{"id":102765,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracija\/erp\/abas-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"abas-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/","title":{"rendered":"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ abas ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai abas ERP: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS ir abas ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner apmain\u0101s ar datiem ar abas ERP abos virzienos: sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas sarakstus, deta\u013cas, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to darbu. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu abas instal\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Vienai iek\u0101rtai vairs netiek iepl\u0101noti vair\u0101ki uzdevumi vienlaikus.<\/p>\n\n\n<p class=\"fx-pain__b\">Katras iek\u0101rtas, darbinieka un instrumenta grafiks atbilst to faktiskajai pieejam\u012bbai, \u0146emot v\u0113r\u0101 mai\u0146as, promb\u016btni un virsstundas. Divi ra\u017eo\u0161anas pas\u016bt\u012bjumi nekad netiek iepl\u0101noti vienai iek\u0101rtai vien\u0101 un taj\u0101 pa\u0161\u0101 stund\u0101. Kad iek\u0101rta ir piln\u012bb\u0101 noslogota, darbs tiek p\u0101rcelts uz citu iek\u0101rtu vai pie\u0161\u0137irts citam darbiniekam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pieg\u0101des datumus nosaka ra\u017eo\u0161anas grafiks.<\/p>\n\n\n<p class=\"fx-pain__b\">Katram ra\u017eo\u0161anas pas\u016bt\u012bjumam tiek apr\u0113\u0137in\u0101ts pl\u0101notais pabeig\u0161anas datums, balstoties uz faktisko jaudu. P\u0101rdo\u0161anas komanda atbild klientiem, vadoties p\u0113c pl\u0101na, nevis MRP datuma, kura apr\u0113\u0137in\u0101 pie\u0146emts, ka iek\u0101rtas ir br\u012bvas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana izmai\u0146u gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, ien\u0101k steidzams pas\u016bt\u012bjums vai ra\u017eo\u0161anas uzdevums tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. P\u0101rpl\u0101no\u0161an\u0101 joproj\u0101m tiek iev\u0113rotas j\u016bsu noteikt\u0101s priorit\u0101tes un fiks\u0113t\u0101s poz\u012bcijas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik ilga ir p\u0101rregul\u0113\u0161ana, p\u0101rejot no viena produkta uz otru, abos virzienos. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60. Pl\u0101no\u0161anas algoritms sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101d\u0101 sec\u012bb\u0101, lai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Koplietojamie instrumenti un brig\u0101des ir \u0146emtas v\u0113r\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Veidne vai pal\u012bgier\u012bce, ko izmanto vien\u0101 iek\u0101rt\u0101, nekad netiek vienlaikus iepl\u0101nota citai. Uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs cilv\u0113ki, kuriem attiec\u012bgaj\u0101s mai\u0146\u0101s ir br\u012bvs laiks.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materi\u0101lu pieejam\u012bba p\u0101rbaud\u012bta pirms darba s\u0101kuma.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner sast\u0101da grafiku, \u0146emot v\u0113r\u0101 abas kr\u0101jumu datus un neizpild\u012btos iepirkuma pas\u016bt\u012bjumus. Uzdevums, kuram vajadz\u012bga pieg\u0101d\u0101t\u0101ja pieg\u0101de, tiek iepl\u0101nots p\u0113c pieg\u0101des datuma, nevis non\u0101k pie iek\u0101rtas un tur gaida materi\u0101lus.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatori redz savu uzdevumu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaitai var sekot re\u0101llaik\u0101, un re\u0123istr\u0113tie dati tiek nos\u016bt\u012bti atpaka\u013c uz abas.