{"id":102881,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/ifs-cloud\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ifs-cloud","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/","title":{"rendered":"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS IFS Cloud sist\u0113mai: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir IFS Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju, iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas uzdevums, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar IFS Cloud darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumu nomenklat\u016bru un iepirkuma pas\u016bt\u012bjumus, bet pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu IFS Cloud konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Visi ra\u017eo\u0161anas pas\u016bt\u012bjumi konkur\u0113 par faktiski pieejamo jaudu.<\/p>\n\n\n<p class=\"fx-pain__b\">IFS Cloud standarta pl\u0101not\u0101js katru ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no t\u0101, it k\u0101 tas b\u016btu vien\u012bgais vis\u0101 ra\u017eotn\u0113. SkyPlanner pl\u0101no visus pas\u016bt\u012bjumus kop\u0101, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, darbinieku promb\u016btni un virsstundas. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek iepl\u0101nots citai iek\u0101rtai vai darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, kurus varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Grafiks par\u0101da, kad katrs ra\u017eo\u0161anas pas\u016bt\u012bjums patie\u0161\u0101m b\u016bs pabeigts. Atbildes klientiem balst\u0101t pl\u0101n\u0101, nevis no IFS eksport\u0113t\u0101 Excel fail\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un iek\u0101rtu boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad iek\u0101rta apst\u0101jas, pien\u0101k steidzams pas\u016bt\u012bjums vai darbs tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu noteikt\u0101s priorit\u0101tes un fiks\u0113t\u0101s grafika poz\u012bcijas paliek sp\u0113k\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik ilgs laiks vajadz\u012bgs, lai p\u0101rregul\u0113tu iek\u0101rtu no viena produkta uz n\u0101kamo \u2014 abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti t\u0101d\u0101 sec\u012bb\u0101, lai p\u0101rregul\u0113\u0161anai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Instrumenti un brig\u0101des, kas tie\u0161\u0101m ir pieejami.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidne, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek taj\u0101 pa\u0161\u0101 laik\u0101 rezerv\u0113ta citai. Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek iepl\u0101noti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Grafiks, kas \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas pas\u016bt\u012bjums, kuram v\u0113l j\u0101gaida pieg\u0101d\u0101t\u0101ja s\u016bt\u012bjums, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, lai darbs neapst\u0101tos ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161et\u0113 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaitai var sekot re\u0101llaik\u0101.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>darba pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu tiek pl\u0101noti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas gaitu re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas pale\u0161u krau\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner veido pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai un nodro\u0161ina t\u0101s uzticam\u012bbu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepako\u0161anai<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u. Atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad tiek sniegtas da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-ifs-cloud-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar IFS Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>IFS Cloud nos\u016bta darba datus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m un materi\u0101liem, tehnolo\u0123iskos procesus, produktu strukt\u016bras, darba centrus, darbasp\u0113ku un instrumentus, k\u0101 ar\u012b datus par kr\u0101jumu pieejam\u012bbu un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js iepl\u0101no katru oper\u0101ciju da\u017eu sekun\u017eu laik\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi tiek nos\u016bt\u012bti atpaka\u013c uz IFS.