{"id":102968,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/jobboss\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"jobboss","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/","title":{"rendered":"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ JobBOSS\u00b2<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai JobBOSS\u00b2: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ECI sist\u0113mai JobBOSS\u00b2 (JobBOSS 2). Tas uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, sast\u0101da grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. J\u016bs redzat, kur\u0101 iek\u0101rt\u0101 un cikos tiek veikta katra ra\u017eo\u0161anas uzdevuma oper\u0101cija, un Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar JobBOSS\u00b2 darbojas abos virzienos. SkyPlanner sa\u0146em Orders un Order Line Items, Order Routings, Estimates un Routings, Work Centers, Employees, Company Calendar, Job Requirements un iepirkuma pas\u016bt\u012bjumu datus. Katras ra\u017eo\u0161anas uzdevuma oper\u0101cijas pl\u0101notais s\u0101kuma un beigu datums tiek nos\u016bt\u012bts atpaka\u013c, un re\u0123istr\u0113to darbu var nos\u016bt\u012bt k\u0101 Time Tickets ierakstus. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu JobBOSS\u00b2 konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-shop\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eotn\u0113<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katrai oper\u0101cijai ir sava iek\u0101rta un izpildes laiks.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner iepl\u0101no katru Order Routing oper\u0101ciju konkr\u0113t\u0101 iek\u0101rt\u0101 un konkr\u0113t\u0101 laik\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, promb\u016btnes un virsstundas. Darba centram ar \u010detr\u0101m fr\u0113zma\u0161\u012bn\u0101m tiek izveidotas \u010detras praks\u0113 izpild\u0101mas darbu rindas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">P\u0101rregul\u0113\u0161ana aiz\u0146em maz\u0101k laika.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner glab\u0101 p\u0101rregul\u0113\u0161anas laiku katram deta\u013cu vai materi\u0101lu p\u0101rim abos p\u0101rejas virzienos. P\u0101reja no alum\u012bnija uz t\u0113raudu var aiz\u0146emt 30 min\u016btes, bet no t\u0113rauda uz alum\u012bniju \u2014 60. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas maz\u0101ks.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ar\u012b operatoru un pal\u012bgier\u012b\u010du pieejam\u012bba ir ierobe\u017eota.<\/p>\n\n\n<p class=\"fx-pain__b\">Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek nor\u012bkoti tr\u012bs cilv\u0113ki ar br\u012bvu laiku attiec\u012bgaj\u0101 mai\u0146\u0101. Pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus rezerv\u0113ta citai. Ja iek\u0101rta ir aiz\u0146emta, darbu p\u0101rdala citai iek\u0101rtai vai darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darba s\u0101kumu nosaka materi\u0101lu pieg\u0101de.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus katrai deta\u013cai. Ra\u017eo\u0161anas uzdevumu, kuram v\u0113l j\u0101gaida stie\u0146u materi\u0101ls vai \u0101rpakalpojums, iepl\u0101no p\u0113c pieg\u0101des datuma, nevis s\u0101k un p\u0113c tam atst\u0101j ceh\u0101 gaid\u012bt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Steidzami pas\u016bt\u012bjumi vairs neizjauc ned\u0113\u013cas pl\u0101nu.