{"id":102794,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/acumatica\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"acumatica","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/","title":{"rendered":"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS Acumatica sist\u0113mai: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir Acumatica Manufacturing Edition papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 katra darba centra, iek\u0101rtas, operatora, r\u012bka un materi\u0101la faktisko pieejam\u012bbu. Pa\u0161as Acumatica APS nodro\u0161ina aptuvenu pl\u0101no\u0161anu. Pl\u0101no\u0161anu ar jaudas ierobe\u017eojumiem taj\u0101 veic, izmantojot Rough Cut Planning formu, bet Classic APS visus pas\u016bt\u012bjumus, kuru beigu datums ir p\u0113c 120 dien\u0101m, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">avots<\/a>). Ar SkyPlanner redzat, kur un kad tiks veikta katra oper\u0101cija, savuk\u0101rt Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Acumatica darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, darba centrus, iek\u0101rtas, r\u012bkus, kr\u0101jumu poz\u012bcijas un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to darbu. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Acumatica konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Katra resursa pieejam\u012bba tiek \u0146emta v\u0113r\u0101 vienm\u0113r.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram darba centram, iek\u0101rtai, darbiniekam un r\u012bkam ir re\u0101ls grafiks, kur\u0101 \u0146emtas v\u0113r\u0101 mai\u0146as, promb\u016btne un virsstundas. Ra\u017eo\u0161anas uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs darbinieki ar br\u012bvu laiku mai\u0146\u0101. Veidni, ko izmanto vien\u0101 iek\u0101rt\u0101, taj\u0101 pa\u0161\u0101 laik\u0101 nekad nerezerv\u0113 citai.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101kas p\u0101rregul\u0113\u0161anas izmaksas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik laika vajag p\u0101rejai starp katru produktu p\u0101ri abos virzienos. P\u0101rtikas ra\u017eo\u0161an\u0101 to var noteikt alerg\u0113ni: p\u0101rejot no produkta bez alerg\u0113niem uz alerg\u0113nus saturo\u0161u produktu, t\u012br\u012b\u0161ana nav vajadz\u012bga, bet pret\u0113j\u0101 virzien\u0101 nepiecie\u0161ama pilna t\u012br\u012b\u0161ana. Pl\u0101no\u0161anas dzinis sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai laika zudumi b\u016btu vismaz\u0101kie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, kurus varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Grafiks jau vair\u0101kus m\u0113ne\u0161us uz priek\u0161u r\u0101da, kad katrs ra\u017eo\u0161anas pas\u016bt\u012bjums patie\u0161\u0101m tiks pabeigts. Klientiem termi\u0146us nor\u0101d\u0101t, balstoties uz pl\u0101nu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas vai ien\u0101k steidzams pas\u016bt\u012bjums, Autopilot p\u0101rpl\u0101no grafiku. J\u016bsu iestat\u012bt\u0101s fiks\u0101cijas un priorit\u0101tes joproj\u0101m tiek iev\u0113rotas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">S\u0101kumu nosaka materi\u0101lu pieejam\u012bba, nevis to tr\u016bkums.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Ra\u017eo\u0161anas uzdevumu, kas gaida pieg\u0101d\u0101t\u0101ja pieg\u0101di, iepl\u0101no p\u0113c \u0161\u012bs pieg\u0101des datuma.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un re\u0123istr\u0113tie darba dati tiek nos\u016bt\u012bti atpaka\u013c uz Acumatica.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepakojumam<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums kop\u0161 2021. gada<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner \u013cauj p\u0101rskat\u012bt jaudu un padara pl\u0101no\u0161anu paredzamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 \u0136\u012bmisko produktu un p\u0101rtikas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0101 SkyPlanner lieto\u0161anas laik\u0101 kop\u0161 2021. gada pieg\u0101\u017eu savlaic\u012bgums ir bijis 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/opes-corporation\/\">Las\u012bt Opes Corporation atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-acumatica-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Acumatica nos\u016bta veicamos darbus.