{"id":103203,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/proshop-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proshop-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/","title":{"rendered":"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ ProShop ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai ProShop ERP: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir ProShop papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas nodro\u0161ina met\u0101lapstr\u0101des uz\u0146\u0113mumiem grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija tiks veikta uz kuras iek\u0101rtas un cikos, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner apmain\u0101s ar datiem ar ProShop abos virzienos. Tas sa\u0146em Work Orders ar to oper\u0101cij\u0101m, Parts, Work Cells, Users, Tools un Purchase Orders datus. Pl\u0101notie datumi un re\u0123istr\u0113tais laiks tiek nos\u016bt\u012bti atpaka\u013c. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu ProShop konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-shop\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eotn\u0113<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sec\u012bbu nosaka pl\u0101no\u0161anas dzinis, nevis pl\u0101not\u0101js.<\/p>\n\n\n<p class=\"fx-pain__b\">Arcturus iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju uz konkr\u0113tas iek\u0101rtas konkr\u0113t\u0101 laik\u0101 un optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101. Sec\u012bbu nosaka izpildes termi\u0146i, klientu priorit\u0101te un Fast Track. Pl\u0101not\u0101jam vairs nav manu\u0101li j\u0101sak\u0101rto katra darba centra uzdevumu saraksts.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">P\u0101rregul\u0113\u0161ana atbilst faktiskajai darbu sec\u012bbai.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku starp katru ra\u017eo\u0161anas uzdevumu p\u0101ri abos virzienos. P\u0101rejot no alum\u012bnija uz ner\u016bs\u0113jo\u0161o t\u0113raudu, var pietikt ar \u012bsu t\u012br\u012b\u0161anu, bet pret\u0113j\u0101 virzien\u0101 vajadz\u012bga piln\u012bga t\u012br\u012b\u0161ana. Uzdevumi, kuros izmanto vienu stiprin\u0101\u0161anas pal\u012bgier\u012bci vai materi\u0101lu, tiek izpild\u012bti cits p\u0113c cita, un dzinis izv\u0113las sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Iek\u0101rtu, darbinieku un instrumentu pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Uzdevumam uz piecu asu iek\u0101rtas, kuram vajadz\u012bgs gan iek\u0101rtu ieregul\u0113t\u0101js, gan operators, tiek pie\u0161\u0137irti abi laik\u0101, kad abiem mai\u0146\u0101 ir br\u012bvs laiks. Pal\u012bgier\u012bce vai instruments, ko izmanto uz vienas iek\u0101rtas, nekad netiek vienlaikus rezerv\u0113ts citai. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz alternat\u012bvu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu kav\u0113jumi vairs neizjauc pl\u0101nu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda katras deta\u013cas kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Uzdevumu, kam j\u0101gaida stie\u0146u materi\u0101ls, iepl\u0101no p\u0113c pieg\u0101des datuma, nevis vispirms sagatavo tam iek\u0101rtu un p\u0113c tam demont\u0113 uzst\u0101d\u012bto apr\u012bkojumu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Steidzami pas\u016bt\u012bjumi un boj\u0101jumi \u2014 autom\u0101tiska p\u0101rpl\u0101no\u0161ana.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja saboj\u0101jas v\u0101rpsta vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. Running Time Lock fiks\u0113 tuv\u0101ko stundu darbus, lai netrauc\u0113tu darbu ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators telefon\u0101 vai plan\u0161et\u0113 redz n\u0101kamos uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroja darbinieki redz progresu re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai faktiski pat\u0113r\u0113tais laiks tiek nos\u016bt\u012bts atpaka\u013c uz ProShop.