{"id":103383,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/acumatica\/razosanas-planosana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/","title":{"rendered":"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? <span class=\"hl\">Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Tikai aptuven\u0101s pl\u0101no\u0161anas l\u012bmen\u012b. Acumatica Manufacturing Edition modulis Advanced Planning and Scheduling (APS) darbojas k\u0101 Rough Cut Planning, nevis sast\u0101da detaliz\u0113tu grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Classic APS rezerv\u0113 darba centrus, iek\u0101rtas un instrumentus fiks\u0113tos laika blokos, bet pas\u016bt\u012bjumus, kuru beigu datums ir t\u0101l\u0101k par 120 dien\u0101m, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">avots<\/a>). Optimized pl\u0101no\u0161anas dzinis, kas ieviests 2026 R2 un joproj\u0101m ir eksperiment\u0101ls, pl\u0101no tikai darba centrus. Ra\u017eotnes, kur\u0101m vis\u0101 pl\u0101no\u0161anas period\u0101 vajadz\u012bgs grafiks ar konkr\u0113tiem laikiem, iev\u0113rojot katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101lo pieejam\u012bbu, l\u012bdz\u0101s Acumatica izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-acumatica-aps-works-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas Acumatica APS: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Iesl\u0113dziet vienu pl\u0101no\u0161anas dzini<\/h3>\n\n\n<p>APS ir funkcija ekr\u0101na <strong>Enable\/Disable Features (CS100000)<\/strong> grup\u0101 Manufacturing. Versij\u0101 2026 R2 ir divi varianti: <strong>Advanced Planning and Scheduling (Classic)<\/strong> un <strong>Advanced Planning and Scheduling (Optimized)<\/strong>. Lai iesl\u0113gtu otro, nor\u0101d\u012bts: &#8220;select the Advanced Planning and Scheduling (Optimized) check box under Experimental Features.&#8221; (Sada\u013c\u0101 Experimental Features atz\u012bm\u0113jiet izv\u0113les r\u016bti\u0146u Advanced Planning and Scheduling (Optimized).) Acumatica skaidri nor\u0101da: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (Abus APS pl\u0101no\u0161anas dzi\u0146us nevar iesl\u0113gt vienlaikus.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Ra\u017eo\u0161anas jaudas pamatdati<\/h3>\n\n\n<p>Jaudas iestat\u012b\u0161ana s\u0101kas ekr\u0101n\u0101 <strong>Work Calendar (CS209000)<\/strong>: darba dienas, s\u0101kuma un beigu laiki, p\u0101rtraukumi. Katram darba centram ekr\u0101n\u0101 <strong>Work Centers (AM207000)<\/strong> ir viena vai vair\u0101kas mai\u0146as, un katrai ir savs kalend\u0101rs. Acumatica nor\u0101da: &#8220;The daily capacity for a work center is the total number of working hours for all shifts.&#8221; (Darba centra dienas jauda ir visu mai\u0146u darba stundu kopsumma.)<\/p>\n\n\n<p>Lauks <strong>Basis for Capacity<\/strong> nosaka, uz k\u0101 pamata apr\u0113\u0137ina ilgumu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Mai\u0146as <strong>Crew Size<\/strong> un <strong>Efficiency<\/strong> \u2014 darba centriem, kuru jaudu nosaka darbasp\u0113ks<\/li>\n\n\n<li><strong>Machines (AM204500)<\/strong> ar savu kalend\u0101ru un efektivit\u0101ti \u2014 darba centriem, kuru jaudu nosaka iek\u0101rtas<\/li>\n\n<\/ul>\n\n\n<p>Grafik\u0101 var iek\u013caut ar\u012b <strong>Tools (AM205500)<\/strong>. Ekr\u0101n\u0101 <strong>Production Preferences (AM102000)<\/strong> izv\u0113lieties <strong>Block Size<\/strong> un nor\u0101diet, vai APS j\u0101\u0146em v\u0113r\u0101 iek\u0101rtas un instrumenti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Oper\u0101cijas ir iek\u013cautas BOM<\/h3>\n\n\n<p>Acumatica nav atsevi\u0161\u0137u tehnolo\u0123isko procesu pamatdatu. Oper\u0101cijas ir iek\u013cautas <strong>Bill of Material (AM208000)<\/strong>. Katrai oper\u0101cijai