{"id":103113,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/mrpeasy\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"mrpeasy","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/","title":{"rendered":"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ MRPeasy<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai MRPeasy: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir MRPeasy papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un vien\u0101 reiz\u0113 iek\u013cauj visus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u012bg\u0101 grafik\u0101. Pl\u0101n\u0101 tiek \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Kad ra\u017eo\u0161an\u0101 kaut kas main\u0101s, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar MRPeasy darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus un artikulus, bet atpaka\u013c nos\u016bta pl\u0101notos datumus un izpildes gaitu. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu MRPeasy konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Viss grafiks uzreiz, nevis pa vienam pas\u016bt\u012bjumam.<\/p>\n\n\n<p class=\"fx-pain__b\">MRPeasy iepl\u0101no katru jaunu ra\u017eo\u0161anas pas\u016bt\u012bjumu pirmaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101. SkyPlanner dzinis Arcturus vien\u0101 reiz\u0113 nosaka visu atv\u0113rto pas\u016bt\u012bjumu sec\u012bbu p\u0113c priorit\u0101tes, izpildes termi\u0146a un materi\u0101la.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, kurus varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma pabeig\u0161anas datumu nosaka p\u0113c visas ra\u017eotnes grafika, kur\u0101 jau iek\u013cauti visi p\u0101r\u0113jie pas\u016bt\u012bjumi. P\u0101rdo\u0161anas komanda atbild klientiem, balstoties uz pl\u0101nu, nevis uz pas\u016bt\u012bjumu, kas nejau\u0161i ievad\u012bts pirmais.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Steidzamie pas\u016bt\u012bjumi tie\u0161\u0101m non\u0101k rindas priek\u0161gal\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Pie\u0161\u0137iriet pas\u016bt\u012bjumam Fast Track vai augst\u0101ku priorit\u0101ti, un dzinis p\u0101rb\u012bd\u012bs citus darbus, lai atbr\u012bvotu tam vietu. Nevienam nav manu\u0101li j\u0101p\u0101rvieto desmit pas\u016bt\u012bjumi Gantt diagramm\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana p\u0113c iek\u0101rtu boj\u0101jumiem.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, materi\u0101ls kav\u0113jas vai darbs tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu iestat\u012btie fiks\u0113jumi un priorit\u0101tes joproj\u0101m nosaka pl\u0101nu, un Running Time Lock saglab\u0101 ies\u0101ktos ra\u017eo\u0161anas uzdevumus to viet\u0101s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina p\u0101rregul\u0113\u0161anas laiku starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, kur\u0101 tiek zaud\u0113ts vismaz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kop\u012bgie instrumenti un brig\u0101des netiek iepl\u0101noti dubult\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Presforma vai pal\u012bgier\u012bce, ko izmanto vien\u0101 darba centr\u0101, nekad netiek vienlaikus rezerv\u0113ta cit\u0101. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku attiec\u012bgaj\u0101s mai\u0146\u0101s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bbas p\u0101rbaude ikreiz, kad grafik\u0101 p\u0101rce\u013c uzdevumu.<\/p>\n\n\n<p class=\"fx-pain__b\">Ikreiz, kad pl\u0101ns main\u0101s, SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevums, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots p\u0113c \u0161\u012bs pieg\u0101des datuma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 izpildes gaita ir redzama re\u0101llaik\u0101, un \u0161ie dati tiek nos\u016bt\u012bti ar\u012b atpaka\u013c uz MRPeasy.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farm\u0101cijas produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, pieaugums no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidr\u0101k saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-mrpeasy-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>MRPeasy nos\u016bta datus par veicamajiem darbiem.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centru grupas, darba centrus, artikulus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Dzinis Arcturus da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 kaut kas main\u0101s.<\/li>\n\n\n<li><strong>Datumi un izpildes gaita tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie datumi un izpildes gaita tiek ierakst\u012bti attiec\u012bgaj\u0101 MRPeasy ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101, t\u0101p\u0113c p\u0101rdo\u0161anas un iepirkumu komandas redz to pa\u0161u pl\u0101nu, ko ra\u017eo\u0161anas cehs.