{"id":103084,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/monitor-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monitor-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Monitor ERP: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Monitor ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un vienlaikus pl\u0101no visu darba centru, operatoru, instrumentu un materi\u0101lu izmanto\u0161anu. Monitor G5 par\u0101da, kur rodas p\u0101rslodze. SkyPlanner to nov\u0113r\u0161, savuk\u0101rt Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner datu apmai\u0146a ar Monitor ERP notiek abos virzienos: ra\u017eo\u0161anas pas\u016bt\u012bjumi, oper\u0101cijas, darba centri un materi\u0101li tiek sa\u0146emti, bet pl\u0101notie oper\u0101ciju datumi un re\u0123istr\u0113tais paveiktais darbs tiek nos\u016bt\u012bti atpaka\u013c. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Monitor G5 konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Vairs nav j\u0101velk rindas priorit\u0101\u0161u pl\u0101n\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Arcturus dzin\u0113js vien\u0101 reiz\u0113 nosaka visu nepabeigto oper\u0101ciju sec\u012bbu visos darba centros. Pl\u0101not\u0101js p\u0101rskata rezult\u0101tu, nevis veido grafiku manu\u0101li katram darba centram atsevi\u0161\u0137i.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">P\u0101rslodze tiek nov\u0113rsta, nevis tikai par\u0101d\u012bta.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrai iek\u0101rtai, darbiniekam un instrumentam tiek izveidots grafiks atbilsto\u0161i faktiskajai pieejam\u012bbai, \u0146emot v\u0113r\u0101 mai\u0146as, promb\u016btni un virsstundas. Divi ra\u017eo\u0161anas pas\u016bt\u012bjumi nekad netiek iepl\u0101noti vienai iek\u0101rtai vien\u0101 un taj\u0101 pa\u0161\u0101 stund\u0101. Kad iek\u0101rtas jauda ir piln\u012bb\u0101 aiz\u0146emta, darbs tiek p\u0101rcelts uz alternat\u012bvu iek\u0101rtu vai uztic\u0113ts citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des datumi katram pas\u016bt\u012bjumam, nevis tikai vienai pas\u016bt\u012bjuma rindai.<\/p>\n\n\n<p class=\"fx-pain__b\">Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma pabeig\u0161anas datumu nosaka p\u0113c visas ra\u017eotnes grafika. P\u0101rdo\u0161anas komanda atbild klientiem, balstoties uz pl\u0101nu, kur\u0101 jau ir \u0146emti v\u0113r\u0101 visi p\u0101r\u0113jie pas\u016bt\u012bjumi.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik ilga ir p\u0101rregul\u0113\u0161ana, p\u0101rejot no viena produkta uz otru, abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas algoritms sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojamie instrumenti un brig\u0101des ir \u0146emti v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0160tance vai pal\u012bgier\u012bce, ko izmanto viena iek\u0101rta, nekad netiek iepl\u0101nota citai iek\u0101rtai taj\u0101 pa\u0161\u0101 laik\u0101. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki, kuri attiec\u012bgaj\u0101s mai\u0146\u0101s ir pieejami.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner sast\u0101da grafiku, \u0146emot v\u0113r\u0101 kr\u0101jumus un v\u0113l neizpild\u012btos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevumu, kam vajadz\u012bga pieg\u0101de no pieg\u0101d\u0101t\u0101ja, iepl\u0101no p\u0113c pieg\u0101des datuma, lai pie iek\u0101rtas neb\u016btu j\u0101gaida materi\u0101li.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un re\u0123istr\u0113tais paveiktais darbs tiek nos\u016bt\u012bts atpaka\u013c uz Monitor.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 ap 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darbu vad\u012bt\u0101js divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, jo \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir b\u016btiski samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monitor-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Monitor nos\u016bta darba datus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, darba centriem, p\u0101rregul\u0113\u0161anas laiku un vien\u012bbas izgatavo\u0161anas laiku, k\u0101 ar\u012b materi\u0101lu vajadz\u012bbas, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido un uztur aktu\u0101lu grafiku.