) Atlas\u012btos uzdevumus iepl\u0101no, sak\u0101rto vai p\u0101rce\u013c uz citu resursu, izmantojot izv\u0113lnes. Pl\u0101not\u0101ji sastopas ar\u012b ar zi\u0146ojumu &#8220;Could not schedule the job within the loaded time period.&#8221; (Neizdev\u0101s iepl\u0101not ra\u017eo\u0161anas uzdevumu iel\u0101d\u0113taj\u0101 laika period\u0101.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">avots<\/a>)<\/li>\n\n\n<li><strong>32 resursi vienai oper\u0101cijai.<\/strong> &#8220;You can schedule a maximum of 32 resources per operation.&#8221; (Tas ir maksim\u0101lais resursu skaits, ko var iepl\u0101not vienai oper\u0101cijai.)<\/li>\n\n<\/ul>\n\n\n<p>Kopum\u0101 D365 SCM iev\u0113ro pieejamo jaudu tikai atsevi\u0161\u0137os gad\u012bjumos: noteikt\u0101 laika interv\u0101l\u0101, ar nemain\u012bgu jaudu un pa vienam pas\u016bt\u012bjumam. P\u0101r\u0113jais ir aptuvens pl\u0101ns, ko pl\u0101not\u0101ji manu\u0101li kori\u0123\u0113 Gantt diagramm\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-d365-scm-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar D365 SCM ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu un Planning Optimization pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pl\u0101nojot pas\u016bt\u012bjumus pa vienam priorit\u0101\u0161u sec\u012bb\u0101, ieg\u016bstat vajadz\u012bgo rezult\u0101tu.<\/li>\n\n\n<li>Mai\u0146u grafiki ir nemain\u012bgi, t\u0101p\u0113c pamatpl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem apr\u0113\u0137ina pareizus laikus.<\/li>\n\n\n<li>Lai iepl\u0101notu p\u0101rregul\u0113\u0161anu, pietiek ar katrai oper\u0101cijai noteikto p\u0101rregul\u0113\u0161anas laiku vai pas\u016bt\u012bjumu sak\u0101rto\u0161anu p\u0113c produkta \u012bpa\u0161\u012bb\u0101m.<\/li>\n\n\n<li>Pl\u0101not\u0101jam ir vajadz\u012bga tikai aptuvena jaudas p\u0101rbaude pamatpl\u0101no\u0161an\u0101.<\/li>\n\n\n<li>Mainoties pl\u0101niem, pl\u0101not\u0101jiem ir laiks p\u0101rpl\u0101not un piel\u0101got ra\u017eo\u0161anas uzdevumus Gantt diagramm\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas atbilst j\u016bsu ra\u017eotnes situ\u0101cijai, iesl\u0113dziet Finite capacity visiem b\u016btiskajiem resursiem un izv\u0113lieties re\u0101listisku laika interv\u0101lu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bga ra\u017eo\u0161anas pl\u0101no\u0161anas sist\u0113ma, kas iev\u0113ro pieejamo jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113taj\u0101m iesp\u0113j\u0101m vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem apst\u0101k\u013ciem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Daudzi ra\u017eo\u0161anas pas\u016bt\u012bjumi izmanto vienas un t\u0101s pa\u0161as iek\u0101rtas, un rezult\u0101ts ir atkar\u012bgs no sec\u012bbas, k\u0101d\u0101 pas\u016bt\u012bjumus iepl\u0101nojat.<\/li>\n\n\n<li>Mai\u0146as, virsstundas un darbinieku promb\u016btne katru ned\u0113\u013cu maina pieejamo jaudu.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana ir atkar\u012bga no ra\u017eo\u0161anas sec\u012bbas.<\/li>\n\n\n<li>Vair\u0101k\u0101m iek\u0101rt\u0101m kop\u012bgi izmanto veidnes, \u0161tances vai pal\u012bgier\u012bces, un da\u017eiem ra\u017eo\u0161anas uzdevumiem vajadz\u012bgi vair\u0101ki operatori vienlaikus.<\/li>\n\n\n<li>Materi\u0101lu pien\u0101k\u0161ana nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not ra\u017eo\u0161anu vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visi pas\u016bt\u012bjumi un resursi tiek pl\u0101noti kop\u0101<\/strong>, nevis katrs ra\u017eo\u0161anas pas\u016bt\u012bjums atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai un mai\u0146\u0101m<\/strong>, \u0146emot v\u0113r\u0101 promb\u016btnes un virsstundas vis\u0101 pl\u0101no\u0161anas period\u0101.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: no sec\u012bbas atkar\u012bgi, asimetriski p\u0101rregul\u0113\u0161anas laiki, ko izmanto, lai l\u012bdz minimumam samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong> un ra\u017eo\u0161anas uzdevumi, kam vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lus<\/strong> un p\u0101rbaudot kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkumu pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, ko pl\u0101no\u0161anas dzinis izmanto, kad prim\u0101rais resurss nav pieejams.