{"id":103353,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/abas-erp\/integracijas-celvedis\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/","title":{"rendered":"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ abas ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">abas ERP integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 abas ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot abas ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un abas ERP notiek abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em datus par deta\u013c\u0101m, ra\u017eo\u0161anas sarakstiem, iek\u0101rt\u0101m, ra\u017eo\u0161anas pas\u016bt\u012bjumiem, kr\u0101jumiem un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un iek\u0101rta tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumos.<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c izpildes apstiprin\u0101\u0161anai.<\/li>\n\n\n<li>SkyPlanner nos\u016bta grafika izmai\u0146as ar webhook pal\u012bdz\u012bbu, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu abas instal\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties integr\u0101cij\u0101 vai pa\u0161i izstr\u0101d\u0101t risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-abas-erp-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">abas ERP saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>abas REST API.<\/strong> &#8220;The Abas REST API is a web interface for real-time data access to Abas ERP.&#8221; (Abas REST API ir t\u012bmek\u013ca saskarne piek\u013cuvei Abas ERP datiem re\u0101llaik\u0101.) (<a href=\"https:\/\/abas-erp.com\/en\/erp-integration\">abas<\/a>) Tas ir galvenais veids, k\u0101 nolas\u012bt ra\u017eo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas sarakstus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus, k\u0101 ar\u012b ierakst\u012bt atpaka\u013c pl\u0101notos datumus.<\/li>\n\n\n<li><strong>abas Connect.<\/strong> M\u0101ko\u0146platforma integr\u0101cijai, kas \u013cauj &#8220;configure interfaces and connections to third-party systems yourself.&#8221; (pa\u0161iem konfigur\u0113t saskarnes un savienojumus ar tre\u0161o pu\u0161u sist\u0113m\u0101m.) (<a href=\"https:\/\/abas-erp.com\/en\/product\/connectivity-iot\">abas<\/a>) Izmantojiet to notikumu vad\u012bt\u0101m pl\u016bsm\u0101m, kas nos\u016bta main\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus no abas.<\/li>\n\n\n<li><strong>abas ESDK (Essentials SDK) un AJO Java API.<\/strong> Partneriem paredz\u0113ts veids, k\u0101 \u012bstenot servera puses lo\u0123iku abas sist\u0113m\u0101. Publiski pieejamajos koda piem\u0113ros izmantotas t\u0101das klases k\u0101 <code>de.abas.erp.db.schema.part.Product<\/code>. (<a href=\"https:\/\/github.com\/esdk\/trainingApp\">GitHub<\/a>)<\/li>\n\n\n<li><strong>MS SQL Connector un ODBC.<\/strong> &#8220;The MS SQL Connector enables flexible and automated export of ERP data.&#8221; (MS SQL Connector nodro\u0161ina elast\u012bgu un automatiz\u0113tu ERP datu eksportu.) (<a href=\"https:\/\/abas-erp.com\/en\/erp-integration\">abas<\/a>) Tikai nolas\u012b\u0161anai un eksportam. Nekad neierakstiet pl\u0101no\u0161anas rezult\u0101tus ar \u0161o savienot\u0101ju, jo tad netiktu izpild\u012bta abas biznesa lo\u0123ika.<\/li>\n\n\n<li><strong>abas Data Import Toolkit un eksports failos.<\/strong> Liela datu apjoma iel\u0101dei un \u0101trai SkyPlanner izm\u0113\u0123in\u0101juma s\u0101k\u0161anai.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>abas pus\u0113 piek\u013cuvi nodro\u0161ina abas t\u012bmek\u013ca pakalpojumi, izmantojot j\u016bsu instal\u0101cij\u0101 konfigur\u0113tu tehnisko lietot\u0101ju vai pilnvaru. Izveidojiet atsevi\u0161\u0137u integr\u0101cijas lietot\u0101ju, kura ties\u012bbas aprobe\u017eojas ar atbilst\u012bbas tabul\u0101 nor\u0101d\u012btajiem objektiem. To iestata j\u016bsu abas partneris, jo sh\u0113mas un piek\u013cuves ties\u012bbas katr\u0101 abas instal\u0101cij\u0101 at\u0161\u0137iras.