{"id":101363,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101363"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/","title":{"rendered":"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Sage X3 standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101 netiek \u0146emta v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101l\u0101 jauda. \u0160o tr\u016bkumu nov\u0113r\u0161 SkyPlanner APS, nodro\u0161inot ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai. X3 pl\u0101no materi\u0101lus ar MRP, bet ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus nosaka ar Scheduling (FUNMAUTJ). Sage Apvienot\u0101s Karalistes atbalsta komanda to raksturo k\u0101 pl\u0101not\u0101ju, kas ne\u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus: tas pl\u0101no &#8220;each work order independently&#8221; (katru ra\u017eo\u0161anas pas\u016bt\u012bjumu neatkar\u012bgi) un neizk\u0101rto pas\u016bt\u012bjumus laik\u0101 atbilsto\u0161i resursu noslodzei.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160\u0101dai ra\u017eo\u0161anas pl\u0101no\u0161anai vajadz\u012bgs atsevi\u0161\u0137s risin\u0101jums. Sage pied\u0101v\u0101 lok\u0101li uzst\u0101d\u0101mu Production Scheduler vai univers\u0101lo Finite scheduler interface (GFS), kas nodro\u0161ina savienojumu ar Sage X3 Web Scheduling vai tre\u0161\u0101s puses pl\u0101not\u0101ju. Ra\u017eotnes, kur\u0101m <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 j\u0101\u0146em v\u0113r\u0101 katras iek\u0101rtas, darbinieka un instrumenta re\u0101l\u0101 pieejam\u012bba<\/a>, l\u012bdz\u0101s X3 izmanto SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Sage X3 pl\u0101no ra\u017eo\u0161anu un sast\u0101da grafikus \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Jauda tiek noteikta darba centros<\/h3>\n\n\n<p>Jaudas datus glab\u0101 darba centr\u0101 (funkcija <strong>GESMWS<\/strong>, tabula WORKSTATIO). Grafiku sast\u0101d\u012b\u0161anai svar\u012bgi ir \u0161\u0101di lauki:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): ned\u0113\u013cas strukt\u016bra, kas nosaka mai\u0146u grafiku.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): resursu skaits, kas oper\u0101cijai vajadz\u012bgs darba centr\u0101. Sage piem\u0113r\u0101 tas ir darbasp\u0113ka darba centrs, kur\u0101 nepiecie\u0161ami tr\u012bs cilv\u0113ki.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) un <strong>Shrinkage in %<\/strong> (SHR): lauki tehnolo\u0123isk\u0101 procesa laiku korekcijai.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): iek\u0101rta, darbasp\u0113ks vai apak\u0161uz\u0146\u0113m\u0113ja darbs.<\/li>\n\n\n<li>Izv\u0113les r\u016bti\u0146a <strong>Constraint<\/strong> un cilne Replacement, kur\u0101 alternat\u012bvajiem darba centriem ir atsevi\u0161\u0137s lauks <strong>Work center type<\/strong> (RPLWSTTYP) un katram pie\u0161\u0137irta priorit\u0101te.<\/li>\n\n\n<li>Jaudas izmai\u0146u tabula pagaidu mai\u0146\u0101m vai d\u012bkst\u0101vei. Taj\u0101 nor\u0101da s\u0101kuma un beigu datumu, iemeslu, izmain\u012bto strukt\u016bru un resursu skaitu.<\/li>\n\n<\/ul>\n\n\n<p>Ciln\u0113 Load slodze ir sadal\u012bta pa kategorij\u0101m Firm, Planned, MRP un MPS, lai pl\u0101not\u0101js redz\u0113tu, kas jau ir apstiprin\u0101ts un kas v\u0113l ir tikai ierosin\u0101jums.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP veido ierosin\u0101jumus<\/h3>\n\n\n<p>MRP (<strong>FUNMRP<\/strong>) l\u012bdzsvaro pied\u0101v\u0101jumu un piepras\u012bjumu katram atsauces datumam un uzglab\u0101\u0161anas vietai. Tas nolasa p\u0101rdo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas pas\u016bt\u012bjumu materi\u0101lus, iepirkuma pas\u016bt\u012bjumus, ra\u017eo\u0161anas pas\u016bt\u012bjumus, apak\u0161uz\u0146\u0113m\u0113ju pas\u016bt\u012bjumus un p\u0101rvietojumus. P\u0113c tam tas veido ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu ierosin\u0101jumus. Rezult\u0101tu nosaka preces un ra\u017eotnes datos nor\u0101d\u012btie lauki Suggestion type, Reorder quantity un Splitting.