<\/li>\n\n\n<li><strong>Gantt diagrammas redi\u0123\u0113\u0161ana, kur\u0101, p\u0101rvietojot vienu ra\u017eo\u0161anas uzdevumu, p\u0101r\u0113jais grafiks paliek saska\u0146ots.<\/strong><\/li>\n\n\n<li><strong>Autom\u0101tiska grafika p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties situ\u0101cijai ra\u017eo\u0161an\u0101 vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Skaidrs atbild\u012bbas sadal\u012bjums ar SCM.<\/strong> Noskaidrojiet, k\u0101 iepl\u0101notie datumi non\u0101k ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 un tehnolo\u0123isk\u0101 mar\u0161ruta oper\u0101cij\u0101s un k\u0101 tiek nov\u0113rsta to p\u0101rrakst\u012b\u0161ana ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anas laik\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>D365 SCM ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana un Planning Optimization<\/strong> nodro\u0161ina atsevi\u0161\u0137u pas\u016bt\u012bjumu pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai un pamatpl\u0101no\u0161anu, kur\u0101 \u0146emta v\u0113r\u0101 jauda.<\/li>\n\n\n<li><strong>Lielo uz\u0146\u0113mumu APS risin\u0101jumu komplektus<\/strong> integr\u0113 ievie\u0161anas projekta gait\u0101, un ar tiem str\u0101d\u0101 \u012bpa\u0161i \u0161im darbam izveidota pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anas pane\u013ci<\/strong> att\u0113lo ra\u017eo\u0161anas pas\u016bt\u012bjumus vizu\u0101l\u0101 panel\u012b, kur tos p\u0101rvalda pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar darba izpildes uzskaiti ra\u017eo\u0161anas ceh\u0101<\/strong> \u2014 pie \u0161\u012bs grupas pieder SkyPlanner \u2014 darbojas l\u012bdz\u0101s Supply Chain Management, autom\u0101tiski sast\u0101da grafiku katram resursam un nep\u0101rtraukti p\u0101rpl\u0101no to, mainoties situ\u0101cijai ra\u017eo\u0161an\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS vienlaikus pl\u0101no visus ra\u017eo\u0161anas pas\u016bt\u012bjumus un visas darba stacijas. Arcturus AI dzinis da\u017e\u0101s sekund\u0113s izveido grafiku oper\u0101ciju l\u012bmen\u012b, nosakot sec\u012bbu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities. Running Time Lock ne\u013cauj p\u0101rvietot jau izpild\u0113 eso\u0161os ra\u017eo\u0161anas uzdevumus.<\/p>\n\n\n<p>Pieejam\u0101 jauda tiek noteikta p\u0113c faktiskaj\u0101m mai\u0146\u0101m, person\u0101la, atva\u013cin\u0101jumiem un virsstundu mai\u0146\u0101m, t\u0101p\u0113c jaudas izmai\u0146as ir ierasta pl\u0101no\u0161anas da\u013ca. P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim ir nor\u0101d\u012bts p\u0101rejas laiks abos virzienos, un dzinis izv\u0113las sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam vienlaikus var b\u016bt vajadz\u012bgi vair\u0101ki operatori.<\/p>\n\n\n<p>Sast\u0101dot grafiku p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, balstoties uz pa\u0161reiz\u0113jiem atlikumiem un gaid\u0101maj\u0101m pieg\u0101d\u0113m p\u0113c iepirkumu pas\u016bt\u012bjumiem. T\u0101d\u0113j\u0101di darbs tiek iepl\u0101nots tikai tad, kad materi\u0101li ir pieejami. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, un iev\u0113ro j\u016bsu noteiktos blo\u0137\u0113jumus un priorit\u0101tes. Operatori redz savu darbu rindu un re\u0123istr\u0113 paveikto ar Mobile Confirmations.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis D365, ja<\/strong> v\u0113laties pilnv\u0113rt\u012bgu ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai, nevis tikai da\u013c\u0113ju jaudas ierobe\u017eojumu iev\u0113ro\u0161anu. SkyPlanner \u0146em v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la ierobe\u017eoto pieejam\u012bbu konkr\u0113taj\u0101 br\u012bd\u012b vis\u0101 pl\u0101no\u0161anas period\u0101, nevis tikai noteikt\u0101 laika interv\u0101l\u0101.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis D365 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu, ja<\/strong> daudziem pas\u016bt\u012bjumiem vajadz\u012bgas vienas un t\u0101s pa\u0161as iek\u0101rtas. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana apstr\u0101d\u0101 pas\u016bt\u012bjumus pa vienam, un lab\u0101kos laika interv\u0101lus sa\u0146em tas pas\u016bt\u012bjums, kuru iepl\u0101no pirmo. SkyPlanner da\u017eu sekun\u017eu laik\u0101 pl\u0101no visus pas\u016bt\u012bjumus kop\u0101, savuk\u0101rt Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Planning Optimization pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem, ja<\/strong> mai\u0146as, virsstundas un promb\u016btnes maina j\u016bsu pieejamo jaudu. Pa\u0161a Microsoft vadl\u012bnijas \u0161\u0101d\u0101 gad\u012bjum\u0101 izsl\u0113dz jaudas ierobe\u017eojumu izmanto\u0161anu \u0123ener\u0101lpl\u0101no\u0161an\u0101. SkyPlanner vis\u0101 pl\u0101no\u0161anas period\u0101 balst\u0101s uz faktiskaj\u0101m mai\u0146\u0101m.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis abus \u0161os risin\u0101jumus, ja<\/strong> to, kuru ra\u017eo\u0161anas uzdevumu var izpild\u012bt n\u0101kamo, nosaka no sec\u012bbas atkar\u012bga p\u0101rregul\u0113\u0161ana, koplietojami instrumenti, uzdevumi, kuru izpildei vajadz\u012bgi vair\u0101ki operatori, un materi\u0101lu pien\u0101k\u0161ana, un ja v\u0113laties s\u0101kt darbu ar sist\u0113mu da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma. Operatoriem ir pieejams Mobile Confirmations.<\/p>\n\n\n<p>S\u0101ciet ar savu ra\u017eo\u0161anas pas\u016bt\u012bjumu eksportu un izmantojiet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> (l\u012bdz 20 darba stacij\u0101m, bez kred\u012btkartes). Cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba stacijas.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Dynamics 365 Supply Chain Management, izmantojot t\u0101 standarta datu ent\u012btijas. SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101. Lasiet p\u0101rskatu par <a href=\"\/lv\/integracija\/erp\/dynamics-365-scm\/\">SkyPlanner risin\u0101jumu Dynamics 365 SCM lietot\u0101jiem<\/a>, <a href=\"\/lv\/integracija\/erp\/dynamics-365-scm\/integracijas-celvedis\/\">Dynamics 365 SCM integr\u0101cijas rokasgr\u0101matu<\/a> vai skatiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013cu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un komut\u0101cijas iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana vis\u0101m darba stacij\u0101m aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedzis 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 ap 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp oper\u0101ciju pl\u0101no\u0161anu un ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">Oper\u0101ciju pl\u0101no\u0161ana rezerv\u0113 laiku resursu grup\u0101s, bet nenosaka s\u0101kuma un beigu laiku un neizv\u0113las konkr\u0113tu resursu. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana sadala oper\u0101cijas sagatavo\u0161anas, apstr\u0101des, gaid\u012b\u0161anas un transport\u0113\u0161anas uzdevumos un iepl\u0101no tos konkr\u0113tiem resursiem. Tas ir \u012bstermi\u0146a pl\u0101no\u0161anas l\u012bmenis, kur\u0101 tiek iev\u0113rota pieejam\u0101 jauda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ar Planning Optimization jaudas ierobe\u017eojumiem pietiek ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. T\u0101 ir \u0123ener\u0101lpl\u0101no\u0161anas funkcija, kas iev\u0113ro jaudas ierobe\u017eojumus tikai Finite capacity time fence interv\u0101l\u0101, bet \u0101rpus t\u0101 pie\u0146em neierobe\u017eotu jaudu. Microsoft neiesaka to izmantot, ja mai\u0146as maina pieejamo jaudu. T\u0101 nosaka pl\u0101noto ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus un jaudu, savuk\u0101rt ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana iepl\u0101no uzdevumus konkr\u0113tiem resursiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai mums izmantot D365 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu un Planning Optimization vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izmantojiet Planning Optimization materi\u0101lu pl\u0101no\u0161anai, bet SkyPlanner \u2014 grafika sast\u0101d\u012b\u0161anai atbilsto\u0161i re\u0101lajai jaudai. D365 iev\u0113ro jaudas ierobe\u017eojumus tikai da\u013c\u0113ji: tikai noteiktaj\u0101 laika interv\u0101l\u0101 un ne tad, ja jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m. Turkl\u0101t ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161an\u0101 pas\u016bt\u012bjumi tiek apstr\u0101d\u0101ti pa vienam, t\u0101p\u0113c pirmais iepl\u0101notais