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API pilnvaru (SkyPlanner Settings &gt; API), un t\u0101 dokument\u0101cija ir pieejama Swagger\/OpenAPI. Lai s\u0101ktu, pietiek ar API pilnvaru. <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">Integr\u0101cijas pam\u0101c\u012bb\u0101<\/a> soli pa solim aprakst\u012bti pirmie izsaukumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Notikumi un periodiska datu aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>abas dokument\u0101cij\u0101 nav aprakst\u012bts publisks API t\u012bmek\u013ca aiz\u0137eru abon\u0113\u0161anai. Izmai\u0146as tiek nos\u016bt\u012btas no viena no trim avotiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>abas Connect pl\u016bsmas<\/strong>, kas nos\u016bta main\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus integr\u0101cijai<\/li>\n\n\n<li><strong>ESDK notikumu apstr\u0101d\u0101t\u0101ja<\/strong>, kas nostr\u0101d\u0101, saglab\u0101jot ra\u017eo\u0161anas pas\u016bt\u012bjumu vai oper\u0101ciju<\/li>\n\n\n<li><strong>regul\u0101ras datu aptaujas<\/strong> caur abas REST API, atlasot tikai atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un izmai\u0146as kop\u0161 iepriek\u0161\u0113j\u0101s aptaujas<\/li>\n\n<\/ul>\n\n\n<p>Savuk\u0101rt SkyPlanner nos\u016bta t\u012bmek\u013ca aiz\u0137eres, kad main\u0101s st\u0101voklis vai grafiks, t\u0101p\u0113c datu ierakst\u012b\u0161anu atpaka\u013c abas sist\u0113m\u0101 izraisa notikumi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>abas ERP objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013ca \/ produkts (Teil, Artikel)<\/td><td>Produkti un materi\u0101li<\/td><td>abas \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Ra\u017eo\u0161anas saraksts (Fertigungsliste): materi\u0101li un daudzl\u012bme\u0146u strukt\u016bra<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, katram produktam nepiecie\u0161amie materi\u0101li<\/td><td>abas \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Oper\u0101cijas (Arbeitsg\u00e4nge) ar apstr\u0101des un sagatavo\u0161anas laikiem<\/td><td>Procesa so\u013ci ar ilgumu un sagatavo\u0161anas laikiem<\/td><td>abas \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam \u2014 mainoties datiem<\/td><\/tr><tr><td>Iek\u0101rtas un resursi, jaudas kalend\u0101rs<\/td><td>Darba centri, darba centru grupas, mai\u0146as, promb\u016btnes<\/td><td>abas \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de; mai\u0146as atjaunina katru dienu vai uztur SkyPlanner<\/td><\/tr><tr><td>Izpildei nodots ra\u017eo\u0161anas pas\u016bt\u012bjums (Betriebsauftrag) ar daudzumu un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjums un darbi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>abas \u2192 SkyPlanner<\/td><td>Datu aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m vai nos\u016bt\u012b\u0161ana ar abas Connect<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>abas \u2192 SkyPlanner<\/td><td>Katru stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjums ar pieg\u0101des datumu<\/td><td>Ien\u0101ko\u0161ais materi\u0101ls t\u0101 pieg\u0101des datum\u0101<\/td><td>abas \u2192 SkyPlanner<\/td><td>Katru stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas: pl\u0101notais s\u0101kums, beigas, iek\u0101rta<\/td><td>Katras oper\u0101cijas grafik\u0101 noteiktais s\u0101kums, beigas un darba centrs<\/td><td>SkyPlanner \u2192 abas<\/td><td>Mainoties grafikam, izmantojot SkyPlanner t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Izpildes apstiprin\u0101jumi (R\u00fcckmeldungen)<\/td><td>Darba laika ieraksti un