{"id":101333,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101333"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/","title":{"rendered":"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160is ce\u013cvedis pal\u012bdz Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine) partneriem un IT komand\u0101m savienot CSI ar SkyPlanner APS. SkyPlanner integr\u0101cija ar CSI darbojas abos virzienos, izmantojot Infor OS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas uzdevumus, oper\u0101cijas, resursus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie oper\u0101ciju datumi tiek ierakst\u012bti atpaka\u013c CSI ra\u017eo\u0161anas uzdevumos.<\/li>\n\n\n<li>Operatoru darba dati tiek nos\u016bt\u012bti atpaka\u013c k\u0101 ra\u017eo\u0161anas uzdevumu transakcijas, ko iegr\u0101mato CSI.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu CSI konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-shapes-every-csi-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas j\u0101\u0146em v\u0113r\u0101 katr\u0101 CSI integr\u0101cij\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner darbojas m\u0101kon\u012b, t\u0101p\u0113c CSI vid\u0113 nav j\u0101instal\u0113 SkyPlanner programmat\u016bra. Daudznomnieku CSI vid\u0113 integr\u0101cijas darbojas caur Infor OS vien\u0101 no diviem veidiem:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mongoose IDO REST API caur ION API Gateway.<\/strong> CSI biznesa objekti ir IDO (Intelligent Data Objects), kas darbojas Mongoose ietvar\u0101. REST pakalpojums ir pieejams ar nosaukumu <code>IDORequestService<\/code>, un Infor to public\u0113 ION API repozitorij\u0101. REST 1. versija pied\u0101v\u0101 <code>LoadCollection<\/code>, <code>AddItem(s)<\/code>, <code>UpdateItem(s)<\/code>, <code>DeleteItem(s)<\/code>, <code>InvokeMethod<\/code>, <code>IDOInfo<\/code> un <code>FireAESEvent<\/code> ar atbild\u0113m XML vai JSON form\u0101t\u0101. Ir pieejama ar\u012b REST 2. versijas galapunktu kopa.<\/li>\n\n\n<li><strong>ION BOD (Business Object Documents) dokumenti<\/strong>, kurus ION p\u0101rs\u016bta caur savienojuma punktiem. CSI public\u0113 izejo\u0161os <code>Sync<\/code> BOD dokumentus objektiem <code>ProductionOrder<\/code>, <code>ItemMaster<\/code> un <code>PurchaseOrder<\/code>, k\u0101 ar\u012b kr\u0101jumu dokumentus, piem\u0113ram, <code>InventoryAdjustment<\/code>, <code>InventoryCount<\/code> un <code>InventoryHold<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>Versijas 2026.10 izejo\u0161o BOD sarakst\u0101 nav materi\u0101lu specifik\u0101ciju, tehnolo\u0123isko procesu vai darba centru datu. T\u0101p\u0113c grafiku sast\u0101d\u012b\u0161anas integr\u0101cija galvenok\u0101rt balst\u0101s uz IDO, bet BOD p\u0113c izv\u0113les var izmantot k\u0101 sign\u0101lu par izmai\u0146\u0101m ra\u017eo\u0161anas uzdevumos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un licenc\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Piek\u013cuvei caur v\u0101rteju CSI izmanto ION API izsniegtos OAuth 2.0 bearer mar\u0137ierus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Izveidojiet ION API lietotni <strong>Backend Service<\/strong> un lejupiel\u0101d\u0113jiet t\u0101s <code>.ionapi<\/code> failu. Taj\u0101 ir klienta autentifik\u0101cijas dati un pakalpojuma konta atsl\u0113gas (<code>saak<\/code>, <code>sask<\/code>). Bez tiem mar\u0137ieru piepras\u012bjumi neizdodas.<\/li>\n\n\n<li>Katr\u0101 izsaukum\u0101 caur ION nos\u016btiet galveni <code>X-Infor-MongooseConfig<\/code>. T\u0101 nor\u0101da CSI konfigur\u0101ciju (ra\u017eotni), kurai paredz\u0113ts izsaukums.<\/li>\n\n\n<li>Katrai videi glab\u0101jiet atsevi\u0161\u0137u <code>.ionapi<\/code> failu. Produkcijas vides fails neder\u0113s autentifik\u0101cijai smil\u0161kastes nomnieka vid\u0113.<\/li>\n\n<\/ul>\n\n\n<p>Lok\u0101li instal\u0113t\u0101 SyteLine izmanto to pa\u0161u IDO pieeju. Mongoose dokument\u0101cij\u0101 ir aprakst\u012bti tie\u0161i IDO REST API izsaukumi ar dro\u0161\u012bbas mar\u0137ieri no <code>GetSecurityToken<\/code>, neizmantojot ION API Gateway.