{"id":103055,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/monday\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monday","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/","title":{"rendered":"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ monday.com<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS platformai monday.com: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ra\u017eot\u0101jiem, kuri p\u0101rvalda pas\u016bt\u012bjumus platform\u0101 monday.com. Tas veido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. J\u016bsu komanda turpina str\u0101d\u0101t sav\u0101s t\u0101fel\u0113s, bet to pamat\u0101 beidzot ir izpild\u0101ms grafiks.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar monday.com darbojas abos virzienos: uz SkyPlanner tiek nos\u016bt\u012btas pas\u016bt\u012bjumu poz\u012bcijas ar daudzumiem, termi\u0146iem un statusu, savuk\u0101rt uz j\u016bsu kolonn\u0101m atgrie\u017eas pl\u0101notais s\u0101kums un beigas, darba centrs un izpildes gaita. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu t\u0101fel\u0113m.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">No sarkaniem ap\u013ciem Workload skat\u0101 l\u012bdz izpild\u0101mam pl\u0101nam.<\/p>\n\n\n<p class=\"fx-pain__b\">monday.com par\u0101da, kam iepl\u0101nots par daudz darba. SkyPlanner katru ra\u017eo\u0161anas uzdevumu iepl\u0101no iek\u0101rtai un mai\u0146ai, kur\u0101 ir br\u012bva jauda, t\u0101p\u0113c p\u0101rslodze l\u012bdz ra\u017eo\u0161anas ceham nemaz nenon\u0101k.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai iek\u0101rtai savs kalend\u0101rs.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram darba centram ir savas mai\u0146as, apkopes p\u0101rtraukumi, virsstundas un darbinieku promb\u016btnes. Uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101. Savuk\u0101rt \u0161tance, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus iepl\u0101nota cit\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Soliet termi\u0146us, kas balst\u012bti grafik\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrai pas\u016bt\u012bjuma poz\u012bcijai j\u016bsu t\u0101fel\u0113 tiek apr\u0113\u0137in\u0101ts pl\u0101notais pabeig\u0161anas datums, \u0146emot v\u0113r\u0101 re\u0101lo jaudu. P\u0101rdo\u0161anas komanda klientiem atbild, balstoties uz pl\u0101nu, nevis cer\u012bgi ievilktu Timeline joslu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamiem pas\u016bt\u012bjumiem.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad apst\u0101jas iek\u0101rta vai t\u0101fel\u0113 par\u0101d\u0101s steidzams pas\u016bt\u012bjums, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku atbilsto\u0161i izmai\u0146\u0101m ra\u017eo\u0161an\u0101. J\u016bsu fiks\u0113tie uzdevumi un priorit\u0101tes joproj\u0101m tiek iev\u0113roti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik ilgs laiks vajadz\u012bgs, lai p\u0101rregul\u0113tu iek\u0101rtu no viena produkta uz n\u0101kamo abos virzienos. P\u0101reja no zila uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkana uz zilu \u2014 60, t\u0101p\u0113c pl\u0101no\u0161anas dzinis sak\u0101rto uzdevumus sec\u012bb\u0101, kas rada vismaz\u0101kos laika zudumus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Uzdevums, kam j\u0101gaida pieg\u0101de, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, lai darbs pie iek\u0101rtas neapst\u0101tos materi\u0101lu tr\u016bkuma d\u0113\u013c.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monday-com-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Pas\u016bt\u012bjumi paliek platform\u0101 monday.com.<\/strong> Pas\u016bt\u012bjumu poz\u012bcijas no j\u016bsu ra\u017eo\u0161anas t\u0101feles tiek nos\u016bt\u012btas uz SkyPlanner kop\u0101 ar produktu, daudzumu, termi\u0146u, priorit\u0101ti un statusu.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un izpildes gaita atgrie\u017eas j\u016bsu t\u0101fel\u0113.<\/strong> Pl\u0101notais s\u0101kums un beigas non\u0101k Timeline kolonn\u0101, darba centrs \u2014 tam paredz\u0113taj\u0101 kolonn\u0101, bet operatoru zi\u0146ot\u0101 izpildes gaita atjaunina Status kolonnu.<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto monday.com GraphQL API un t\u012bmek\u013ca aiz\u0137eres, t\u0101p\u0113c j\u016bsu komanda saglab\u0101 savas t\u0101feles un automatiz\u0101cijas. Katrs uz\u0146\u0113mums monday.com t\u0101feles veido cit\u0101di, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda izveido j\u016bsu kolonnu atbilst\u012bbu un p\u0113c palai\u0161anas nodro\u0161ina integr\u0101cijas atbalstu. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu monday.com partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p><a href=\"\/lv\/integracija\/erp\/monday\/integracijas-celvedis\/\">monday.com integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a> ir skaidrots, k\u0101 darbojas kolonnu atbilst\u012bba, t\u012bmek\u013ca aiz\u0137eres un datu ierakst\u012b\u0161ana atpaka\u013c.