{"id":103173,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/proalpha\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proalpha","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/","title":{"rendered":"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai proALPHA: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir proALPHA papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. Pl\u0101not\u0101jiem vairs nav j\u0101p\u0101rstr\u0101d\u0101 pl\u0101ns Excel, un Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Proalpha darbojas abos virzienos: no Proalpha tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi, oper\u0101cijas, resursi, deta\u013cas un kr\u0101jumi, bet atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie oper\u0101ciju datumi, pie\u0161\u0137irt\u0101s iek\u0101rtas un operatoru apstiprin\u0101jumi. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Proalpha konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Excel pl\u0101ns vairs nav vajadz\u012bgs.<\/p>\n\n\n<p class=\"fx-pain__b\">Grafiks atrodas vienuviet un tiek veidots no j\u016bsu Proalpha ra\u017eo\u0161anas pas\u016bt\u012bjumiem. Visi str\u0101d\u0101 p\u0113c viena pl\u0101na, nevis izmanto pl\u0101not\u0101ja izkl\u0101jlapu vai piez\u012bmju gr\u0101mati\u0146u.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katra resursa pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Pl\u0101nojot iek\u0101rtas, darbiniekus un instrumentus, tiek \u0146emtas v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btne un virsstundas. Pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus iepl\u0101nota citai. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki ar br\u012bv\u0101m mai\u0146\u0101m.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram produktu p\u0101rim abos p\u0101rejas virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu p\u0101rbaude pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner sast\u0101da grafiku, \u0146emot v\u0113r\u0101 kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevums, kam vajadz\u012bga pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots ne agr\u0101k k\u0101 pieg\u0101des datum\u0101, lai darbs neapst\u0101tos pie iek\u0101rtas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana p\u0113c izmai\u0146\u0101m.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, ien\u0101k steidzams pas\u016bt\u012bjums vai darbs tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie uzdevumi un priorit\u0101tes joproj\u0101m tiek iev\u0113roti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c uz Proalpha ra\u017eo\u0161anas pas\u016bt\u012bjumu.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proalpha-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha nos\u016bta ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> SkyPlanner sa\u0146em atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus (Fertigungsauftr\u00e4ge) ar to oper\u0101cij\u0101m, resursiem, p\u0101rregul\u0113\u0161anas un apstr\u0101des laikiem, k\u0101 ar\u012b deta\u013cas un kr\u0101jumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido un atjaunina grafiku.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi, iek\u0101rtas un apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas, pie\u0161\u0137irtais resurss un operatoru apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c uz ra\u017eo\u0161anas pas\u016bt\u012bjumu Proalpha sist\u0113m\u0101.<\/li>\n\n<\/ol>\n\n\n<p>Datu nos\u016bt\u012b\u0161anai atpaka\u013c izmanto pa\u0161as Proalpha REST API no Proalpha API Portal: setWorkOrderOperationDates, changeWorkOrderOperationResource un operationDataEntry. Katr\u0101 ra\u017eotn\u0113 Proalpha ir konfigur\u0113ta cit\u0101di, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda izveido j\u016bsu resursu un ra\u017eo\u0161anas pas\u016bt\u012bjumu atbilst\u012bbu starp sist\u0113m\u0101m un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101 iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Ar\u012b j\u016bsu Proalpha partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Saskarnes, lauku atbilst\u012bba un noteikumi par to, kura sist\u0113ma nosaka datus, ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/proalpha\/integracijas-celvedis\/\">proALPHA integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-proalpha-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp proALPHA un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>proALPHA<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013ca (Teil)<\/td><td>Produkti un materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums (Fertigungsauftrag) ar daudzumu un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas ar paredz\u0113to p\u0101rregul\u0113\u0161anas un apstr\u0101des laiku<\/td><td>Procesa so\u013ci ar p\u0101rregul\u0113\u0161anas laikiem un ilgumu<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Resursi, resursu grupas, alternat\u012bv\u0101s resursu grupas<\/td><td>Darba centri, darba centru grupas, alternat\u012bvie darba centri<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Resursu kalend\u0101ri<\/td><td>Mai\u0146as, promb\u016btne un efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Kr\u0101jumi katr\u0101 MRP apgabal\u0101<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des datumu<\/td><td>Gaid\u0101mie materi\u0101li ar to pieg\u0101des datumu<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td>Atpaka\u013c uz proALPHA<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Grafik\u0101 pie\u0161\u0137irtais darba centrs<\/td><td>Atpaka\u013c uz proALPHA<\/td><\/tr><tr><td>operationDataEntry<\/td><td>Operatoru re\u0123istr\u0113tie darba laiki un daudzumi<\/td><td>Atpaka\u013c uz proALPHA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner sist\u0113m\u0101 konfigur\u0113 sagatavo\u0161anas un p\u0101rejas laiku matricu, instrumentu resursus un katram ra\u017eo\u0161anas uzdevumam vajadz\u012bgo operatoru skaitu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proalpha-aps-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha APS un ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha pied\u0101v\u0101 savu APS modu\u013ca Proalpha Production sast\u0101v\u0101. Pieg\u0101d\u0101t\u0101js to apraksta \u0161\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APS ir pamat\u0101.<\/strong> &#8220;APS (Advanced Planning and Scheduling) is the core of Proalpha Production.&#8221; (APS jeb progres\u012bv\u0101 pl\u0101no\u0161ana un grafiku sast\u0101d\u012b\u0161ana ir Proalpha Production pamat\u0101.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/modules\/production\/\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Optimiz\u0113ta vair\u0101ku resursu pl\u0101no\u0161ana.<\/strong> APS &#8220;allows optimized resource planning according to managerial targets such as delivery reliability and cycle times.&#8221; (\u013bauj optimiz\u0113t resursu pl\u0101no\u0161anu atbilsto\u0161i vad\u012bbas m\u0113r\u0137iem, piem\u0113ram, pieg\u0101\u017eu savlaic\u012bgumam un cikla ilgumam.) Oper\u0101cijai var izmantot neierobe\u017eotu skaitu resursu, kuru pieejam\u012bba ir savstarp\u0113ji saska\u0146ota.<\/li>\n\n\n<li><strong>Autom\u0101tiska pas\u016bt\u012bjumu pl\u0101no\u0161ana.<\/strong> Proalpha klienta pieredzes st\u0101st\u0101 APS autom\u0101tiski pl\u0101no pas\u016bt\u012bjumus un nosaka to izpildes sec\u012bbu: &#8220;automatisch geplant und eingetaktet&#8221; (autom\u0101tiski iepl\u0101noti un iek\u013cauti grafik\u0101). (<a href=\"https:\/\/www.proalpha.com\/de\/proalpha-referenzen\/dickert\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Iesp\u0113jamas ar\u012b manu\u0101las izmai\u0146as.<\/strong> &#8220;Finite planning allows manual changes to the sequence in which orders are processed on short notice.&#8221; (Pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai \u013cauj \u012bs\u0101 laik\u0101 manu\u0101li main\u012bt pas\u016bt\u012bjumu izpildes sec\u012bbu.)<\/li>\n\n\n<li><strong>Procesu mode\u013ci tehnolo\u0123isko mar\u0161rutu viet\u0101.<\/strong> Proalpha &#8220;completely dispenses with bills of materials and routings for production planning&#8221; (ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 piln\u012bb\u0101 atsak\u0101s no materi\u0101lu specifik\u0101cij\u0101m un tehnolo\u0123iskajiem mar\u0161rutiem) un pl\u0101no, balstoties uz produktu procesu mode\u013ciem.<\/li>\n\n\n<li><strong>Nepiecie\u0161ami aktu\u0101li dati no ra\u017eo\u0161anas.<\/strong> Ra\u017eo\u0161anas datu v\u0101k\u0161ana &#8220;enables precise advanced planning and scheduling (APS).