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumta dro\u0161\u012bbas elementu r\u016bpn\u012bca Kauhav\u0101 no putna lidojuma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad savlaic\u012bgo pieg\u0101\u017eu \u012bpatsvars sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums iepriek\u0161\u0113jo aptuveni 50% viet\u0101<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad divu meistaru viet\u0101 vajadz\u012bgs viens.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proshop-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ProShop nos\u016bta darba datus.<\/strong> SkyPlanner sa\u0146em Work Orders ar to oper\u0101cij\u0101m un pl\u0101notajiem izpildes laikiem, k\u0101 ar\u012b Parts, Work Order BOM, Work Cells, Users, Tools, Fixtures un Purchase Orders ierakstus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais laiks tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti ProShop ra\u017eo\u0161anas pas\u016bt\u012bjumos, un operatoru darba laiku var nos\u016bt\u012bt uz ProShop Time Tracking.<\/li>\n\n<\/ol>\n\n\n<p>ProShop paliek j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Pied\u0101v\u0101jumu sagatavo\u0161ana, ra\u017eo\u0161anas pas\u016bt\u012bjumi, vizu\u0101l\u0101s darba instrukcijas, kvalit\u0101tes vad\u012bba, kr\u0101jumu uzskaite, iepirkumi un pas\u016bt\u012bjumu pa\u0161izmaksas apr\u0113\u0137ins paliek turpat, kur l\u012bdz \u0161im. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku uz katra resursa.<\/p>\n\n\n<p>SkyPlanner nolasa ProShop datus, izmantojot ProShop GraphQL API adres\u0113 <code>\/api\/graphql<\/code>. Autentifik\u0101cijai izmanto OAuth 2.0 Authorization, ko j\u016bsu ProShop administrators izveido sada\u013c\u0101 System Config &gt; Manage Authorizations. Izmai\u0146as tiek sa\u0146emtas ar Recently Updated Records API, atlasot ra\u017eo\u0161anas pas\u016bt\u012bjumus, darba centrus, iepirkuma pas\u016bt\u012bjumus un laika uzskaites ierakstus. Pl\u0101notie datumi tiek nos\u016bt\u012bti atpaka\u013c ar GraphQL, izmantojot rakst\u012b\u0161anas ties\u012bbas objektam workorders. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek, savuk\u0101rt ProShop sinhroniz\u0101cijas bie\u017eumu nosaka katram uz\u0146\u0113mumam atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katr\u0101 uz\u0146\u0113mum\u0101 ProShop izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu ProShop konsultants vai pa\u0161u izstr\u0101d\u0101t\u0101ji var izveidot risin\u0101jumu, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Vaic\u0101jumi, piek\u013cuves ties\u012bbas, datu lauku atbilst\u012bba un noteikumi datu ierakst\u012b\u0161anai atpaka\u013c ProShop ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/proshop-erp\/integracijas-celvedis\/\">ProShop integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-proshop-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no ProShop un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ProShop ir sava grafiku sast\u0101d\u012b\u0161anas funkcija, kas balst\u0101s uz Work Cells un \u0146em v\u0113r\u0101 katra darba centra pieejamo jaudu. ProShop dokument\u0101cij\u0101 t\u0101s darb\u012bba aprakst\u012bta \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pieejam\u0101s stundas nosaka darba centros.<\/strong> &#8220;Any machine tool, workbench, equipment, or even person can be assigned as a workcell. Once assigned as a workcell, the number and timing of available hours per day can be managed using the schedule.&#8221; (Par darba centru var noteikt jebkuru darbgaldu, darbagaldu, apr\u012bkojumu vai pat cilv\u0113ku. P\u0113c tam grafik\u0101 var p\u0101rvald\u012bt t\u0101 pieejamo stundu skaitu un laiku katr\u0101 dien\u0101.) (<a href=\"https:\/\/proshoperp.com\/wp-content\/uploads\/2025\/06\/ProShop_ModuleFlyer.pdf.pdf\">modu\u013cu buklets<\/a>)<\/li>\n\n\n<li><strong>Ilgumu apr\u0113\u0137ina p\u0113c apl\u0113s\u0113m.<\/strong> &#8220;Estimated set-up and cycle times are used to calculate job duration on the schedule.