<\/p>\n\n\n<p>Datumus apr\u0113\u0137ina p\u0113c izpildes laikiem. Ierosin\u0101t\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma beigu datumu ieg\u016bst, no vajadz\u012bbas datuma at\u0146emot kvalit\u0101tes kontrolei nepiecie\u0161amo laiku. S\u0101kuma datumu ieg\u016bst, no beigu datuma at\u0146emot ra\u017eo\u0161anas izpildes laiku vai tehnolo\u0123isk\u0101 procesa laiku, ja precei apr\u0113\u0137ins tiek veikts p\u0113c t\u0101s tehnolo\u0123isk\u0101 procesa. Ja ieg\u016btais s\u0101kuma datums ir pirms apstr\u0101des datuma, X3 izmanto apstr\u0101des datumu.<\/p>\n\n\n<p>MRP pal\u012bdz\u012bb\u0101 jaudai velt\u012bts viens teikums: &#8220;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8221; (Ar atbilsto\u0161iem MRP iestat\u012bjumiem paral\u0113li MRP procesam tiek \u0123ener\u0113ta darba slodze.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">Sage X3 pal\u012bdz\u012bba, FUNMRP<\/a>) T\u0101tad tiek apr\u0113\u0137in\u0101ta slodze, nevis p\u0101rbaud\u012bta jauda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Scheduling (FUNMAUTJ) nosaka oper\u0101ciju datumus<\/h3>\n\n\n<p>Scheduling izk\u0101rto katra ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijas p\u0113c t\u0101 tehnolo\u0123isk\u0101 procesa (<strong>GESROU<\/strong>). Pl\u0101no\u0161anu veic uz priek\u0161u vai atpaka\u013c atkar\u012bb\u0101 no pas\u016bt\u012bjum\u0101 piepras\u012btajiem datumiem. Oper\u0101ciju s\u0101kuma un beigu datumi tiek ierakst\u012bti ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cij\u0101s (MFGOPE), bet pas\u016bt\u012bjuma galven\u0113 (MFGHEAD) lauka Scheduling status v\u0113rt\u012bba main\u0101s uz Scheduled.<\/p>\n\n\n<p>Sage Apvienot\u0101s Karalistes atbalsta komanda V12 grafiku sast\u0101d\u012b\u0161anas rokasgr\u0101mat\u0101 skaidri apraksta \u0161o lo\u0123iku: &#8220;The function schedules each work order independently.&#8221; (Funkcija pl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu neatkar\u012bgi.) Un: &#8220;It does not delay or stagger work orders based on overall resource load.&#8221; (T\u0101 nep\u0101rce\u013c un neizk\u0101rto ra\u017eo\u0161anas pas\u016bt\u012bjumus laik\u0101 atbilsto\u0161i kop\u0113jai resursu noslodzei.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) Visiem desmit pas\u016bt\u012bjumiem, kuriem j\u0101iziet caur vienu CNC \u0161\u016bnu, tiek pie\u0161\u0137irti ide\u0101lie datumi neatkar\u012bgi no \u0161\u016bnas faktisk\u0101s jaudas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loads par\u0101da p\u0101rslodzi, pl\u0101not\u0101js to nov\u0113r\u0161<\/h3>\n\n\n<p><strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) sal\u012bdzina slodzi ar jaudu katram darba centram un periodam. <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) no jauna apr\u0113\u0137ina slodzes datus. Sarkana josla noz\u012bm\u0113, ka attiec\u012bgaj\u0101 period\u0101 darba centra slodze p\u0101rsniedz t\u0101 jaudu. Pl\u0101not\u0101jam tad j\u0101maina vai j\u0101atce\u013c iepl\u0101notie laiki r\u012bk\u0101 <strong>Planning workbench<\/strong>, j\u0101p\u0101rce\u013c oper\u0101cijas uz br\u012bvu darba centru vai manu\u0101li j\u0101izk\u0101rto pas\u016bt\u012bjumi laik\u0101.<\/p>\n\n\n<p>X3 par\u0101da probl\u0113mu. Cilv\u0113ks to atrisina.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ra\u017eo\u0161anas pl\u0101no\u0161anai vajadz\u012bgs papildrisin\u0101jums<\/h3>\n\n\n<p>Sage pied\u0101v\u0101 divus variantus, un abus iesl\u0113dz ar aktivit\u0101\u0161u kodiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (aktivit\u0101tes kods POPS ar atz\u012bm\u0113tu Active, funkcija FUNPSSCH). Pl\u0101no\u0161anas r\u012bks, kas att\u0113lo ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku &#8220;in the form of a Gantt chart&#8221; (Gantt diagrammas veid\u0101). Atsevi\u0161\u0137ais aktivit\u0101tes kods <strong>Finite Capacity<\/strong> iesl\u0113dz ra\u017eo\u0161anas pl\u0101no\u0161anas re\u017e\u012bmu, kur\u0101 grafiku sast\u0101d\u012b\u0161anas funkcijas \u0146em v\u0113r\u0101 re\u0101lo jaudu. Ra\u017eo\u0161anas pas\u016bt\u012bjumus nodod ar komandu Submit for scheduling.