<\/strong> SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus ar to oper\u0101cij\u0101m, darba centriem, iek\u0101rt\u0101m, r\u012bkiem, mai\u0146\u0101m, kr\u0101jumu poz\u012bcij\u0101m un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>SkyPlanner izveido grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tie darba dati tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> Pl\u0101notie s\u0101kuma un beigu datumi tiek ierakst\u012bti Acumatica ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101s, un pas\u016bt\u012bjums tiek fiks\u0113ts, lai Acumatica \u0161os datumus saglab\u0101tu. No re\u0123istr\u0113tajiem darba datiem tiek izveidoti darbasp\u0113ka un p\u0101rvieto\u0161anas ieraksti.<\/li>\n\n<\/ol>\n\n\n<p>Acumatica paliek j\u016bsu galven\u0101 uzskaites sist\u0113ma. Kr\u0101jumu poz\u012bcijas, materi\u0101lu specifik\u0101cijas, MRP, iepirkumi un pa\u0161izmaksas apr\u0113\u0137ini paliek turpat. SkyPlanner atbild par vienu lietu: katra resursa oper\u0101ciju sec\u012bbu un izpildes laiku.<\/p>\n\n\n<p>SkyPlanner savienojas, izmantojot pa\u0161as Acumatica uz l\u012bgumiem balst\u012bto REST API un Manufacturing un Default galapunktus, t\u0101p\u0113c j\u016bsu Acumatica instanc\u0113 nekas nav j\u0101instal\u0113. Katr\u0101 r\u016bpn\u012bc\u0101 Acumatica izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas s\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu Acumatica partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Datu objekti, datu lauku atbilst\u012bbas un noteikumi datu ierakst\u012b\u0161anai atpaka\u013c Acumatica ir aprakst\u012bti <a href=\"\/lv\/integracija\/erp\/acumatica\/integracijas-celvedis\/\">Acumatica integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-acumatica-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko pl\u0101no Acumatica un ko papildus nodro\u0161ina SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acumatica Manufacturing Edition modulis Advanced Planning and Scheduling (APS) nodro\u0161ina aptuvenu pl\u0101no\u0161anu, nevis detaliz\u0113tu grafiku, kas iev\u0113ro re\u0101los jaudas ierobe\u017eojumus. Classic APS izv\u0113l\u0113tajiem pas\u016bt\u012bjumiem palai\u017eat Rough Cut Planning (AM501000) formu (<a href=\"https:\/\/help.myob.com.au\/advanced\/Docs\/Published\/UserGuide\/MFG_APS_GeneralInfo.html\">avots<\/a>). Versij\u0101 2026 R2 APS ir pieejami divi dzi\u0146i, un <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">Acumatica nor\u0101da<\/a>: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (Abus APS dzi\u0146us nevar iesp\u0113jot vienlaikus.) Pa\u0161as Acumatica dokument\u0101cij\u0101 ir nor\u0101d\u012bti \u0161\u0101di ierobe\u017eojumi:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Classic APS \u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus tikai 120 dien\u0101m.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (APS ra\u017eo\u0161anas pas\u016bt\u012bjumus, kuru beigu datums ir p\u0113c \u0161\u012b perioda, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">avots<\/a>)<\/li>\n\n\n<li><strong>Classic APS rezerv\u0113 fiks\u0113tus laika blokus.<\/strong> &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (Oper\u0101cijas vienm\u0113r pl\u0101no nep\u0101rtrauktos blokos, izlai\u017eot \u0101rpusdarba laiku un grafik\u0101 paredz\u0113tos p\u0101rtraukumus.)<\/li>\n\n\n<li><strong>Jaunais Optimized dzinis ne\u0146em v\u0113r\u0101 iek\u0101rtas un r\u012bkus.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (Optimized APS pl\u0101no darba centrus, nevis atsevi\u0161\u0137as iek\u0101rtas, r\u012bkus vai materi\u0101lu pieejam\u012bbu.) Tas ir iek\u013cauts sada\u013c\u0101 Experimental Features. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">avots<\/a>)<\/li>\n\n\n<li><strong>Sec\u012bba netiek noteikta p\u0113c produktu \u012bpa\u0161\u012bb\u0101m.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (Dzinis neizmanto atrib\u016btu v\u0113rt\u012bbas, lai noteiktu oper\u0101ciju sec\u012bbu grafik\u0101.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">avots<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Ikdienas ra\u017eo\u0161anas pl\u0101n\u0101 darbasp\u0113ku atspogu\u013co darbinieku skaits un efektivit\u0101te darba centra mai\u0146\u0101, nevis konkr\u0113ti cilv\u0113ki. Katrai oper\u0101cijai ir viena fiks\u0113ta p\u0101rregul\u0113\u0161anas laika v\u0113rt\u012bba neatkar\u012bgi no t\u0101, kas ra\u017eots iepriek\u0161. P\u0101rpl\u0101no\u0161ana ir process, kas j\u0101palai\u017e, izmantojot Rough Cut Planning vai APS Maintenance Process. Rezult\u0101ts ir aptuvens pl\u0101ns: darbinieku skaits konkr\u0113tu cilv\u0113ku viet\u0101, viens p\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai un jaudas ierobe\u017eojumu iev\u0113ro\u0161ana tikai 120 dien\u0101m.<\/p>\n\n\n<p>Classic APS materi\u0101lu p\u0101rbaude darbojas p\u0113c principa \u201cvisu vai neko\u201d. Ja t\u0101 ir iesl\u0113gta, pirms pas\u016bt\u012bjuma iepl\u0101no\u0161anas visiem materi\u0101liem j\u0101b\u016bt pieejamiem piln\u0101 apjom\u0101. Pas\u016bt\u012bjumus iepl\u0101no citu p\u0113c cita noteikt\u0101 sec\u012bb\u0101: vispirms p\u0113c izpildes priorit\u0101tes, tad p\u0113c ierobe\u017eojuma datuma un p\u0113c tam p\u0113c ra\u017eo\u0161anas pas\u016bt\u012bjuma numura. Ja pl\u0101not\u0101jam vajadz\u012bga cita sec\u012bba, j\u0101maina priorit\u0101tes un process j\u0101palai\u017e v\u0113lreiz.<\/p>\n\n\n<p>Katrs solis un ierobe\u017eojums ir izskaidrots rakst\u0101 <a href=\"\/lv\/integracija\/erp\/acumatica\/razosanas-planosana\/\">Vai Acumatica nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"acumatica-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Acumatica pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Acumatica APS<\/th><th>Acumatica ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Periods, kur\u0101 iev\u0113ro jaudas ierobe\u017eojumus<\/td><td>Aptuvens pl\u0101ns: Classic iev\u0113ro jaudas ierobe\u017eojumus tikai pas\u016bt\u012bjumiem, kas beidzas 120 dienu laik\u0101; v\u0113l\u0101k pie\u0146em neierobe\u017eotu jaudu<\/td><td>Vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b tiek iev\u0113rota katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la faktisk\u0101 pieejam\u012bba<\/td><\/tr><tr><td>Resursi<\/td><td>Classic: darba centri, iek\u0101rtas, r\u012bki; Optimized: tikai darba centri<\/td><td>Darba centri, iek\u0101rtas, darbinieki un r\u012bki \u2014 tiek iev\u0113rota visu faktisk\u0101 pieejam\u012bba<\/td><\/tr><tr><td>Darbasp\u0113ks<\/td><td>Darbinieku skaits un efektivit\u0101te katr\u0101 mai\u0146\u0101<\/td><td>Konkr\u0113ti operatori ar sav\u0101m mai\u0146\u0101m, promb\u016btn\u0113m un virsstund\u0101m<\/td><\/tr><tr><td>Darbu sec\u012bba<\/td><td>Vispirms izpildes priorit\u0101te, tad ierobe\u017eojuma datums un pas\u016bt\u012bjuma numurs<\/td><td>Pl\u0101no\u0161anas dzin\u0113js nosaka sec\u012bbu, \u0146emot v\u0113r\u0101 priorit\u0101tes, izpildes termi\u0146us un p\u0101rregul\u0113\u0161anas vajadz\u012bbas<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Fiks\u0113ts p\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai<\/td><td>P\u0101rregul\u0113\u0161anas laiku matrica: \u012bs\u0101kais kop\u0113jais p\u0101rregul\u0113\u0161anas laiks<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Classic: visiem materi\u0101liem j\u0101b\u016bt pieejamiem piln\u0101 apjom\u0101, cit\u0101di pas\u016bt\u012bjums gaida<\/td><td>Kr\u0101jumi un gaid\u0101mie iepirkuma pas\u016bt\u012bjumi p\u0113c pieg\u0101des datuma<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>J\u0101palai\u017e Rough Cut Planning vai APS Maintenance