daudzumi no Mobile Confirmations<\/td><td>SkyPlanner \u2192 abas<\/td><td>P\u0113c katra apstiprin\u0101juma vai katr\u0101 mai\u0146\u0101<\/td><\/tr><tr><td>SkyPlanner ierobe\u017eojumu dati<\/td><td>Sagatavo\u0161anas laiku matrica, instrumenti k\u0101 ierobe\u017eoti resursi, alternat\u012bvas iek\u0101rtas un darbinieki<\/td><td>Uztur SkyPlanner<\/td><td>Iestata ievie\u0161anas laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet deta\u013cas, ra\u017eo\u0161anas sarakstus un iek\u0101rtas caur abas REST API vai vienreiz\u0113ji iel\u0101d\u0113jiet tos no eksport\u0113ta faila. R\u016bp\u012bgi nosakiet, kuram SkyPlanner darba centram atbilst katra abas iek\u0101rta. Izlemiet, vai iek\u0101rtu grupu att\u0113lot k\u0101 vienu darba centru grupu vai vair\u0101kus darba centrus.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas, k\u0101 ar\u012b kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. T\u0101d\u0113j\u0101di, sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti gan kr\u0101jumi, gan gaid\u0101m\u0101s iepirkumu pieg\u0101des.<\/p>\n\n\n<p>Grafik\u0101 iek\u013caujiet izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus, nevis ra\u017eo\u0161anas pas\u016bt\u012bjumu priek\u0161likumus (Fertigungsvorschl\u00e4ge). Priek\u0161likumi ir MRP apr\u0113\u0137ina rezult\u0101ts un main\u0101s n\u0101kamaj\u0101 MRP apr\u0113\u0137in\u0101.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Katrai oper\u0101cijai, kuru pl\u0101no\u0161anas dzinis ir iepl\u0101nojis vai p\u0101rc\u0113lis, integr\u0101cija caur abas REST API ieraksta pl\u0101noto s\u0101kumu, beigas un iek\u0101rtu attiec\u012bgaj\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101. Ierakstot datus caur API, abas valid\u0101cija paliek sp\u0113k\u0101 \u2014 t\u0101pat k\u0101 tad, ja ra\u017eo\u0161anas pas\u016bt\u012bjumu redi\u0123\u0113 pl\u0101not\u0101js.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 darbu ar SkyPlanner Mobile Confirmations vai Production Timer. Darba laika ieraksti uztur grafiku aktu\u0101lu un tiek nos\u016bt\u012bti atpaka\u013c uz abas k\u0101 izpildes apstiprin\u0101jumi. Ja j\u016bsu ra\u017eotn\u0113 apstiprin\u0101\u0161anai jau izmanto abas PDC termin\u0101\u013cus, saglab\u0101jiet vienu apstiprin\u0101jumu kan\u0101lu, lai izvair\u012btos no ierakstu dubl\u0113\u0161an\u0101s.<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms darb\u012bbas uzs\u0101k\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013cas, ra\u017eo\u0161anas saraksti, daudzumi, ra\u017eo\u0161anas pas\u016bt\u012bjumu statuss<\/td><td>abas ERP<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiki, iek\u0101rtu pie\u0161\u0137\u012brums<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits, alternat\u012bvie resursi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Mai\u0146as un promb\u016btnes<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Izpildes apstiprin\u0101jumi un kr\u0101jumu gr\u0101matojumi<\/td><td>abas ERP, sa\u0146emot SkyPlanner darba laika ierakstus vai PDC datus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>SkyPlanner darb\u012bbai abas APS nav nepiecie\u0161ams. Ja jums ir ar\u012b abas APS licence, uzticiet oper\u0101ciju datumu p\u0101rvald\u012bbu SkyPlanner, jo divas pl\u0101no\u0161anas sist\u0113mas, kas ieraksta vienus un tos pa\u0161us datumus, p\u0101rraksta viena otras datus. Kad par \u0161iem datiem atbild SkyPlanner, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz abas. Atsevi\u0161\u0137s optimiz\u0101cijas apr\u0113\u0137ins nav j\u0101palai\u017e.