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (aktivit\u0101tes kods <strong>GFS<\/strong>). Sage izstr\u0101d\u0101ta univers\u0101la saskarne, kas savieno m\u0101kon\u012b vai lok\u0101li darbin\u0101tu X3 ar Sage papildpl\u0101not\u0101ju <strong>Sage X3 Web Scheduling<\/strong> vai neatkar\u012bga programmat\u016bras pieg\u0101d\u0101t\u0101ja t\u012bmek\u013ca pl\u0101not\u0101ju. X3 to vada ar komand\u0101m Submit for scheduling, Resubmit for scheduling un Remove from scheduling (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>X3 katrai oper\u0101cijai apr\u0113\u0137ina ar\u012b <strong>Earliest start<\/strong> datumu, balstoties uz komponentu pieejam\u012bbu (pirmais materi\u0101lu pieejam\u012bbas datums, FDMA). \u0160o datumu k\u0101 ierobe\u017eojumu nodod Production Scheduler vai t\u012bmek\u013ca pl\u0101not\u0101jam. Pati standarta grafiku sast\u0101d\u012b\u0161ana to neizmanto. Ra\u017eo\u0161anas pas\u016bt\u012bjuma pal\u012bdz\u012bb\u0101 teikts: &#8220;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8221; (Sage X3 grafiku sast\u0101d\u012b\u0161anas process, nosakot oper\u0101ciju s\u0101kuma datumus, ne\u0146em v\u0113r\u0101 komponentu pieejam\u012bbu.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur beidzas Sage X3 iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standarta grafikos jaudas ierobe\u017eojumi netiek \u0146emti v\u0113r\u0101.<\/strong> Sage atbalsta rokasgr\u0101mat\u0101 teikts, ka p\u0101rslodzes nov\u0113r\u0161anai &#8220;would require finite capacity scheduling or manual adjustment&#8221; (b\u016btu vajadz\u012bga ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai vai manu\u0101las korekcijas). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>Slodzes dati noveco.<\/strong> Pievienojot mai\u0146u vai mainot kalend\u0101ru, &#8220;existing load buckets won&#8217;t automatically adjust&#8221; (eso\u0161ie slodzes periodu dati autom\u0101tiski netiks kori\u0123\u0113ti), kam\u0113r nav palaista funkcija Recalculate the loads. P\u0113c noklus\u0113juma skat\u0101 redzami tikai pas\u016bt\u012bjumi ar sast\u0101d\u012btu grafiku; MRP ierosin\u0101jumi par\u0101d\u0101s tikai ar skat\u012bjuma kodu ALL. (Tas pats avots.)<\/li>\n\n\n<li><strong>Production Scheduler ir pieejams tikai lok\u0101l\u0101m instal\u0101cij\u0101m.<\/strong> &#8220;Production Scheduler is only available for on-premises instances of Sage X3.&#8221; (Production Scheduler ir pieejams tikai lok\u0101l\u0101m Sage X3 instal\u0101cij\u0101m.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">Sage X3 pal\u012bdz\u012bba V12, POPS<\/a>) V11 lap\u0101 nor\u0101d\u012bts v\u0113l stingr\u0101ks ierobe\u017eojums: &#8220;Production Scheduler is not available for new Sage X3 installations.&#8221; (Production Scheduler nav pieejams jaun\u0101m Sage X3 instal\u0101cij\u0101m.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">Sage X3 pal\u012bdz\u012bba V11<\/a>)<\/li>\n\n\n<li><strong>Production Scheduler ir dokument\u0113ti funkcionalit\u0101tes tr\u016bkumi.<\/strong> Sage nor\u0101da, ka \u0161\u0101das iesp\u0113jas pa\u0161laik nav pieejamas (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">Sage X3 pal\u012bdz\u012bba, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; iestat\u012b\u0161anas laiku optimiz\u0113\u0161ana p\u0113c vair\u0101kiem preces parametriem un iestat\u012b\u0161anas matricas &#8211; saiknes starp pas\u016bt\u012bjumiem ra\u017eo\u0161anas uzs\u0101k\u0161anai &#8211; vair\u0101ku resursu pl\u0101no\u0161ana, sinhroniz\u0113jot paral\u0113las oper\u0101cijas &#8211; izmantojamo resursu saraksti ar at\u0161\u0137ir\u012bgu ra\u017e\u012bgumu<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Optimiz\u0113\u0161anas laik\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumi tiek blo\u0137\u0113ti.<\/strong> Uz Production Scheduler nos\u016bt\u012bts ra\u017eo\u0161anas pas\u016bt\u012bjums ieg\u016bst statusu <strong>Being optimized<\/strong>, un &#8220;You cannot modify the work order at these statuses.&#8221; (\u0160ajos statusos ra\u017eo\u0161anas pas\u016bt\u012bjumu nevar main\u012bt.) Tas paliek blo\u0137\u0113ts, l\u012bdz tiek iz\u0146emts no pl\u0101no\u0161anas. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">Sage X3 pal\u012bdz\u012bba, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>GFS papla\u0161in\u0101t\u0101 saskarne prasa vienu resursu katrai oper\u0101cijai.<\/strong> Lauka No. of resources pal\u012bdz\u012bb\u0101 teikts: &#8220;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8221; (Ja izmantojat univers\u0101lo Finite scheduler papla\u0161in\u0101to saskarni, \u0161aj\u0101 lauk\u0101 j\u0101iestata 1.) Nor\u0101d\u012bts ar\u012b iemesls: &#8220;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8221; (Sage X3 Web Scheduling nevar optimiz\u0113t ra\u017eo\u0161anas laikus, ja darba centram pie\u0161\u0137irti vair\u0101ki resursi.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">Sage X3 pal\u012bdz\u012bba, GESMWS<\/a>) T\u0101tad pl\u0101not\u0101jam nevar nor\u0101d\u012bt, ka oper\u0101cijai vajadz\u012bga tr\u012bs cilv\u0113ku brig\u0101de.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Sage X3 ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Daudz\u0101m ra\u017eotn\u0113m, kas izmanto Sage X3, nav vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas sast\u0101da grafikus atbilsto\u0161i re\u0101lajai jaudai.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tempu nosaka materi\u0101li, nevis iek\u0101rtas.<\/strong> Ra\u017eotn\u0113s, kas ra\u017eo noliktavai vai atk\u0101rtoti izgatavo vien\u0101dus izstr\u0101d\u0101jumus, galvenais risks ir nov\u0113loti iepirkumi. Korektas materi\u0101lu specifik\u0101cijas, tehnolo\u0123iskie procesi, pas\u016bt\u012bjuma izpildes laiki, partiju lielumi un dro\u0161\u012bbas kr\u0101jumi MRP sist\u0113m\u0101 atrisina liel\u0101ko da\u013cu probl\u0113mas.<\/li>\n\n\n<li><strong>Pietiek ar slodzes p\u0101rskat\u0101m\u012bbu.<\/strong> Reizi ned\u0113\u013c\u0101 p\u0101rbaudot Loads un veicot da\u017eas manu\u0101las p\u0101rb\u012bdes r\u012bk\u0101 Planning workbench, ra\u017eotne sp\u0113j iev\u0113rot termi\u0146us.<\/li>\n\n\n<li><strong>Jums jau ir lok\u0101li uzst\u0101d\u012bts Production Scheduler.<\/strong> Tas ir pietiekams darbu sec\u012bbas pl\u0101no\u0161anai Gantt diagramm\u0101, ja nav vajadz\u012bgas iestat\u012b\u0161anas matricas, saiknes starp pas\u016bt\u012bjumiem vai sinhroniz\u0113tas paral\u0113las oper\u0101cijas.<\/li>\n\n\n<li><strong>J\u016bs jau izmantojat Web Scheduling<\/strong>, lauk\u0101 No. of resources ir iestat\u012bts 1, un pl\u0101ns atbilst situ\u0101cijai ra\u017eo\u0161anas ceh\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u010cetri veidi, k\u0101 sast\u0101d\u012bt ra\u017eo\u0161anas grafikus, izmantojot Sage X3<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101no\u0161anas pane\u013ci X3 klientprogramm\u0101:<\/strong> Planning workbench un Loads vai panelis ar vilk\u0161anas un nome\u0161anas funkciju X3 ekr\u0101nos. Tie ir piem\u0113roti, ja ar slodzes p\u0101rskat\u0101m\u012bbu un manu\u0101l\u0101m p\u0101rb\u012bd\u0113m pietiek, lai ra\u017eotne iev\u0113rotu termi\u0146us.<\/li>\n\n\n<li><strong>Sage ra\u017eo\u0161anas pl\u0101no\u0161anas risin\u0101jumi:<\/strong> lok\u0101li uzst\u0101d\u012bts Production Scheduler vai Sage X3 Web Scheduling caur GFS saskarni, lauk\u0101 No. of resources iestatot 1.<\/li>\n\n\n<li><strong>Pla\u0161as APS sist\u0113mas lieliem uz\u0146\u0113mumiem:<\/strong> apjom\u012bgi pl\u0101no\u0161anas risin\u0101jumi, ko ievie\u0161 integrators vair\u0101kus m\u0113ne\u0161us ilg\u0101 projekt\u0101. Tie paredz\u0113ti ra\u017eotnei ar savu pl\u0101no\u0161anas noda\u013cu.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar darbu izpildi ra\u017eo\u0161anas ceh\u0101:<\/strong> SkyPlanner APS da\u017eu sekun\u017eu laik\u0101 sast\u0101da grafiku, \u0146emot v\u0113r\u0101 katru darba centru, operatoru, instrumentu un materi\u0101lu, savuk\u0101rt operatori str\u0101d\u0101 ar t\u0101lruni vai plan\u0161etdatoru. Tas ir piem\u0113rots ra\u017eot\u0101jiem, kas izmanto X3 un v\u0113las s\u0101kt darbu ar risin\u0101jumu da\u017eu ned\u0113\u013cu laik\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>Liel\u0101kaj\u0101 da\u013c\u0101 ned\u0113\u013cu Loads r\u0101da sarkanas joslas, un darbs r\u012bk\u0101 Planning workbench jau aiz\u0146em visu darba laiku.