ir nor\u0101d\u012bti \u0161\u0101di dati:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation ID<\/strong> un <strong>Work Center<\/strong><\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Machine Time<\/strong><\/li>\n\n\n<li><strong>Queue Time<\/strong>, <strong>Finish Time<\/strong> un <strong>Move Time<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Veidojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, oper\u0101cijas tiek iekop\u0113tas pas\u016bt\u012bjum\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas pas\u016bt\u012bjuma iek\u013cau\u0161ana grafik\u0101<\/h3>\n\n\n<p>Katram ra\u017eo\u0161anas pas\u016bt\u012bjumam ir nor\u0101d\u012bta <strong>Scheduling Method<\/strong>:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Metode<\/th><th>Darb\u012bba<\/th><\/tr><\/thead><tbody><tr><td>Finish On<\/td><td>Sast\u0101da grafiku atpaka\u013cgait\u0101 no ierobe\u017eojo\u0161\u0101 datuma<\/td><\/tr><tr><td>Start On<\/td><td>Sast\u0101da grafiku uz priek\u0161u no ierobe\u017eojo\u0161\u0101 datuma<\/td><\/tr><tr><td>User Dates<\/td><td>Izmanto manu\u0101li ievad\u012btos s\u0101kuma un beigu datumus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">5. Rough Cut Planning: pl\u0101no\u0161ana jaudas robe\u017e\u0101s<\/h3>\n\n\n<p>Classic APS izv\u0113l\u0113tajiem pas\u016bt\u012bjumiem palai\u017eat pl\u0101no\u0161anu ekr\u0101n\u0101 <strong>Rough Cut Planning (AM501000)<\/strong>. Sec\u012bba, k\u0101d\u0101 tiek noslogoti resursi, ir fiks\u0113ta: vispirms <strong>Dispatch Priority<\/strong> (&#8220;One (1) is the highest priority and ten (10) is the lowest&#8221; (Viens (1) ir augst\u0101k\u0101 priorit\u0101te, bet desmit (10) \u2014 zem\u0101k\u0101)), tad ierobe\u017eojo\u0161ais datums un visbeidzot ra\u017eo\u0161anas pas\u016bt\u012bjuma numurs. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">avots<\/a>)<\/p>\n\n\n<p>Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 tiek \u0146emta v\u0113r\u0101 darba centru, iek\u0101rtu un instrumentu jauda un pa\u0161reiz\u0113j\u0101 noslodze. &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (Oper\u0101cijas vienm\u0113r tiek pl\u0101notas sec\u012bgos blokos, izlai\u017eot \u0101rpusdarba laiku un grafik\u0101 paredz\u0113tos p\u0101rtraukumus.) Bloku ilgums ir 5, 10, 15, 30 vai 60 min\u016btes. Materi\u0101lu pieejam\u012bba tiek p\u0101rbaud\u012bta, ja vien pas\u016bt\u012bjuma veida vai kr\u0101juma vien\u012bbas iestat\u012bjumos \u0161\u012b p\u0101rbaude nav izsl\u0113gta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Grafika p\u0101rskat\u012b\u0161ana un uztur\u0113\u0161ana<\/h3>\n\n\n<p>Pl\u0101not\u0101js str\u0101d\u0101 ekr\u0101n\u0101 <strong>Production Schedule Board (AM215555)<\/strong>. Taj\u0101 pas\u016bt\u012bjumi ir redzami pa darba centriem un iek\u0101rt\u0101m, un var main\u012bt ierobe\u017eojo\u0161os datumus un priorit\u0101tes, k\u0101 ar\u012b fiks\u0113t grafikus. <strong>APS Maintenance Process (AM512000)<\/strong> periodiski atk\u0101rto grafika sast\u0101d\u012b\u0161anu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Optimized pl\u0101no\u0161anas dzinis (2026 R2, eksperiment\u0101ls)<\/h3>\n\n\n<p>Optimized pl\u0101no\u0161anas dzinis &#8220;calculates production dates with minute-level precision.&#8221; (Apr\u0113\u0137ina ra\u017eo\u0161anas laikus ar min\u016btes precizit\u0101ti.) Katram darba centram lauk\u0101 <strong>Work Center Scheduling Method<\/strong> nor\u0101da Finite vai Infinite. Finite rezerv\u0113 &#8220;the remaining available capacity during the work center&#8217;s finite scheduling time fence,&#8221; (atliku\u0161o pieejamo jaudu darba centra pl\u0101no\u0161anas period\u0101, kur\u0101 tiek iev\u0113roti jaudas ierobe\u017eojumi), ko iestata no 1 l\u012bdz 999 dien\u0101m. &#8220;A production order can include both finite and infinite work centers.