<\/strong> Pl\u0101notais s\u0101kuma un beigu laiks, k\u0101 ar\u012b izv\u0113l\u0113tais darba centra resurss tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumu oper\u0101cij\u0101s. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/li>\n\n<\/ol>\n\n\n<p>IFS Cloud paliek j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Taj\u0101 paliek kr\u0101jumu nomenklat\u016bra, produktu strukt\u016bras, MRP, iepirkumi un izmaksu apr\u0113\u0137ini, un t\u0101 joproj\u0101m izveido ra\u017eo\u0161anas pas\u016bt\u012bjumus un nodod tos izpildei. SkyPlanner atbild par vienu lietu: katras oper\u0101cijas sec\u012bbu un izpildes laiku.<\/p>\n\n\n<p>SkyPlanner piesl\u0113dzas, izmantojot pa\u0161as IFS Cloud OData projekciju API un autentific\u0113joties ar IFS IAM klientu, t\u0101p\u0113c IFS sist\u0113m\u0101 nekas nav j\u0101instal\u0113. Katr\u0101 ra\u017eotn\u0113 IFS izmanto at\u0161\u0137ir\u012bgi, t\u0101d\u0113\u013c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesu un vajadz\u012bbas. Ar\u012b j\u016bsu IFS partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Tehnisk\u0101 inform\u0101cija ir pieejama <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/integracijas-celvedis\/\">rokasgr\u0101mat\u0101 par IFS Cloud integr\u0101ciju ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-ifs-cloud-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no IFS Cloud un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>IFS Cloud pl\u0101no materi\u0101lus un pie\u0161\u0137ir datumu katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai. Ta\u010du tr\u016bkst jaudas p\u0101rbaudes. <a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">IFS darba centru dokument\u0101cij\u0101<\/a> tas pateikts tie\u0161i: &#8220;Operations scheduled with CRP and shop order are always scheduled infinite.&#8221; (Oper\u0101cijas ar CRP un ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anu vienm\u0113r tiek pl\u0101notas, pie\u0146emot neierobe\u017eotu jaudu.) Ikdienas ra\u017eo\u0161an\u0101 tas noz\u012bm\u0113:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumi vien\u0101 un taj\u0101 pa\u0161\u0101 iek\u0101rt\u0101 p\u0101rkl\u0101jas laik\u0101.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101not\u0101js katram pas\u016bt\u012bjumam atsevi\u0161\u0137i izv\u0113las vismaz\u0101k noslogoto resursu. Diviem pas\u016bt\u012bjumiem var tikt iepl\u0101notas vienas un t\u0101s pa\u0161as stundas.<\/li>\n\n\n<li><strong>Pl\u0101not\u0101ji maina sec\u012bbu manu\u0101li.<\/strong> Steidzamus pas\u016bt\u012bjumus un iek\u0101rtu boj\u0101jumus n\u0101kas risin\u0101t no IFS eksport\u0113t\u0101s izkl\u0101jlap\u0101s.<\/li>\n\n\n<li><strong>Advanced Planning Board redz tikai da\u013cu ra\u017eotnes.<\/strong> K\u0101 nor\u0101da IFS, \u0161is r\u012bks &#8220;only considers the constraints placed by shop orders and resources that are actually loaded to the APB at a given time.&#8221; (\u0145em v\u0113r\u0101 tikai to ra\u017eo\u0161anas pas\u016bt\u012bjumu un resursu ierobe\u017eojumus, kas attiec\u012bgaj\u0101 br\u012bd\u012b ir iel\u0101d\u0113ti APB.) Viss p\u0101r\u0113jais joproj\u0101m tiek pl\u0101nots, pie\u0146emot neierobe\u017eotu jaudu.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anai p\u0113c re\u0101l\u0101s jaudas ir atsevi\u0161\u0137s modulis.