&#8221; (Uzdevuma ilgumu grafik\u0101 apr\u0113\u0137ina, izmantojot apl\u0113sto p\u0101rregul\u0113\u0161anas un cikla laiku.) (<a href=\"https:\/\/proshoperp.com\/blog\/better-shop-floor-scheduling\/\">ProShop blogs<\/a>)<\/li>\n\n\n<li><strong>Priorit\u0101ti nosaka uz\u0146\u0113mums.<\/strong> &#8220;The machine schedule can provide a view into your existing pipeline, order of priority for active jobs, job status, and capacity planning features.&#8221; (Iek\u0101rtu grafiks var sniegt p\u0101rskatu par gaid\u0101majiem darbiem, akt\u012bvo uzdevumu priorit\u0101\u0161u sec\u012bbu un statusu, k\u0101 ar\u012b pied\u0101v\u0101t ra\u017eo\u0161anas jaudas pl\u0101no\u0161anas funkcijas.) (<a href=\"https:\/\/proshoperp.com\/blog\/better-shop-floor-scheduling\/\">ProShop blogs<\/a>)<\/li>\n\n\n<li><strong>Uz br\u012bdin\u0101jumiem rea\u0123\u0113 darbinieki.<\/strong> ProShop savu grafiku sast\u0101d\u012b\u0161anas funkciju apraksta \u0161\u0101di: &#8220;automatically updates to reflect actual progress. Adjust priorities and manage bottlenecks proactively, not reactively.&#8221; (Grafiks autom\u0101tiski atjaunin\u0101s atbilsto\u0161i faktiskajai izpildes gaitai. Piel\u0101gojiet priorit\u0101tes un risiniet ra\u017eo\u0161anas \u0161auro vietu probl\u0113mas savlaic\u012bgi, nevis tikai rea\u0123\u0113jiet uz t\u0101m.) (<a href=\"https:\/\/proshoperp.com\/product\/mes\/\">ProShop MES<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Tas nodro\u0161ina labu pamatu ra\u017eo\u0161anas p\u0101rskat\u0101m\u012bbai. Tom\u0113r darbu sec\u012bbu uz katras iek\u0101rtas joproj\u0101m nosaka pl\u0101not\u0101js. Katram uzdevumam izmanto vienu apl\u0113sto p\u0101rregul\u0113\u0161anas laiku neatkar\u012bgi no iepriek\u0161\u0113j\u0101 darba, un katrs darba centrs ir vai nu iek\u0101rta, vai cilv\u0113ks, nevis abi kop\u0101. SkyPlanner to papildina ar pl\u0101no\u0161anas dzini: tas autom\u0101tiski nosaka sec\u012bbu, \u0146emot v\u0113r\u0101 iek\u0101rtas, operatorus, instrumentus un materi\u0101lus, apr\u0113\u0137ina no sec\u012bbas atkar\u012bgo p\u0101rregul\u0113\u0161anu un nep\u0101rtraukti p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<p>Katrs solis un p\u0101rregul\u0113\u0161anas laika datu lauks ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/proshop-erp\/razosanas-planosana\/\">Vai ProShop nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proshop-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">ProShop pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>ProShop Scheduling (Work Cells)<\/th><th>ProShop ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Katra darba centra pieejam\u0101s stundas atbilsto\u0161i mai\u0146u grafikiem<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta ierobe\u017eot\u0101 pieejam\u012bba, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btni un virsstundas<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Uz\u0146\u0113mums nosaka darbu priorit\u0101\u0161u sec\u012bbu katrai iek\u0101rtai<\/td><td>Arcturus autom\u0101tiski nosaka visu oper\u0101ciju sec\u012bbu da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Apl\u0113stais p\u0101rregul\u0113\u0161anas laiks katram uzdevumam<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: laiks atkar\u012bgs no p\u0101rejas virziena, minim\u0101ls kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki<\/td><td>Darbinieku var nor\u0101d\u012bt k\u0101 atsevi\u0161\u0137u darba centru<\/td><td>Operatorus un iek\u0101rtas pl\u0101no kop\u0101; uzdevumiem ar vair\u0101kiem operatoriem pie\u0161\u0137ir visus vajadz\u012bgos darbiniekus<\/td><\/tr><tr><td>Instrumenti un pal\u012bgier\u012bces<\/td><td>Uzskaite sada\u013c\u0101s Tools, Fixtures un RTAs<\/td><td>Instrumenti un pal\u012bgier\u012bces grafik\u0101 ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Ar kr\u0101s\u0101m izcelti iepirkumu statusa indikatori grafik\u0101<\/td><td>Uzdevumus s\u0101k, kad pien\u0101k kr\u0101jumi vai iepirkuma pas\u016bt\u012bjumu pieg\u0101des<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Grafiks