&#8221; (Vien\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 var b\u016bt darba centri gan ar ierobe\u017eotu, gan neierobe\u017eotu jaudu.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Scheduling-Production-Orders?contentId=uGA1DJYAmrgLBcx6_ArzHA\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas paliek pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0113c 120 dien\u0101m Classic pie\u0146em neierobe\u017eotu jaudu.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (APS sist\u0113ma pl\u0101no ar neierobe\u017eotu jaudu tos ra\u017eo\u0161anas pas\u016bt\u012bjumus, kuru beigu datums p\u0101rsniedz min\u0113to robe\u017eu.) Aiz \u0161\u012bs robe\u017eas datumus nosaka tikai oper\u0101ciju ilgums.<\/li>\n\n\n<li><strong>Optimized ne\u0146em v\u0113r\u0101 iek\u0101rtas, instrumentus un materi\u0101lus.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (Optimized APS pl\u0101no darba centrus, nevis atsevi\u0161\u0137as iek\u0101rtas, instrumentus vai materi\u0101lu pieejam\u012bbu.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">avots<\/a>) Kad tas ir iesl\u0113gts, iek\u0101rtu un instrumentu grafiku ekr\u0101ni nav pieejami.<\/li>\n\n\n<li><strong>Sec\u012bbu nenosaka p\u0113c produktu \u012bpa\u0161\u012bb\u0101m.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (Pl\u0101no\u0161anas dzinis neizmanto atrib\u016btu v\u0113rt\u012bbas, lai noteiktu oper\u0101ciju sec\u012bbu grafik\u0101.) Katrai oper\u0101cijai Setup Time ir viena fiks\u0113ta v\u0113rt\u012bba neatkar\u012bgi no t\u0101, kas ra\u017eots iepriek\u0161.<\/li>\n\n\n<li><strong>Oper\u0101cijas netiek sadal\u012btas posmos pirms un p\u0113c jau rezerv\u0113ta laika.<\/strong> Optimized gad\u012bjum\u0101 &#8220;the engine does not split the operation around capacity already reserved by another operation.&#8221; (Pl\u0101no\u0161anas dzinis nesadala oper\u0101ciju posmos pirms un p\u0113c laika, kur\u0101 jauda jau rezerv\u0113ta citai oper\u0101cijai.) Tas ar\u012b &#8220;does not consider fixed manufacturing lead times during scheduling.&#8221; (Sast\u0101dot grafiku, ne\u0146em v\u0113r\u0101 fiks\u0113tos ra\u017eo\u0161anas izpildes laikus.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">avots<\/a>)<\/li>\n\n\n<li><strong>Darbasp\u0113ku raksturo brig\u0101des lielums.<\/strong> Darbiniekus model\u0113 k\u0101 brig\u0101des lielumu un efektivit\u0101ti darba centra mai\u0146\u0101, nevis k\u0101 konkr\u0113tus operatorus ar sav\u0101m mai\u0146\u0101m un promb\u016btn\u0113m.<\/li>\n\n\n<li><strong>Materi\u0101liem j\u0101b\u016bt pieejamiem piln\u0101 apjom\u0101.<\/strong> Kad Classic p\u0101rbauda materi\u0101lu pieejam\u012bbu, visiem materi\u0101liem j\u0101b\u016bt pieejamiem piln\u0101 nepiecie\u0161amaj\u0101 daudzum\u0101.<\/li>\n\n\n<li><strong>Fiks\u0113tie pas\u016bt\u012bjumi paliek sav\u0101s viet\u0101s.<\/strong> &#8220;When you run finite scheduling of production orders, the system does not reschedule the firmed production orders.&#8221; (Palai\u017eot ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anu jaudas robe\u017e\u0101s, sist\u0113ma nep\u0101rpl\u0101no fiks\u0113tos ra\u017eo\u0161anas pas\u016bt\u012bjumus.)<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana ir j\u0101palai\u017e, t\u0101 nav reakcija uz izmai\u0146\u0101m.<\/strong> Jums j\u0101palai\u017e Rough Cut Planning vai APS Maintenance Process.