{"id":102823,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/dynamics-365-scm\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"dynamics-365-scm","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Microsoft Dynamics 365 Supply Chain Management papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu, k\u0101 ar\u012b katra ra\u017eo\u0161anas pas\u016bt\u012bjuma, resursa, operatora, instrumenta un materi\u0101la ierobe\u017eojumus. Pati D365 jaudas ierobe\u017eojumus \u0146em v\u0113r\u0101 tikai da\u013c\u0113ji. Planning Optimization tos iev\u0113ro tikai noteiktaj\u0101 jaudas pl\u0101no\u0161anas period\u0101. Microsoft nor\u0101da, ka jaudas ierobe\u017eojumu funkcionalit\u0101ti nevajag izmantot, ja jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">avots<\/a>), savuk\u0101rt ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161an\u0101 pas\u016bt\u012bjumus iepl\u0101no pa vienam (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>). SkyPlanner pl\u0101no visus pas\u016bt\u012bjumus kop\u0101, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Dynamics 365 Supply Chain Management: sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isko mar\u0161rutu oper\u0101cijas, resursus, izlaistos produktus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta iepl\u0101notos datumus un resursus. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Supply Chain Management iestat\u012bjumiem.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Visa r\u016bpn\u012bca vien\u0101 grafik\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">D365 SCM ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana izvieto ra\u017eo\u0161anas pas\u016bt\u012bjumus pa vienam, \u0146emot v\u0113r\u0101 jau rezerv\u0113to jaudu. SkyPlanner pl\u0101no visus atv\u0113rtos pas\u016bt\u012bjumus kop\u0101 atbilsto\u0161i re\u0101lajai jaudai. T\u0101p\u0113c pirmais iepl\u0101notais pas\u016bt\u012bjums vairs autom\u0101tiski nesa\u0146em izdev\u012bg\u0101kos laika interv\u0101lus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai\u0146as, kas patie\u0161\u0101m tiek \u0146emtas v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Katras iek\u0101rtas un katra darbinieka pieejamo jaudu nosaka re\u0101l\u0101s mai\u0146as, promb\u016btne un virsstundas. Tie\u0161i tad, ja jauda ir atkar\u012bga no mai\u0146\u0101m, Microsoft neiesaka galvenaj\u0101 pl\u0101no\u0161an\u0101 izmantot jaudas ierobe\u017eojumu funkcionalit\u0101ti. SkyPlanner ir veidots \u0161\u0101diem apst\u0101k\u013ciem.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina p\u0101rregul\u0113\u0161anas laiku starp katru produktu p\u0101ri abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojami instrumenti un brig\u0101des \u2014 tikai tad, kad pieejami.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidni, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad vienlaikus nerezerv\u0113 citai iek\u0101rtai. Ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, pie\u0161\u0137ir tr\u012bs darbiniekus ar br\u012bvu laiku attiec\u012bgaj\u0101s mai\u0146\u0101s. Ja resurss ir aiz\u0146emts, darbu p\u0101rce\u013c uz citu iek\u0101rtu vai uztic citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Grafiks \u0146em v\u0113r\u0101 materi\u0101lu pieejam\u012bbu.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevumu, kuram j\u0101gaida pieg\u0101d\u0101t\u0101ja pieg\u0101de, iepl\u0101no p\u0113c t\u0101s datuma, nevis pie\u013cauj darba apst\u0101\u0161anos ceh\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Steidzamie pas\u016bt\u012bjumi p\u0101rpl\u0101noti sekund\u0113s.<\/p>\n\n\n<p class=\"fx-pain__b\">Kad apst\u0101jas iek\u0101rta vai pien\u0101k steidzams pas\u016bt\u012bjums, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie grafika elementi un priorit\u0101tes joproj\u0101m nosaka pl\u0101no\u0161anas robe\u017eas, un pl\u0101not\u0101ji var kori\u0123\u0113t ra\u017eo\u0161anas uzdevumus interakt\u012bv\u0101 Gantt laika skal\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161et\u0113 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana no Excel tabul\u0101m ir p\u0101rg\u0101jusi uz ra\u017eo\u0161anas optimiz\u0113\u0161anu re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu ietaupa 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Vair\u0101ki t\u016bksto\u0161i (1 