<\/p>\n\n\n<p>\u0100r\u0113j\u0101s lietotnes, kas piesl\u0113dzas caur IDO sl\u0101ni, izmanto licences moduli <strong>Automation<\/strong>, kuram vienm\u0113r tiek pie\u0161\u0137irts sesijas tips IDO. Pa\u0161a Infor lietotn\u0113m, piem\u0113ram, APS, papildu licence nav vajadz\u012bga. SkyPlanner savienojumam ir nepiecie\u0161ama viena \u0161\u0101da licence, k\u0101 ar\u012b ION API piek\u013cuve j\u016bsu nomnieka vid\u0113.<\/p>\n\n\n<p>SkyPlanner pus\u0113 REST API nolasa un ieraksta pas\u016bt\u012bjumus, produktus, materi\u0101lus, tehnolo\u0123isk\u0101 procesa so\u013cus, iepirkuma pas\u016bt\u012bjumus un darba laika ierakstus. Autentifik\u0101cijai izmanto API pilnvaru, ko nos\u016bta galven\u0113 Authorization-Token. API ir dokument\u0113ts Swagger\/OpenAPI form\u0101t\u0101 (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>); skatiet ar\u012b <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101ciju<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-bod-triggers-aes-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana: BOD trigeri, AES un periodiska aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CSI nos\u016bta izmai\u0146as k\u0101 ION BOD dokumentus, un grafiku sast\u0101d\u012b\u0161anai svar\u012bgs ir <code>ProductionOrder<\/code> BOD. To konfigur\u0113 veidlap\u0101 <strong>Replication Document Outbound Cross References<\/strong>, nor\u0101dot public\u0113\u0161anas defin\u012bcijas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Trigeris<\/th><th>Ko tas public\u0113<\/th><\/tr><\/thead><tbody><tr><td><code>TriggerProductionOrderSyncSp<\/code><\/td><td>Visus ra\u017eo\u0161anas pas\u016bt\u012bjumus, tikai priek\u0161pl\u0101n\u0101<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSyncSp<\/code><\/td><td>Pas\u016bt\u012bjumus, kuriem tikko sast\u0101d\u012bts grafiks; var izpild\u012bt k\u0101 fona uzdevumu<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSchSyncSp<\/code><\/td><td>Main\u012btos ra\u017eo\u0161anas pas\u016bt\u012bjumus; var izpild\u012bt k\u0101 fona uzdevumu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Infor piem\u0113ros izmanto ra\u017eo\u0161anas uzdevuma statusa filtru: <code>'Firm'<\/code> grafika izmai\u0146\u0101m un p\u0113c izv\u0113les <code>'Released'<\/code> materi\u0101lu un darbasp\u0113ka izmai\u0146\u0101m. Tajos ar\u012b atlasa ierakstus, kuru <code>RecordDate<\/code> ir v\u0113l\u0101ks par fona uzdevuma p\u0113d\u0113j\u0101s manu\u0101l\u0101s public\u0113\u0161anas datumu.<\/p>\n\n\n<p>Mongoose <strong>Application Event System (AES)<\/strong> var ar\u012b izpild\u012bt notikumu darb\u012bbas, un REST API nodro\u0161ina <code>FireAESEvent<\/code>. Pamat\u0101 izmanto periodisku IDO datu piepras\u012b\u0161anu: ik p\u0113c da\u017e\u0101m min\u016bt\u0113m izsauc <code>LoadCollection<\/code> objektiem <code>SLJobs<\/code> un <code>SLJobRoutes<\/code>, filtr\u0113jot p\u0113c ieraksta datuma. Ja ra\u017eotne v\u0113las, lai izmai\u0146as tiktu nos\u016bt\u012btas autom\u0101tiski, papildus izmanto <code>ProductionOrder<\/code> BOD.<\/p>\n\n\n<p>Pret\u0113j\u0101 virzien\u0101 SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek, un katrs \u0161\u0101ds pazi\u0146ojums ierosina datu ierakst\u012b\u0161anu atpaka\u013c CSI.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu atbilst\u012bbu kart\u0113\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u0101l\u0101k nor\u0101d\u012bti standarta IDO nosaukumi. Nomnieku vid\u0113s ar IDO papla\u0161in\u0101jumiem tiek saglab\u0101ti tie pa\u0161i objekti, papildinot tos ar \u012bpa\u0161\u012bb\u0101m. SkyPlanner komanda ievie\u0161anas laik\u0101 kart\u0113 ar\u012b \u0161o \u012bpa\u0161\u012bbu atbilst\u012bbas.