<\/li>\n\n<\/ul>\n\n\n<p>Acumatica savu pl\u0101no\u0161anu jaudas robe\u017e\u0101s nosauc prec\u012bzi: Rough Cut Planning. Brig\u0101\u017eu lielums konkr\u0113tu darbinieku viet\u0101, viens p\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai un neierobe\u017eota jauda p\u0113c 120 dien\u0101m dod aptuvenu pl\u0101nu, nevis ceham paredz\u0113tu grafiku, kas iev\u0113ro re\u0101lo jaudu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-acumatica-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Acumatica ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Classic APS ir pietiekams, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>J\u016bsu pl\u0101no\u0161anas periods ir krietni \u012bs\u0101ks par 120 dien\u0101m.<\/li>\n\n\n<li>Darbasp\u0113ks tiek pl\u0101nots kop\u0101, un brig\u0101des lielums katr\u0101 mai\u0146\u0101 to labi raksturo.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiki gandr\u012bz nav atkar\u012bgi no iepriek\u0161 ra\u017eot\u0101 produkta.<\/li>\n\n\n<li>Priorit\u0101tes un ierobe\u017eojo\u0161ie datumi atspogu\u013co pl\u0101not\u0101ja ieceri.<\/li>\n\n\n<li>Periodiska grafika p\u0101rr\u0113\u0137in\u0101\u0161ana ir pietiekama, lai sekotu izmai\u0146u tempam.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas iev\u0113ro re\u0101lo jaudu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acumatica APS vairs nav pietiekams, ja uz jums attiecas vair\u0101ki no \u0161iem nosac\u012bjumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Konkr\u0113ti operatori, vi\u0146u mai\u0146as un promb\u016btnes ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no sec\u012bbas: alerg\u0113niem, kr\u0101s\u0101m, materi\u0101liem vai instrumentiem.<\/li>\n\n\n<li>Iek\u0101rtu, instrumentu un materi\u0101lu pieejam\u012bba j\u0101p\u0101rbauda kop\u0101.<\/li>\n\n\n<li>J\u016bsu pas\u016bt\u012bjumu portfelis vai visp\u0101r\u012bg\u0101s vieno\u0161an\u0101s aptver periodu, kas p\u0101rsniedz 120 dienas.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visu resursu re\u0101l\u0101s jaudas iev\u0113ro\u0161ana vienlaikus:<\/strong> darba centri, iek\u0101rtas, darbinieki un instrumenti.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica:<\/strong> laiki p\u0101rejai starp produktiem, kas atkar\u012bgi no sec\u012bbas un at\u0161\u0137iras katr\u0101 p\u0101rejas virzien\u0101.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong>, lai viena pal\u012bgier\u012bce nekad neb\u016btu paredz\u0113ta div\u0101m iek\u0101rt\u0101m vienlaikus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumi vair\u0101kiem operatoriem<\/strong>, iev\u0113rojot katra darbinieka mai\u0146u.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lus<\/strong> un p\u0101rbaudot kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus p\u0113c pieg\u0101des datuma.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, ko pl\u0101no\u0161anas dzinis patie\u0161\u0101m izmanto.<\/li>\n\n\n<li><strong>Vizu\u0101la Gantt grafika redi\u0123\u0113\u0161ana<\/strong>, kur\u0101, p\u0101rvietojot vienu ra\u017eo\u0161anas uzdevumu, p\u0101r\u0113jais grafiks paliek saska\u0146ots.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Korekta datu ierakst\u012b\u0161ana atpaka\u013c<\/strong> Acumatica ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s, fiks\u0113jot pas\u016bt\u012bjumus, lai Acumatica APS nep\u0101rrakst\u012btu datumus.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pa\u0161as Acumatica APS<\/strong> vien\u0101 sist\u0113m\u0101 pl\u0101no noslodzi atbilsto\u0161i pieejamajai jaudai, iev\u0113rojot iepriek\u0161 min\u0113tos ierobe\u017eojumus. Acumatica nor\u0101da: &#8220;Advanced planning and scheduling is subject to licensing&#8221; (progres\u012bvajai pl\u0101no\u0161anai un grafiku sast\u0101d\u012b\u0161anai ir nepiecie\u0161ama licence; <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">avots<\/a>). Lai \u0146emtu v\u0113r\u0101 izmai\u0146as, pl\u0101not\u0101jam apr\u0113\u0137ins j\u0101palai\u017e atk\u0101rtoti.