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad pien\u0101k steidzams pas\u016bt\u012bjums vai apst\u0101jas iek\u0101rta, Arcturus da\u017eu sekun\u017eu laik\u0101 optimiz\u0113 visu pl\u0101nu, bet Autopilot p\u0101rpl\u0101no darbu. J\u016bsu noteiktie blo\u0137\u0113jumi un priorit\u0101tes paliek sp\u0113k\u0101, un Running Time Lock saglab\u0101 nemain\u012bgu tuv\u0101ko stundu darba grafiku ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori str\u0101d\u0101 p\u0113c pl\u0101na.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un darba gait\u0101 re\u0123istr\u0113 p\u0101rregul\u0113\u0161anas un izpildes laiku. Biroj\u0101 darba gaitu redz re\u0101llaik\u0101, un j\u016bs izv\u0113laties, vai faktisko laiku nos\u016bt\u012bt atpaka\u013c uz JobBOSS\u00b2 k\u0101 Time Tickets ierakstus.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ji, kas izmanto SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosada\u013c\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161ana \u013cauj ietaup\u012bt 2 darba stundas katru ned\u0113\u013cu, un jauna darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113tu tr\u012bs m\u0113ne\u0161u pl\u0101nu visiem darba centriem var sast\u0101d\u012bt maz\u0101k nek\u0101 30 min\u016bt\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 \u2014 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-jobboss-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar JobBOSS\u00b2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>JobBOSS\u00b2 nos\u016bta ra\u017eo\u0161anas uzdevumus.<\/strong> SkyPlanner sa\u0146em neizpild\u012btos ra\u017eo\u0161anas uzdevumus ar to Order Routings, Estimates, Routings un materi\u0101liem, k\u0101 ar\u012b Work Centers, Employees, mai\u0146u, Job Requirements un iepirkuma pas\u016bt\u012bjumu rindu datus.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru ra\u017eo\u0161anas uzdevuma oper\u0101ciju un p\u0101rpl\u0101no darbu, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Katras Order Routing oper\u0101cijas pl\u0101notais s\u0101kuma un beigu datums tiek nos\u016bt\u012bts atpaka\u013c uz JobBOSS\u00b2, un re\u0123istr\u0113to p\u0101rregul\u0113\u0161anas un izpildes laiku var nos\u016bt\u012bt k\u0101 Time Ticket Details ierakstus.<\/li>\n\n<\/ol>\n\n\n<p>JobBOSS\u00b2 paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Cenu pied\u0101v\u0101jumu sagatavo\u0161ana, Estimates, Order Entry, iepirkumi, kr\u0101jumu uzskaite, ra\u017eo\u0161anas uzdevumu izmaksu uzskaite un gr\u0101matved\u012bba paliek turpat, kur l\u012bdz \u0161im. SkyPlanner atbild par vienu lietu: katras ra\u017eo\u0161anas uzdevuma oper\u0101cijas sec\u012bbu un izpildes laiku katr\u0101 resurs\u0101.<\/p>\n\n\n<p>SkyPlanner savienojumam izmanto pa\u0161a ECI saskarnes. Mitin\u0101t\u0101 JobBOSS\u00b2 versija izmanto JobBOSS\u00b2 API \u2014 REST API ar OpenAPI dokument\u0101ciju un OAuth 2.0 klienta akredit\u0101cijas datiem. Lok\u0101li instal\u0113t\u0101 JobBOSS\u00b2 versija izmanto ECI ERP API, ko ECI izstr\u0101d\u0101jis piek\u013cuvei gan m\u0101ko\u0146a, gan lok\u0101laj\u0101m instal\u0101cij\u0101m. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek, savuk\u0101rt JobBOSS\u00b2 sinhroniz\u0101cijas bie\u017eumu nosaka katrai ra\u017eotnei atsevi\u0161\u0137i.