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>CSI objekts (IDO \/ BOD \/ veidlapa)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Nomenklat\u016bras vien\u012bbas (<code>SLItems<\/code>), <code>Sync ItemMaster<\/code> BOD<\/td><td>Produkti un materi\u0101li<\/td><td>CSI \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam BOD vai ikdienas izmai\u0146u iel\u0101de<\/td><\/tr><tr><td>Nomenklat\u016bras vien\u012bbas tehnolo\u0123iskais process (<code>SLItemRoutes<\/code>)<\/td><td>Procesa posmi ar sagatavo\u0161anas un izpildes laiku<\/td><td>CSI \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Sagatavo\u0161anas resursu grupas un sagatavo\u0161anas uzzi\u0146u tabulas<\/td><td>Sagatavo\u0161anas laiku matrica (p\u0101rregul\u0113\u0161ana starp produktiem atkar\u012bb\u0101 no to sec\u012bbas)<\/td><td>CSI \u2192 SkyPlanner, turpm\u0101k datus p\u0101rvalda SkyPlanner sist\u0113m\u0101<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Nomenklat\u016bras vien\u012bbas BOM, ra\u017eo\u0161anas uzdevuma materi\u0101li (<code>SLJobmatls<\/code>)<\/td><td>Produkta strukt\u016bra, apak\u0161produkti, materi\u0101lu vajadz\u012bba katram ra\u017eo\u0161anas uzdevumam<\/td><td>CSI \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam kop\u0101 ar katru ra\u017eo\u0161anas uzdevumu<\/td><\/tr><tr><td>Resursu grupas un resursi (ar resursu sec\u012bbu grup\u0101)<\/td><td>Darba centru grupas, darba centri, alternat\u012bvie darba centri<\/td><td>CSI \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, turpm\u0101k reti<\/td><\/tr><tr><td>Instrumenti un darbinieku skaits katrai oper\u0101cijai<\/td><td>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, operatoru skaits katr\u0101 darba centr\u0101<\/td><td>Datus uztur SkyPlanner sist\u0113m\u0101<\/td><td>Konfigur\u0113 ievie\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba centri (<code>SLWcs<\/code>)<\/td><td>Nav grafika sast\u0101d\u012b\u0161anas objekts; saglab\u0101 tikai izmaksu uzzi\u0146ai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>P\u0113c izv\u0113les<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Mai\u0146as un promb\u016btnes<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Reizi ned\u0113\u013c\u0101 vai datus p\u0101rvalda SkyPlanner sist\u0113m\u0101<\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi (<code>SLJobs<\/code>), <code>Sync ProductionOrder<\/code> BOD<\/td><td>Pas\u016bt\u012bjumi ar izpildes termi\u0146iem un priorit\u0101ti<\/td><td>CSI \u2192 SkyPlanner<\/td><td>BOD trigeris vai datu piepras\u012b\u0161ana ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevuma oper\u0101cijas (<code>SLJobRoutes<\/code>)<\/td><td>Ra\u017eo\u0161anas uzdevumi un resursu grupa katram procesa posmam<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kop\u0101 ar katru ra\u017eo\u0161anas uzdevumu<\/td><\/tr><tr><td>Klientu pas\u016bt\u012bjumu rindas (<code>SLCoItems<\/code>), klienti (<code>SLCustomers<\/code>)<\/td><td>Klientu pas\u016bt\u012bjumu izpildes termi\u0146i un klientu priorit\u0101te<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Periodiska datu piepras\u012b\u0161ana<\/td><\/tr><tr><td>Nomenklat\u016bras vien\u012bbu kr\u0101jumi noliktav\u0101, kr\u0101jumu BOD dokumenti<\/td><td>Kr\u0101jumi (noliktavas atlikumi)<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Ik stundu vai pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi (atv\u0113rt\u0101s pas\u016bt\u012bjumu rindas), <code>Sync PurchaseOrder<\/code> BOD<\/td><td>Iepirkuma pas\u016bt\u012bjumi un gaid\u0101mie materi\u0101li ar paredz\u0113to pieg\u0101des datumu<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Ik stundu vai sa\u0146emot BOD, pirms katras grafika sast\u0101d\u012b\u0161anas<\/td><\/tr><tr><td>Ra\u017eo\u0161anas uzdevuma oper\u0101ciju grafiks (katras oper\u0101cijas s\u0101kums un beigas) un uzdevuma Start un End datumi objekt\u0101 <code>SLJobs<\/code>, izmantojot <code>UpdateItems<\/code><\/td><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td>SkyPlanner \u2192 CSI<\/td><td>P\u0113c katras grafika izmai\u0146as; ierakst\u012b\u0161anu ierosina SkyPlanner webhook pazi\u0146ojums<\/td><\/tr><tr><td>Neiegr\u0101matoti ra\u017eo\u0161anas uzdevuma dar\u012bjumi (<code>SLJobtrans<\/code>), izmantojot <code>AddItems<\/code>, darbinieki (<code>SLEmployees<\/code>), iemesli (<code>SLReasons<\/code>)<\/td><td>Laika uzskaites ieraksti, der\u012bg\u0101s produkcijas un br\u0101\u0137a daudzums, iemeslu kodi<\/td><td>SkyPlanner \u2192 CSI<\/td><td>Ar katru izpildes apstiprin\u0101jumu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet nomenklat\u016bras vien\u012bbas, to tehnolo\u0123iskos procesus, BOM, resursu grupas, resursus un mai\u0146as, izmantojot <code>LoadCollection<\/code>. Veidojiet SkyPlanner darba centrus no resursiem un resursu grup\u0101m, nevis no CSI darba centriem. Infor skaidri nor\u0101da, ka darba centrs &#8220;captures costs only and does not affect the actual planning or scheduling.