<\/strong> Arcturus dzin\u0113js da\u017e\u0101s sekund\u0113s iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais paveiktais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas tiek ierakst\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 sist\u0113m\u0101 Monitor, savuk\u0101rt re\u0123istr\u0113tais laiks un daudzumi nodro\u0161ina datu saska\u0146ot\u012bbu ab\u0101s sist\u0113m\u0101s.<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto Monitor pa\u0161a saskarni Monitor ERP API, t\u0101p\u0113c sist\u0113m\u0101 Monitor nekas nav j\u0101instal\u0113. Katra ra\u017eotne izmanto Monitor G5 at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda nosaka, k\u0101 j\u016bsu darba centri, oper\u0101ciju rindas un pas\u016bt\u012bjumu pl\u016bsma atbilst SkyPlanner datiem, un nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Monitor partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Galapunkti, lauku atbilst\u012bba, versijas un datu ierakst\u012b\u0161ana atpaka\u013c ir izskaidroti <a href=\"\/lv\/integracija\/erp\/monitor-erp\/integracijas-celvedis\/\">Monitor ERP integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monitor-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek apmain\u012bti starp Monitor ERP un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Monitor ERP<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Artikuls (Artikel)<\/td><td>Produkti un materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>BOM un tehnolo\u0123iskais process (Beredning): oper\u0101ciju rindas ar p\u0101rregul\u0113\u0161anas, vien\u012bbas izgatavo\u0161anas un gaid\u012b\u0161anas laiku<\/td><td>Procesa so\u013ci ar ilgumu un p\u0101rregul\u0113\u0161anas laiku<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Darba centrs (Produktionsgrupp), alternat\u012bvie darba centri, resursu kop\u0101 ietilpsto\u0161ie resursi<\/td><td>Darba centri, darba centru grupas, alternat\u012bvas<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas grafiki un kalend\u0101ra iz\u0146\u0113mumi<\/td><td>Mai\u0146as un promb\u016btne<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums (Tillverkningsorder) ar oper\u0101cij\u0101m un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma materi\u0101li, kr\u0101jumi, iepirkuma pas\u016bt\u012bjumi<\/td><td>Materi\u0101lu vajadz\u012bbas, kr\u0101jumi, gaid\u0101m\u0101s pieg\u0101des<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cija: pl\u0101notais s\u0101kums, pl\u0101not\u0101s beigas, darba centrs<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>Atpaka\u013c uz Monitor<\/td><\/tr><tr><td>Oper\u0101ciju izpildes uzskaite: laiks un daudzums<\/td><td>Operatoru re\u0123istr\u0113tais laiks un daudzumi<\/td><td>Abos virzienos, izv\u0113loties vienu kan\u0101lu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>P\u0101rregul\u0113\u0161anas laika matricas, instrumenti k\u0101 ierobe\u017eoti resursi un ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem tiek konfigur\u0113ti ievie\u0161anas laik\u0101 un p\u0101rvald\u012bti sist\u0113m\u0101 SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"monitor-priority-planning-and-finite-capacity-sc\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor priorit\u0101\u0161u pl\u0101no\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor G5 ir ERP sist\u0113ma ar pla\u0161\u0101m pl\u0101no\u0161anas iesp\u0113j\u0101m. T\u0101 par\u0101da katra darba centra noslodzi un apr\u0113\u0137ina pabeig\u0161anas datumus. Tom\u0113r p\u0101rslodzes nov\u0113r\u0161ana joproj\u0101m ir pl\u0101not\u0101ja zi\u0146\u0101, un tas ir nor\u0101d\u012bts ar\u012b Monitor pal\u012bdz\u012bbas dokument\u0101cij\u0101:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pas\u016bt\u012bjumus re\u0123istr\u0113, nep\u0101rbaudot citu pas\u016bt\u012bjumu rad\u012bto noslodzi.