<\/p>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 JobBOSS\u00b2 izmanto cit\u0101di, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavo iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Ar\u012b j\u016bsu JobBOSS\u00b2 partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Galapunkti, datu kart\u0113\u0161ana un atpaka\u013cieraksta noteikumi ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/jobboss\/integracijas-celvedis\/\">JobBOSS\u00b2 integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-jobboss-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko iepl\u0101no JobBOSS\u00b2 un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>JobBOSS\u00b2 ir pilnv\u0113rt\u012bgs grafiku sast\u0101d\u012b\u0161anas modulis. ECI to sauc par &#8220;the only ERP with two ways to schedule&#8221; (vien\u012bgo ERP ar diviem grafiku sast\u0101d\u012b\u0161anas veidiem): Whiteboard Scheduler un Planning Board ar vilk\u0161anas un nome\u0161anas funkciju, savuk\u0101rt Scheduling Advisor r\u0101da ra\u017eo\u0161anas uzdevumus, kas kav\u0113jas. ECI sav\u0101s lap\u0101s izskaidro darb\u012bbas principus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ar jaudas ierobe\u017eojumiem vai bez tiem \u2014 katram darba centram.<\/strong> &#8220;Choose from finite or infinite scheduling to manage capacity questions.&#8221; (Jaudas p\u0101rvald\u012bbai izv\u0113lieties pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem vai bez tiem.) Ra\u017eo\u0161anas uzdevumus iepl\u0101no pa darba centriem un pie\u0161\u0137ir darbiniekiem. (<a href=\"https:\/\/www.ecisolutions.com\/products\/jobboss2\/features\/scheduling\/\">ECI<\/a>)<\/li>\n\n\n<li><strong>R\u012bks pl\u0101not\u0101jam.<\/strong> &#8220;The Schedule is a tool to help you run your shop; it will not run it for you.&#8221; (Grafiks ir r\u012bks, kas pal\u012bdz vad\u012bt ra\u017eotni; tas nevad\u012bs ra\u017eotni j\u016bsu viet\u0101.) (<a href=\"https:\/\/www.ecisolutions.com\/blog\/manufacturing\/jobboss2\/common-roadblocks-to-implementing-the-scheduling-module-in-jobboss2\/\">ECI emu\u0101rs<\/a>)<\/li>\n\n\n<li><strong>Sec\u012bbu nosaka manu\u0101li.<\/strong> &#8220;Others may wish to manipulate the schedule to reorder the jobs in a work center to have greater control.&#8221; (Citi, iesp\u0113jams, v\u0113l\u0113sies main\u012bt grafiku un p\u0101rk\u0101rtot ra\u017eo\u0161anas uzdevumus darba centr\u0101, lai vair\u0101k kontrol\u0113tu darbu.) ECI piebilst, ka grafika manu\u0101la piel\u0101go\u0161ana situ\u0101cijai ceh\u0101 &#8220;is a full-time job and leads to being reactive rather than proactive.&#8221; (ir pilna laika darbs un liek rea\u0123\u0113t uz notiku\u0161o, nevis r\u012bkoties savlaic\u012bgi.)<\/li>\n\n\n<li><strong>Materi\u0101lus \u0146em v\u0113r\u0101 p\u0113c pieg\u0101des termi\u0146iem.<\/strong> &#8220;All raw materials and outside services need realistic lead times.&#8221; (Vis\u0101m izejviel\u0101m un \u0101rpakalpojumiem j\u0101nosaka re\u0101listiski pieg\u0101des un izpildes termi\u0146i.)<\/li>\n\n<\/ul>\n\n\n<p>JobBOSS\u00b2 glab\u0101 vienu p\u0101rregul\u0113\u0161anas laiku katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai un jaudu izsaka darba centra stund\u0101s l\u012bdz trim mai\u0146\u0101m (<a href=\"https:\/\/api-jb2.integrations.ecimanufacturing.com\/openapi.json\">JobBOSS\u00b2 API dokument\u0101cija<\/a>). Grafiku sast\u0101d\u012b\u0161anu vair\u0101kiem resursiem ar individu\u0101liem ierobe\u017eojumiem ECI pied\u0101v\u0101 atsevi\u0161\u0137\u0101 produkt\u0101: ECI APS \u2014 papildin\u0101jum\u0101, kura pamat\u0101 ir LYNQ.