&#8221; (tikai uzskaita izmaksas un neietekm\u0113 faktisko pl\u0101no\u0161anu vai grafiku sast\u0101d\u012b\u0161anu).<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nos\u016btiet apstiprin\u0101tos un izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus kop\u0101 ar to oper\u0101cij\u0101m un materi\u0101liem. APS pl\u0101notos pas\u016bt\u012bjumus atst\u0101jiet CSI. APS Planning katr\u0101 palai\u0161anas reiz\u0113 dz\u0113\u0161 un no jauna \u0123ener\u0113 savu pl\u0101nu, t\u0101p\u0113c pl\u0101notajiem pas\u016bt\u012bjumiem nav stabila identifikatora, uz kuru balst\u012bt grafiku. Vispirms apstipriniet tos k\u0101 ra\u017eo\u0161anas uzdevumus form\u0101 <strong>Planning Detail<\/strong>.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c CSI.<\/strong> Ierakst\u012b\u0161anu ierosina SkyPlanner grafika t\u012bmek\u013ca aiz\u0137ere. Integr\u0101cija no SkyPlanner REST API nolasa katras oper\u0101cijas jauno pl\u0101noto s\u0101kumu un beigas. Ar <code>UpdateItems<\/code> t\u0101 ieraksta \u0161os datus ra\u017eo\u0161anas uzdevuma oper\u0101ciju grafik\u0101, identific\u0113jot ierakstu p\u0113c ra\u017eo\u0161anas uzdevuma, sufiksa un oper\u0101cijas numura. Tie ir tie pa\u0161i oper\u0101ciju datumi, kurus iestata Scheduler un redi\u0123\u0113 Resource Gantt; attiec\u012bgi main\u0101s ar\u012b ra\u017eo\u0161anas uzdevuma Start un End datumi objekt\u0101 <code>SLJobs<\/code>.<\/p>\n\n\n<p>Da\u017e\u0101s ra\u017eotn\u0113s grafika lauki ir aizsarg\u0101ti vai katrai izmai\u0146ai j\u0101piem\u0113ro CSI puses lo\u0123ika. \u0160\u0101dos gad\u012bjumos ierakst\u012b\u0161anai izmanto piel\u0101gotu IDO metodi, ko izsauc ar <code>InvokeMethod<\/code>. T\u0101 veic to pa\u0161u atjaunin\u0101jumu, izmantojot CSI valid\u0101ciju.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 laiku un daudzumus t\u0101lrun\u012b vai plan\u0161etdator\u0101 (Mobile Confirmations, Production Timer, Quick Log Mode). Katrs nosl\u0113gtais laika uzskaites ieraksts k\u013c\u016bst par neiegr\u0101matotu <code>SLJobtrans<\/code> rindu, ko izveido ar <code>AddItems<\/code>. Taj\u0101 iek\u013cauj ra\u017eo\u0161anas uzdevumu, sufiksu, oper\u0101ciju, darbinieku, stundas, der\u012bg\u0101s produkcijas un br\u0101\u0137a daudzumu. P\u0113c tam CSI funkcija Job Labor Transaction Posting j\u016bsu izv\u0113l\u0113taj\u0101 bie\u017eum\u0101 iegr\u0101mato darbasp\u0113ka izmaksas un pieskait\u0101m\u0101s izmaksas ra\u017eo\u0161anas uzdevuma nepabeigtaj\u0101 ra\u017eo\u0161an\u0101 (WIP).<\/p>\n\n\n<p><strong>5. Atbild\u012bba par datiem, atk\u0101rtoti m\u0113\u0123in\u0101jumi un konfliktu nov\u0113r\u0161anas noteikumi.<\/strong><\/p>\n\n\n<p>Katra ieraksta atsl\u0113gu veido CSI identifikatori (ra\u017eo\u0161anas uzdevums, sufikss, oper\u0101cijas numurs, transakcijas ID). T\u0101p\u0113c atk\u0101rtots t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojums vai aptauja atjaunina to pa\u0161u rindu, nevis izveido dublik\u0101tu. Neveiksm\u012bgie ierakst\u012b\u0161anas m\u0113\u0123in\u0101jumi tiek atk\u0101rtoti un re\u0123istr\u0113ti \u017eurn\u0101l\u0101 kop\u0101 ar CSI k\u013c\u016bdas tekstu. Ja CSI ra\u017eo\u0161anas uzdevumam pie\u0161\u0137ir statusu Complete vai History, n\u0101kamaj\u0101 sinhroniz\u0101cijas reiz\u0113 tas tiek iz\u0146emts no SkyPlanner grafika. Atcelts SkyPlanner ra\u017eo\u0161anas uzdevums nekad netiek ierakst\u012bts atpaka\u013c CSI.