Process<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Pl\u0101not\u0101ja skats<\/td><td>Production Schedule Board: datumu un priorit\u0101\u0161u mai\u0146a<\/td><td>Interakt\u012bva Gantt diagramma: p\u0101rvietojiet ra\u017eo\u0161anas uzdevumus, pl\u0101ns paliek saska\u0146ots<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Datu ievade Acumatica sada\u013c\u0101s Labor, Move un Materials<\/td><td>Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><tr><td>Darba s\u0101k\u0161ana<\/td><td>APS: &#8220;subject to licensing&#8221; (pieejam\u012bba atkar\u012bga no licences); Optimized ir eksperiment\u0101ls<\/td><td>J\u016bsu pas\u016bt\u012bjumu grafiks 30 dienu izm\u0113\u0123in\u0101jum\u0101, ievie\u0161ana da\u017eu ned\u0113\u013cu laik\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-acumatica\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties ra\u017eo\u0161anas pl\u0101no\u0161anas risin\u0101jumu darbam ar Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acumatica APS ir aptuven\u0101s pl\u0101no\u0161anas r\u012bks: pl\u0101nu izveido, palai\u017eot Rough Cut Planning; jaudas ierobe\u017eojumus iev\u0113ro 120 dienu period\u0101, darbasp\u0113ku model\u0113 k\u0101 darbinieku skaitu brig\u0101d\u0113 un katrai oper\u0101cijai izmanto vienu p\u0101rregul\u0113\u0161anas laiku. Tas, vai visp\u0101r varat \u0161o r\u012bku izmantot, ir atkar\u012bgs no j\u016bsu licences. Acumatica nor\u0101da: &#8220;Advanced planning and scheduling is subject to licensing&#8221; (progres\u012bv\u0101s pl\u0101no\u0161anas un grafiku sast\u0101d\u012b\u0161anas pieejam\u012bba ir atkar\u012bga no licences) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">avots<\/a>). R\u012bks ietilpst Manufacturing Edition, un jaunais Optimized dzin\u0113js ir eksperiment\u0101la 2026 R2 funkcija. Kad r\u012bks ir iesp\u0113jots, tas iepl\u0101no pas\u016bt\u012bjumus nemain\u012bg\u0101 priorit\u0101\u0161u sec\u012bb\u0101, \u0146emot v\u0113r\u0101 darbinieku skaitu brig\u0101d\u0113. P\u0113c katr\u0101m izmai\u0146\u0101m pl\u0101not\u0101jam tas j\u0101palai\u017e no jauna. Ra\u017eotnei, kas atsak\u0101s no izkl\u0101jlap\u0101m, vajadz\u012bgs grafiks, kas pats tiek atjaunin\u0101ts un ir pieejams operatoriem. Abos gad\u012bjumos Acumatica dati paliek galvenais datu avots.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis Acumatica APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums vajadz\u012bga ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai, nevis aptuvens pl\u0101ns.<\/strong> Vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b tiek \u0146emti v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi, ar\u012b pas\u016bt\u012bjumiem p\u0113c 120 dien\u0101m.<\/li>\n\n\n<li><strong>Pl\u0101nu ierobe\u017eo konkr\u0113tu operatoru pieejam\u012bba, nevis darbinieku skaits brig\u0101d\u0113.<\/strong> Mai\u0146as, promb\u016btnes un ra\u017eo\u0161anas uzdevumi, kuros vajadz\u012bgi vair\u0101ki operatori, tiek pl\u0101noti katram darbiniekam atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matrica nosaka sec\u012bbu p\u0113c alerg\u0113niem, kr\u0101s\u0101m vai materi\u0101liem t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vis\u012bs\u0101kais.<\/li>\n\n\n<li><strong>Iek\u0101rtu, instrumentu un materi\u0101lu pieejam\u012bba j\u0101p\u0101rbauda kop\u0101.<\/strong> Visi ierobe\u017eojumi tiek \u0146emti v\u0113r\u0101 vien\u0101 aktu\u0101l\u0101 grafik\u0101, un nav j\u0101izv\u0113las atsevi\u0161\u0137s pl\u0101no\u0161anas dzin\u0113js.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot p\u0101rpl\u0101no p\u0113c katr\u0101m izmai\u0146\u0101m, Running Time Lock fiks\u0113 tuv\u0101ko stundu ra\u017eo\u0161anas uzdevumus, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Acumatica.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c savas uzdevumu rindas.<\/strong> Mobile Confirmations nodro\u0161ina grafika pieejam\u012bbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un dati par re\u0123istr\u0113to paveikto darbu tiek nos\u016bt\u012bti atpaka\u013c uz Acumatica.