<\/p>\n\n\n<p>Katrs solis un ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/jobboss\/razosanas-planosana\/\">Vai JobBOSS\u00b2 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"jobboss-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Grafiku sast\u0101d\u012b\u0161ana JobBOSS\u00b2<\/th><th>JobBOSS\u00b2 kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Ar jaudas ierobe\u017eojumiem vai bez tiem katram darba centram; stundas mai\u0146\u0101<\/td><td>\u0145em v\u0113r\u0101 katras iek\u0101rtas, operatora un instrumenta ierobe\u017eoto pieejam\u012bbu, faktisk\u0101s mai\u0146as un promb\u016btnes<\/td><\/tr><tr><td>Sec\u012bba<\/td><td>Pl\u0101not\u0101js p\u0101rk\u0101rto ra\u017eo\u0161anas uzdevumus darba centr\u0101, izmantojot Whiteboard<\/td><td>Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Viens p\u0101rregul\u0113\u0161anas laiks katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica abiem p\u0101rejas virzieniem: minim\u0101ls kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Darbinieki<\/td><td>Ra\u017eo\u0161anas uzdevumus pie\u0161\u0137ir darbiniekiem<\/td><td>Uzdevumiem ar vair\u0101kiem operatoriem nor\u012bko darbiniekus ar br\u012bvu laiku mai\u0146\u0101; promb\u016btnes gad\u012bjum\u0101 izv\u0113las aizvietot\u0101jus<\/td><\/tr><tr><td>Instrumenti un pal\u012bgier\u012bces<\/td><td>Instrumentu uzskaite apkopes vajadz\u012bb\u0101m<\/td><td>Instrumentu pieejam\u012bba ir ierobe\u017eota: tos nekad neiepl\u0101no div\u0101m iek\u0101rt\u0101m vienlaikus<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu pieg\u0101des un \u0101rpakalpojumu izpildes termi\u0146i<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir pieejami noliktav\u0101 vai sa\u0146emti p\u0113c iepirkuma pas\u016bt\u012bjuma<\/td><\/tr><tr><td>Steidzami ra\u017eo\u0161anas uzdevumi un iek\u0101rtu boj\u0101jumi<\/td><td>Steidzamu ra\u017eo\u0161anas uzdevumu atz\u012bm\u0113\u0161ana un darbu p\u0101rvieto\u0161ana pl\u0101no\u0161anas panel\u012b ar vilk\u0161anu<\/td><td>Autopilot p\u0101rpl\u0101no, iev\u0113rojot j\u016bsu noteiktos blo\u0137\u0113jumus un priorit\u0101tes<\/td><\/tr><tr><td>Ies\u0101ktie darbi<\/td><td>Grafiku atjaunina, izmantojot sav\u0101ktos datus<\/td><td>Re\u0123istr\u0113t\u0101 darba izpilde atjaunina pl\u0101nu; Running Time Lock blo\u0137\u0113 izmai\u0146as tuv\u0101ko stundu grafik\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Datu v\u0101k\u0161ana JobBOSS\u00b2 sist\u0113m\u0101<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"jobboss-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">JobBOSS\u00b2 grafiku sast\u0101d\u012b\u0161anas programmat\u016bras un papildin\u0101jumu sal\u012bdzin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Risin\u0101jums<\/th><th>Kas tas ir<\/th><th>Kad piem\u0113rots<\/th><\/tr><\/thead><tbody><tr><td>JobBOSS\u00b2 grafiku sast\u0101d\u012b\u0161ana un ECI APS<\/td><td>Whiteboard Scheduler un Planning Board ir iek\u013cauti JobBOSS\u00b2; ECI APS ir atsevi\u0161\u0137s ECI papildin\u0101jums, kura pamat\u0101 ir LYNQ<\/td><td>Par pl\u0101no\u0161anas paneli atbild viens pl\u0101not\u0101js, vai ar\u012b v\u0113laties izmantot tikai ECI produktus<\/td><\/tr><tr><td>Dator\u0101 instal\u0113jamas ra\u017eo\u0161anas pl\u0101no\u0161anas programmas, kas iev\u0113ro pieejamo jaudu un izmanto eksport\u0113tus datus (piem\u0113ram, User Solutions izstr\u0101d\u0101t\u0101 EDGEBIC)<\/td><td>Ra\u017eo\u0161anas uzdevumus un tehnolo\u0123iskos procesus eksport\u0113 no JobBOSS uz Excel vai CSV un import\u0113 dator\u0101 instal\u0113t\u0101 grafiku sast\u0101d\u012b\u0161anas programm\u0101<\/td><td>Pl\u0101not\u0101jam ir pie\u0146emami p\u0101rvietot failus un datumus ievad\u012bt atpaka\u013c manu\u0101li<\/td><\/tr><tr><td>M\u0101ko\u0146a APS ar API savienojumu (SkyPlanner APS, Skody)<\/td><td>P\u0101rl\u016bk\u0101 pieejama grafiku sast\u0101d\u012b\u0161anas programma, kas sinhroniz\u0113jas ar JobBOSS\u00b2 ra\u017eo\u0161anas uzdevumiem<\/td><td>Grafikam j\u0101atjaunin\u0101s autom\u0101tiski un j\u0101b\u016bt pieejamam katram operatoram<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis JobBOSS\u00b2 grafiku sast\u0101d\u012b\u0161anas iesp\u0113jas, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties, lai dators nosaka darbu sec\u012bbu.