<\/li>\n\n\n<li>Sol\u012btos datumus nosaka p\u0113c pas\u016bt\u012bjuma izpildes laikiem, t\u0101p\u0113c p\u0101rdo\u0161anas un ra\u017eo\u0161anas komand\u0101m at\u0161\u0137iras viedoklis par re\u0101li izpild\u0101miem termi\u0146iem.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana nosaka ra\u017eo\u0161anas caurlaidsp\u0113ju, bet X3 standarta grafiku sast\u0101d\u012b\u0161ana neizk\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai samazin\u0101tu p\u0101rregul\u0113\u0161anas nepiecie\u0161am\u012bbu.<\/li>\n\n\n<li>Ra\u017eo\u0161anas uzdevumiem vienlaikus vajadz\u012bgi vair\u0101ki operatori, vai ar\u012b vair\u0101kas iek\u0101rtas izmanto kop\u012bgus instrumentus un pal\u012bgier\u012bces.<\/li>\n\n\n<li>J\u016bs lietojat Sage X3 m\u0101kon\u012b, t\u0101p\u0113c lok\u0101li instal\u0113jamais Production Scheduler nav pieejams.<\/li>\n\n\n<li>Steidzamu pas\u016bt\u012bjumu un iek\u0101rtu boj\u0101jumu d\u0113\u013c pl\u0101ns j\u0101p\u0101rveido manu\u0101li, bie\u017ei vien Excel.<\/li>\n\n\n<li>Operatoriem vajadz\u012bga sava ra\u017eo\u0161anas uzdevumu rinda, nevis izdruk\u0101ts ra\u017eo\u0161anas pas\u016bt\u012bjumu saraksts.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Katra resursa, mai\u0146as un darbinieka re\u0101l\u0101s jaudas iev\u0113ro\u0161ana<\/strong>, \u0146emot v\u0113r\u0101 ar\u012b promb\u016btni un virsstundas.<\/li>\n\n\n<li><strong>No sec\u012bbas atkar\u012bga p\u0101rregul\u0113\u0161ana<\/strong>: p\u0101rregul\u0113\u0161anas laiku matrica, kur\u0101 p\u0101reja no A uz B var aiz\u0146emt vair\u0101k laika nek\u0101 no B uz A, un apr\u0113\u0137inu dzinis, kas izv\u0113las sec\u012bbu ar maz\u0101ko p\u0101rregul\u0113\u0161anai nepiecie\u0161amo laiku.<\/li>\n\n\n<li><strong>Instrumenti un brig\u0101des k\u0101 pl\u0101no\u0161anas ierobe\u017eojumi<\/strong>: koplietojamu instrumentu vienlaikus var rezerv\u0113t tikai vienai iek\u0101rtai, un var pl\u0101not oper\u0101cijas, kur\u0101m vienlaikus vajadz\u012bgi vair\u0101ki operatori.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas p\u0101rbaude, sast\u0101dot grafiku<\/strong>, \u0146emot v\u0113r\u0101 kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus ar to paredzamajiem pieg\u0101des datumiem.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbiniekus<\/strong>, k\u0101 ar\u012b produktus ar vair\u0101ku l\u012bme\u0146u strukt\u016bru pl\u0101no apr\u0113\u0137inu dzinis, nevis pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana bez manu\u0101las atk\u0101rtotas palai\u0161anas<\/strong>: grafiks tiek atjaunin\u0101ts, kad tiek re\u0123istr\u0113ta ra\u017eo\u0161anas pas\u016bt\u012bjuma izpilde vai sa\u0146emts jauns pas\u016bt\u012bjums, nevis tikai atsevi\u0161\u0137\u0101 pl\u0101no\u0161anas cikl\u0101.<\/li>\n\n\n<li><strong>Skaidrs atbild\u012bbas sadal\u012bjums ar X3<\/strong>: kura sist\u0113ma nosaka datumus, k\u0101 tiek apstr\u0101d\u0101ti blo\u0137\u0113tie ra\u017eo\u0161anas pas\u016bt\u012bjumi un k\u0101di dati tiek nos\u016bt\u012bti atpaka\u013c (oper\u0101ciju datumi, statuss, izpildes uzskaite).<\/li>\n\n\n<li><strong>J\u016bsu videi piem\u0113rots izvieto\u0161anas veids.<\/strong> X3 m\u0101ko\u0146versija nenodro\u0161ina tie\u0161u piek\u013cuvi failu sist\u0113mai vai datub\u0101zei, t\u0101p\u0113c grafiku sast\u0101d\u012b\u0161anas risin\u0101jumam j\u0101izmanto GraphQL API, t\u012bmek\u013ca pakalpojumi vai mitin\u0101ts failu p\u0101rs\u016bt\u012b\u0161anas pakalpojums.<\/li>\n\n\n<li><strong>Laiks l\u012bdz pirmajam ieguvumam<\/strong>: iesp\u0113ja p\u0101rbaud\u012bt risin\u0101jumu ar saviem datiem pirms integr\u0101cijas projekta uzs\u0101k\u0161anas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ir m\u0101ko\u0146risin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai. Str\u0101d\u0101jot kop\u0101 ar Sage X3, tas nov\u0113r\u0161 katru no iepriek\u0161 min\u0113tajiem tr\u016bkumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vienm\u0113r aktu\u0101ls grafiks.