<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, tehnolo\u0123iskie procesi, materi\u0101lu specifik\u0101cijas, daudzumi, ra\u017eo\u0161anas uzdevumu statuss, izmaksu apr\u0113\u0137ins<\/td><td>CSI<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, s\u0101kuma un beigu laiks, resursu pie\u0161\u0137ir\u0161ana<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ilgtermi\u0146a materi\u0101lu pl\u0101ns, Get CTP\/ATP<\/td><td>CSI APS, ja ir licence<\/td><\/tr><tr><td>Mai\u0146as un br\u012bvdienas<\/td><td>Viena sist\u0113ma, ko izv\u0113las tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td>Darba un sara\u017eot\u0101s produkcijas dati<\/td><td>Tiek ierakst\u012bti CSI no SkyPlanner laika uzskaites ierakstiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Galvenais konfliktu avots ir CSI ieb\u016bv\u0113tie grafiku sast\u0101d\u012b\u0161anas r\u012bki. APS Planning uzskata grafik\u0101 iepl\u0101not\u0101s oper\u0101cijas par fiks\u0113t\u0101m, ta\u010du v\u0113l\u0101kas <strong>Scheduler<\/strong> palai\u0161anas reizes (parasti reizi dien\u0101 ar vienas dienas pl\u0101no\u0161anas horizontu) var t\u0101s atkal p\u0101rvietot. Ja noteikt\u0101m resursu grup\u0101m detaliz\u0113tu oper\u0101ciju sec\u012bbu nosaka SkyPlanner, izsl\u0113dziet \u0161\u012bs grupas no CSI Scheduler tv\u0113ruma. P\u0113c tam sada\u013c\u0101 <strong>Shop Floor Control Parameters<\/strong> izsl\u0113dziet iestat\u012bjumu, kas liek Scheduler uztvert pl\u0101notos pas\u016bt\u012bjumus k\u0101 piepras\u012bjumu. MRP, APS pas\u016bt\u012bjumu pl\u0101no\u0161ana un Get CTP var palikt CSI. SkyPlanner funkcija Running Time Lock saglab\u0101 uzs\u0101kt\u0101s oper\u0101cijas nemain\u012bgas. Ja ra\u017eo\u0161an\u0101 notiek izmai\u0146as, SkyPlanner funkcija Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu noteiktos fiks\u0113jumus un priorit\u0101tes.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. CSI projekt\u0101 ietilpst \u0161\u0101di posmi:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Izm\u0113\u0123in\u0101\u0161ana ar eksport\u0113tiem datiem.<\/strong> CSI ra\u017eo\u0161anas uzdevumu, oper\u0101ciju un resursu sarakstos izmantojiet <strong>Save to Excel<\/strong>, p\u0101rveidojiet datus CSV form\u0101t\u0101 un import\u0113jiet tos SkyPlanner. Pirms saskar\u0146u izstr\u0101des p\u0101rbaudiet grafiku.<\/li>\n\n\n<li><strong>Tv\u0113ruma noteik\u0161ana un pamatdatu atbilst\u012bbu kart\u0113\u0161ana.<\/strong> Vienojieties par atbilst\u012bbu tabulu, katra lauka atbild\u012bgo sist\u0113mu, sinhroniz\u0101cijas bie\u017eumu, iegr\u0101mato\u0161anas kan\u0101lu un to, k\u0101 sa\u0161aurin\u0101t ieb\u016bv\u0113t\u0101 Scheduler tv\u0113rumu.<\/li>\n\n\n<li><strong>Infor OS konfigur\u0113\u0161ana.<\/strong> Backend Service lietotne, <code>.ionapi<\/code> faili katram nomniekam, Automation licence un IDO REST piek\u013cuve. Jau s\u0101kum\u0101 pieprasiet IDO REST aktiviz\u0113\u0161anu Infor Cloud atbalsta dienestam, jo da\u017eu nomnieku vid\u0113s tas ir j\u0101iesp\u0113jo.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de.<\/strong> Ar <code>LoadCollection<\/code> iel\u0101d\u0113 nomenklat\u016bras vien\u012bbas, BOM, vien\u012bbu tehnolo\u0123iskos procesus, resursus, resursu grupas un mai\u0146as. SkyPlanner papildus konfigur\u0113 sagatavo\u0161anas laiku matricu, instrumentus un darbinieku skaitu.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Vispirms periodiski pieprasa ra\u017eo\u0161anas uzdevumu, oper\u0101ciju, materi\u0101lu un atv\u0113rto iepirkuma pas\u016bt\u012bjumu datus ar IDO. P\u0113c tam, ja nepiecie\u0161ams, pievieno <code>ProductionOrder<\/code> BOD trigeri.<\/li>\n\n\n<li><strong>Test\u0113\u0161ana paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam.<\/strong> Izmantojiet SkyPlanner l\u012bdztekus izpildei nodoto darbu sarakstam un preciz\u0113jiet tehnolo\u0123isk\u0101 procesa laikus un resursu datus.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c CSI un izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Kad datumi un dati sakr\u012bt, iesl\u0113dziet grafika ierakst\u012b\u0161anu atpaka\u013c CSI un darbasp\u0113ka uzskaites nodo\u0161anu ar <code>SLJobtrans<\/code>.