<\/strong> ECI nor\u0101da, ka t\u0101 grafiks &#8220;will not run it for you&#8221; (nevad\u012bs darbu j\u016bsu viet\u0101) un ka t\u0101 manu\u0101la saska\u0146o\u0161ana ar situ\u0101ciju ceh\u0101 ir pilnas slodzes darbs. Arcturus optimiz\u0113 visu pl\u0101nu da\u017eu sekun\u017eu laik\u0101, un Autopilot p\u0101rpl\u0101no p\u0113c katr\u0101m b\u016btisk\u0101m izmai\u0146\u0101m.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> JobBOSS\u00b2 katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai glab\u0101 vienu p\u0101rregul\u0113\u0161anas laiku. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 katram p\u0101rim katr\u0101 p\u0101rejas virzien\u0101 ir savs laiks, un sist\u0113ma izv\u0113las darbu sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Operatori, pal\u012bgier\u012bces un materi\u0101li ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/strong> Vienlaikus tiek \u0146emta v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la ierobe\u017eot\u0101 pieejam\u012bba. Uzdevumiem, kuriem vajadz\u012bgi vair\u0101ki operatori, tiek iepl\u0101nots nepiecie\u0161amais person\u0101ls, un ra\u017eo\u0161anas uzdevumi s\u0101kas, kad ir pieejami materi\u0101li.<\/li>\n\n\n<li><strong>V\u0113laties sast\u0101d\u012bt grafiku vair\u0101kiem resursiem bez v\u0113l viena papildin\u0101juma ievie\u0161anas projekta.<\/strong> Grafiku sast\u0101d\u012b\u0161anu vair\u0101kiem resursiem ar piel\u0101gotiem ierobe\u017eojumiem ECI pied\u0101v\u0101 k\u0101 atsevi\u0161\u0137u papildin\u0101jumu ECI APS. SkyPlanner s\u0101k darboties da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas uzs\u0101k\u0161anas, un pirms tam 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat to p\u0101rbaud\u012bt ar saviem JobBOSS\u00b2 ra\u017eo\u0161anas uzdevumiem.<\/li>\n\n\n<li><strong>Katram operatoram j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da aktu\u0101lo uzdevumu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un re\u0123istr\u0113tais darba laiks non\u0101k atpaka\u013c JobBOSS\u00b2.<\/li>\n\n\n<li><strong>V\u0113laties vienu skaidru cenu.<\/strong> No 199 \u20ac m\u0113nes\u012b. Divvirzienu integr\u0101cijas cenu pied\u0101v\u0101jum\u0101 nor\u0101da iepriek\u0161, un t\u0101s atbalstu nodro\u0161ina SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet savus JobBOSS\u00b2 Work Centers. Ir pieejama pal\u012bdz\u012bba ievie\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas uzdevumus.<\/strong> Eksport\u0113jiet no JobBOSS\u00b2 uz Excel atv\u0113rtos ra\u017eo\u0161anas uzdevumus un to tehnolo\u0123isk\u0101 procesa oper\u0101cijas. Import\u0113jiet tos SkyPlanner un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101no\u0161anas paneli.<\/li>\n\n\n<li><strong>Savienojiet ar JobBOSS\u00b2.