<\/strong> IFS risin\u0101jums Manufacturing Scheduling and Optimization (MSO) pl\u0101no iek\u0101rtas, darbasp\u0113ku, instrumentus un materi\u0101lu pieejam\u012bbu. Tas ir pieejams klientiem ar piek\u013cuvi MSO un darbojas, izmantojot ieg\u0101d\u0101tu PSO Cloud Service vai IFS.ai Activation Pass (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">IFS MSO<\/a>). SkyPlanner \u0146em v\u0113r\u0101 visus ierobe\u017eojumus vien\u0101 pl\u0101no\u0161anas dzin\u0113j\u0101 par publiski nor\u0101d\u012btu cenu. Jau 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 j\u016bs redzat savu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, kas atbilst faktiskajai jaudai, un da\u017eu ned\u0113\u013cu laik\u0101 s\u0101kat darbu ar sist\u0113mu, kur\u0101 jau ir ieb\u016bv\u0113ta darba re\u0123istr\u0113\u0161ana ra\u017eo\u0161anas ceh\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Visi ierobe\u017eojumi, tostarp MSO, ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/ifs-cloud\/razosanas-planosana\/\">Vai IFS Cloud nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"ifs-cloud-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">IFS Cloud pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>IFS Cloud standarta grafiku sast\u0101d\u012b\u0161ana<\/th><th>IFS Cloud ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumu un CRP pl\u0101no\u0161an\u0101 vienm\u0113r tiek pie\u0146emta neierobe\u017eota jauda<\/td><td>Katrai iek\u0101rtai, darbiniekam un instrumentam tiek \u0146emta v\u0113r\u0101 re\u0101l\u0101 jauda un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>Katrs ra\u017eo\u0161anas pas\u016bt\u012bjums tiek pl\u0101nots atsevi\u0161\u0137i<\/td><td>Visi ra\u017eo\u0161anas pas\u016bt\u012bjumi tiek iepl\u0101noti kop\u0101 da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>P\u0101rregul\u0113\u0161anas laiks katrai tehnolo\u0123isk\u0101 procesa oper\u0101cijai<\/td><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba nodro\u0161ina maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku<\/td><\/tr><tr><td>Instrumenti un brig\u0101des<\/td><td>Pieejam\u012bbas ierobe\u017eojumi starp ra\u017eo\u0161anas pas\u016bt\u012bjumiem netiek \u0146emti v\u0113r\u0101<\/td><td>Koplietojamie instrumenti un uzdevumi ar vair\u0101kiem operatoriem tiek pl\u0101noti atbilsto\u0161i re\u0101lajai pieejam\u012bbai<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101li tiek pl\u0101noti atsevi\u0161\u0137i no iek\u0101rtu noslodzes<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir kr\u0101jum\u0101 vai pieg\u0101d\u0101ti<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>P\u0113c steidzama pas\u016bt\u012bjuma sa\u0146em\u0161anas pl\u0101not\u0101js p\u0101rpl\u0101no grafiku<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni, iev\u0113rojot j\u016bsu priorit\u0101tes<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba izpildes re\u0123istr\u0113\u0161ana Shop Floor Workbench<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><tr><td>Pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai<\/td><td>MSO: atsevi\u0161\u0137a piek\u013cuve un PSO Cloud Service vai IFS.ai Activation Pass<\/td><td>Iek\u013cauta cen\u0101 no 199 \u20ac m\u0113nes\u012b, ievie\u0161ana da\u017eu ned\u0113\u013cu laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-ifs-cloud\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bku darbam ar IFS Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>IFS Cloud standarta grafiku sast\u0101d\u012b\u0161ana ir piem\u0113rota ra\u017eotnei ar br\u012bvu jaudu, \u012bsiem tehnolo\u0123iskajiem procesiem un ned\u0113\u013cas pl\u0101nu. Pl\u0101no\u0161anai atbilsto\u0161i faktiskajai jaudai IFS pied\u0101v\u0101 MSO, ta\u010du ar nosac\u012bjumiem, ko IFS nor\u0101da sav\u0101 dokument\u0101cij\u0101. MSO &#8220;is available for customers with access to Manufacturing Scheduling and Optimization&#8221; (ir pieejams klientiem ar piek\u013cuvi Manufacturing Scheduling and Optimization), un tam nepiecie\u0161ams PSO Cloud Service vai IFS.ai Activation Pass (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">IFS MSO<\/a>). IFS.ai platformas pakalpojumos &#8220;Automatic scheduling mode is not available,&#8221; (autom\u0101tiskais grafiku sast\u0101d\u012b\u0161anas re\u017e\u012bms nav pieejams), un lietot\u0101jiem &#8220;must have a number of dedicated tokens on hand to do a finite schedule or to do a simulation&#8221; (j\u0101b\u016bt pieejamam noteiktam skaitam \u012bpa\u0161i paredz\u0113tu \u017eetonu, lai sast\u0101d\u012btu grafiku atbilsto\u0161i faktiskajai jaudai vai veiktu simul\u0101ciju) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">IFS MSO 26R1<\/a>). Papildu parametriem nor\u0101d\u012bts &#8220;For modification by PSO\/MSO SMEs only,&#8221; (tos dr\u012bkst main\u012bt tikai attiec\u012bg\u0101s jomas eksperti), un IFS pozicion\u0113 MSO &#8220;primarily&#8221; (galvenok\u0101rt) izmanto\u0161anai &#8220;detailed short-term scheduling&#8221; (detaliz\u0113tai \u012bstermi\u0146a grafiku sast\u0101d\u012b\u0161anai) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">IFS MSO 26R2<\/a>).