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektriskie sadales skapji un sadalietaises<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visa organiz\u0101cija var sekot ra\u017eo\u0161anai re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Maz\u0101k<\/b><span>d\u012bkst\u0101vju materi\u0101lu tr\u016bkuma d\u0113\u013c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner v\u0113rt\u012bba mums ir t\u0101, ka tas ir ikdien\u0101 noder\u012bgs r\u012bks, jo \u012bpa\u0161i pieg\u0101des datumu noteik\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, ra\u017eo\u0161anas pl\u0101no\u0161anas vad\u012bt\u0101js<\/b><br>Eskomatic \u00b7 Meh\u0101nisk\u0101 apstr\u0101de p\u0113c pas\u016bt\u012bjuma<\/p>\n\n\n<p class=\"ind-cust__result\">Autom\u0101tiska noslodzes pl\u0101no\u0161ana \u013cauj prec\u012bz\u0101k noteikt pieg\u0101des datumus, un ra\u017eo\u0161anas d\u012bkst\u0101ves materi\u0101lu tr\u016bkuma d\u0113\u013c ir b\u016btiski samazin\u0101ju\u0161\u0101s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/eskomatic\/\">Las\u012bt Eskomatic atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-abas-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 darbojas integr\u0101cija ar abas ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>abas nos\u016bta darba datus.<\/strong> Izpildei nodotie ra\u017eo\u0161anas pas\u016bt\u012bjumi (Betriebsauftr\u00e4ge) kop\u0101 ar ra\u017eo\u0161anas sarakstos nor\u0101d\u012btaj\u0101m oper\u0101cij\u0101m, iek\u0101rt\u0101m un laikiem non\u0101k SkyPlanner l\u012bdz ar kr\u0101jumu datiem un iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/strong> Arcturus pl\u0101no\u0161anas dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju katr\u0101 darba centr\u0101 un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/li>\n\n\n<li><strong>Datumi un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/strong> SkyPlanner webhook pazi\u0146ojumi nos\u016bta katru grafika izmai\u0146u uzreiz, tikl\u012bdz t\u0101 notiek. Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un pie\u0161\u0137irt\u0101 iek\u0101rta tiek ierakst\u012bti atpaka\u013c abas ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101, bet operatoru darba laika ieraksti nodro\u0161ina datus izpildes apstiprin\u0101jumiem.<\/li>\n\n<\/ol>\n\n\n<p>Integr\u0101cija izmanto abas saskarnes \u2014 abas REST API un abas Connect. Vairums abas instal\u0101ciju ir piel\u0101gotas, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda izveido j\u016bsu objektu un lauku atbilst\u012bbas un p\u0113c palai\u0161anas nodro\u0161ina integr\u0101cijas atbalstu. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu abas partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Par saskarn\u0113m, lauku atbilst\u012bb\u0101m un datu ierakst\u012b\u0161anu atpaka\u013c lasiet <a href=\"\/lv\/integracija\/erp\/abas-erp\/integracijas-celvedis\/\">abas ERP integr\u0101cijas rokasgr\u0101mat\u0101 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-abas-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101di dati tiek nodoti starp abas ERP un SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>abas ERP<\/th><th>SkyPlanner<\/th><th>Virziens<\/th><\/tr><\/thead><tbody><tr><td>Deta\u013ca \/ produkts (Teil, Artikel)<\/td><td>Produkti un materi\u0101li<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas saraksts (Fertigungsliste): oper\u0101cijas, iek\u0101rtas, p\u0101rregul\u0113\u0161anas un apstr\u0101des laiki<\/td><td>Procesa so\u013ci ar ilgumu un p\u0101rregul\u0113\u0161anas laikiem<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Iek\u0101rtas un jaudas kalend\u0101rs<\/td><td>Darba centri, mai\u0146as un promb\u016btne<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjums (Betriebsauftrag) ar daudzumu un izpildes termi\u0146u<\/td><td>Pas\u016bt\u012bjums un ra\u017eo\u0161anas uzdevumi ar izpildes termi\u0146u un priorit\u0101ti<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Kr\u0101jumu atlikumi<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjums ar pieg\u0101des datumu<\/td><td>Ien\u0101ko\u0161ais materi\u0101ls t\u0101 pieg\u0101des datum\u0101<\/td><td>Uz SkyPlanner<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas (Arbeitsg\u00e4nge)<\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums, beigas un darba centrs<\/td><td>Atpaka\u013c