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiski projekta so\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 izmantojiet savus datus. Eksport\u0113jiet no abas atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un iek\u0101rtas CSV vai Excel form\u0101t\u0101, import\u0113jiet tos un p\u0101rbaudiet grafiku, pirms s\u0101kat integr\u0101cijas darbus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Datu atbilst\u012bbas darbsemin\u0101rs.<\/strong> Kop\u0101 ar abas partneri vienojieties par atbilst\u012bbas tabulu, atbild\u012bbu par datiem, sinhroniz\u0101cijas bie\u017eumu un apstiprin\u0101jumu kan\u0101lu.<\/li>\n\n\n<li><strong>Saskar\u0146u iestat\u012b\u0161ana.<\/strong> Iesp\u0113jojiet abas REST API vai abas Connect pl\u016bsmas un izveidojiet integr\u0101cijas lietot\u0101ju. Vispirms testa vid\u0113, p\u0113c tam \u2014 produkcijas vid\u0113.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Deta\u013cas, ra\u017eo\u0161anas saraksti, iek\u0101rtas un kalend\u0101ri.<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumu, kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Datu aptauja vai nos\u016bt\u012b\u0161ana ar Connect, paredzot atk\u0101rtotus m\u0113\u0123in\u0101jumus.<\/li>\n\n\n<li><strong>Ierobe\u017eojumu iestat\u012b\u0161ana SkyPlanner.<\/strong> Sagatavo\u0161anas laiku matrica, instrumenti, operatoru skaits un alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Pl\u0101notos datumus ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s; \u0161aj\u0101 posm\u0101 pievieno ar\u012b apstiprin\u0101jumus.<\/li>\n\n\n<li><strong>Paral\u0113l\u0101 darb\u012bba.<\/strong> Sal\u012bdziniet SkyPlanner datumus ar pa\u0161reiz\u0113jo pl\u0101nu un izlabojiet pamatdatus.<\/li>\n\n\n<li><strong>Darb\u012bbas uzs\u0101k\u0161ana.<\/strong> Iesl\u0113dziet datu ierakst\u012b\u0161anu atpaka\u013c, kad dati ir saska\u0146oti.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-abas-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101, pl\u0101nojot abas ERP integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Piel\u0101gotas datu sh\u0113mas.<\/strong> Liel\u0101kaj\u0101 da\u013c\u0101 abas instal\u0101ciju ir piel\u0101goti lauki un objekti. Kop\u0101 ar partneri nosakiet, kuri katra objekta lauki b\u016bs iek\u013cauti integr\u0101cij\u0101. Nepie\u0146emiet, ka citas ra\u017eotnes datu kart\u0113jums der\u0113s ar\u012b jums.<\/li>\n\n\n<li><strong>Nav atsevi\u0161\u0137a tehnolo\u0123isk\u0101 procesa objekta.<\/strong> Oper\u0101cijas atrodas ra\u017eo\u0161anas sarakst\u0101, nevis tehnolo\u0123isk\u0101 procesa objekt\u0101. No SAP vai Business Central projektiem p\u0101r\u0146emti r\u012bki mekl\u0113 tehnolo\u0123iskos procesus un t\u0101p\u0113c neatrod da\u013cu datu.<\/li>\n\n\n<li><strong>\u201cScheduling\u201d noz\u012bm\u0113 MRP.<\/strong> abas ang\u013cu valodas versij\u0101 ar Scheduling apz\u012bm\u0113 MRP apr\u0113\u0137ina izpildi.<\/li>\n\n\n<li><strong>Sagatavo\u0161anas un apstr\u0101des laiks.<\/strong> Pirms import\u0113\u0161anas p\u0101rbaudiet m\u0113rvien\u012bbas un to, vai sagatavo\u0161anas laiks nor\u0101d\u012bts uz ra\u017eo\u0161anas pas\u016bt\u012bjumu vai uz vienu izstr\u0101d\u0101jumu. Nepareizu m\u0113rvien\u012bbu d\u0113\u013c visi ilgumi b\u016bs k\u013c\u016bdaini.<\/li>\n\n\n<li><strong>Neaktu\u0101li kalend\u0101ri.<\/strong> Iek\u0101rtu kalend\u0101riem j\u0101aptver viss grafika pl\u0101no\u0161anas periods, cit\u0101di pl\u0101n\u0101 paz\u016bd pieejam\u0101 jauda.<\/li>\n\n\n<li><strong>SQL tikai las\u012b\u0161anai.<\/strong> MS SQL Connector un ODBC eksport\u0113 datus. Datu ierakst\u012b\u0161anai izmanto REST API, abas Connect vai ESDK.<\/li>\n\n\n<li><strong>Dokument\u0101cija pieejama p\u0113c pieteik\u0161an\u0101s.<\/strong> Ofici\u0101l\u0101 abas pal\u012bdz\u012bba ir pieejama klientu port\u0101l\u0101. Lauku nosaukumus preciz\u0113jiet ar savu partneri, nevis miniet.