000)<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anu tagad kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un viss uz\u0146\u0113mums redz ra\u017eo\u0161anas norisi re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, blakus robotiz\u0113tai palet\u0113\u0161anas \u0161\u016bnai Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u. Atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai vair\u0101k, tagad tiek sniegtas sekund\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-dynamics-365-supply-chain-management-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Dynamics 365 Supply Chain Management<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Supply Chain Management nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em apstiprin\u0101tos un izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus ar tehnolo\u0123isko mar\u0161rutu oper\u0101cij\u0101m un BOM rind\u0101m, k\u0101 ar\u012b resursus, kalend\u0101rus, faktiskos kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzin\u0113js da\u017e\u0101s sekund\u0113s iepl\u0101no katru oper\u0101ciju, \u0146emot v\u0113r\u0101 visus resursus, un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi tiek nos\u016bt\u012bti atpaka\u013c uz Supply Chain Management.<\/strong> Iepl\u0101notie s\u0101kuma un beigu laiki un izv\u0113l\u0113tais resurss tiek ierakst\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 un t\u0101 tehnolo\u0123isk\u0101 mar\u0161ruta oper\u0101cij\u0101s. SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/li>\n\n<\/ol>\n\n\n<p>Supply Chain Management joproj\u0101m ir j\u016bsu galven\u0101 datu uzskaites sist\u0113ma. Taj\u0101 joproj\u0101m tiek uztur\u0113ti izlaistie produkti, BOM, tehnolo\u0123iskie mar\u0161ruti, Planning Optimization, iepirkumi, kr\u0101jumi un izmaksu apr\u0113\u0137ini. SkyPlanner nosaka katras oper\u0101cijas sec\u012bbu un laiku.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Dynamics 365 SCM objekts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Izlaistie produkti<\/td><td>Produkti un materi\u0101li<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Materi\u0101lu specifik\u0101cija, ra\u017eo\u0161anas BOM rindas<\/td><td>Produkta strukt\u016bra, apak\u0161produkti<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Tehnolo\u0123iskais mar\u0161ruts, mar\u0161ruta oper\u0101cijas, oper\u0101ciju \u012bpa\u0161\u012bbas<\/td><td>Procesa so\u013ci ar p\u0101rregul\u0113\u0161anas un izpildes laikiem<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Resursi, resursu grupas, sp\u0113jas<\/td><td>Darba centri, darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101ji<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Darba laika kalend\u0101ri<\/td><td>Mai\u0146as<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi, mar\u0161ruta oper\u0101cijas, mar\u0161ruta uzdevumi<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146iem<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Faktiskie kr\u0101jumi, iepirkuma pas\u016bt\u012bjumu rindas<\/td><td>Kr\u0101jumi un gaid\u0101m\u0101s materi\u0101lu pieg\u0101des<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Iepl\u0101notais s\u0101kums un beigas, resurss<\/td><td>Pl\u0101notie oper\u0101cijas datumi un darba centrs<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><tr><td>Mar\u0161ruta kartes \u017eurn\u0101ls<\/td><td>Re\u0123istr\u0113t\u0101s stundas un daudzumi<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>SkyPlanner savienojas ar Supply Chain Management standarta datu ent\u012btij\u0101m, izmantojot OData REST galapunktu un autentific\u0113joties ar Microsoft Entra ID re\u0123istr\u0113tu lietotni. Papildin\u0101jums nav j\u0101instal\u0113. Katr\u0101 r\u016bpn\u012bc\u0101 D365 SCM izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ar\u012b j\u016bsu Dynamics partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Datu ent\u012btijas, atpaka\u013crakst\u012b\u0161anas noteikumi un iesp\u0113jamie klup\u0161anas akme\u0146i ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/dynamics-365-scm\/integracijas-celvedis\/\">Dynamics 365 SCM integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"job-scheduling-planning-optimization-and-finite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana, Planning Optimization un pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>D365 SCM jaudas ierobe\u017eojumus \u0146em v\u0113r\u0101 tikai da\u013c\u0113ji. Planning Optimization noteiktaj\u0101 pl\u0101no\u0161anas period\u0101 iev\u0113ro jaudas ierobe\u017eojumus, bet \u0101rpus t\u0101 pie\u0146em, ka jauda ir neierobe\u017eota. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161an\u0101 \u0161ie ierobe\u017eojumi tiek iev\u0113roti, ta\u010du pas\u016bt\u012bjumus iepl\u0101no pa vienam, \u0146emot v\u0113r\u0101 jaudu, ko jau rezerv\u0113ju\u0161i iepriek\u0161\u0113jie pas\u016bt\u012bjumi (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>). <a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">Pa\u0161a Microsoft dokument\u0101cij\u0101<\/a> ir nor\u0101d\u012bti ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Galven\u0101 pl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem paredz nemain\u012bgu jaudu.<\/strong> Par galveno pl\u0101no\u0161anu Microsoft iesaka: &#8220;If your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality.&#8221; (Ja j\u016bsu jauda var main\u012bties l\u012bdz ar vajadz\u012bb\u0101m, piem\u0113ram, str\u0101d\u0101jot mai\u0146\u0101s, nevajadz\u0113tu izmantot jaudas ierobe\u017eojumu funkcionalit\u0101ti.)<\/li>\n\n\n<li><strong>Jaudas ierobe\u017eojumi darbojas tikai noteikt\u0101 laika interv\u0101l\u0101.<\/strong> \u0100rpus jaudas ierobe\u017eojumu laika interv\u0101la galvenaj\u0101 pl\u0101no\u0161an\u0101 jauda tiek uzskat\u012bta par neierobe\u017eotu. Microsoft nor\u0101da: &#8220;a single-day time fence is probably too low for most manufacturers.&#8221; (Vienas dienas interv\u0101ls liel\u0101kajai da\u013cai ra\u017eot\u0101ju, visticam\u0101k, ir p\u0101r\u0101k \u012bss.)<\/li>\n\n\n<li><strong>Pa vienam pas\u016bt\u012bjumam.<\/strong> Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu uz priek\u0161u vai atpaka\u013c laik\u0101, \u0146emot v\u0113r\u0101 eso\u0161\u0101s rezerv\u0101cijas, un izv\u0113las resursus p\u0113c \u012bs\u0101k\u0101 pas\u016bt\u012bjuma izpildes laika vai priorit\u0101tes. P\u0101rregul\u0113\u0161anas laiks tiek pieskait\u012bts oper\u0101cijas laikam, un vienai oper\u0101cijai var iepl\u0101not ne vair\u0101k k\u0101 32 resursus. Galven\u0101 pl\u0101no\u0161ana var sak\u0101rtot pl\u0101notos pas\u016bt\u012bjumus sec\u012bb\u0101 p\u0113c produkta \u012bpa\u0161\u012bb\u0101m, piem\u0113ram, kr\u0101sas un izm\u0113ra (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">avots<\/a>).<\/li>\n\n\n<li><strong>Gantt diagramma manu\u0101liem labojumiem.<\/strong> Pl\u0101not\u0101ji ar izv\u0113lnes komand\u0101m iepl\u0101no atlas\u012btos ra\u017eo\u0161anas uzdevumus, maina resursam pie\u0161\u0137irto uzdevumu sec\u012bbu un pie\u0161\u0137ir uzdevumus citam resursam. Velkot un nometot var p\u0101rvietot pa vienam ra\u017eo\u0161anas uzdevumam t\u0101 pa\u0161a resursa ietvaros. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u0100rpus \u0161\u012b laika interv\u0101la un gad\u012bjumos, kad mai\u0146as maina pieejamo jaudu, D365 galven\u0101 pl\u0101no\u0161ana sniedz tikai aptuvenu pl\u0101nu. SkyPlanner vienot\u0101 pl\u0101no\u0161anas dzin\u0113j\u0101 kop\u012bgi pl\u0101no visus pas\u016bt\u012bjumus, iek\u0101rtas, darbiniekus, instrumentus, materi\u0101lus un p\u0101rregul\u0113\u0161anu vis\u0101 pl\u0101no\u0161anas period\u0101, iev\u0113rojot re\u0101los jaudas un pieejam\u012bbas ierobe\u017eojumus. Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. S\u012bk\u0101ks skaidrojums pieejams rakst\u0101 <a href=\"\/lv\/integracija\/erp\/dynamics-365-scm\/razosanas-planosana\/\">Vai Dynamics 365 SCM nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo jaudu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dynamics 365 SCM pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>D365 SCM standarta grafiku sast\u0101d\u012b\u0161ana<\/th><th>D365 SCM ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Tv\u0113rums<\/td><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumus iepl\u0101no pa vienam, \u0146emot v\u0113r\u0101 eso\u0161\u0101s rezerv\u0101cijas<\/td><td>Visus ra\u017eo\u0161anas pas\u016bt\u012bjumus iepl\u0101no kop\u0101 da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>Jauda<\/td><td>Jaudas ierobe\u017eojumus iev\u0113ro da\u013c\u0113ji: galvenaj\u0101 pl\u0101no\u0161an\u0101 tikai noteikt\u0101 laika interv\u0101l\u0101 