atjaunin\u0101s atbilsto\u0161i izpildes gaitai; pl\u0101not\u0101js piel\u0101go priorit\u0101tes<\/td><td>Autopilot p\u0101rpl\u0101no visu cehu, iev\u0113rojot j\u016bsu priorit\u0101tes un fiks\u0113tos darbus<\/td><\/tr><tr><td>Alternat\u012bvas<\/td><td>Oper\u0101cija ir piesaist\u012bta savam darba centram<\/td><td>Ja prim\u0101rais resurss ir aiz\u0146emts, izmanto alternat\u012bvus darba centrus un darbiniekus<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Iek\u0101rtu grafiks ar prognozi par termi\u0146u iev\u0113ro\u0161anu<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojiet uzdevumus, un pl\u0101ns paliks saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Time Tracking sist\u0113m\u0101 ProShop<\/td><td>Operatori telefon\u0101 vai plan\u0161et\u0113 redz savu darbu rindu un re\u0123istr\u0113 paveikto<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"proshop-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">ProShop grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad tas ir piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>ProShop Scheduling (Work Cells)<\/td><td>Grafiks sist\u0113m\u0101 ProShop: stundas katram darba centram, priorit\u0101tes katrai iek\u0101rtai, prognoze par termi\u0146u iev\u0113ro\u0161anu<\/td><td>Priorit\u0101tes main\u0101s reti, un p\u0101rregul\u0113\u0161ana nav atkar\u012bga no darbu sec\u012bbas<\/td><\/tr><tr><td>Iek\u0101rtu uzraudz\u012bbas platformas<\/td><td>V\u0101rpstas darb\u012bbas un ciklu dati ar ProShop ra\u017eo\u0161anas pas\u016bt\u012bjumu grafika skatu<\/td><td>M\u0113r\u0137is ir ieg\u016bt datus par iek\u0101rtu noslodzi<\/td><\/tr><tr><td>Dator\u0101 instal\u0113jamas ra\u017eo\u0161anas pl\u0101no\u0161anas programmas, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu<\/td><td>Instal\u0113jama grafiku sast\u0101d\u012b\u0161anas programmat\u016bra, kur\u0101 datus ievada no Excel vai CSV eksporta failiem<\/td><td>Viens pl\u0101not\u0101js sast\u0101da grafiku, periodiski eksport\u0113jot datus failos<\/td><\/tr><tr><td>M\u0101ko\u0146pakalpojuma APS ar darbu izpildes funkcij\u0101m ra\u017eo\u0161anas ceh\u0101 (SkyPlanner)<\/td><td>Autom\u0101tiska ra\u017eo\u0161anas pl\u0101no\u0161ana, iev\u0113rojot katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbu, ar divvirzienu datu apmai\u0146u ar ProShop<\/td><td>Darbu sec\u012bba nosaka pieg\u0101des datumus, un pl\u0101ns main\u0101s katru dienu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis ProShop grafiku sast\u0101d\u012b\u0161anas funkcijas, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101not\u0101js stund\u0101m k\u0101rto darba centru uzdevumu sarakstus.<\/strong> ProShop r\u0101da ra\u017eotn\u0113 noteikto &#8220;order of priority for active jobs&#8221; (akt\u012bvo ra\u017eo\u0161anas uzdevumu priorit\u0101\u0161u sec\u012bbu). Arcturus izveido visu darbu sec\u012bbu da\u017eu sekun\u017eu laik\u0101 un p\u0101rveido to p\u0113c katr\u0101m izmai\u0146\u0101m.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161\u0113j\u0101 darba.<\/strong> ProShop apr\u0113\u0137ina ilgumu, izmantojot &#8220;estimated set-up and cycle times&#8221; (apl\u0113stos p\u0101rregul\u0113\u0161anas un cikla laikus). P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram ra\u017eo\u0161anas uzdevumu p\u0101rim glab\u0101jas p\u0101rregul\u0113\u0161anas laiks abos sec\u012bbas virzienos. Tas \u013cauj sak\u0101rtot uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anu ierobe\u017eo gan iek\u0101rtu, gan to operatoru pieejam\u012bba.<\/strong> ProShop darba centrs ir iek\u0101rta vai darbinieks. SkyPlanner vienai oper\u0101cijai rezerv\u0113 gan iek\u0101rtu, gan operatorus un pal\u012bgier\u012bci, k\u0101 ar\u012b iepl\u0101no darbiniekus uzdevumiem, kuriem vajadz\u012bgi vair\u0101ki cilv\u0113ki.<\/li>\n\n\n<li><strong>Steidzami darbi un iek\u0101rtu boj\u0101jumi gad\u0101s katru dienu.