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monday-com-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek p\u0101rs\u016bt\u012bti starp monday.com un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>monday.com<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Poz\u012bcija ra\u017eo\u0161anas t\u0101fel\u0113 (Name, Numbers, Date, Status kolonnas)<\/td><td>Pas\u016bt\u012bjums ar produktu, daudzumu, termi\u0146u un priorit\u0101ti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Apak\u0161poz\u012bcijas vai t\u0101fele, kas saist\u012bta ar Connect Boards<\/td><td>Katra pas\u016bt\u012bjuma tehnolo\u0123isk\u0101 procesa so\u013ci<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Poz\u012bcija produktu vai kr\u0101jumu t\u0101fel\u0113<\/td><td>Produkti, materi\u0101li un kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumu t\u0101fele ar paredzamo pieg\u0101des datumu<\/td><td>Gaid\u0101mais materi\u0101ls t\u0101 pieg\u0101des datum\u0101<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Timeline kolonna<\/td><td>Pl\u0101notais s\u0101kums un beigas<\/td><td>Atpaka\u013c uz monday.com<\/td><\/tr><tr><td>Status, Dropdown vai Text kolonna<\/td><td>Darba centrs un ra\u017eo\u0161anas uzdevuma izpildes gaita<\/td><td>Atpaka\u013c uz monday.com<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Iek\u0101rtu kalend\u0101ri, p\u0101rregul\u0113\u0161anas laiki, instrumenti un alternat\u012bv\u0101s iek\u0101rtas tiek uztur\u0113ti SkyPlanner, jo monday.com t\u0101fel\u0113s tie nav pieejami k\u0101 grafiku sast\u0101d\u012b\u0161anai izmantojami dati.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-monday-com-s-gantt-and-workload-views-cover\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko nodro\u0161ina monday.com Gantt un Workload skati, un ko papildus dod SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>monday.com ir darba p\u0101rvald\u012bbas platforma, nevis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bks. T\u0101 att\u0113lo Gantt joslas p\u0113c cilv\u0113ku ievad\u012btajiem datumiem un iekr\u0101so resursu, ja slodze p\u0101rsniedz t\u0101 jaudu. monday.com pal\u012bdz\u012bbas centrs skaidro, ko tas noz\u012bm\u0113:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Workload par\u0101da p\u0101rslodzi, bet to nov\u0113r\u0161 cilv\u0113ks.<\/strong> Skats \u013cauj redz\u0113t &#8220;who is over their capacity and assign upcoming tasks accordingly.&#8221; (kam slodze p\u0101rsniedz pieejamo jaudu, un attiec\u012bgi pie\u0161\u0137irt n\u0101kamos uzdevumus). Nekas pats no sevis nep\u0101rce\u013c darbu uz br\u012bvu laiku grafik\u0101. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360010166559-Resource-management-with-Workload\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Atkar\u012bbas p\u0101rb\u012bda datumus, nevis pl\u0101no jaudu.<\/strong> Flexible re\u017e\u012bms &#8220;ensures no overlap between the dates of items that are dependent on one another.&#8221; (nodro\u0161ina, ka savstarp\u0113ji atkar\u012bgu poz\u012bciju datumi nep\u0101rkl\u0101jas). Divi neatkar\u012bgi pas\u016bt\u012bjumi joproj\u0101m var tikt iepl\u0101noti vienai iek\u0101rtai vien\u0101 un taj\u0101 pa\u0161\u0101 stund\u0101. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360007402599-Dependencies-on-monday-com\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Darba grafiki ir paredz\u0113ti cilv\u0113kiem.<\/strong> &#8220;work schedule defines which days and hours a resource works each week,&#8221; (darba grafiks nosaka, kur\u0101s dien\u0101s un stund\u0101s resurss str\u0101d\u0101 katru ned\u0113\u013cu), un tas tiek piesaist\u012bts lietot\u0101jiem un komand\u0101m. Iek\u0101rtas mai\u0146ai vai apkopes periodam nav atsevi\u0161\u0137as vietas. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/36305176145682-Managing-resource-schedules-and-time-off\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Nav tehnolo\u0123isko procesu, p\u0101rregul\u0113\u0161anas vai materi\u0101lu uzskaites.<\/strong> T\u0101fel\u0113s nav tehnolo\u0123isk\u0101 procesa, p\u0101rregul\u0113\u0161anas laika, materi\u0101lu specifik\u0101cijas vai kr\u0101jumu p\u0101rbaudes.