<\/strong> Ar noklus\u0113juma iestat\u012bjumu pas\u016bt\u012bjumu re\u0123istr\u0113 &#8220;as per the requirement date in BOM and routing regardless of the work center&#8217;s capacity.&#8221; (atbilsto\u0161i vajadz\u012bbas datumam BOM un tehnolo\u0123iskaj\u0101 proces\u0101 neatkar\u012bgi no darba centra jaudas). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/GeneralRegisters\/BasicSettings\/SystemSettings\/bOrderManufacturing.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Loading plan par\u0101da p\u0101rslodzi, nevis to nov\u0113r\u0161.<\/strong> Master planning ir &#8220;a loading plan where any overload might require the entire order to be replanned with regard to quantity and dates.&#8221; (noslodzes pl\u0101ns, kur\u0101 jebkuras p\u0101rslodzes d\u0113\u013c var n\u0101kties p\u0101rpl\u0101not visa pas\u016bt\u012bjuma daudzumu un datumus). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/Flows\/ManufacturingOrderFlow\/MainPlanning.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Priority planning darbojas ar vienu darba centru vienlaikus.<\/strong> Tas &#8220;shows all operations for the work center in all manufacturing orders,&#8221; (par\u0101da visas darba centra oper\u0101cijas visos ra\u017eo\u0161anas pas\u016bt\u012bjumos), un pl\u0101not\u0101js nosaka sec\u012bbu, velkot rindas. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanning\/bPriorityPlan.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n\n<li><strong>Check delivery times pl\u0101no vienu pas\u016bt\u012bjuma rindu.<\/strong> CDT atrod br\u012bvo jaudu tai rindai, kurai gatavojat pied\u0101v\u0101jumu, bet manu\u0101l\u0101s p\u0101rpl\u0101no\u0161anas izmai\u0146as &#8220;are not saved.&#8221; (netiek saglab\u0101tas). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/CheckDeliveryTimes\/CheckCapacityAvailability.htm\">Monitor pal\u012bdz\u012bba<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>T\u0101p\u0113c visas ra\u017eotnes grafiks, kas \u0146em v\u0113r\u0101 faktisko jaudu, ir j\u0101veido specializ\u0113t\u0101 grafiku sast\u0101d\u012b\u0161anas r\u012bk\u0101. SkyPlanner vienlaikus nosaka oper\u0101ciju sec\u012bbu visos darba centros un uztur grafiku aktu\u0101lu. Visi Monitor pl\u0101no\u0161anas so\u013ci ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/monitor-erp\/razosanas-planosana\/\">Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu p\u0113c faktisk\u0101s jaudas?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monitor-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Pl\u0101no\u0161ana sist\u0113m\u0101 Monitor G5<\/th><th>Monitor G5 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Par\u0101da katra darba centra noslodzi; p\u0101rslodzi nov\u0113r\u0161 pl\u0101not\u0101js<\/td><td>\u0145em v\u0113r\u0101 katras iek\u0101rtas, darbinieka un instrumenta faktisko pieejam\u012bbu un mai\u0146as<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba<\/td><td>Rindas velk priorit\u0101\u0161u pl\u0101n\u0101 katram darba centram atsevi\u0161\u0137i<\/td><td>Oper\u0101ciju sec\u012bbu visos darba centros nosaka vien\u0101 reiz\u0113, da\u017e\u0101s sekund\u0113s<\/td><\/tr><tr><td>Pieg\u0101des datumi<\/td><td>CDT nosaka termi\u0146u vienai pas\u016bt\u012bjuma rindai<\/td><td>Katra pas\u016bt\u012bjuma datumu nosaka p\u0113c visas ra\u017eotnes grafika<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Pas\u016bt\u012bjumus, kam vajadz\u012bgs viens un tas pats instruments, filtr\u0113 un grup\u0113 manu\u0101li<\/td><td>Ra\u017eo\u0161anas uzdevumus sak\u0101rto t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas maz\u0101ks<\/td><\/tr><tr><td>Instrumenti un brig\u0101des<\/td><td>Par\u0101da p\u0101rregul\u0113\u0161anas laiku p\u0101rkl\u0101\u0161anos, kas j\u0101p\u0101rbauda manu\u0101li<\/td><td>\u0145em v\u0113r\u0101 instrumentu faktisko pieejam\u012bbu; uzdevumiem ar vair\u0101kiem operatoriem pie\u0161\u0137ir vajadz\u012bgos darbiniekus<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>CDT p\u0101rbauda materi\u0101lu nodro\u0161in\u0101jumu katrai pas\u016bt\u012bjuma rindai<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir kr\u0101jum\u0101 vai pieg\u0101d\u0101ti<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js atk\u0101rtoti izmanto New finish un p\u0101rpl\u0101no grafiku<\/td><td>Autopilot p\u0101rpl\u0101no, iev\u0113rojot j\u016bsu fiks\u0113tos elementus un priorit\u0101tes<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba uzskaites termin\u0101lis un iek\u0101rtu integr\u0101cija<\/td><td>Operatora uzdevumu rinda un darba re\u0123istr\u0113\u0161ana t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monitor-erp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas r\u012bku sist\u0113mai Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor ieb\u016bv\u0113t\u0101 priorit\u0101\u0161u pl\u0101no\u0161ana ir piem\u0113rota ra\u017eotnei ar vienu vai diviem darba centriem, kas ir \u0161aur\u0101s vietas, un pl\u0101not\u0101ju, kur\u0161 ik dienu str\u0101d\u0101 ar priorit\u0101\u0161u pl\u0101nu. Ja ar to nepietiek, pirc\u0113ji sal\u012bdzina \u010detras risin\u0101jumu grupas. Monitor konsultanti izstr\u0101d\u0101 individu\u0101lus pl\u0101no\u0161anas ekr\u0101nus konkr\u0113tai ra\u017eotnei. Ra\u017eo\u0161anas ceha un OEE r\u012bki nos\u016bta laika un daudzumu datus atpaka\u013c uz Monitor, ta\u010du neveido grafiku atbilsto\u0161i faktiskajai jaudai. Lielo uz\u0146\u0113mumu APS risin\u0101jumu dokument\u0113taj\u0101s ERP integr\u0101cij\u0101s Monitor nav nor\u0101d\u012bts. SkyPlanner pieder pie m\u0101ko\u0146pakalpojuma APS risin\u0101jumiem, kas nodro\u0161ina ar\u012b darbu izpildi ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja j\u016bsu pl\u0101not\u0101js katru ned\u0113\u013cu stund\u0101m ilgi velk rindas<\/strong> priorit\u0101\u0161u pl\u0101n\u0101 un nov\u0113r\u0161 Loading plan par\u0101d\u012bto p\u0101rslodzi.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja, mainoties produktu kl\u0101stam, main\u0101s ar\u012b ra\u017eo\u0161anas \u0161aur\u0101s vietas<\/strong> un ar katra darba centra pl\u0101no\u0161anu atsevi\u0161\u0137i vairs nepietiek.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja p\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja koplietojamie instrumenti, iek\u0101rtu regul\u0113t\u0101ji un brig\u0101des nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja materi\u0101lu pien\u0101k\u0161ana nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/strong> Katras oper\u0101cijas s\u0101k\u0161anu nosaka kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101ns main\u0101s katru dienu.<\/strong> Autopilot p\u0101rpl\u0101no darbu p\u0113c iek\u0101rtas boj\u0101juma vai steidzama pas\u016bt\u012bjuma sa\u0146em\u0161anas, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Monitor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet \u0161os datus. Ir pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no Monitor uz Excel neizpild\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cijas un darba centrus, import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar savu priorit\u0101\u0161u pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Monitor ERP.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu Monitor G5 iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, bet citas ERP sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Monitor ERP. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, darba centrus un materi\u0101lus, savuk\u0101rt pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to darbu datus nos\u016bta atpaka\u013c. Pl\u0101no\u0161an\u0101 tiek \u0146emti v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp darbiem un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Monitor G5 \u0146em v\u0113r\u0101 jaudu. Loading plan par\u0101da slodzi attiec\u012bb\u0101 pret jaudu, savuk\u0101rt Priority planning apr\u0113\u0137ina New finish katrai oper\u0101cijai, apstr\u0101d\u0101jot vienu darba centru vienlaikus. P\u0101rslod\u017eu nov\u0113r\u0161ana vis\u0101 ra\u017eotn\u0113 paliek pl\u0101not\u0101ja zi\u0146\u0101. SkyPlanner APS papildina Monitor ERP ar <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu<\/a>, kas \u0146em v\u0113r\u0101 katra darba centra, darbinieka, instrumenta un materi\u0101la re\u0101los ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Monitor G5 ir kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdztekus Monitor un izveido savienojumu, izmantojot Monitor ERP API \u2014 pa\u0161a Monitor dokument\u0113to saskarni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Monitor ra\u017eo\u0161anas moduli?