un ne tad, ja jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m; ra\u017eo\u0161anas uzdevumus pl\u0101no pa vienam pas\u016bt\u012bjumam<\/td><td>Vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113taj\u0101 br\u012bd\u012b iev\u0113ro katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as un promb\u016btnes<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>P\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai; pl\u0101noto pas\u016bt\u012bjumu sec\u012bba p\u0113c produkta \u012bpa\u0161\u012bb\u0101m<\/td><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba nodro\u0161ina maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku<\/td><\/tr><tr><td>Instrumenti un brig\u0101des<\/td><td>Instrumentus un darbiniekus rezerv\u0113 katram pas\u016bt\u012bjumam atsevi\u0161\u0137i<\/td><td>Koplietojamos instrumentus un vair\u0101ku operatoru darbu rezerv\u0113, \u0146emot v\u0113r\u0101 visus pas\u016bt\u012bjumus kop\u0101<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Materi\u0101lu pieejam\u012bbas ierobe\u017eojumus iev\u0113ro katram pas\u016bt\u012bjumam atsevi\u0161\u0137i<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai ir sa\u0146emtas gaid\u0101m\u0101s pieg\u0101des<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js p\u0101rpl\u0101no pas\u016bt\u012bjumus un kori\u0123\u0113 ra\u017eo\u0161anas uzdevumus Gantt diagramm\u0101<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darbu izpilde ra\u017eo\u0161anas ceh\u0101<\/td><td>Mobile Confirmations: operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 paveikto darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-dynamics-365-scm\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas r\u012bku darbam ar Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><a href=\"\/lv\/razosanas-grafiku-sastadisanas-programmatura-videjiem\/\">Vid\u0113ja lieluma ra\u017eotnei<\/a>, kas atsak\u0101s no izkl\u0101jlap\u0101m, ir divas izv\u0113les: D365 ieb\u016bv\u0113t\u0101 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana kop\u0101 ar Planning Optimization vai SkyPlanner. D365 iev\u0113ro jaudas ierobe\u017eojumus noteikt\u0101 laika interv\u0101l\u0101 un pl\u0101no pa vienam pas\u016bt\u012bjumam. SkyPlanner izveido grafiku visai ra\u017eotnei, iev\u0113rojot re\u0101lo jaudu. <strong>Izv\u0113lieties SkyPlanner, nevis D365 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu un Planning Optimization, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem vajadz\u012bgi vieni un tie pa\u0161i resursi.<\/strong> Pl\u0101nojot ra\u017eo\u0161anas uzdevumus, j\u016bs nor\u0101d\u0101t s\u0101kuma vai beigu datumu un palai\u017eat pl\u0101no\u0161anu. Dzin\u0113js izv\u0113las resursu ar \u012bs\u0101ko pas\u016bt\u012bjuma izpildes laiku, \u0146emot v\u0113r\u0101 jau veikt\u0101s rezerv\u0101cijas (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>). Pirmais iepl\u0101notais pas\u016bt\u012bjums sa\u0146em lab\u0101kos laika interv\u0101lus. SkyPlanner visus pas\u016bt\u012bjumus iepl\u0101no kop\u0101 da\u017eu sekun\u017eu laik\u0101.<\/li>\n\n\n<li><strong>V\u0113laties iev\u0113rot re\u0101lo jaudu un faktisk\u0101s mai\u0146as vis\u0101 pl\u0101no\u0161anas period\u0101.<\/strong> Planning Optimization iev\u0113ro jaudas ierobe\u017eojumus tikai noteikt\u0101 laika interv\u0101l\u0101, un Microsoft neiesaka tos izmantot galvenaj\u0101 pl\u0101no\u0161an\u0101, ja jauda main\u0101s atkar\u012bb\u0101 no mai\u0146\u0101m (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">avots<\/a>). SkyPlanner vis\u0101 pl\u0101no\u0161anas period\u0101 pl\u0101no katras iek\u0101rtas un darbinieka darbu atbilsto\u0161i re\u0101lajai jaudai, \u0146emot v\u0113r\u0101 faktisk\u0101s mai\u0146as, virsstundas un promb\u016btnes.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161an\u0101 p\u0101rregul\u0113\u0161anas laiks ir da\u013ca no oper\u0101cijas laika un tiek pieskait\u012bts izpildes laikam (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">avots<\/a>). SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos. SkyPlanner sak\u0101rto ra\u017eo\u0161anas uzdevumus sec\u012bb\u0101 ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Koplietojamie instrumenti, brig\u0101des un materi\u0101lu pien\u0101k\u0161ana nosaka, ko var ra\u017eot t\u0101l\u0101k.