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner jau ir integr\u0113ts ar MRPeasy klientu projektos. Integr\u0101cija izmanto MRPeasy REST API, t\u0101p\u0113c pa\u0161\u0101 MRPeasy nekas nav j\u0101instal\u0113. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek, savuk\u0101rt jaunie un main\u012btie pas\u016bt\u012bjumi tiek sa\u0146emti no MRPeasy, regul\u0101ri pieprasot datus ar \u012bsiem interv\u0101liem. Katra ra\u017eotne izmanto MRPeasy at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda saska\u0146o j\u016bsu tehnolo\u0123iskos procesus, darba centru grupas un pas\u016bt\u012bjumu pl\u016bsmu starp ab\u0101m sist\u0113m\u0101m un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/p>\n\n\n<p>Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu MRPeasy konsultants vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Galapunkti, lauku atbilst\u012bba, piepras\u012bjumu bie\u017euma ierobe\u017eojumi un datu ierakst\u012b\u0161ana atpaka\u013c ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/mrpeasy\/integracijas-celvedis\/\">MRPeasy integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-mrpeasy-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko iepl\u0101no MRPeasy un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy iepl\u0101no oper\u0101cijas, \u0146emot v\u0113r\u0101 darba centru ierobe\u017eoto jaudu. Tas apstr\u0101d\u0101 pas\u016bt\u012bjumus pa vienam to ievad\u012b\u0161anas sec\u012bb\u0101. <a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/production-schedule\/\">MRPeasy lietot\u0101ja rokasgr\u0101mat\u0101<\/a> ir skaidri aprakst\u012bts, kas notiek t\u0101l\u0101k:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pirmais br\u012bvais laika interv\u0101ls.<\/strong> &#8220;By default, the software schedules the Manufacturing Order to the first available time.&#8221; (P\u0113c noklus\u0113juma programmat\u016bra iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumu pirmaj\u0101 pieejamaj\u0101 laik\u0101.)<\/li>\n\n\n<li><strong>P\u0101rvietojas viens pas\u016bt\u012bjums, p\u0101r\u0113jie paliek viet\u0101.<\/strong> &#8220;The software will only reschedule the manufacturing order which has been dragged to a new time, other manufacturing orders will not be rescheduled.&#8221; (Programmat\u016bra p\u0101rpl\u0101no tikai to ra\u017eo\u0161anas pas\u016bt\u012bjumu, kas p\u0101rvilkts uz jaunu laiku; p\u0101r\u0113jie ra\u017eo\u0161anas pas\u016bt\u012bjumi netiek p\u0101rpl\u0101noti.)<\/li>\n\n\n<li><strong>Gantt diagramm\u0101 materi\u0101lus nep\u0101rbauda.<\/strong> P\u0101rvelkot pas\u016bt\u012bjumu, &#8220;The software will not check for material availability.&#8221; (Programmat\u016bra nep\u0101rbauda materi\u0101lu pieejam\u012bbu.)<\/li>\n\n\n<li><strong>D\u012bkst\u0101ve nep\u0101rb\u012bda darbus.<\/strong> &#8220;Setting an idle time does not reschedule works automatically which were previously planned for the idle time.&#8221; (Nosakot d\u012bkst\u0101ves laiku, \u0161aj\u0101 laik\u0101 iepl\u0101notie darbi netiek autom\u0101tiski p\u0101rpl\u0101noti.)<\/li>\n\n<\/ul>\n\n\n<p>Pl\u0101no\u0161anai atpaka\u013c no izpildes termi\u0146a nepiecie\u0161ams Enterprise pl\u0101ns, un MRPeasy nor\u0101da: &#8220;Material lead times are ignored when backward scheduling is used.&#8221; (Pl\u0101nojot atpaka\u013c no izpildes termi\u0146a, materi\u0101lu pieg\u0101des laiki netiek \u0146emti v\u0113r\u0101.) Katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai ir viens fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks neatkar\u012bgi no t\u0101, kas ra\u017eots pirms tam. T\u0101p\u0113c katrs steidzamais pas\u016bt\u012bjums, iek\u0101rtas boj\u0101jums vai kav\u0113ta pieg\u0101de noz\u012bm\u0113, ka pl\u0101not\u0101jam manu\u0101li j\u0101maina pas\u016bt\u012bjumu sec\u012bba. Katrs ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/mrpeasy\/razosanas-planosana\/\">Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-mrpeasy-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp MRPeasy un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>MRPeasy<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Item, Product group, Unit of measurement<\/td><td>Produkti un materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>BOM, daudzl\u012bme\u0146u BOM<\/td><td>Produkta strukt\u016bra, starpprodukti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Tehnolo\u0123isk\u0101 procesa oper\u0101cijas: Setup time, Cycle time, Capacity<\/td><td>Procesa posmi, p\u0101rregul\u0113\u0161anas laiki, partiju ra\u017eo\u0161anas uzdevumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Workstation group, Workstation, Productivity<\/td><td>Darba centru grupas, darba