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, SkyPlanner to papildina. Deta\u013cas, materi\u0101lu specifik\u0101cijas (BOM), tehnolo\u0123iskie procesi, ra\u017eo\u0161anas pas\u016bt\u012bjumi, iepirkumi, kr\u0101jumi, atskaites un finanses paliek Monitor p\u0101rzi\u0146\u0101. SkyPlanner sast\u0101da ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101ciju grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta pl\u0101notos datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var izmantot m\u016bsu darba centru grupas un alternat\u012bv\u0101s iek\u0101rtas?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Grup\u0101 ietilpsto\u0161ie un alternat\u012bvie darba centri k\u013c\u016bst par alternat\u012bviem darba centriem SkyPlanner. Ja galven\u0101 iek\u0101rta ir aiz\u0146emta, pl\u0101no\u0161anas dzin\u0113js p\u0101rce\u013c ra\u017eo\u0161anas uzdevumu uz alternat\u012bvu iek\u0101rtu, un izv\u0113l\u0113tais darba centrs tiek nos\u016bt\u012bts atpaka\u013c attiec\u012bgajai oper\u0101cijai Monitor sist\u0113m\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner izmaks\u0101 ra\u017eotnei, kas izmanto Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba uzs\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas procesa s\u0101kuma. Komanda saska\u0146o darba centrus un oper\u0101ciju rindas starp sist\u0113m\u0101m, savieno ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu datus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo priorit\u0101\u0161u pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto no Monitor uz Excel eksport\u0113tus neizpild\u012bto ra\u017eo\u0161anas pas\u016bt\u012bjumu datus. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redzat savas ra\u017eo\u0161anas grafiku, kas \u0146em v\u0113r\u0101 re\u0101lo pieejamo jaudu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Monitor ERP SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS ir Monitor ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un vienlaikus pl\u0101no visu darba centru, operatoru, instrumentu un materi\u0101lu izmanto\u0161anu. Monitor G5 par\u0101da, kur rodas p\u0101rslodze. SkyPlanner to nov\u0113r\u0161, savuk\u0101rt Autopilot autom\u0101tiski &#8230; <a title=\"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103084","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/\",\"name\":\"Monitor ERP integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monitor-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas","description":"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","og_description":"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/","name":"Monitor ERP integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c faktisk\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina Monitor ERP: pl\u0101no p\u0113c faktisk\u0101s jaudas; divvirzienu integr\u0101cija darba centriem, operatoriem, instrumentiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monitor-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Monitor ERP SkyPlanner APS sist\u0113mai Monitor ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS ir Monitor ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 faktisko iek\u0101rtu un darbinieku jaudu un vienlaikus pl\u0101no visu darba centru, operatoru, instrumentu un materi\u0101lu izmanto\u0161anu. Monitor G5 par\u0101da, kur rodas p\u0101rslodze. SkyPlanner to nov\u0113r\u0161, savuk\u0101rt Autopilot autom\u0101tiski&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103084"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103084\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}