<\/li>\n\n<\/ul>\n\n\n<p>T\u0101p\u0113c p\u0113c katra steidzama pas\u016bt\u012bjuma pl\u0101not\u0101js p\u0101rvieto poz\u012bcijas manu\u0101li. Visi ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/monday\/razosanas-planosana\/\">Vai monday.com nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monday-com-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">monday.com \u0161odien un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>monday.com<\/th><th>monday.com ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>P\u0101rslodze nor\u0101d\u012bta ar kr\u0101su<\/td><td>Tiek iev\u0113rota katras iek\u0101rtas, darbinieka un instrumenta pieejam\u012bba un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>Datumus ievada cilv\u0113ki<\/td><td>Grafiks oper\u0101ciju l\u012bmen\u012b da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>Iek\u0101rtas<\/td><td>Model\u0113tas k\u0101 kolonna vai persona<\/td><td>Darba centri ar saviem kalend\u0101riem un alternat\u012bv\u0101m<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Netiek model\u0113ta<\/td><td>Uzdevumi sak\u0101rtoti t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Atsevi\u0161\u0137as t\u0101feles bez p\u0101rbaudes<\/td><td>Uzdevumi s\u0101kas, kad materi\u0101li ir kr\u0101jumos vai pieg\u0101d\u0101ti<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Poz\u012bcijas p\u0101rvieto manu\u0101li<\/td><td>Autopilot p\u0101rpl\u0101no, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Statusu maina t\u0101fel\u0113<\/td><td>Operatori redz savu uzdevumu rindu t\u0101lrun\u012b vai plan\u0161et\u0113<\/td><\/tr><tr><td>J\u016bsu komanda<\/td><td>Str\u0101d\u0101 platform\u0101 monday.com<\/td><td>Turpina str\u0101d\u0101t platform\u0101 monday.com ar re\u0101liem datumiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monday-com\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bku platformai monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>monday.com Gantt un Workload skati ir piem\u0113roti nelielai ra\u017eotnei ar da\u017e\u0101m iek\u0101rt\u0101m, vienas oper\u0101cijas uzdevumiem un vienu pl\u0101not\u0101ju, kur\u0161 zina ra\u017eo\u0161anas \u0161auro vietu. Ja ar to nepietiek, pirc\u0113ji sal\u012bdzina \u010detras risin\u0101jumu grupas. Gantt un resursu lietotnes papildina t\u0101feles ar jauniem skatiem. MRP sist\u0113mas tiek savienotas ar automatiz\u0101cijas r\u012bkiem. Lieliem uz\u0146\u0113mumiem paredz\u0113tajiem APS risin\u0101jumiem vajadz\u012bga pl\u0101no\u0161anas komanda. SkyPlanner ir m\u0101ko\u0146a APS risin\u0101jums, kas nodro\u0161ina ar\u012b darba izpildi ra\u017eo\u0161anas ceh\u0101.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja vair\u0101ku oper\u0101ciju uzdevumi j\u0101izpilda vair\u0101k\u0101s iek\u0101rt\u0101s<\/strong> un Workload skats katru ned\u0113\u013cu ir sarkans.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja p\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> SkyPlanner sak\u0101rto uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja koplietoti instrumenti, brig\u0101des un iek\u0101rtu mai\u0146as nosaka, kuru uzdevumu var s\u0101kt n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja materi\u0101lu pieg\u0101de nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot p\u0101rpl\u0101no ra\u017eo\u0161anu, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz j\u016bsu t\u0101feli.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties turpin\u0101t izmantot monday.com<\/strong> pas\u016bt\u012bjumiem, p\u0101rdo\u0161anai un statusu uzskaitei, papildinot to ar tr\u016bksto\u0161o grafiku sast\u0101d\u012b\u0161anas dzin\u0113ju.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet \u0161os datus. Ir pieejams atbalsts darba uzs\u0101k\u0161anai.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet ra\u017eo\u0161anas t\u0101feli no monday.com uz Excel, import\u0113jiet to un sal\u012bdziniet SkyPlanner sast\u0101d\u012bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet monday.com.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju ar j\u016bsu t\u0101fel\u0113m un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 br\u012bd\u012b varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais monday.com papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar monday.com. Tas sa\u0146em pas\u016bt\u012bjumu poz\u012bcijas ar daudzumiem, izpildes termi\u0146iem un statusiem, bet uz j\u016bsu t\u0101feles kolonn\u0101m nos\u016bta pl\u0101noto s\u0101kumu, beigas, darba centru un izpildes gaitu. Katras iek\u0101rtas, operatora un instrumenta pieejam\u012bba, k\u0101 ar\u012b materi\u0101lu daudzums ir ierobe\u017eots. SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laikus, p\u0101rejot no viena produkta uz citu abos virzienos, un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks. Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai monday.com var pl\u0101not ra\u017eo\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo pieejamo jaudu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. monday.com skat\u0101 Workload par\u0101da, kad darbinieka vai resursa noslodze p\u0101rsniedz pieejamo jaudu, un pl\u0101not\u0101js manu\u0101li p\u0101rdala darbus. Tas neiepl\u0101no ra\u017eo\u0161anas uzdevumus iek\u0101rtu br\u012bvaj\u0101 laik\u0101. SkyPlanner APS pievieno visai ra\u017eotnei <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101nu, kas \u0146em v\u0113r\u0101 re\u0101lo pieejamo jaudu<\/a>, un ieraksta datumus atpaka\u013c j\u016bsu t\u0101fel\u0113s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai monday.com var sast\u0101d\u012bt iek\u0101rtu darba grafikus?