pas\u016bt\u012bjums sa\u0146em lab\u0101kos laika interv\u0101lus. SkyPlanner vienlaikus pl\u0101no visus pas\u016bt\u012bjumus, iek\u0101rtas, darbiniekus, instrumentus un materi\u0101lus atbilsto\u0161i to re\u0101lajai pieejam\u012bbai, izmantojot p\u0101rregul\u0113\u0161anas laiku matricu, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens. Autopilot p\u0101rpl\u0101no grafiku p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m. S\u0101ksiet darbu da\u017eu ned\u0113\u013cu laik\u0101; cena ir no 199 \u20ac m\u0113nes\u012b, un ir pieejams 30 dienu izm\u0113\u0123in\u0101jums ar j\u016bsu datiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai D365 SCM \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgus p\u0101rregul\u0113\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">P\u0101rregul\u0113\u0161anas laiku nosaka katrai tehnolo\u0123isk\u0101 mar\u0161ruta oper\u0101cijai, un \u0123ener\u0101lpl\u0101no\u0161ana var sak\u0101rtot pl\u0101notos pas\u016bt\u012bjumus p\u0113c produktu \u012bpa\u0161\u012bb\u0101m, piem\u0113ram, kr\u0101sas un izm\u0113ra. SkyPlanner APS izmanto p\u0101rregul\u0113\u0161anas laiku matricu (no zilas kr\u0101sas uz sarkanu \u2014 30 min\u016btes, no sarkanas uz zilu \u2014 60) un nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu t\u0101, lai samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Planning Optimization?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Planning Optimization turpina pl\u0101not materi\u0101lus un ierosin\u0101t pl\u0101notos ra\u017eo\u0161anas pas\u016bt\u012bjumus. SkyPlanner sast\u0101da apstiprin\u0101to ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku visiem resursiem un nos\u016bta iepl\u0101notos datumus atpaka\u013c uz Supply Chain Management.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isk\u0101 mar\u0161ruta oper\u0101cijas un resursus Excel vai CSV form\u0101t\u0101, import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet ieg\u016bto grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS Tikai da\u013c\u0113ji. Microsoft Dynamics 365 Supply Chain Management pl\u0101no\u0161anas dzinis Planning Optimization iev\u0113ro pieejamo jaudu tikai noteikt\u0101 laika interv\u0101l\u0101. Microsoft nor\u0101da, ka jaudas &#8230; <a title=\"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/\" aria-label=\"Read more about Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102823,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103443","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Dynamics 365 SCM pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamai jaudai?<\/title>\n<meta name=\"description\" content=\"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/razosanas-planosana\\\/\",\"name\":\"Vai Dynamics 365 SCM pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamai jaudai?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Dynamics 365 SCM pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamai jaudai?","description":"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS","og_description":"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/","name":"Vai Dynamics 365 SCM pl\u0101no ra\u017eo\u0161anu atbilsto\u0161i pieejamai jaudai?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"D365 SCM pl\u0101no atbilsto\u0161i jaudai pa pas\u016bt\u012bjumam; Planning Optimization \u2014 tikai laika robe\u017e\u0101s. Abu iesp\u0113jas un ierobe\u017eojumi. Kad vajag APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/"},{"@type":"ListItem","position":5,"name":"Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management Vai Dynamics 365 Supply Chain Management atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un darbinieku jaudu? Job Scheduling, Planning Optimization un SkyPlanner APS Tikai da\u013c\u0113ji. Microsoft Dynamics 365 Supply Chain Management pl\u0101no\u0161anas dzinis Planning Optimization iev\u0113ro pieejamo jaudu tikai noteikt\u0101 laika interv\u0101l\u0101. Microsoft nor\u0101da, ka jaudas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103443"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103443\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102823"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}