<\/li>\n\n\n<li><strong>V\u0113laties rezult\u0101tus da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> J\u016bsu pas\u016bt\u012bjumiem tiek sast\u0101d\u012bts grafiks 30 dienu izm\u0113\u0123in\u0101juma laik\u0101, un SkyPlanner komanda konfigur\u0113 integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez maks\u0101jumu kartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eotnes modeli.<\/strong> Pievienojiet SkyPlanner darba centrus, iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet \u0161os datus. Darba s\u0101k\u0161an\u0101 ir pieejama pal\u012bdz\u012bba.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet neizpild\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas no Acumatica Generic Inquiry uz Excel, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet Acumatica.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c darba s\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Nor\u0113\u0137ini notiek katru m\u0113nesi. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas papildin\u0101jums darbam ar Acumatica?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar Acumatica. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, darba centrus, iek\u0101rtas, instrumentus, kr\u0101jumu nomenklat\u016bras vien\u012bbas un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to paveikto darbu. Tiek \u0146emti v\u0113r\u0101 katra darba centra, iek\u0101rtas, operatora, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumi. P\u0101rregul\u0113\u0161anas laiku matrica \u0146em v\u0113r\u0101 p\u0101rejas virzienu un sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vis\u012bs\u0101kais. Autopilot autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Acumatica nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101los jaudas ierobe\u017eojumus?<\/summary>\n<p class=\"sp-faq__a\">Tikai aptuven\u0101s pl\u0101no\u0161anas l\u012bmen\u012b. Manufacturing Edition modulis Advanced Planning and Scheduling darbojas k\u0101 Rough Cut Planning. Pas\u016bt\u012bjumus, kuru beigu datums ir p\u0113c 120 dien\u0101m, Classic APS pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu, savuk\u0101rt eksperiment\u0101lais Optimized dzin\u0113js sast\u0101da grafiku tikai darba centriem. SkyPlanner APS sast\u0101da ra\u017eo\u0161anas grafiku visam pl\u0101no\u0161anas periodam, \u0146emot v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101los pieejam\u012bbas ierobe\u017eojumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Acumatica ir kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s Acumatica un savienojas, izmantojot Acumatica standarta, uz l\u012bgumiem balst\u012bto REST API. Integr\u0101cija autentific\u0113jas ar pievienotu lietotni, kuru j\u016bs re\u0123istr\u0113jat Acumatica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Acumatica Manufacturing Edition?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina Acumatica Manufacturing Edition. Acumatica p\u0101rzi\u0146\u0101 paliek kr\u0101jumu nomenklat\u016bra, materi\u0101lu specifik\u0101cijas, MRP, iepirkumi, kr\u0101jumu uzskaite, pa\u0161izmaksas apr\u0113\u0137ini un finanses. SkyPlanner sast\u0101da j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties Acumatica APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja aptuvena pl\u0101na viet\u0101 v\u0113laties grafiku, kas atbilst re\u0101lajiem jaudas ierobe\u017eojumiem. Acumatica pl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem notiek ar Rough Cut Planning, bet Classic APS period\u0101 p\u0113c 120 dien\u0101m pie\u0146em neierobe\u017eotu jaudu. APS pieejam\u012bba ir atkar\u012bga no licences. Tas model\u0113 darbasp\u0113ku k\u0101 darbinieku skaitu brig\u0101d\u0113, katrai oper\u0101cijai izmanto vienu fiks\u0113tu p\u0101rregul\u0113\u0161anas laiku un veic p\u0101rr\u0113\u0137inu, kad pl\u0101not\u0101js palai\u017e Rough Cut Planning vai APS Maintenance Process. SkyPlanner sast\u0101da ra\u017eo\u0161anas