<\/strong> Pl\u0101no\u0161an\u0101 tiek iev\u0113rota instrumentu pieejam\u012bba, uzdevumiem ar vair\u0101kiem operatoriem tiek nodro\u0161in\u0101ti visi vajadz\u012bgie darbinieki, darbu var p\u0101rcelt uz alternat\u012bviem darba centriem, un ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai ir sa\u0146emtas gaid\u0101m\u0101s pieg\u0101des.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Supply Chain Management.<\/li>\n\n\n<li><strong>V\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt grafiku, kas iev\u0113ro re\u0101lo jaudu.<\/strong> 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus, abon\u0113\u0161anas pl\u0101ni maks\u0101 no 199 \u20ac m\u0113nes\u012b, un operatori taj\u0101 pa\u0161\u0101 r\u012bk\u0101 re\u0123istr\u0113 paveikto darbu ar Mobile Confirmations.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Ievadiet iek\u0101rtas, darbiniekus un mai\u0146as SkyPlanner vai import\u0113jiet tos no saviem resursiem un kalend\u0101riem. Ir pieejama pal\u012bdz\u012bba darba uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un tehnolo\u0123isko mar\u0161rutu oper\u0101cijas no D365 SCM, izmantojot datu p\u0101rvald\u012bbas eksporta projektu vai Excel pievienojumprogrammu. Import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Supply Chain Management.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darba s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina katru m\u0113nesi par katru darba centru. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>. Citas ERP sist\u0113mas ir nor\u0101d\u012btas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums darbam ar Dynamics 365 Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas iev\u0113ro re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Dynamics 365 Supply Chain Management. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isko mar\u0161rutu oper\u0101cijas, resursus, izlaistos produktus un iepirkuma pas\u016bt\u012bjumus, savuk\u0101rt atpaka\u013c nos\u016bta iepl\u0101notos datumus un resursus. Pl\u0101no\u0161an\u0101 tiek iev\u0113roti katra resursa, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, nosaka uzdevumu sec\u012bbu ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Dynamics 365 Supply Chain Management nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo jaudu?<\/summary>\n<p class=\"sp-faq__a\">Tikai da\u013c\u0113ji. Planning Optimization iev\u0113ro jaudas ierobe\u017eojumus tikai noteikt\u0101 laika interv\u0101l\u0101, un Microsoft neiesaka tos izmantot galvenaj\u0101 pl\u0101no\u0161an\u0101, ja mai\u0146as maina pieejamo jaudu. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana iev\u0113ro jaudas ierobe\u017eojumus, ta\u010du pl\u0101no pa vienam pas\u016bt\u012bjumam, \u0146emot v\u0113r\u0101 jau rezerv\u0113to jaudu. SkyPlanner APS pievieno vienotu grafiku visiem pas\u016bt\u012bjumiem, iek\u0101rt\u0101m, darbiniekiem, instrumentiem un materi\u0101liem vis\u0101 pl\u0101no\u0161anas period\u0101, iev\u0113rojot re\u0101los ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izmantot D365 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anu un Planning Optimization vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izmantojiet Planning Optimization materi\u0101lu pl\u0101no\u0161anai un SkyPlanner grafika sast\u0101d\u012b\u0161anai atbilsto\u0161i re\u0101lajai jaudai. D365 jaudas ierobe\u017eojumus iev\u0113ro tikai da\u013c\u0113ji. Planning Optimization tos iev\u0113ro tikai noteikt\u0101 laika interv\u0101l\u0101, un Microsoft neiesaka galvenaj\u0101 pl\u0101no\u0161an\u0101 izmantot jaudas ierobe\u017eojumus, ja mai\u0146as maina pieejamo jaudu. Ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161ana iepl\u0101no pa vienam pas\u016bt\u012bjumam, \u0146emot v\u0113r\u0101 eso\u0161\u0101s rezerv\u0101cijas, t\u0101p\u0113c pirmais iepl\u0101notais pas\u016bt\u012bjums sa\u0146em lab\u0101kos laika interv\u0101lus. SkyPlanner kop\u012bgi pl\u0101no visus pas\u016bt\u012bjumus, iek\u0101rtas, darbiniekus, instrumentus un materi\u0101lus, p\u0101rregul\u0113\u0161anai izmantojot p\u0101rregul\u0113\u0161anas laiku matricu. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku p\u0113c katras b\u016btiskas izmai\u0146as. SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu, un j\u016bs s\u0101kat darbu da\u017eu ned\u0113\u013cu laik\u0101. Abon\u0113\u0161anas pl\u0101ni maks\u0101 no 199 \u20ac m\u0113nes\u012b, un ir pieejams 30 dienu bezmaksas izm\u0113\u0123in\u0101jums ar j\u016bsu datiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Supply Chain Management ir j\u0101instal\u0113 pievienojumprogramma?