&#8221; (Nodro\u0161ina prec\u012bzu progres\u012bvo pl\u0101no\u0161anu un grafiku sast\u0101d\u012b\u0161anu (APS).) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/processes\/plant-data-collection-pdc\">Proalpha<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u0160\u0101da optimiz\u0101cija ir atkar\u012bga no prec\u012bziem procesu mode\u013ciem, resursu kalend\u0101riem un aktu\u0101liem datiem no ra\u017eo\u0161anas ceha, ko nodro\u0161ina Proalpha ievie\u0161anas projekt\u0101. Proalpha p\u0101rst\u0101vis Dr. Markus Berg par pap\u012br\u0101 re\u0123istr\u0113tiem apstiprin\u0101jumiem, kurus sist\u0113m\u0101 ievada ned\u0113\u013cas nogal\u0113, saka: &#8220;f\u00fcr eine APS-Planung zu ungenau&#8221; (p\u0101r\u0101k neprec\u012bzi APS pl\u0101no\u0161anai) (<a href=\"https:\/\/it-production.com\/produktionsmanagement\/interview-markus-berg-proalpha\/\">IT&amp;Production<\/a>). Ra\u017eotnes, kur\u0101s tas nav nodro\u0161in\u0101ts, turpina pl\u0101not Excel l\u012bdztekus ERP. SkyPlanner vien\u0101 dzin\u0113j\u0101 vienlaikus pl\u0101no iek\u0101rtas, darbiniekus, instrumentus, materi\u0101lus un p\u0101rregul\u0113\u0161anu, izmantojot Autopilot p\u0101rpl\u0101no\u0161anu un SkyPlanner komandas konfigur\u0113tu integr\u0101ciju. Jau izm\u0113\u0123in\u0101juma laik\u0101 t\u0101s ieg\u016bst savu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, kas atbilst pieejamajai jaudai, par publiski nor\u0101d\u012btu cenu. Katrs solis ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/proalpha\/razosanas-planosana\/\">Vai proALPHA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko SkyPlanner pievieno proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Proalpha ar Excel pl\u0101nu<\/th><th>Proalpha ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Pl\u0101ns<\/td><td>Viena pl\u0101not\u0101ja uztur\u0113ta izkl\u0101jlapa<\/td><td>Viens aktu\u0101ls grafiks no Proalpha ra\u017eo\u0161anas pas\u016bt\u012bjumiem<\/td><\/tr><tr><td>Jauda<\/td><td>Nov\u0113rt\u0113ta p\u0113c acum\u0113ra<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bbas ierobe\u017eojumi un mai\u0146as<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Main\u012bta manu\u0101li<\/td><td>Grafiks oper\u0101ciju l\u012bmen\u012b da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Pl\u0101not\u0101ja pieredze<\/td><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku<\/td><\/tr><tr><td>Instrumenti un brig\u0101des<\/td><td>Uzskait\u012bti atsevi\u0161\u0137i<\/td><td>Iev\u0113rota instrumentu pieejam\u012bba; uzdevumiem pie\u0161\u0137irti visi vajadz\u012bgie operatori<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>P\u0101rbauda pl\u0101not\u0101js<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir kr\u0101jumos vai pieg\u0101d\u0101ti<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101ns j\u0101p\u0101rstr\u0101d\u0101 p\u0113c katra trauc\u0113juma<\/td><td>Autopilot p\u0101rpl\u0101no, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Apstiprin\u0101jumi uz pap\u012bra vai termin\u0101l\u012b<\/td><td>Operatora uzdevumu rinda un darba re\u0123istr\u0113\u0161ana t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><tr><td>Datu nos\u016bt\u012b\u0161ana atpaka\u013c<\/td><td>Datumi j\u0101ievada Proalpha manu\u0101li<\/td><td>Datumi, resursi un apstiprin\u0101jumi, izmantojot REST<\/td><\/tr><tr><td>Darba s\u0101k\u0161ana<\/td><td>Proalpha projekts bez publiska cenr\u0101\u017ea<\/td><td>J\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiks bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties proALPHA pl\u0101no\u0161anas risin\u0101jumu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Papildus iepriek\u0161 aprakst\u012btajai projekta ievie\u0161anai Proalpha APS piel\u0101go\u0161an\u0101 iesaista savus konsultantus. Uz\u0146\u0113mum\u0101 KWM: &#8220;Production planning was optimized remotely together with Proalpha consultants&#8221; (Ra\u017eo\u0161anas pl\u0101no\u0161ana tika optimiz\u0113ta att\u0101lin\u0101ti kop\u0101 ar Proalpha konsultantiem) (<a href=\"https:\/\/www.proalpha.com\/en\/references\/kwm-weisshaar-gmbh\">Proalpha<\/a>). Proalpha cenu nepublisko; cenu lap\u0101 atbilde ir &#8220;Das kommt darauf an&#8221; (Tas ir atkar\u012bgs no situ\u0101cijas) (<a href=\"https:\/\/www.proalpha.com\/de\/preis\">Proalpha<\/a>). <a href=\"\/lv\/razosanas-grafiku-sastadisanas-programmatura-videjiem\/\">Vid\u0113ja lieluma ra\u017eotne<\/a>, kas pa\u0161laik pl\u0101no Excel, ar SkyPlanner \u0101tr\u0101k ieg\u016bst izmantojamu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101l\u0101 jauda. Abos gad\u012bjumos Proalpha paliek galven\u0101 sist\u0113ma.