<\/li>\n\n\n<li><strong>Ekspluat\u0101cijas s\u0101k\u0161ana<\/strong> resursu grup\u0101m, par kur\u0101m atbild SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"csi-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101kie klup\u0161anas akme\u0146i CSI integr\u0101cij\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darba centru piel\u012bdzin\u0101\u0161ana iek\u0101rt\u0101m.<\/strong> <code>SLWcs<\/code> \u0161\u0137iet ac\u012bmredzama IDO izv\u0113le, ta\u010du jaudas pl\u0101no\u0161anai t\u0101 ir nepareiza. Grafiku sast\u0101d\u012b\u0161an\u0101 izmanto resursus un resursu grupas (ar resursu sec\u012bbu grup\u0101).<\/li>\n\n\n<li><strong>BOD filtri, kas izlai\u017e vai atk\u0101rtoti nos\u016bta ra\u017eo\u0161anas uzdevumus.<\/strong> <code>ProductionOrder<\/code> public\u0113\u0161ana ir atkar\u012bga no izv\u0113l\u0113t\u0101 trigera un statusu filtriem. Filtr\u0113jot tikai p\u0113c <code>'Firm'<\/code>, netiek uztvertas materi\u0101lu un darbasp\u0113ka izmai\u0146as ra\u017eo\u0161an\u0101 nodotajos uzdevumos. Ja nav filtra p\u0113c p\u0113d\u0113j\u0101s public\u0113\u0161anas datuma, viss tiek nos\u016bt\u012bts atk\u0101rtoti.<\/li>\n\n\n<li><strong>Darba datu noraid\u012b\u0161ana atpaka\u013cierakstes laik\u0101.<\/strong> CSI noraida darba datus, ja ra\u017eo\u0161anas uzdevuma statuss nav Released vai Scheduled, oper\u0101cija jau ir pabeigta vai darbinieks nav akt\u012bvs. Pirms nos\u016bt\u012b\u0161anas p\u0101rbaudiet datus un re\u0123istr\u0113jiet noraid\u012bjumus \u017eurn\u0101l\u0101.<\/li>\n\n\n<li><strong>Pie\u0146\u0113mums, ka rinda jau ir iegr\u0101matots dar\u012bjums.<\/strong> <code>SLJobtrans<\/code> rinda paliek neiegr\u0101matota l\u012bdz Job Labor Transaction Posting izpildei. Saska\u0146ojiet iegr\u0101mato\u0161anas bie\u017eumu ar finan\u0161u noda\u013cu, lai darbasp\u0113ka dati non\u0101ktu nepabeigt\u0101s ra\u017eo\u0161anas un algu uzskait\u0113 paredz\u0113taj\u0101 laik\u0101.<\/li>\n\n\n<li><strong>Kav\u0113ti ra\u017eo\u0161anas uzdevumi no APS.<\/strong> APS pl\u0101no atpaka\u013c no izpildes termi\u0146a un, ja tas neizdodas, uz priek\u0161u no \u0161odienas; tas nekad nepl\u0101no pag\u0101tn\u0113. \u013baujiet SkyPlanner iepl\u0101not kav\u0113tos pas\u016bt\u012bjumus atbilsto\u0161i re\u0101lajai jaudai, nevis pa\u013caujieties uz sa\u0146emto s\u0101kuma datumu.<\/li>\n\n\n<li><strong>Mongoose nianses.<\/strong> Komatus <code>InvokeMethod<\/code> parametru v\u0113rt\u012bb\u0101s aizst\u0101jiet ar atso\u013ca sec\u012bbu <code>\\x2c<\/code>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-cloudsuite-industrial-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 CloudSuite Industrial integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong> Tas ietver gan SkyPlanner pusi, gan IDO un BOD saskarni, kas piel\u0101gota j\u016bsu nomnieka videi. Komanda uztur integr\u0101ciju, ja main\u0101s resursu grupas, IDO papla\u0161in\u0101jumi vai ra\u017eo\u0161anas uzdevumu statusi. Katr\u0101 r\u016bpn\u012bc\u0101 CSI izmanto cit\u0101di, un \u0161o atbilst\u012bbu kart\u0113\u0161ana ir komandas kompetence.<\/li>\n\n\n<li><strong>J\u016bsu Infor partneris var piedal\u012bties.<\/strong> Partneris p\u0101rzina j\u016bsu IDO papla\u0161in\u0101jumus un ION konfigur\u0101ciju, str\u0101d\u0101 ar SkyPlanner Swagger\/OpenAPI dokument\u0101ciju un abon\u0113 t\u0101 t\u012bmek\u013ca aiz\u0137eru pazi\u0146ojumus.