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-abas-erp-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">abas ERP integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver ra\u017eo\u0161anas sarakstu, iek\u0101rtu un ra\u017eo\u0161anas pas\u016bt\u012bjumu datu kart\u0113\u0161anu, k\u0101 ar\u012b SkyPlanner ierobe\u017eojumu konfigur\u0113\u0161anu, piem\u0113ram, sagatavo\u0161anas laiku matricas un instrumentu nor\u0101d\u012b\u0161anu.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/strong> Liel\u0101k\u0101 da\u013ca abas instal\u0101ciju ir piel\u0101gotas, un tie\u0161i \u0161eit noder komandas zin\u0101\u0161anas un pieredze.<\/li>\n\n\n<li><strong>Var iesaist\u012bties ar\u012b j\u016bsu abas partneris.<\/strong> Partneris p\u0101rzina j\u016bsu datu sh\u0113mu, piel\u0101gotos laukus un ESDK lietotnes un var iestat\u012bt REST API piek\u013cuvi vai Connect pl\u016bsmas. SkyPlanner nodro\u0161ina REST API, Swagger\/OpenAPI dokument\u0101ciju un t\u012bmek\u013ca aiz\u0137eres.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var papla\u0161in\u0101t integr\u0101ciju,<\/strong> izmantojot to pa\u0161u REST API un API pilnvaru. SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz. Produkta dokument\u0101cija ir publiski pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus un nor\u0113\u0137inoties katru m\u0113nesi. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Par to, k\u0101 abas pl\u0101no jaudu, lasiet rakst\u0101 <a href=\"\/lv\/integracija\/erp\/abas-erp\/razosanas-planosana\/\">Vai abas ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 faktisko iek\u0101rtu un person\u0101la jaudu?<\/a>. P\u0101rskats pieejams <a href=\"\/lv\/integracija\/erp\/abas-erp\/\">abas ERP lap\u0101<\/a>, bet citas sist\u0113mas atrad\u012bsiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana katru ned\u0113\u013cu ietaupa 2 darba stundas, un jauna darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj mums p\u0101rredz\u0113t jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko vielu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums ir bijis 100% vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 \u2014 kop\u0161 2021. gada.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas pale\u0161u krau\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepako\u0161anai<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad ir gatavas da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru abas saskarni izmanto integr\u0101cija?<\/summary>\n<p class=\"sp-faq__a\">Pas\u016bt\u012bjumu un pamatdatu las\u012b\u0161anai un pl\u0101noto datumu ierakst\u012b\u0161anai atpaka\u013c izmanto abas REST API. abas Connect pl\u016bsma vai ESDK notikumu apstr\u0101d\u0101t\u0101js var nos\u016bt\u012bt main\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus no abas. Izm\u0113\u0123in\u0101jumam un apjom\u012bgai datu iel\u0101dei izmanto failu eksportu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai abas ERP atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">abas dokument\u0101cij\u0101 nav aprakst\u012bta publiska API t\u012bmek\u013ca aiz\u0137eru abon\u0113\u0161anai. Izmai\u0146as non\u0101k SkyPlanner ar abas Connect pl\u016bsm\u0101m, ESDK notikumu apstr\u0101d\u0101t\u0101jiem vai datu piepras\u012bjumiem ik p\u0113c da\u017e\u0101m min\u016bt\u0113m. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nodro\u0161ina datu ierakst\u012b\u0161anu atpaka\u013c, rea\u0123\u0113jot uz notikumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cijai varam izmantot MS SQL Connector?<\/summary>\n<p class=\"sp-faq__a\">Las\u012b\u0161anai \u2014 j\u0101. Tas efekt\u012bvi eksport\u0113 abas datus. Pl\u0101no\u0161anas rezult\u0101tus ieraksta atpaka\u013c, izmantojot REST API, abas Connect vai ESDK, lai abas biznesa lo\u0123ika p\u0101rbaud\u012btu katru izmai\u0146u.