<\/summary>\n<p class=\"sp-faq__a\">Iek\u0101rtu var tikai nor\u0101d\u012bt. To var atz\u012bm\u0113t kolonn\u0101 Status vai izmantot k\u0101 resursu skat\u0101 Workload, ta\u010du darba grafiki un promb\u016btnes laiks tiek piesaist\u012bti cilv\u0113kiem un komand\u0101m. SkyPlanner \u013cauj katrai iek\u0101rtai noteikt savas mai\u0146as, apkopes p\u0101rtraukumus, p\u0101rregul\u0113\u0161anu un alternat\u012bv\u0101s iek\u0101rtas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas main\u012bsies m\u016bsu monday.com t\u0101fel\u0113s?<\/summary>\n<p class=\"sp-faq__a\">\u013boti maz. J\u016bsu monday.com administrators vienreiz at\u013cauj piek\u013cuvi API, un j\u016bs pievienojat Timeline kolonnu un darba centra kolonnu, ja t\u0101du t\u0101fel\u0113 v\u0113l nav. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s monday.com un izveido savienojumu, izmantojot monday.com GraphQL API un t\u012bmek\u013ca aiz\u0137eres.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j monday.com?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas darbojas kop\u0101 ar monday.com. Pas\u016bt\u012bjumi, klienti, projekti un statusi paliek monday.com. SkyPlanner sast\u0101da ra\u017eo\u0161anas grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta pl\u0101notos datumus un izpildes gaitu atpaka\u013c uz j\u016bsu t\u0101feli.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto monday.com?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto darbu rindu. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un iek\u013caujam pied\u0101v\u0101jum\u0101 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu. T\u0101d\u0113j\u0101di visas izmaksas zin\u0101t jau pirms darba uzs\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas. Komanda sasaista j\u016bsu t\u0101feles kolonnas ar atbilsto\u0161ajiem datu laukiem, piesl\u0113dz pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu ierakst\u012b\u0161anu atpaka\u013c t\u0101fel\u0113. Pirms ekspluat\u0101cijas s\u0101kuma visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms monday.com pievieno\u0161anas?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet ra\u017eo\u0161anas t\u0101feli uz Excel un import\u0113jiet to 30 dienu izm\u0113\u0123in\u0101juma laik\u0101. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma redz\u0113siet savas ra\u017eotnes pl\u0101nu, kas \u0146em v\u0113r\u0101 re\u0101lo pieejamo jaudu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ monday.com SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ra\u017eot\u0101jiem, kuri p\u0101rvalda pas\u016bt\u012bjumus platform\u0101 monday.com. Tas veido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. J\u016bsu komanda turpina str\u0101d\u0101t sav\u0101s t\u0101fel\u0113s, bet to pamat\u0101 beidzot ir &#8230; <a title=\"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/\" aria-label=\"Read more about SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103055","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>monday.com integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monday\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monday\\\/\",\"name\":\"monday.com integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monday\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monday\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/monday\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"monday.com integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas","description":"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/","name":"monday.com integr\u0101cija: APS ra\u017eo\u0161anas pl\u0101no\u0161ana p\u0113c jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: monday.com papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai p\u0113c jaudas. Divvirzienu integr\u0101cija. Pl\u0101ns katrai iek\u0101rtai, mai\u0146ai un materi\u0101lam. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/monday\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ monday.com SkyPlanner APS platformai monday.com: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ra\u017eot\u0101jiem, kuri p\u0101rvalda pas\u016bt\u012bjumus platform\u0101 monday.com. Tas veido grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu. J\u016bsu komanda turpina str\u0101d\u0101t sav\u0101s t\u0101fel\u0113s, bet to pamat\u0101 beidzot ir&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103055","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=103055"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/103055\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=103055"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}