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, iepaz\u012bstiet <a href=\"\/lv\/funkcijas\/\">visas funkcijas<\/a> vai apskatiet <a href=\"\/lv\/integracija\/erp\/\">visas ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais JobBOSS\u00b2 papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas iev\u0113ro re\u0101lo iek\u0101rtu un person\u0101la jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar JobBOSS\u00b2. Tas sa\u0146em pas\u016bt\u012bjumus, Order Routings, Estimates, Work Centers, Employees, Job Requirements un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta katras ra\u017eo\u0161anas uzdevuma oper\u0101cijas pl\u0101notos s\u0101kuma un beigu datumus. Pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la ierobe\u017eoto pieejam\u012bbu. P\u0101rregul\u0113\u0161anas laiku matrica, kas \u0146em v\u0113r\u0101 p\u0101rejas virzienu, nosaka uzdevumu sec\u012bbu ar vismaz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Autopilot autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai JobBOSS\u00b2 nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot pieejamo jaudu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, darba centru l\u012bmen\u012b. ECI \u013cauj izv\u0113l\u0113ties pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem vai bez tiem un p\u0101rvietot ra\u017eo\u0161anas uzdevumus, izmantojot Whiteboard Scheduler un Planning Board. Darbu sec\u012bbu katr\u0101 darba centr\u0101 joproj\u0101m nosaka pl\u0101not\u0101js, un katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai ir viens p\u0101rregul\u0113\u0161anas laiks. SkyPlanner APS darbojas l\u012bdz\u0101s JobBOSS\u00b2, sast\u0101da grafiku, iev\u0113rojot katras iek\u0101rtas, operatora, instrumenta un materi\u0101la ierobe\u017eoto pieejam\u012bbu, un autom\u0101tiski optimiz\u0113 darbu sec\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izmantot JobBOSS\u00b2 grafiku sast\u0101d\u012b\u0161anu vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Turpiniet izmantot JobBOSS\u00b2 grafiku sast\u0101d\u012b\u0161anu, ja vienam pl\u0101not\u0101jam ir \u0113rti str\u0101d\u0101t ar Whiteboard un p\u0101rregul\u0113\u0161ana nav atkar\u012bga no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma. Izv\u0113lieties SkyPlanner, ja v\u0113laties, lai darbu sec\u012bba tiktu optimiz\u0113ta j\u016bsu viet\u0101: vien\u0101 grafik\u0101 tiek \u0146emti v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laiki abos p\u0101rejas virzienos, uzdevumi ar vair\u0101kiem operatoriem, pal\u012bgier\u012b\u010du ierobe\u017eot\u0101 pieejam\u012bba un materi\u0101lu pien\u0101k\u0161ana, k\u0101 ar\u012b nodro\u0161in\u0101ta autom\u0101tiska p\u0101rpl\u0101no\u0161ana. ECI pa\u0161u risin\u0101jums grafiku sast\u0101d\u012b\u0161anai vair\u0101kiem resursiem ir ECI APS \u2014 atsevi\u0161\u0137s papildin\u0101jums, kura pamat\u0101 ir LYNQ. SkyPlanner darbojas l\u012bdz\u0101s JobBOSS\u00b2, un bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat p\u0101rbaud\u012bt t\u0101 darb\u012bbu ar saviem ra\u017eo\u0161anas uzdevumiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas programmat\u016bra integr\u0113jas ar JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS nodro\u0161ina divvirzienu integr\u0101ciju ar JobBOSS\u00b2, izmantojot JobBOSS\u00b2 API. Host\u0113tai JobBOSS\u00b2 versijai SkyPlanner caur JobBOSS\u00b2 API nolasa pas\u016bt\u012bjumus, Order Routings, Estimates, Work Centers un iepirkuma pas\u016bt\u012bjumus un katr\u0101 Order Routing oper\u0101cij\u0101 ieraksta pl\u0101notos s\u0101kuma un beigu datumus. Autentifik\u0101cijai izmanto ECI Integration Engine Management Console API lietot\u0101ju un OAuth 2.0.