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s D365 SCM un piesl\u0113dzas t\u0101s standarta datu ent\u012btij\u0101m, izmantojot OData. J\u016bsu administrators re\u0123istr\u0113 Microsoft Entra ID lietotni un piesaista to lietot\u0101jam ar nepiecie\u0161amaj\u0101m lom\u0101m.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Planning Optimization vai D365 SCM ra\u017eo\u0161anas funkcijas?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina \u0161os risin\u0101jumus. Planning Optimization turpina pl\u0101not materi\u0101lus un pied\u0101v\u0101t pl\u0101notos ra\u017eo\u0161anas pas\u016bt\u012bjumus. Supply Chain Management joproj\u0101m p\u0101rvalda produktus, materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskos mar\u0161rutus, iepirkumus un pa\u0161izmaksas apr\u0113\u0137inus. SkyPlanner iepl\u0101no apstiprin\u0101tos ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner ir paredz\u0113ts tikai Business Central?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Business Central un Supply Chain Management ir atsevi\u0161\u0137i Microsoft produkti, un SkyPlanner integr\u0113jas ar abiem. \u0160\u012b lapa ir par Supply Chain Management: ra\u017eo\u0161anas pas\u016bt\u012bjumiem, tehnolo\u0123isko mar\u0161rutu oper\u0101cij\u0101m, resursiem un resursu grup\u0101m. Business Central ir velt\u012bta <a href=\"\/lv\/integracija\/erp\/business-central\/\">atsevi\u0161\u0137a lapa<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik maks\u0101 SkyPlanner ra\u017eotnei, kas izmanto Dynamics 365 SCM?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus, un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu apr\u0113\u0137ina iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101da kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu visas izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgu laiku aiz\u0146em ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c darba uzs\u0101k\u0161anas procesa s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. Komanda saska\u0146o j\u016bsu resursu un tehnolo\u0123isko mar\u0161rutu datus starp sist\u0113m\u0101m, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un konfigur\u0113 datu nos\u016bt\u012b\u0161anu atpaka\u013c sist\u0113m\u0101. Pirms risin\u0101juma palai\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu eksport\u0113tos ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isko mar\u0161rutu oper\u0101cijas un resursus. Pirms jebk\u0101du integr\u0101cijas darbu s\u0101k\u0161anas j\u016bs redzat savas ra\u017eo\u0161anas grafiku, kur\u0101 iev\u0113roti re\u0101lie jaudas ierobe\u017eojumi.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Microsoft Dynamics 365 Supply Chain Management papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu, k\u0101 ar\u012b katra ra\u017eo\u0161anas pas\u016bt\u012bjuma, resursa, &#8230; <a title=\"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102823","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/\",\"name\":\"Dynamics 365 SCM integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","description":"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","og_description":"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/","name":"Dynamics 365 SCM integr\u0101cija: APS pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina Dynamics 365 Supply Chain Management: pl\u0101no\u0161ana p\u0113c re\u0101l\u0101s jaudas, divvirzienu integr\u0101cija. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/dynamics-365-scm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS sist\u0113mai Dynamics 365 Supply Chain Management: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai SkyPlanner APS ir Microsoft Dynamics 365 Supply Chain Management papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu, k\u0101 ar\u012b katra ra\u017eo\u0161anas pas\u016bt\u012bjuma, resursa,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=102823"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102823\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=102823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}