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur abas sist\u0113m\u0101 tiek ierakst\u012bti pl\u0101notie datumi?<\/summary>\n<p class=\"sp-faq__a\">Izpildei nodot\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma (Betriebsauftrag) oper\u0101cij\u0101s: pl\u0101notais s\u0101kums, beigas un iek\u0101rta. Daudzumus, statusu un izmaksas turpina p\u0101rvald\u012bt abas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner grafik\u0101 var \u0146emt v\u0113r\u0101 abas kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Kr\u0101jumu atlikumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus nolasa no abas katru stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas. Pas\u016bt\u012btos materi\u0101lus uzskata par pieejamiem to pieg\u0101des datum\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai abas partnerim b\u016btu j\u0101pied\u0101v\u0101 abas APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja klients v\u0113las \u0101tri ieviest aktu\u0101lu grafiku visai ra\u017eotnei. Pa\u0161reiz\u0113j\u0101 abas APS paaudze tika ieviesta ar atjaunin\u0101jumu pakotni Abas 2024.Q3.1, un t\u0101 \u013cauj optimiz\u0113t grafiku, velkot un nometot vai palai\u017eot optimiz\u0101cijas apr\u0113\u0137inus. SkyPlanner savienojas ar abas REST API, autom\u0101tiski p\u0101rpl\u0101no grafiku, pl\u0101no p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus un nodro\u0161ina operatoriem Mobile Confirmations \u2014 no 199 \u20ac m\u0113nes\u012b. (<a href=\"https:\/\/abas-erp.com\/de\/news\/abas-update-mit-weiterentwickelter-aps-generation-cloud-und-ki-funktionen\">abas<\/a>)<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas izveides?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem, import\u0113jot ra\u017eo\u0161anas pas\u016bt\u012bjumus no CSV vai Excel eksporta. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu integr\u0101cijas tv\u0113rumu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ abas ERP abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 abas ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot abas ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un abas ERP notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i &#8230; <a title=\"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/\" aria-label=\"Read more about abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102765,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103353","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>abas ERP APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/integracijas-celvedis\\\/\",\"name\":\"abas ERP APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"abas ERP APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","description":"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/","name":"abas ERP APS integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"abas ERP\u2013SkyPlanner APS: abas REST API, abas Connect, ESDK, ra\u017eo\u0161anas pas\u016bt\u012bjumu un sarakstu kart\u0113\u0161ana, atpaka\u013cierakste, aptauja, projektu padomi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/"},{"@type":"ListItem","position":5,"name":"abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ abas ERP abas ERP integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 abas ERP integr\u0101cijas ce\u013cved\u012b partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot abas ERP ar SkyPlanner APS. Datu apmai\u0146a starp SkyPlanner un abas ERP notiek abos virzienos: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103353"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103353\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102765"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}