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai tas darbojas ar lok\u0101li instal\u0113tu JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Lok\u0101li instal\u0113tu JobBOSS\u00b2 savieno, izmantojot ECI ERP API, ko ECI ir izstr\u0101d\u0101jis piek\u013cuvei gan lok\u0101l\u0101m, gan m\u0101ko\u0146a instal\u0101cij\u0101m. Tv\u0113ruma noteik\u0161anas laik\u0101 SkyPlanner komanda nosaka j\u016bsu instal\u0101cijai piem\u0113rot\u0101ko savienojuma veidu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j JobBOSS\u00b2 cenu pied\u0101v\u0101jumu sagatavo\u0161anu, Order Entry vai ra\u017eo\u0161anas uzdevumu pa\u0161izmaksas apr\u0113\u0137inu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. JobBOSS\u00b2 p\u0101rzi\u0146\u0101 paliek Estimates, cenu pied\u0101v\u0101jumi, Order Entry, iepirkumi, kr\u0101jumi, datu v\u0101k\u0161ana, ra\u017eo\u0161anas uzdevumu pa\u0161izmaksas apr\u0113\u0137ins un gr\u0101matved\u012bba. SkyPlanner sast\u0101da ra\u017eo\u0161anas uzdevumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner izmaks\u0101 ra\u017eotnei, kas izmanto JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, papildus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu apr\u0113\u0137ina atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101da iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c t\u0101s uzs\u0101k\u0161anas. Komanda nosaka j\u016bsu Work Centers, iek\u0101rtu un tehnolo\u0123isko procesu atbilst\u012bbu sist\u0113m\u0101, savieno ra\u017eo\u0161anas uzdevumu un iepirkuma pas\u016bt\u012bjumu datus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu atv\u0113rtos JobBOSS\u00b2 ra\u017eo\u0161anas uzdevumus, kas eksport\u0113ti uz Excel. V\u0113l pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savas ra\u017eotnes <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anas rezult\u0101tu<\/a> \u2014 grafiku, kur\u0101 iev\u0113rota re\u0101l\u0101 iek\u0101rtu un person\u0101la jauda.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ JobBOSS\u00b2 SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ECI sist\u0113mai JobBOSS\u00b2 (JobBOSS 2). Tas uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, sast\u0101da grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. J\u016bs redzat, kur\u0101 iek\u0101rt\u0101 un cikos &#8230; <a title=\"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102968","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>JobBOSS\u00b2 integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/\",\"name\":\"JobBOSS\u00b2 integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/jobboss\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"JobBOSS\u00b2 integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai","og_description":"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/","name":"JobBOSS\u00b2 integr\u0101cija ar APS: pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina JobBOSS\u00b2 (JobBOSS 2): pl\u0101no atbilsto\u0161i katras iek\u0101rtas, operatora un instrumenta jaudai. Divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/jobboss\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ JobBOSS\u00b2 SkyPlanner APS sist\u0113mai JobBOSS\u00b2: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums ECI sist\u0113mai JobBOSS\u00b2 (JobBOSS 2). Tas uz\u0146\u0113mumiem, kas ra\u017eo p\u0113c pas\u016bt\u012bjuma, sast\u0101da grafiku katrai iek\u0101rtai, operatoram, instrumentam un materi\u0101lam, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu. J\u016bs redzat, kur\u0101 iek\u0101rt\u0101 un cikos&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=102968"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102968\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=102968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}