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161anas papildin\u0101jumi Acumatica saskarn\u0113<\/strong> papla\u0161ina pl\u0101no\u0161anas pane\u013ca iesp\u0113jas, bet pl\u0101no\u0161anu vada pats pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>Lielo uz\u0146\u0113mumu APS risin\u0101jumu komplektus<\/strong> pievieno ievie\u0161anas projekta ietvaros, un ar tiem str\u0101d\u0101 \u012bpa\u0161a pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> autom\u0101tiski sast\u0101da grafiku katram resursam l\u012bdz\u0101s Acumatica un nodod to operatoriem. Pie \u0161\u012bs grupas pieder SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur iederas SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ir izstr\u0101d\u0101ts tie\u0161i \u0161o tr\u016bkumu nov\u0113r\u0161anai. Katra darba centra, darbinieka un instrumenta pieejam\u012bba ir ierobe\u017eota vis\u0101 pl\u0101no\u0161anas period\u0101. Arcturus AI dzinis da\u017eu sekun\u017eu laik\u0101 izveido oper\u0101ciju l\u012bme\u0146a grafiku, nosakot sec\u012bbu p\u0113c ra\u017eo\u0161anas uzdevuma priorit\u0101tes, pabeig\u0161anas datuma, klienta priorit\u0101tes, Fast Track un Dynamic Priorities.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim ir nor\u0101d\u012bts p\u0101rejas laiks abos virzienos, pamatojoties uz produktu \u012bpa\u0161\u012bb\u0101m. Dzinis izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienu ra\u017eo\u0161anas uzdevumu vienlaikus var veikt vair\u0101ki darbinieki. Ja prim\u0101r\u0101 iek\u0101rta vai darbinieks nav pieejams, dzinis p\u0101rce\u013c darbu uz alternat\u012bv\u0101m iek\u0101rt\u0101m vai citiem darbiniekiem.<\/p>\n\n\n<p>Sast\u0101dot grafiku atbilsto\u0161i materi\u0101lu pieejam\u012bbai, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, \u0146emot v\u0113r\u0101 noliktavas atlikumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101. Kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu fiks\u0113tos elementus un priorit\u0101tes. Operatori telefon\u0101 vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Acumatica APS, ja<\/strong> atsak\u0101ties no izkl\u0101jlap\u0101m un v\u0113laties grafiku, kas pats atjaunin\u0101s, nevis v\u0113l vienu procesu, kas j\u0101palai\u017e manu\u0101li:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>V\u0113laties re\u0101lu ra\u017eo\u0161anas pl\u0101no\u0161anu, nevis aptuvenu pl\u0101nu: katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bba tiek iev\u0113rota konkr\u0113taj\u0101 laik\u0101.<\/li>\n\n\n<li>Pl\u0101nu ierobe\u017eo darbinieku faktisk\u0101 pieejam\u012bba, nevis brig\u0101des lielums, un katram darbiniekam ir savas mai\u0146as un promb\u016btnes.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no darbu sec\u012bbas, vai ar\u012b koplietojamo instrumentu pieejam\u012bba nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/li>\n\n\n<li>Iek\u0101rtu, instrumentu un materi\u0101lu pieejam\u012bba j\u0101p\u0101rbauda kop\u0101, neizv\u0113loties starp diviem dzin\u0113jiem.<\/li>\n\n\n<li>J\u016bsu pas\u016bt\u012bjumi aptver vair\u0101k nek\u0101 120 dienas, un visiem datumiem j\u0101atbilst re\u0101li pieejamajai jaudai.<\/li>\n\n\n<li>Pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101, un periodiska APS palai\u0161ana nesp\u0113j tam tikt l\u012bdzi. Autopilot p\u0101rpl\u0101no grafiku p\u0113c katr\u0101m izmai\u0146\u0101m.<\/li>\n\n\n<li>Operatoriem j\u0101redz sava uzdevumu rinda un j\u0101re\u0123istr\u0113 darbs telefon\u0101 vai plan\u0161etdator\u0101, bet paveikt\u0101 darba dati j\u0101nos\u016bta atpaka\u013c uz Acumatica.<\/li>\n\n<\/ul>\n\n\n<p>Darbu ar sist\u0113mu s\u0101ksiet da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma, un SkyPlanner komanda konfigur\u0113s un uztur\u0113s divvirzienu integr\u0101ciju.