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Proalpha APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pa\u0161laik pl\u0101nojat Excel<\/strong> un v\u0113laties savu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, kas atbilst re\u0101lajai jaudai, ieg\u016bt da\u017eu ned\u0113\u013cu laik\u0101, nevis p\u0113c pl\u0101no\u0161anas projekta pabeig\u0161anas.<\/li>\n\n\n<li><strong>Vispirms v\u0113laties izm\u0113\u0123in\u0101t risin\u0101jumu ar re\u0101liem datiem<\/strong> 30 dienu izm\u0113\u0123in\u0101jum\u0101, pirms pie\u0146emat l\u0113mumu par licenci vai projektu.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Koplietojamie instrumenti un uzdevumi, kuros vajadz\u012bgi vair\u0101ki operatori, nosaka, ko var s\u0101kt n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Materi\u0101lu pien\u0101k\u0161ana nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/strong> Katras oper\u0101cijas s\u0101k\u0161ana ir atkar\u012bga no kr\u0101jumiem un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s katru dienu.<\/strong> Autopilot p\u0101rpl\u0101no p\u0113c katr\u0101m izmai\u0146\u0101m, un pl\u0101not\u0101jam apr\u0113\u0137ins nav j\u0101palai\u017e pa\u0161am. Jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Proalpha.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c savas uzdevumu rindas<\/strong> t\u0101lrun\u012b vai plan\u0161etdator\u0101, nos\u016btot izpildes apstiprin\u0101jumus uz Proalpha.<\/li>\n\n\n<li><strong>V\u0113laties, lai integr\u0101ciju jums iestata un nodro\u0161ina t\u0101s atbalstu.<\/strong> SkyPlanner komanda to iestata un uztur p\u0113c palai\u0161anas. Publiski nor\u0101d\u012bt\u0101 cena ir no 199 \u20ac m\u0113nes\u012b.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet \u0161os datus. Pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet savus ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Proalpha atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas CSV vai Excel form\u0101t\u0101. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Proalpha.<\/strong> SkyPlanner komanda iestata divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu sist\u0113mas konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, bet citas ERP sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums Proalpha sist\u0113mai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Proalpha. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, resursus, deta\u013cas un kr\u0101jumu datus, savuk\u0101rt atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus, pie\u0161\u0137irt\u0101s iek\u0101rtas un operatoru izpildes apstiprin\u0101jumus. Katras iek\u0101rtas, operatora un instrumenta pieejam\u012bba un materi\u0101lu daudzums ir ierobe\u017eots. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais. Autopilot autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai proALPHA pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Proalpha APS optimiz\u0113 pl\u0101nus ar vair\u0101kiem resursiem atbilsto\u0161i t\u0101diem m\u0113r\u0137iem k\u0101 pieg\u0101\u017eu savlaic\u012bgums un cikla ilgums, savuk\u0101rt Feinplanung \u013cauj pl\u0101not\u0101jiem manu\u0101li main\u012bt sec\u012bbu. Tam vajadz\u012bgi korekti procesu mode\u013ci un aktu\u0101li izpildes dati no ra\u017eo\u0161anas ceha. SkyPlanner APS pl\u0101no katras iek\u0101rtas, darbinieka un instrumenta izmanto\u0161anu un materi\u0101lu pat\u0113ri\u0146u vienot\u0101 m\u0101ko\u0146risin\u0101jum\u0101. Tas pied\u0101v\u0101 Autopilot p\u0101rpl\u0101no\u0161anu, publiski nor\u0101d\u012btu cenu un izm\u0113\u0123in\u0101jumu ar j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties Proalpha APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja pa\u0161laik pl\u0101nojat Excel. Proalpha APS labi pl\u0101no tikai tad, kad Proalpha projekt\u0101 ir iestat\u012bti procesu mode\u013ci, resursu kalend\u0101ri un aktu\u0101lo PDC datu sa\u0146em\u0161ana. Proalpha to piel\u0101go ar saviem konsultantiem, katrai instal\u0101cijai