<\/strong> ProShop aicina pl\u0101not\u0101jus &#8220;adjust priorities and manage bottlenecks&#8221; (piel\u0101got priorit\u0101tes un p\u0101rvald\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas). Autopilot autom\u0101tiski p\u0101rpl\u0101no darbus, savuk\u0101rt Running Time Lock saglab\u0101 nemain\u012bgu tuv\u0101ko stundu grafiku.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bba nosaka, kurus darbus var s\u0101kt.<\/strong> Ra\u017eo\u0161anas uzdevumus iepl\u0101no tad, kad materi\u0101li ir pieejami noliktav\u0101 vai tiks sa\u0146emti ar iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>V\u0113laties vienu m\u0113ne\u0161a maksu.<\/strong> No 199 \u20ac m\u0113nes\u012b ar neierobe\u017eotu lietot\u0101ju skaitu un divvirzienu integr\u0101ciju, ko konfigur\u0113 un uztur SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus, mai\u0146as un instrumentus vai import\u0113jiet ProShop darba centrus. Pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no ProShop Advanced Search uz Excel, import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar ProShop.<\/strong> J\u016bsu ProShop administrators izveido Authorization, bet SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Darba centrus varat pievienot vai no\u0146emt un abonementu atcelt jebkur\u0101 laik\u0101. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, iepaz\u012bstieties ar <a href=\"\/lv\/funkcijas\/\">funkcij\u0101m<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ProShop papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas iev\u0113ro re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar ProShop. No ProShop tiek sa\u0146emti Work Orders ar to oper\u0101cij\u0101m, Parts, Work Cells, Users, Tools un Purchase Orders dati, savuk\u0101rt atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie datumi un re\u0123istr\u0113tais laiks. Pl\u0101no\u0161an\u0101 tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. P\u0101rregul\u0113\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 darbu sec\u012bbas virziens, \u013cauj sak\u0101rtot ra\u017eo\u0161anas uzdevumus ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ProShop nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 pieejamo jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, darba centra l\u012bmen\u012b. Katram darba centram \u2014 iek\u0101rtai, darbagaldam, apr\u012bkojumam vai darbiniekam \u2014 ir noteiktas dien\u0101 pieejam\u0101s stundas un mai\u0146u grafiki, bet ra\u017eo\u0161anas uzdevuma ilgumu apr\u0113\u0137ina no apl\u0113st\u0101 p\u0101rregul\u0113\u0161anas un cikla laika. Ra\u017eotne nosaka katras iek\u0101rtas darbu priorit\u0101\u0161u sec\u012bbu. SkyPlanner APS papildus autom\u0101tiski veido darbu sec\u012bbu, kop\u012bgi \u0146emot v\u0113r\u0101 iek\u0101rtas, operatorus, instrumentus un materi\u0101lus, k\u0101 ar\u012b no darbu sec\u012bbas atkar\u012bgo p\u0101rregul\u0113\u0161anu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izmantot ProShop grafiku sast\u0101d\u012b\u0161anas funkcijas vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ja darbu sec\u012bba nosaka j\u016bsu pieg\u0101des datumus. ProShop grafik\u0101 redzamas priorit\u0101tes, statuss un prognozes par savlaic\u012bgu izpildi, savuk\u0101rt pl\u0101not\u0101ji priorit\u0101tes piel\u0101go manu\u0101li. SkyPlanner optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101 un pl\u0101no p\u0101rregul\u0113\u0161anu, izmantojot laiku matricu, kur\u0101 \u0146emts v\u0113r\u0101 darbu sec\u012bbas virziens. Tas rezerv\u0113 operatorus, instrumentus un pal\u012bgier\u012bces kop\u0101 ar iek\u0101rt\u0101m un autom\u0101tiski p\u0101rpl\u0101no darbus ar Autopilot. ProShop joproj\u0101m ir j\u016bsu galven\u0101 sist\u0113ma ra\u017eo\u0161anas pas\u016bt\u012bjumu, kvalit\u0101tes un izmaksu uzskaitei.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar ProShop?