<\/strong> Arcturus AI dzinis da\u017eu sekun\u017eu laik\u0101 sast\u0101da grafiku atbilsto\u0161i re\u0101lajai jaudai, un Autopilot to autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Nav atsevi\u0161\u0137i j\u0101izpilda Recalculate the loads, un pl\u0101not\u0101jam nav manu\u0101li j\u0101nov\u0113r\u0161 atlikus\u012b p\u0101rslodze.<\/li>\n\n\n<li><strong>Brig\u0101des un alternat\u012bvas bez mode\u013ca p\u0101rveido\u0161anas.<\/strong> Vien\u0101 darba centr\u0101 vienlaikus var str\u0101d\u0101t vair\u0101ki operatori, t\u0101p\u0113c oper\u0101cija, kurai vajadz\u012bgi tr\u012bs cilv\u0113ki, paliek viena oper\u0101cija. Paral\u0113l\u0101s iek\u0101rtas ir vien\u0101 grup\u0101 apvienoti darba centri, katrs ar savu efektivit\u0101ti. Ja galven\u0101 iek\u0101rta vai darbinieks nav pieejams, apr\u0113\u0137inu dzinis p\u0101rce\u013c ra\u017eo\u0161anas uzdevumus uz alternat\u012bv\u0101m iek\u0101rt\u0101m vai pie citiem darbiniekiem vai sadala uzdevumu starp vair\u0101kiem resursiem.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas matrica, kuras tr\u016bkums nor\u0101d\u012bts Production Scheduler dokument\u0101cij\u0101.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas no sec\u012bbas atkar\u012bgie p\u0101rejas laiki starp produktiem (no zila uz sarkanu 30 min, no sarkana uz zilu 60 min), un apr\u0113\u0137inu dzinis izv\u0113las sec\u012bbu ar maz\u0101ko p\u0101rregul\u0113\u0161anai nepiecie\u0161amo laiku. Model\u012b tiek \u0146emts v\u0113r\u0101 ar\u012b sagatavo\u0161anas un demont\u0101\u017eas laiks.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 ierobe\u017eoti resursi.<\/strong> Instrumentu, kas tiek lietots vien\u0101 darba centr\u0101, taj\u0101 pa\u0161\u0101 laik\u0101 neiepl\u0101no cit\u0101.<\/li>\n\n\n<li><strong>Grafiks atbilsto\u0161i materi\u0101lu pieejam\u012bbai.<\/strong> Apr\u0113\u0137inu dzinis model\u0113 turpm\u0101kos kr\u0101jumus, t\u0101p\u0113c darbu iepl\u0101no tikai tad, kad tam ir pieejami materi\u0101li. Pas\u016bt\u012btos materi\u0101lus uzskata par pieejamiem iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101, bet kr\u0101jumi tiek atjaunin\u0101ti, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered (<a href=\"\/lv\/docs\/kas-ir-un-ka-izmantot-funkciju-iepirkuma-pasutijumi\/\">iepirkuma pas\u016bt\u012bjumi SkyPlanner dokument\u0101cij\u0101<\/a>).<\/li>\n\n\n<li><strong>Priorit\u0101tes un blo\u0137\u0113\u0161ana j\u016bsu kontrol\u0113.<\/strong> Apr\u0113\u0137inu dzin\u0113ja darbu nosaka ra\u017eo\u0161anas uzdevuma priorit\u0101te, prioritiz\u0113\u0161ana p\u0113c pabeig\u0161anas datuma, klienta priorit\u0101te, Fast Track un Dynamic Priorities. Running Time Lock un Bulldozer, kas p\u0101rb\u012bda turpm\u0101kos ra\u017eo\u0161anas uzdevumus, \u013cauj pl\u0101not\u0101jiem saglab\u0101t kontroli.<\/li>\n\n\n<li><strong>Darba izpilde ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu ar Mobile Confirmations, Production Timer un Quick Log Mode.<\/li>\n\n\n<li><strong>M\u0101ko\u0146risin\u0101jums neatkar\u012bgi no X3 izvietojuma.<\/strong> SkyPlanner darbojas vien\u0101di gan tad, ja X3 ir Sage m\u0101kon\u012b, gan tad, ja tas ir j\u016bsu serveros.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja X3 m\u0101ko\u0146versij\u0101 vajadz\u012bga ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai<\/strong> un Production Scheduler nav pieejams.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja oper\u0101cij\u0101m vajadz\u012bgas brig\u0101des vai alternat\u012bvas iek\u0101rtas<\/strong> un nev\u0113laties b\u016bt spiesti lauk\u0101 No. of resources nor\u0101d\u012bt v\u0113rt\u012bbu 1.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties vien\u0101 r\u012bk\u0101 gan pl\u0101not, gan uzskait\u012bt operatoru darba laiku,<\/strong> nos\u016btot laika uzskaites ierakstus atpaka\u013c uz X3 k\u0101 ra\u017eo\u0161anas izpildes datus.