grafiku visam pl\u0101no\u0161anas periodam, katr\u0101 konkr\u0113taj\u0101 laik\u0101 iev\u0113rojot katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la pieejam\u012bbas ierobe\u017eojumus. Tas nosaka darbu sec\u012bbu, izmantojot p\u0101rregul\u0113\u0161anas laiku matricu, kur\u0101 \u0146emts v\u0113r\u0101 p\u0101rejas virziens, autom\u0101tiski p\u0101rpl\u0101no ar Autopilot un nodro\u0161ina operatoriem piek\u013cuvi savai uzdevumu rindai t\u0101lrun\u012b vai plan\u0161etdator\u0101. Darbu s\u0101ksiet da\u017eu ned\u0113\u013cu laik\u0101 par cenu no 199 \u20ac m\u0113nes\u012b, ar 30 dienu izm\u0113\u0123in\u0101jumu, izmantojot savus datus. Ja APS paliek iesl\u0113gts, SkyPlanner fiks\u0113 katru pas\u016bt\u012bjumu, kuram tas sast\u0101da grafiku, un Acumatica pl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem fiks\u0113tos pas\u016bt\u012bjumus nep\u0101rpl\u0101no.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto Acumatica?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, k\u0101 ar\u012b 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu pl\u0101noto uzdevumu rindu. Integr\u0101cijas cenu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101d\u0101m to kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai piln\u0101s izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgi notiek ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta s\u0101kotn\u0113j\u0101 sagatavo\u0161ana. Komanda izveido j\u016bsu darba centru, iek\u0101rtu un BOM oper\u0101ciju atbilst\u012bbas, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu apmai\u0146u un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darba s\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Acumatica?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 tiek izmantoti dati, kas no Acumatica Generic Inquiry eksport\u0113ti uz Excel. Pirms jebk\u0101du integr\u0101cijas darbu s\u0101k\u0161anas j\u016bs redzat savas ra\u017eotnes <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101nu<\/a>, kur\u0101 \u0146emti v\u0113r\u0101 re\u0101lie jaudas ierobe\u017eojumi.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir Acumatica Manufacturing Edition papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 katra darba centra, iek\u0101rtas, operatora, r\u012bka un materi\u0101la faktisko pieejam\u012bbu. Pa\u0161as Acumatica APS nodro\u0161ina aptuvenu pl\u0101no\u0161anu. Pl\u0101no\u0161anu ar &#8230; <a title=\"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/\" aria-label=\"Read more about SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102794","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/\",\"name\":\"Acumatica integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/acumatica\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","description":"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai","og_description":"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/","name":"Acumatica integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina Acumatica: divvirzienu integr\u0101cija, pl\u0101ns p\u0113c katras iek\u0101rtas, darbinieka, r\u012bka un materi\u0101la pieejam\u012bbas. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/acumatica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS Acumatica sist\u0113mai: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai SkyPlanner APS ir Acumatica Manufacturing Edition papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas vis\u0101 pl\u0101no\u0161anas period\u0101 katr\u0101 konkr\u0113t\u0101 br\u012bd\u012b \u0146em v\u0113r\u0101 katra darba centra, iek\u0101rtas, operatora, r\u012bka un materi\u0101la faktisko pieejam\u012bbu. Pa\u0161as Acumatica APS nodro\u0161ina aptuvenu pl\u0101no\u0161anu. Pl\u0101no\u0161anu ar&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=102794"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102794\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=102794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}