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar ProShop, izmantojot ProShop GraphQL API. SkyPlanner nolasa ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, deta\u013cas, darba centrus un iepirkuma pas\u016bt\u012bjumus, izmantojot OAuth 2.0 Authorization ar \u0161iem modu\u013ciem ierobe\u017eotu piek\u013cuvi. Izmai\u0146as tas sa\u0146em caur Recently Updated Records API un nos\u016bta pl\u0101notos datumus un laiku atpaka\u013c, izmantojot GraphQL.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j ProShop?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina ProShop. ProShop joproj\u0101m p\u0101rvalda cenu pied\u0101v\u0101jumus, ra\u017eo\u0161anas pas\u016bt\u012bjumus, darba instrukcijas, kvalit\u0101ti, kr\u0101jumus, iepirkumus un ra\u017eo\u0161anas uzdevumu izmaksu uzskaiti. SkyPlanner sast\u0101da ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c uz ProShop.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto ProShop?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu, piem\u0113ram, CNC iek\u0101rta. Lietot\u0101ju skaits ir neierobe\u017eots. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iek\u013caujam pied\u0101v\u0101jum\u0101 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba uzs\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas ar klientu. Komanda saska\u0146o j\u016bsu darba centrus, oper\u0101cijas un laika normas, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu datu apmai\u0146u un nos\u016bta pl\u0101notos datumus atpaka\u013c. Pirms sist\u0113mas palai\u0161anas darb\u0101 visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas gan ar ProShop m\u0101kon\u012b, gan ar ProShop uz sava servera?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Abos gad\u012bjumos ProShop darbojas p\u0101rl\u016bkprogramm\u0101, un j\u016bsu ProShop adres\u0113 ir pieejams tas pats GraphQL API. Ja ProShop ir izvietots uz j\u016bsu servera, tam j\u0101pie\u0146em HTTPS piepras\u012bjumi no SkyPlanner. To j\u016bsu IT komanda iestata tv\u0113ruma noteik\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar ProShop?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu atv\u0113rto ProShop ra\u017eo\u0161anas pas\u016bt\u012bjumu Excel eksportu. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eotnes <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anas rezult\u0101tu<\/a> \u2014 grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ ProShop ERP SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai SkyPlanner APS ir ProShop papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas nodro\u0161ina met\u0101lapstr\u0101des uz\u0146\u0113mumiem grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija tiks veikta uz kuras iek\u0101rtas &#8230; <a title=\"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103203","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ProShop ERP integr\u0101cija: APS pl\u0101no\u0161anai atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/\",\"name\":\"ProShop ERP integr\u0101cija: APS pl\u0101no\u0161anai atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proshop-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ProShop ERP integr\u0101cija: APS pl\u0101no\u0161anai atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai","og_description":"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/","name":"ProShop ERP integr\u0101cija: APS pl\u0101no\u0161anai atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina ProShop ERP: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proshop-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ ProShop ERP SkyPlanner APS sist\u0113mai ProShop ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku pieejam\u012bbai SkyPlanner APS ir ProShop papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. Tas nodro\u0161ina met\u0101lapstr\u0101des uz\u0146\u0113mumiem grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam. J\u016bs redzat, kura ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija tiks veikta uz kuras iek\u0101rtas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103203"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103203\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}