cenu nosakot atsevi\u0161\u0137i. SkyPlanner m\u0101kon\u012b pl\u0101no katras iek\u0101rtas, darbinieka un instrumenta izmanto\u0161anu un materi\u0101lu pat\u0113ri\u0146u, Autopilot p\u0101rpl\u0101no p\u0113c katr\u0101m izmai\u0146\u0101m, un operatori str\u0101d\u0101 ar Mobile Confirmations. P\u0113c 30 dienu izm\u0113\u0123in\u0101juma ar j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumiem darbu s\u0101ksiet da\u017eu ned\u0113\u013cu laik\u0101 par cenu no 199 \u20ac m\u0113nes\u012b. Lai izmantotu SkyPlanner, Proalpha APS nav nepiecie\u0161ams. Ja tas ir akt\u012bvs, ievie\u0161anas laik\u0101 nosaka, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Proalpha Production?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina Proalpha Production. Proalpha p\u0101rzi\u0146\u0101 paliek deta\u013cas, produktu procesu mode\u013ci, materi\u0101lu p\u0101rvald\u012bba, iepirkumi un finanses. SkyPlanner sast\u0101da atv\u0113rto ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta atpaka\u013c datumus, resursus un izpildes apstiprin\u0101jumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Proalpha sist\u0113m\u0101 kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b un ieraksta datus atpaka\u013c, izmantojot Proalpha publiskot\u0101s REST API saskarnes. Ra\u017eo\u0161anas pas\u016bt\u012bjumi non\u0101k SkyPlanner caur j\u016bsu Proalpha saskarn\u0113m, kas tiek iestat\u012btas ievie\u0161anas laik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto Proalpha?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un papildu maksu 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesiem un vajadz\u012bb\u0101m un nor\u0101d\u0101m kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c klienta ievad\u012b\u0161anas procesa s\u0101kuma. Komanda izveido j\u016bsu resursu un ra\u017eo\u0161anas pas\u016bt\u012bjumu datu atbilst\u012bbas, piesl\u0113dz kr\u0101jumu un iepirkuma pas\u016bt\u012bjumu datus un aktiviz\u0113 datu ierakst\u012b\u0161anu atpaka\u013c. Pirms palai\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Proalpha?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto no Proalpha CSV vai Excel form\u0101t\u0101 eksport\u0113tus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus. J\u016bs redzat savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">grafiku, kas atbilst re\u0101lajai jaudai<\/a>, pirms s\u0101kas jebk\u0101di integr\u0101cijas darbi.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ proALPHA ERP SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir proALPHA papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. Pl\u0101not\u0101jiem vairs nav j\u0101p\u0101rstr\u0101d\u0101 pl\u0101ns Excel, un Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 rodas &#8230; <a title=\"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103173","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>proALPHA integr\u0101cija: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas ar APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/\",\"name\":\"proALPHA integr\u0101cija: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas ar APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/proalpha\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"proALPHA integr\u0101cija: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas ar APS","description":"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/","name":"proALPHA integr\u0101cija: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas ar APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildin\u0101jums proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas, divvirzienu integr\u0101cija. Katra iek\u0101rta, mai\u0146a, instruments, materi\u0101ls. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/proalpha\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ proALPHA ERP SkyPlanner APS sist\u0113mai proALPHA: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir proALPHA papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. Pl\u0101not\u0101jiem vairs nav j\u0101p\u0101rstr\u0101d\u0101 pl\u0101ns Excel, un Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 rodas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103173"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103173\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}