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties ieviest ra\u017eo\u0161anas pl\u0101no\u0161anu da\u017eu ned\u0113\u013cu laik\u0101,<\/strong> nevis p\u0113c m\u0113ne\u0161iem ilga APS projekta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Integr\u0101cija ar Sage X3<\/h3>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Sage X3. No X3 tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi (MFGHEAD, MFGOPE), tehnolo\u0123iskie procesi, darba centri, kalend\u0101ri, kr\u0101jumi un atv\u0113rtie iepirkuma pas\u016bt\u012bjumi. Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c, izmantojot Work order t\u012bmek\u013ca pakalpojumu (GESMFG), bet uzskait\u012bt\u0101s stundas tiek re\u0123istr\u0113tas k\u0101 Production tracking (GESMTK). SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/p>\n\n\n<p>Katra ra\u017eotne izmanto X3 cit\u0101di, t\u0101p\u0113c SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu sist\u0113mas iestat\u012bjumiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c ievie\u0161anas. Ar\u012b j\u016bsu Sage X3 partneris vai uz\u0146\u0113muma izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>). Lai s\u0101ktu, pietiek ar API atsl\u0113gu.<\/p>\n\n\n<p>X3 joproj\u0101m ir j\u016bsu sist\u0113ma MRP, produktu, materi\u0101lu specifik\u0101ciju, tehnolo\u0123isko procesu, iepirkumu un kr\u0101jumu p\u0101rvald\u012bbai.<\/p>\n\n\n<p>S\u0101ciet ar CSV importu 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101. Cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai pirms darba s\u0101k\u0161anas j\u016bs zin\u0101tu visas izmaksas.<\/p>\n\n\n<p>Uzziniet vair\u0101k par <a href=\"\/lv\/integracija\/erp\/sage-x3\/\">SkyPlanner APS darbam ar Sage X3<\/a>, skatiet datu atbilst\u012bbu <a href=\"\/lv\/integracija\/erp\/sage-x3\/integracijas-celvedis\/\">Sage X3 integr\u0101cijas ce\u013cved\u012b<\/a> un iepaz\u012bstieties ar <a href=\"\/lv\/funkcijas\/\">funkcij\u0101m<\/a> un <a href=\"\/lv\/cenu-noteiksana\/\">cen\u0101m<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana no Excel tabul\u0101m ir p\u0101rg\u0101jusi uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu izdodas ietaup\u012bt 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina stabilu un uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad tiek sniegtas da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101 izdodas ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage X3 grafiku sast\u0101d\u012b\u0161an\u0101 jaudu uzskata par ierobe\u017eotu vai neierobe\u017eotu?<\/summary>\n<p class=\"sp-faq__a\">Standarta versij\u0101 jauda tiek uzskat\u012bta par neierobe\u017eotu. Scheduling (FUNMAUTJ) nosaka katra ra\u017eo\u0161anas pas\u016bt\u012bjuma datumus p\u0113c t\u0101 tehnolo\u0123isk\u0101 procesa, nep\u0101rb\u012bdot pas\u016bt\u012bjumus atbilsto\u0161i resursu noslodzei. Loads (CONSMWK) par\u0101da p\u0101rslodzi, un pl\u0101not\u0101js to nov\u0113r\u0161 manu\u0101li. Ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i re\u0101lajai jaudai nepiecie\u0161ams Production Scheduler vai grafiku sast\u0101d\u012b\u0161anas risin\u0101jums, kas pievienots caur GFS saskarni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage X3 Production Scheduler v\u0113l var ieg\u0101d\u0101ties?<\/summary>\n<p class=\"sp-faq__a\">Saska\u0146\u0101 ar V12 pal\u012bdz\u012bbas dokument\u0101ciju \u2014 tikai lok\u0101li instal\u0113tam X3. V11 pal\u012bdz\u012bbas dokument\u0101cij\u0101 teikts, ka jaun\u0101m instal\u0101cij\u0101m tas nav pieejams, t\u0101p\u0113c j\u016bsu Sage partneris var apstiprin\u0101t, kas pa\u0161laik tiek p\u0101rdots. Sage X3 m\u0101ko\u0146versijai dokument\u0101cij\u0101 paredz\u0113ta visp\u0101r\u012bg\u0101 Finite scheduler saskarne.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp Production Scheduler un Sage X3 Web Scheduling?