<\/p>\n\n\n<p>S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar Excel eksportu no Acumatica Generic Inquiry (l\u012bdz 20 darba centriem, bez kred\u012btkartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b ar ikm\u0113ne\u0161a nor\u0113\u0137iniem un 5 iek\u013cautiem darba centriem. Integr\u0101cijas izmaksu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar j\u016bsu pl\u0101na pied\u0101v\u0101jumu, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Acumatica, izmantojot uz datu l\u012bgumiem balst\u012bto REST API. SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101, un j\u016bsu partneris vai izstr\u0101d\u0101t\u0101ji var str\u0101d\u0101t ar dokument\u0113to <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a>. Skatiet lapu <a href=\"\/lv\/integracija\/erp\/acumatica\/\">SkyPlanner darbam ar Acumatica<\/a>, <a href=\"\/lv\/integracija\/erp\/acumatica\/integracijas-celvedis\/\">Acumatica integr\u0101cijas rokasgr\u0101matu<\/a> vai visas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darba rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na sagatavo\u0161ana trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, sal\u012bdzinot ar aptuveni 50% iepriek\u0161<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir r\u012bks, kas labi darbojas ikdien\u0101, \u012bpa\u0161i pieg\u0101des datumu noteik\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir strauji samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Acumatica ir r\u012bks ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, aptuven\u0101s pl\u0101no\u0161anas l\u012bmen\u012b. Manufacturing Edition pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus uz priek\u0161u vai atpaka\u013c, savuk\u0101rt APS papildus pied\u0101v\u0101 Rough Cut Planning un Production Schedule Board. Pas\u016bt\u012bjumus, kuru beigu datums ir t\u0101l\u0101k par 120 dien\u0101m, Classic APS pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp Classic un Optimized APS?<\/summary>\n<p class=\"sp-faq__a\">Classic rezerv\u0113 darba centrus, iek\u0101rtas un instrumentus fiks\u0113tos laika blokos no 5 l\u012bdz 60 min\u016bt\u0113m. Optimized apr\u0113\u0137ina datumus ar min\u016btes precizit\u0101ti un katram darba centram piem\u0113ro savu periodu, kur\u0101 tiek iev\u0113rota pieejam\u0101 jauda, ta\u010du sast\u0101da grafikus tikai darba centriem. Versij\u0101 2026 R2 Optimized ir eksperiment\u0101la funkcija, un vienlaikus var b\u016bt iesl\u0113gts tikai viens dzinis.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties Acumatica APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja aptuvena pl\u0101na viet\u0101 v\u0113laties re\u0101lu ra\u017eo\u0161anas grafiku, kas iev\u0113ro pieejamo jaudu. Acumatica pl\u0101no\u0161anu pieejam\u0101s jaudas robe\u017e\u0101s nodro\u0161ina Rough Cut Planning, bet Classic APS periodam p\u0113c 120 dien\u0101m pie\u0146em neierobe\u017eotu jaudu. Darbasp\u0113ku raksturo brig\u0101des lielums, katrai oper\u0101cijai ir viens fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks, un APS ir nepiecie\u0161ama licence. SkyPlanner vis\u0101 pl\u0101no\u0161anas period\u0101 iev\u0113ro katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbu konkr\u0113taj\u0101 laik\u0101. P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir \u0146emts v\u0113r\u0101 p\u0101rejas virziens, un Autopilot p\u0101rpl\u0101no grafiku p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m. Darbu s\u0101ksiet da\u017eu ned\u0113\u013cu laik\u0101; cena ir no 199 \u20ac m\u0113nes\u012b, un pieejams 30 dienu izm\u0113\u0123in\u0101jums ar j\u016bsu datiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Acumatica \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgus p\u0101rregul\u0113\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Setup