centri, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Work hours, Holidays, Idle time<\/td><td>Mai\u0146as un promb\u016btnes<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Manufacturing Order ar oper\u0101cij\u0101m un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Stock lots, kr\u0101jumi, Purchase Order<\/td><td>Kr\u0101jumi un gaid\u0101m\u0101s materi\u0101lu pieg\u0101des<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Manufacturing Order izpildes termi\u0146\u0161 un piel\u0101gotie lauki<\/td><td>Pl\u0101notais s\u0101kums, beigas un izpildes gaita<\/td><td>Atpaka\u013c uz MRPeasy<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"mrpeasy-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">MRPeasy \u0161odien un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>MRPeasy<\/th><th>MRPeasy ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Sec\u012bbas noteik\u0161ana<\/td><td>Pirmaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101, ievad\u012b\u0161anas sec\u012bb\u0101<\/td><td>Visi atv\u0113rtie pas\u016bt\u012bjumi sak\u0101rtoti p\u0113c priorit\u0101tes un izpildes termi\u0146a<\/td><\/tr><tr><td>Steidzamie pas\u016bt\u012bjumi<\/td><td>Tiek iepl\u0101noti tikai br\u012bvajos laika interv\u0101los<\/td><td>Fast Track p\u0101rb\u012bda citus darbus, lai atbr\u012bvotu vietu<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Katrs pas\u016bt\u012bjums j\u0101p\u0101rvelk manu\u0101li<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica, minim\u0101ls kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Instrumenti un brig\u0101des<\/td><td>Tikai darba centru darba laiks<\/td><td>Ierobe\u017eota instrumentu pieejam\u012bba, uzdevumi ar vair\u0101kiem operatoriem<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>P\u0101rvietojot pas\u016bt\u012bjumus Gantt diagramm\u0101, materi\u0101lu pieejam\u012bbu nep\u0101rbauda<\/td><td>Kr\u0101jumi un gaid\u0101mie iepirkuma pas\u016bt\u012bjumi tiek p\u0101rbaud\u012bti p\u0113c katr\u0101m izmai\u0146\u0101m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>S\u0101kt, aptur\u0113t un pabeigt katru oper\u0101ciju<\/td><td>Operatora uzdevumu rinda, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-mrpeasy\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bku sist\u0113mai MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>MRPeasy ieb\u016bv\u0113t\u0101 grafiku sast\u0101d\u012b\u0161ana ir piem\u0113rota nelielai ra\u017eotnei ar nedaudz\u0101m \u0161auraj\u0101m viet\u0101m, kur pas\u016bt\u012bjumus ievada to izpildes sec\u012bb\u0101. Ja ar to nepietiek, pirc\u0113ji apsver \u010detrus variantus: tikai MRPeasy, pl\u0101no\u0161anas r\u012bkus izkl\u0101jlap\u0101s, kas izmanto CSV form\u0101t\u0101 eksport\u0113tus datus, visp\u0101r\u012bgus automatiz\u0101cijas r\u012bkus pazi\u0146ojumiem un APS m\u0101ko\u0146risin\u0101jumu, kas ieraksta datus atpaka\u013c MRPeasy.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja jaunu priorit\u0101\u0161u d\u0113\u013c j\u0101p\u0101rk\u0101rto eso\u0161ie pas\u016bt\u012bjumi,<\/strong> nevis tikai j\u0101iepl\u0101no darbi br\u012bvajos laika interv\u0101los.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101not\u0101js ik dienu stund\u0101m ilgi p\u0101rvieto pas\u016bt\u012bjumus<\/strong> p\u0113c iek\u0101rtu boj\u0101jumiem un kav\u0113t\u0101m pieg\u0101d\u0113m.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja p\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no darbu sec\u012bbas.<\/strong> Sec\u012bbu nosaka p\u0101rregul\u0113\u0161anas laiku matrica.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja koplietojamie instrumenti un brig\u0101des nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties sa\u0146emt grafiku atpaka\u013c MRPeasy,<\/strong> nevis atsevi\u0161\u0137\u0101 izkl\u0101jlap\u0101.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja operatoriem j\u0101str\u0101d\u0101 p\u0113c savas uzdevumu rindas<\/strong> t\u0101lrun\u012b vai plan\u0161etdator\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet darba centrus, darbiniekus un mai\u0146as SkyPlanner vai import\u0113jiet tos. Ir pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no MRPeasy sarakstu skatiem CSV form\u0101t\u0101. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner izveidoto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet MRPeasy.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>. Izmantojat ar\u012b citu sist\u0113mu? Apskatiet visas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar MRPeasy. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus un preces, bet nos\u016bta atpaka\u013c pl\u0101notos datumus un izpildes gaitu. Katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba ir ierobe\u017eota. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp darbiem un nosaka ra\u017eo\u0161anas uzdevumu sec\u012bbu t\u0101, lai p\u0101rregul\u0113\u0161anai vajadz\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 pieejamo jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, katram pas\u016bt\u012bjumam atsevi\u0161\u0137i. MRPeasy iepl\u0101no katru jaunu ra\u017eo\u0161anas pas\u016bt\u012bjumu pirmaj\u0101 br\u012bvaj\u0101 darba centra laika interv\u0101l\u0101. P\u0101rvietojot vienu pas\u016bt\u012bjumu, p\u0101r\u0113jie netiek p\u0101rvietoti. SkyPlanner APS nosaka visu atv\u0113rto pas\u016bt\u012bjumu sec\u012bbu kop\u0101 un autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRPeasy ir kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s MRPeasy un savienojas ar to, izmantojot MRPeasy REST API. SkyPlanner jau ir integr\u0113ts ar MRPeasy klientu projektos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina MRPeasy. MRPeasy joproj\u0101m p\u0101rvalda preces, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos procesus, kr\u0101jumus, iepirkumus, p\u0101rdo\u0161anu un gr\u0101matved\u012bbu. SkyPlanner iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i faktiskajai jaudai un nos\u016bta datumus un izpildes gaitu atpaka\u013c uz MRPeasy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner izmanto\u0161ana kop\u0101 ar MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Ra\u017eotne ar 20 darba centriem maks\u0101 499 \u20ac m\u0113nes\u012b neatkar\u012bgi no MRPeasy lietot\u0101ju skaita. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iek\u013caujam pied\u0101v\u0101jum\u0101 kop\u0101 ar izv\u0113l\u0113to abon\u0113\u0161anas pl\u0101nu. T\u0101d\u0113j\u0101di visas izmaksas zin\u0101t jau pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 MRPeasy abon\u0113\u0161anas pl\u0101ns ir nepiecie\u0161ams integr\u0101cijai?<\/summary>\n<p class=\"sp-faq__a\">Integr\u0101cija darba vid\u0113 izmanto MRPeasy REST API, kas ir iek\u013cauts MRPeasy Unlimited pl\u0101n\u0101. Izm\u0113\u0123in\u0101jums ir pieejams ar jebkuru MRPeasy pl\u0101nu, jo taj\u0101 izmanto CSV failus, kas eksport\u0113ti no MRPeasy sarakstu skatiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgs laiks nepiecie\u0161ams ievie\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta sagatavo\u0161an\u0101s darbam sist\u0113m\u0101. Komanda saska\u0146o darba centru grupas un tehnolo\u0123iskos procesus ab\u0101s sist\u0113m\u0101s, savieno ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darba uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai vispirms varam izm\u0113\u0123in\u0101t SkyPlanner ar saviem MRPeasy datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet tehnolo\u0123iskos procesus, darba centrus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus CSV form\u0101t\u0101 un import\u0113jiet tos izm\u0113\u0123in\u0101juma vid\u0113. Jau pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eo\u0161anas <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">pl\u0101nu, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ MRPeasy SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir MRPeasy papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un vien\u0101 reiz\u0113 iek\u013cauj visus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u012bg\u0101 grafik\u0101. Pl\u0101n\u0101 tiek \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Kad ra\u017eo\u0161an\u0101 &#8230; <a title=\"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103113","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MRPeasy integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/\",\"name\":\"MRPeasy integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/mrpeasy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MRPeasy integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/","name":"MRPeasy integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS MRPeasy ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija: visi darba centri, operatori, instrumenti un materi\u0101li. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/mrpeasy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ MRPeasy SkyPlanner APS sist\u0113mai MRPeasy: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir MRPeasy papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu un vien\u0101 reiz\u0113 iek\u013cauj visus atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u012bg\u0101 grafik\u0101. Pl\u0101n\u0101 tiek \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Kad ra\u017eo\u0161an\u0101&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103113"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103113\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}