uz abas<\/td><\/tr><tr><td>Izpildes apstiprin\u0101jumi (R\u00fcckmeldungen)<\/td><td>Operatoru re\u0123istr\u0113tie darba laiki un daudzumi<\/td><td>Atpaka\u013c uz abas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matricas, instrumenti k\u0101 resursi ar ierobe\u017eotu pieejam\u012bbu un alternat\u012bv\u0101s iek\u0101rtas tiek konfigur\u0113tas SkyPlanner ievie\u0161anas laik\u0101 un uztur\u0113tas taj\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"abas-mrp-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">abas MRP un ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>abas ERP vispirms pl\u0101no materi\u0101lus. T\u0101 MRP funkcija, ko abas ang\u013cu valod\u0101 sauc par Scheduling, katras vajadz\u012bbas seg\u0161anai pie\u0161\u0137ir kr\u0101jumus vai ra\u017eo\u0161anas pas\u016bt\u012bjumu. \u0160\u012bs pieejas ierobe\u017eojumus pieg\u0101d\u0101t\u0101js apraksta sav\u0101 lap\u0101, kur\u0101 sal\u012bdzin\u0101ti APS un MRP:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vispirms materi\u0101li, p\u0113c tam pas\u016bt\u012bjumi.<\/strong> &#8220;Zuerst wird der Materialbedarf berechnet. Danach werden Fertigungsauftr\u00e4ge erstellt.&#8221; (Vispirms tiek apr\u0113\u0137in\u0101ta materi\u0101lu vajadz\u012bba, p\u0113c tam izveidoti ra\u017eo\u0161anas pas\u016bt\u012bjumi.) (<a href=\"https:\/\/abas-erp.com\/de\/herausforderungen\/produktion-dynamisch-planen\">abas<\/a>)<\/li>\n\n\n<li><strong>Jaudu p\u0101rbauda aptuveni vai v\u0113l\u0101k.<\/strong> Jauda tiek &#8220;h\u00e4ufig vereinfacht, auf einer gr\u00f6beren Ebene oder erst nachgelagert gepr\u00fcft&#8221; (bie\u017ei p\u0101rbaud\u012bta vienk\u0101r\u0161oti, visp\u0101r\u012bg\u0101k\u0101 l\u012bmen\u012b vai tikai p\u0113c tam).<\/li>\n\n\n<li><strong>Pas\u016bt\u012bjumi vienai iek\u0101rtai p\u0101rkl\u0101jas.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumus var iepl\u0101not vienlaikus vienai un tai pa\u0161ai iek\u0101rtai vai resursam ar ierobe\u017eotu jaudu.<\/li>\n\n\n<li><strong>Detaliz\u0113to pl\u0101no\u0161anu veic atsevi\u0161\u0137i.<\/strong> &#8220;While rough planning automatically runs in the background, you can also perform detailed planning&#8221; (Kam\u0113r aptuven\u0101 pl\u0101no\u0161ana autom\u0101tiski darbojas fon\u0101, varat veikt ar\u012b detaliz\u0113tu pl\u0101no\u0161anu), izmantojot APS. (<a href=\"https:\/\/abas-erp.com\/en\/product\/production\">abas<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>T\u0101tad grafiks, kas atbilst faktiskajai jaudai, ir j\u0101sast\u0101da specializ\u0113t\u0101 pl\u0101no\u0161anas r\u012bk\u0101. abas pied\u0101v\u0101 savu APS divos l\u012bme\u0146os \u2014 Basic un Professional. SkyPlanner jau izm\u0113\u0123in\u0101juma laik\u0101 nodro\u0161ina j\u016bsu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku atbilsto\u0161i faktiskajai jaudai par publiski nor\u0101d\u012btu cenu. Visi so\u013ci ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/abas-erp\/razosanas-planosana\/\">Vai abas ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai jaudai?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"abas-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">abas ERP pa\u0161laik un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>abas MRP<\/th><th>abas ERP ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Aptuvena p\u0101rbaude vai p\u0101rbaude p\u0113c materi\u0101lu pl\u0101no\u0161anas<\/td><td>\u0145em v\u0113r\u0101 katras iek\u0101rtas, darbinieka un instrumenta re\u0101lo pieejam\u012bbu un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>MRP apr\u0113\u0137in\u0101tie datumi; pl\u0101not\u0101js redi\u0123\u0113 pas\u016bt\u012bjumus un nodod tos izpildei modul\u012b Production center<\/td><td>Grafiks oper\u0101ciju l\u012bmen\u012b da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>P\u0101rregul\u0113\u0161anas laiks katrai oper\u0101cijai<\/td><td>Ra\u017eo\u0161anas uzdevumu sec\u012bba ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku<\/td><\/tr><tr><td>Resursi<\/td><td>Iek\u0101rtas un laiki no ra\u017eo\u0161anas saraksta<\/td><td>\u0145em v\u0113r\u0101 instrumentu pieejam\u012bbu; uzdevumiem ar vair\u0101kiem operatoriem nodro\u0161ina nepiecie\u0161amos darbiniekus<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Pl\u0101no pirms jaudas pl\u0101no\u0161anas<\/td><td>Uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai ir pieg\u0101d\u0101ti<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Atk\u0101rtots MRP apr\u0113\u0137ins, p\u0113c tam pl\u0101not\u0101ja p\u0101rbaude<\/td><td>Autopilot p\u0101rpl\u0101no atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>PDC termin\u0101\u013ci un darba kartes<\/td><td>Operatora uzdevumu rinda un darba re\u0123istr\u0113\u0161ana t\u0101lrun\u012b vai plan\u0161etdator\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-abas-erp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas r\u012bku abas ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>abas MRP ar pl\u0101na p\u0101rbaudi modul\u012b Production center ir piem\u0113rots ra\u017eotnei ar nelielu ra\u017eo\u0161anas apjomu, gariem izpildes termi\u0146iem un vienu pl\u0101not\u0101ju, kur\u0161 p\u0101rzina \u0161auro vietu. Ra\u017eotnei, kas pl\u0101no izkl\u0101jlap\u0101s un noslogo iek\u0101rtas p\u0101ri to iesp\u0113j\u0101m, vajadz\u012bgs r\u012bks, kas sast\u0101da grafiku atbilsto\u0161i re\u0101lajai jaudai. Praks\u0113 j\u0101izv\u0113las starp abas APS un SkyPlanner APS.<\/p>\n\n\n<p>abas APS ir pl\u0101not\u0101ja r\u012bks. T\u0101 pa\u0161reiz\u0113j\u0101 paaudze \u2014 APS Basic un APS Professional \u2014 tika izlaista kop\u0101 ar atjaunin\u0101jumu pakotni Abas 2024.Q3.1. Klientam piel\u0101gotai pl\u0101no\u0161anas lo\u0123ikai vajadz\u012bgs Professional papla\u0161in\u0101jums. Publiski nor\u0101d\u012bt\u0101s funkcijas ir pl\u0101no\u0161anas skati, manu\u0101la vilk\u0161ana un nome\u0161ana un &#8220;automatic optimization runs&#8221; (autom\u0101tiski optimiz\u0101cijas apr\u0113\u0137ini). (<a href=\"https:\/\/abas-erp.com\/de\/news\/abas-update-mit-weiterentwickelter-aps-generation-cloud-und-ki-funktionen\">abas<\/a>, <a href=\"https:\/\/abas-erp.com\/en\/product\/aps-detailed-planning\">abas<\/a>) abas \u0161\u012b r\u012bka cenu nepublic\u0113. SkyPlanner sast\u0101da grafiku visai ra\u017eotnei, patst\u0101v\u012bgi p\u0101rpl\u0101no un nodod pl\u0101nu ra\u017eo\u0161anas ceham \u2014 par publiski nor\u0101d\u012btu cenu.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, nevis abas APS, ja:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u0113laties lieto\u0161anai gatavu ra\u017eo\u0161anas grafiku da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> SkyPlanner ir m\u0101ko\u0146programmat\u016bra, kas darbojas l\u012bdz\u0101s abas ERP. To varat p\u0101rbaud\u012bt ar saviem ra\u017eo\u0161anas pas\u016bt\u012bjumiem 30 dienu izm\u0113\u0123in\u0101jum\u0101. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta sagatavo\u0161an\u0101s lieto\u0161anai.<\/li>\n\n\n<li><strong>Pl\u0101ns main\u0101s katru dienu.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no p\u0113c katras b\u016btiskas izmai\u0146as, un pl\u0101not\u0101jam nav j\u0101palai\u017e apr\u0113\u0137ins. Jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz abas.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana nosaka ra\u017eo\u0161anas apjomu.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 nor\u0101da laikus p\u0101rejai no viena produkta uz citu, \u0146emot v\u0113r\u0101 p\u0101rejas virzienu. P\u0113c tiem nosaka uzdevumu sec\u012bbu ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti, brig\u0101des un materi\u0101li nosaka, ko ra\u017eot n\u0101kamo.<\/strong> Pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101lo pieejam\u012bbu. Uzdevumiem ar vair\u0101kiem operatoriem pie\u0161\u0137ir nepiecie\u0161amos darbiniekus, izmanto alternat\u012bvus darba centrus, un uzdevumi s\u0101kas tikai tad, kad materi\u0101li ir pieejami noliktav\u0101 vai pieg\u0101d\u0101ti saska\u0146\u0101 ar iepirkuma pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Operatoriem j\u0101str\u0101d\u0101 p\u0113c pl\u0101na.