<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis IFS MSO, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atsak\u0101ties no izkl\u0101jlap\u0101m un v\u0113laties rezult\u0101tus da\u017eu ned\u0113\u013cu laik\u0101,<\/strong> vispirms neieg\u0101d\u0101joties MSO piek\u013cuvi un PSO vai IFS.ai ievie\u0161anu.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101atjaunin\u0101s autom\u0101tiski.<\/strong> Autopilot p\u0101rpl\u0101no p\u0113c katr\u0101m izmai\u0146\u0101m. Nav vajadz\u012bgs \u017eetonu bud\u017eets katrai palai\u0161anas reizei, un pl\u0101not\u0101jam nav j\u0101uzs\u0101k grafika sast\u0101d\u012b\u0161ana.<\/li>\n\n\n<li><strong>P\u0101rdo\u0161anas komandai vajadz\u012bgi faktiskaj\u0101 jaud\u0101 balst\u012bti termi\u0146i vair\u0101kus m\u0113ne\u0161us uz priek\u0161u,<\/strong> nevis tikai \u012bstermi\u0146\u0101. Fredman p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Koplietojamie instrumenti, uzdevumi ar vair\u0101kiem operatoriem un materi\u0101lu pieg\u0101des nosaka, ko var s\u0101kt ra\u017eot n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c savas uzdevumu rindas<\/strong> t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations taj\u0101 pa\u0161\u0101 r\u012bk\u0101.<\/li>\n\n\n<li><strong>V\u0113laties, lai integr\u0101ciju jums konfigur\u0113 un atbalstu nodro\u0161ina<\/strong> SkyPlanner komanda, nevis lai t\u0101s piel\u0101go\u0161anai b\u016btu j\u0101piesaista jomas eksperti.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet tos no saviem IFS darba centriem. Pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no IFS Cloud uz Excel, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Piesl\u0113dziet IFS Cloud.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksa tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. Pla\u0161\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>. Citas ERP sist\u0113mas ir nor\u0101d\u012btas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai ar divvirzienu integr\u0101ciju ar IFS Cloud: tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumu nomenklat\u016bras vien\u012bbas un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus. Pl\u0101no\u0161an\u0101 tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu starp uzdevumiem un sak\u0101rto tos t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai IFS Cloud pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">Standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101 \u2014 n\u0113. IFS dokument\u0101cij\u0101 nor\u0101d\u012bts, ka ra\u017eo\u0161anas pas\u016bt\u012bjumi un CRP vienm\u0113r tiek pl\u0101noti, pie\u0146emot neierobe\u017eotu jaudu. Pl\u0101no\u0161anai atbilsto\u0161i faktiskajai jaudai vajadz\u012bgs MSO ar atsevi\u0161\u0137u piek\u013cuvi un PSO vai IFS.ai ievie\u0161anu, vai ar\u012b vec\u0101kais Advanced Planning Board. SkyPlanner APS nodro\u0161ina <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">faktiskajai jaudai atbilsto\u0161u ra\u017eo\u0161anas grafiku<\/a> visai ra\u017eotnei.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai IFS Cloud ir kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s IFS Cloud un savienojas ar to, izmantojot IFS OData projekciju API. J\u016bsu IFS administrators re\u0123istr\u0113 SkyPlanner vajadz\u012bb\u0101m IAM klientu ar servisa lietot\u0101ju, bet p\u0101r\u0113jo konfigur\u0113 SkyPlanner komanda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j IFS Cloud ra\u017eo\u0161anas funkcionalit\u0101ti?