Time ir fiks\u0113ta v\u0113rt\u012bba katrai BOM oper\u0101cijai, un Optimized dzinis oper\u0101ciju sec\u012bbas noteik\u0161anai neizmanto atrib\u016btu v\u0113rt\u012bbas. SkyPlanner APS izmanto p\u0101rregul\u0113\u0161anas laiku matricu, kur\u0101 nor\u0101d\u012bti p\u0101rejas laiki starp produktu p\u0101riem, piem\u0113ram, no zila uz sarkanu \u2014 30 min\u016btes, bet no sarkana uz zilu \u2014 60. Dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai \u0161os laikus samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Acumatica pl\u0101no konkr\u0113tu operatoru darbu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Darbasp\u0113ku model\u0113 k\u0101 brig\u0101des lielumu un efektivit\u0101ti darba centra mai\u0146\u0101. SkyPlanner pl\u0101no darbinieku darbu, \u0146emot v\u0113r\u0101 katra mai\u0146as, promb\u016btnes un virsstundas, un vajadz\u012bbas gad\u012bjum\u0101 vienam ra\u017eo\u0161anas uzdevumam pie\u0161\u0137ir vair\u0101kus operatorus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Acumatica?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un darba centrus no Acumatica Generic Inquiry uz Excel un import\u0113jiet tos 30 dienu izm\u0113\u0123in\u0101juma laik\u0101. Kred\u012btkarte nav nepiecie\u0161ama. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Acumatica Cloud ERP Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS Tikai aptuven\u0101s pl\u0101no\u0161anas l\u012bmen\u012b. Acumatica Manufacturing Edition modulis Advanced Planning and Scheduling (APS) darbojas k\u0101 Rough Cut Planning, nevis sast\u0101da detaliz\u0113tu grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Classic APS rezerv\u0113 darba &#8230; <a title=\"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/\" aria-label=\"Read more about Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102794,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103383","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica: ra\u017eo\u0161anas pl\u0101no\u0161ana jaudas robe\u017e\u0101s? APS ce\u013cvedis<\/title>\n<meta name=\"description\" content=\"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/razosanas-planosana\\\/\",\"name\":\"Acumatica: ra\u017eo\u0161anas pl\u0101no\u0161ana jaudas robe\u017e\u0101s? APS ce\u013cvedis\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica: ra\u017eo\u0161anas pl\u0101no\u0161ana jaudas robe\u017e\u0101s? APS ce\u013cvedis","description":"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS","og_description":"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/","name":"Acumatica: ra\u017eo\u0161anas pl\u0101no\u0161ana jaudas robe\u017e\u0101s? APS ce\u013cvedis","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Acumatica APS iev\u0113ro jaudu ar ierobe\u017eojumiem: Classic p\u0113c 120 dien\u0101m to neierobe\u017eo, Optimized pl\u0101no tikai darba centrus. Kad vajag APS, kas iev\u0113ro re\u0101lo jaudu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/"},{"@type":"ListItem","position":5,"name":"Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Acumatica Cloud ERP Vai Acumatica atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai? Classic un Optimized APS sal\u012bdzin\u0101jum\u0101 ar SkyPlanner APS Tikai aptuven\u0101s pl\u0101no\u0161anas l\u012bmen\u012b. Acumatica Manufacturing Edition modulis Advanced Planning and Scheduling (APS) darbojas k\u0101 Rough Cut Planning, nevis sast\u0101da detaliz\u0113tu grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Classic APS rezerv\u0113 darba&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103383"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103383\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102794"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}