<\/summary>\n<p class=\"sp-faq__a\">Production Scheduler ir ieb\u016bv\u0113ts Gantt grafiku sast\u0101d\u012b\u0161anas r\u012bks lok\u0101lai instal\u0101cijai, ko aktiviz\u0113 ar POPS aktivit\u0101tes kodu. Web Scheduling ir atsevi\u0161\u0137s Sage papildin\u0101jums, kas izmanto visp\u0101r\u012bgo Finite scheduler saskarni (GFS); t\u0101 darbojas gan ar X3 m\u0101ko\u0146versiju, gan lok\u0101lo instal\u0101ciju. Web Scheduling 2023.3.4 versij\u0101 tika pievienota GraphQL integr\u0101cija, kurai nepiecie\u0161ams Sage X3 2024 R1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner APS darbojas ar Sage X3?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju gan ar Sage X3 m\u0101ko\u0146versiju, gan lok\u0101lo instal\u0101ciju. Tas sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus un darba centrus, bet atpaka\u013c nos\u016bta pl\u0101notos datumus un ra\u017eo\u0161anas izpildes uzskaites datus. S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar CSV eksportiem; darba uzs\u0101k\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113s integr\u0101ciju.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas pl\u0101no\u0161anai j\u0101p\u0101rveido darba centru modelis?<\/summary>\n<p class=\"sp-faq__a\">Ja izmantojat visp\u0101r\u012bgo Finite scheduler advanced saskarni, tad j\u0101. Sage pieprasa, lai katram darba centram b\u016btu iestat\u012bts No. of resources = 1, t\u0101p\u0113c oper\u0101cij\u0101m, kur\u0101s vajadz\u012bga brig\u0101de, \u0161\u012b inform\u0101cija z\u016bd. Ar SkyPlanner tas nav j\u0101dara. Vien\u0101 darba centr\u0101 vienlaikus var str\u0101d\u0101t vair\u0101ki operatori, paral\u0113li str\u0101d\u0101jo\u0161as iek\u0101rtas tiek apvienotas darba centru grup\u0101, un j\u016bsu X3 darba centri paliek nemain\u012bti.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Sage X3 sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai samazin\u0101tu p\u0101rregul\u0113\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">Standarta grafiku sast\u0101d\u012b\u0161an\u0101 tas netiek dar\u012bts, un ar\u012b Production Scheduler nor\u0101da, ka optimiz\u0101cija p\u0113c p\u0101rregul\u0113\u0161anas laiku matricas pa\u0161laik nav pieejama. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki katram produktu p\u0101rim abos virzienos, un pl\u0101no\u0161anas dzin\u0113js sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Sage X3 Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS Sage X3 standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101 netiek \u0146emta v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101l\u0101 jauda. \u0160o tr\u016bkumu nov\u0113r\u0161 SkyPlanner APS, nodro\u0161inot ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai. X3 pl\u0101no materi\u0101lus ar MRP, bet ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus &#8230; <a title=\"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/\" aria-label=\"Read more about Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100916,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101363","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/razosanas-planosana\\\/\",\"name\":\"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Sage X3: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS","og_description":"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/","name":"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Sage X3 standart\u0101 pl\u0101no bez jaudas ierobe\u017eojumiem. To iev\u0113ro\u0161anai vajag Production Scheduler vai GFS saskarni. Kas darbojas, un kad vajag APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Sage X3: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Sage X3 Vai Sage X3 atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? MRP, slodze, ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bki un SkyPlanner APS Sage X3 standarta ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku sast\u0101d\u012b\u0161an\u0101 netiek \u0146emta v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101l\u0101 jauda. \u0160o tr\u016bkumu nov\u0113r\u0161 SkyPlanner APS, nodro\u0161inot ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai. X3 pl\u0101no materi\u0101lus ar MRP, bet ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101363"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101363\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}