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina eso\u0161o sist\u0113mu. IFS Cloud joproj\u0101m uztur kr\u0101jumu nomenklat\u016bras vien\u012bbas, produktu strukt\u016bras, tehnolo\u0123iskos procesus, MRP, iepirkumus, kr\u0101jumu uzskaiti un pa\u0161izmaksas apr\u0113\u0137inus, k\u0101 ar\u012b veido ra\u017eo\u0161anas pas\u016bt\u012bjumus. SkyPlanner sast\u0101da \u0161o pas\u016bt\u012bjumu grafiku atbilsto\u0161i faktiskajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties IFS MSO vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja atsak\u0101ties no izkl\u0101jlap\u0101m un v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt ra\u017eo\u0161anas grafiku, kas atbilst faktiskajai jaudai. MSO vajadz\u012bga atsevi\u0161\u0137a piek\u013cuve un PSO Cloud Service vai IFS.ai Activation Pass. IFS.ai platformas pakalpojumos tas darbojas manu\u0101l\u0101 re\u017e\u012bm\u0101 un pat\u0113r\u0113 \u017eetonus ikreiz, kad tiek sast\u0101d\u012bts faktiskajai jaudai atbilsto\u0161s grafiks vai veikta simul\u0101cija, turkl\u0101t IFS at\u013cauj main\u012bt papildu parametrus tikai PSO un MSO speci\u0101listiem. SkyPlanner pl\u0101no katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la izmanto\u0161anu vienot\u0101 m\u0101ko\u0146risin\u0101jum\u0101, Autopilot autom\u0101tiski p\u0101rpl\u0101no p\u0113c katr\u0101m izmai\u0146\u0101m, bet operatori darbam izmanto Mobile Confirmations. P\u0113c 30 dienu izm\u0113\u0123in\u0101juma ar j\u016bsu pa\u0161u ra\u017eo\u0161anas pas\u016bt\u012bjumiem cena ir no 199 \u20ac m\u0113nes\u012b, un lieto\u0161anai nav nepiecie\u0161ams MSO vai PSO.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, plus 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m kop\u0101 ar abon\u0113\u0161anas maksu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas, ar\u012b lielos uz\u0146\u0113mumos. Komanda izveido j\u016bsu darba centru un tehnolo\u0123isko procesu atbilst\u012bbas starp sist\u0113m\u0101m, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un konfigur\u0113 datu ierakst\u012b\u0161anu atpaka\u013c IFS Cloud. Pirms darb\u012bbas uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto uz Excel eksport\u0113tus j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un darba centrus. J\u016bs redzat savas ra\u017eo\u0161anas grafiku, kas atbilst faktiskajai jaudai, v\u0113l pirms jebk\u0101du integr\u0101cijas darbu s\u0101k\u0161anas.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ IFS Cloud SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir IFS Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju, iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas uzdevums, un &#8230; <a title=\"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/\" aria-label=\"Read more about SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102881","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>IFS Cloud integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/\",\"name\":\"IFS Cloud integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/ifs-cloud\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"IFS Cloud integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","description":"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/","name":"IFS Cloud integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: IFS Cloud papildin\u0101jums, divvirzienu integr\u0101cija. Pl\u0101no p\u0113c re\u0101l\u0101s jaudas: katru iek\u0101rtu, darbinieku, instrumentu un materi\u0101lu. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/ifs-cloud\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ IFS Cloud SkyPlanner APS IFS Cloud sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir IFS Cloud papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Tas pl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101ciju, iek\u0101rtu, operatoru, instrumentu un materi\u0101lu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas uzdevums, un&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=102881"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102881\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=102881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}