<\/strong> Mobile Confirmations par\u0101da katra operatora uzdevumu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101 un nos\u016bta izpildes apstiprin\u0101jumus atpaka\u013c uz abas.<\/li>\n\n\n<li><strong>V\u0113laties jau s\u0101kum\u0101 zin\u0101t visas izmaksas.<\/strong> No 199 \u20ac m\u0113nes\u012b; divvirzienu integr\u0101ciju konfigur\u0113 un atbalsta SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas, bez kred\u012btkartes.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Pievienojiet SkyPlanner iek\u0101rtas, darbiniekus un mai\u0146as vai import\u0113jiet tos. Ir pieejama pal\u012bdz\u012bba lieto\u0161anas uzs\u0101k\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet no abas atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un to oper\u0101cijas CSV vai Excel form\u0101t\u0101, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Pievienojiet abas ERP.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju j\u016bsu sist\u0113mai un nodro\u0161ina t\u0101s atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Abon\u0113\u0161anas maksu apr\u0113\u0137ina par katru darba centru m\u0113nes\u012b. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>, bet citas ERP sist\u0113mas \u2014 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0161 ir lab\u0101kais abas ERP papildin\u0101jums ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS ir ra\u017eo\u0161anas pl\u0101no\u0161anas papildin\u0101jums, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu un nodro\u0161ina divvirzienu integr\u0101ciju ar abas ERP. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas sarakstus, deta\u013cas, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un re\u0123istr\u0113to darbu. Pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 katras iek\u0101rtas, operatora, instrumenta un materi\u0101la re\u0101lo pieejam\u012bbu. P\u0101rregul\u0113\u0161anas laiku matrica, kas \u0146em v\u0113r\u0101 p\u0101rejas virzienu, nosaka uzdevumu sec\u012bbu ar maz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Autopilot autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Cena ir no 199 \u20ac m\u0113nes\u012b, un bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai abas ERP nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai?<\/summary>\n<p class=\"sp-faq__a\">MRP pamatfunkcionalit\u0101t\u0113 \u2014 n\u0113. Pieg\u0101d\u0101t\u0101js nor\u0101da, ka abas MRP p\u0101rbauda jaudu vienk\u0101r\u0161ot\u0101 veid\u0101 vai p\u0113c pl\u0101no\u0161anas, t\u0101p\u0113c vienai iek\u0101rtai vienlaikus var b\u016bt iepl\u0101noti vair\u0101ki ra\u017eo\u0161anas pas\u016bt\u012bjumi. Detaliz\u0113tai pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai vajadz\u012bgs specializ\u0113ts grafiku sast\u0101d\u012b\u0161anas r\u012bks. SkyPlanner APS papildina abas ERP ar <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu<\/a>, kur\u0101 \u0146em v\u0113r\u0101 katras iek\u0101rtas, darbinieka, instrumenta un materi\u0101la re\u0101lo pieejam\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai izv\u0113l\u0113ties abas APS vai SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Izv\u0113lieties SkyPlanner, ja v\u0113laties visai ra\u017eotnei vienotu grafiku, kas atbilst re\u0101lajai jaudai un autom\u0101tiski atjaunin\u0101s. abas APS pied\u0101v\u0101 pl\u0101not\u0101jam skatus, vilk\u0161anas un nome\u0161anas funkciju un optimiz\u0101cijas apr\u0113\u0137inus. T\u0101 pa\u0161reiz\u0113j\u0101 paaudze tika izlaista kop\u0101 ar atjaunin\u0101jumu pakotni 2024.Q3.1. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s abas ERP bez abas APS un autom\u0101tiski p\u0101rpl\u0101no p\u0113c katras izmai\u0146as. Tas pl\u0101no instrumentus, brig\u0101des, p\u0101rregul\u0113\u0161anu un materi\u0101lus, k\u0101 ar\u012b par\u0101da operatoriem uzdevumu rindu t\u0101lrun\u012b. Pirms jebk\u0101da l\u0113muma pie\u0146em\u0161anas izm\u0113\u0123in\u0101jum\u0101 redzat savas ra\u017eotnes grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j abas ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas to papildina. Deta\u013cas, ra\u017eo\u0161anas saraksti, MRP, iepirkumi, kr\u0101jumi un finanses paliek abas p\u0101rzi\u0146\u0101. SkyPlanner sast\u0101da grafiku izpildei nodotajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta atpaka\u013c pl\u0101notos datumus un re\u0123istr\u0113to darbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var atjaunin\u0101t kr\u0101jumu datus no abas?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Kr\u0101jumu atlikumi un atv\u0113rtie iepirkuma pas\u016bt\u012bjumi tiek nolas\u012bti no abas j\u016bsu noteiktaj\u0101 bie\u017eum\u0101. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem pieg\u0101des datum\u0101, t\u0101p\u0113c katru uzdevumu pl\u0101no atbilsto\u0161i faktiskajai materi\u0101lu pieejam\u012bbai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto abas?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu iepl\u0101noto uzdevumu rindu. J\u016bsu procesam un vajadz\u012bb\u0101m atbilsto\u0161\u0101s integr\u0101cijas cenu pied\u0101v\u0101jum\u0101 nor\u0101da jau s\u0101kum\u0101 kop\u0101 ar abonementa cenu, lai pirms darba uzs\u0101k\u0161anas j\u016bs zin\u0101tu visas izmaksas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgi notiek ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kta sagatavo\u0161an\u0101s lieto\u0161anai. Komanda izveido j\u016bsu ra\u017eo\u0161anas sarakstu un iek\u0101rtu datu atbilst\u012bbas, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darb\u012bbas uzs\u0101k\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar abas ERP?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 izmanto j\u016bsu abas ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas eksport\u0113ti CSV vai Excel form\u0101t\u0101. V\u0113l pirms jebk\u0101du integr\u0101cijas darbu s\u0101kuma redzat savas ra\u017eotnes grafiku, kas sast\u0101d\u012bts atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ abas ERP SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS ir abas ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums, un Autopilot autom\u0101tiski p\u0101rpl\u0101no &#8230; <a title=\"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102765","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>abas ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/\",\"name\":\"abas ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/abas-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"abas ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","description":"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai","og_description":"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/","name":"abas ERP integr\u0101cija: APS pl\u0101no\u0161ana atbilsto\u0161i jaudai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS papildina abas ERP: divvirzienu integr\u0101cija, pl\u0101no\u0161ana p\u0113c iek\u0101rtu jaudas, mai\u0146\u0101m, r\u012bkiem un materi\u0101liem. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/abas-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ abas ERP SkyPlanner APS sist\u0113mai abas ERP: ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i faktiskajai jaudai SkyPlanner APS ir abas ERP papildin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas \u0146em v\u0113r\u0101 iek\u0101rtu un darbinieku faktisko jaudu un pl\u0101no katras iek\u0101rtas, operatora, instrumenta un materi\u0101la izmanto\u0161anu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas pas\u016bt\u012bjums, un Autopilot autom\u0101tiski p\u0101rpl\u0101no&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=102765"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/102765\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=102765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}