<\/li>\n\n\n<li><strong>Integr\u0101ciju var izstr\u0101d\u0101t j\u016bsu pa\u0161u izstr\u0101d\u0101t\u0101ji<\/strong>, izmantojot to pa\u0161u REST API ar pilnvaras autentifik\u0101ciju. Lai s\u0101ktu, pietiek ar SkyPlanner API atsl\u0113gu (<a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bba<\/a>), un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"why-csi-teams-add-skyplanner-instead-of-tuning-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c CSI komandas ievie\u0161 SkyPlanner, nevis piel\u0101go k\u0101rt\u0113jo pake\u0161apstr\u0101des ciklu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner darbam CSI pus\u0113 vajag tikai nelielu integr\u0101cijas da\u013cu. Tas nolasa ra\u017eo\u0161anas uzdevumus, oper\u0101cijas, materi\u0101lus un resursus, bet atpaka\u013c ieraksta divu veidu datus: oper\u0101ciju pl\u0101notos laikus un darbasp\u0113ka uzskaiti objekt\u0101 <code>SLJobtrans<\/code>. Starp \u0161\u012bm darb\u012bb\u0101m tas p\u0101rpl\u0101no grafiku \u2014 darbu, kas CSI gad\u012bjum\u0101 paliek pl\u0101not\u0101ja labojumiem Resource Gantt un n\u0101kamajai Scheduler palai\u0161anai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Grafiks rea\u0123\u0113 uz notikumiem.<\/strong> Arcturus da\u017eu sekun\u017eu laik\u0101 veic ra\u017eo\u0161anas pl\u0101no\u0161anu, sast\u0101dot grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku kapacit\u0101tei, un Autopilot to autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as \u2014 gan sa\u0146emot main\u012btu ra\u017eo\u0161anas uzdevumu no CSI, gan operatoram re\u0123istr\u0113jot darba gaitu. P\u0113c tam jaunie laiki tiek nos\u016bt\u012bti, izmantojot webhooks.<\/li>\n\n\n<li><strong>Darbasp\u0113ka uzskaite tie\u0161i darba viet\u0101.<\/strong> Mobile Confirmations, Production Timer un Quick Log Mode p\u0101rv\u0113r\u0161 operatoru ievad\u012btos datus laika uzskaites ierakstos, kas atbilst <code>SLJobtrans<\/code> rind\u0101m. T\u0101d\u0113j\u0101di darbasp\u0113ka dati non\u0101k CSI bez atk\u0101rtotas ievad\u012b\u0161anas.<\/li>\n\n\n<li><strong>Ierobe\u017eojumi atbilst situ\u0101cijai ceh\u0101.<\/strong> Sagatavo\u0161anas laiku matrica \u013cauj izv\u0113l\u0113ties p\u0101rregul\u0113\u0161anas sec\u012bbu ar maz\u0101ko sagatavo\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, vien\u0101 darba centr\u0101 vienlaikus var str\u0101d\u0101t vair\u0101ki operatori, un, ja prim\u0101r\u0101 iek\u0101rta vai darbinieks ir aiz\u0146emts, tos aizst\u0101j alternat\u012bvas iek\u0101rtas un darbinieki.<\/li>\n\n\n<li><strong>Darbu sec\u012bba atbilst materi\u0101lu pieejam\u012bbai.<\/strong> Sa\u0146emot datus par ra\u017eo\u0161anas uzdevumu materi\u0101liem, kr\u0101jumiem un atv\u0113rtajiem CSI iepirkuma pas\u016bt\u012bjumiem, grafik\u0101 tiek p\u0101rbaud\u012bta materi\u0101lu pieejam\u012bba. Pas\u016bt\u012bto materi\u0101lu uzskata par pieejamu iepirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101, un kr\u0101jumi tiek atjaunin\u0101ti, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums mazina projekta risku.<\/strong> Iel\u0101d\u0113jiet ar Save to Excel eksport\u0113tos datus 30 dienu izm\u0113\u0123in\u0101juma vid\u0113 un apskatiet savus ra\u017eo\u0161anas uzdevumus ra\u017eo\u0161anas pl\u0101no\u0161anas grafik\u0101, kas atbilst re\u0101lajai iek\u0101rtu un darbinieku kapacit\u0101tei. Apturiet resursu, kas ir \u0161aur\u0101 vieta, pievienojiet steidzamu pas\u016bt\u012bjumu un aizkav\u0113jiet iepirkuma pas\u016bt\u012bjumu. \u0160eit p\u0101rbaud\u012bt\u0101s datu atbilst\u012bbas nosaka IDO darbu tv\u0113rumu.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> CSI j\u0101saglab\u0101 k\u0101 prim\u0101r\u0101 artikulu, ra\u017eo\u0161anas uzdevumu un izmaksu uzskaites sist\u0113ma. J\u016bs ieg\u016bstat grafiku sast\u0101d\u012b\u0161anas r\u012bku un ra\u017eo\u0161anas ceha lietotni ar nelielu, skaidri defin\u0113tu saskarni: t\u0101 sa\u0146em ra\u017eo\u0161anas uzdevumus un pamatdatus, bet nos\u016bta pl\u0101notos laikus un darba datus. SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem, ikm\u0113ne\u0161a nor\u0113\u0137iniem un iesp\u0113ju jebkur\u0101 laik\u0101 atteikties. Integr\u0101cijas cenu apr\u0113\u0137ina iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma.<\/p>\n\n\n<p>Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101ciju<\/a>. Sal\u012bdziniet CSI APS un Scheduler ar m\u0101ko\u0146a grafiku sast\u0101d\u012b\u0161anas r\u012bku rakst\u0101 <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/\">Ra\u017eo\u0161anas pl\u0101no\u0161ana ar Infor CloudSuite Industrial<\/a>. Varat ar\u012b apmekl\u0113t <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/\">Infor CloudSuite Industrial lapu<\/a> un <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju p\u0101rskatu<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales pane\u013cu ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda sasniedz ra\u017eo\u0161anas l\u012bniju da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sagatavo\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alah\u00e4rm\u00e4 ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai divu meistaru viet\u0101 pietiek ar vienu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen Raum\u0101 pie robotiz\u0113tas \u0161\u016bnas produktu krau\u0161anai uz palet\u0113m\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina stabilu pamatu un uzticam\u012bbu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 P\u0101rtikas iepako\u0161anai dro\u0161s pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz piepras\u012bjumiem main\u012bt grafiku tagad atbild da\u017eu sekun\u017eu laik\u0101, nevis stundas laik\u0101 vai ilg\u0101k.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 integr\u0101ciju ar CloudSuite Industrial vai SyteLine?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju atbilsto\u0161i j\u016bsu CSI iestat\u012bjumiem, izmantojot IDO REST API un ION BODs, un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu Infor partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to SkyPlanner REST API \u2014 nepiecie\u0161ama tikai API atsl\u0113ga. Izm\u0113\u0123in\u0101juma laik\u0101 varat s\u0101kt ar CSV vai Excel eksportiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru CSI API izmantot ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas integr\u0101cijai?<\/summary>\n<p class=\"sp-faq__a\">Mongoose IDO REST API caur ION API Gateway, izmantojot OAuth 2.0 ar datiem no Backend Service <code>.ionapi<\/code> faila. Ja periodiska datu piepras\u012b\u0161ana nav pietiekami \u0101tra, pievienojiet <code>ProductionOrder<\/code> BOD ra\u017eo\u0161anas uzdevumu izmai\u0146u noteik\u0161anai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 pl\u0101notie datumi un darbasp\u0113ka dati tiek ierakst\u012bti atpaka\u013c CSI?<\/summary>\n<p class=\"sp-faq__a\">Oper\u0101ciju pl\u0101noto s\u0101kumu un beigas ieraksta atpaka\u013c ra\u017eo\u0161anas uzdevuma oper\u0101ciju grafik\u0101 ar IDO <code>UpdateItems<\/code>, atjauninot ar\u012b uzdevuma Start un End datumus objekt\u0101 <code>SLJobs<\/code>. Ra\u017eotn\u0113s, kur \u0161ie lauki ir aizsarg\u0101ti, izmanto piel\u0101gotu IDO metodi, ko izsauc ar <code>InvokeMethod<\/code>. Darbasp\u0113ka datus ievada ar <code>AddItems<\/code> k\u0101 neiegr\u0101matotas <code>SLJobtrans<\/code> rindas, un Job Labor Transaction Posting t\u0101s iegr\u0101mato nepabeigtaj\u0101 ra\u017eo\u0161an\u0101 (WIP).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai \u0101r\u0113jas grafiku sast\u0101d\u012b\u0161anas sist\u0113mas piesl\u0113g\u0161anai vajadz\u012bga papildu Infor licence?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, nepiecie\u0161ama Automation licence. Infor licenc\u0113\u0161anas dokument\u0101cij\u0101 nor\u0101d\u012bts, ka \u0101r\u0113j\u0101m lietojumprogramm\u0101m, kas savienojas caur IDO sl\u0101ni, ir j\u0101izmanto \u0161\u012b licence ar sesijas tipu IDO.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam turpin\u0101t izmantot CSI APS un pievienot SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. CSI APS p\u0101rzi\u0146\u0101 paliek materi\u0101lu pl\u0101ns un Get CTP\/ATP, savuk\u0101rt SkyPlanner nosaka darbu sec\u012bbu taj\u0101s resursu grup\u0101s, kuras nododat t\u0101 p\u0101rzi\u0146\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgs ir CSI integr\u0101cijas projekts?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Projekts ietver datu atbilst\u012bbu noteik\u0161anu, s\u0101kotn\u0113jo iel\u0101di, ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101ciju, grafika ierakst\u012b\u0161anu atpaka\u013c CSI, <code>SLJobtrans<\/code> izpildes apstiprin\u0101jumus, paral\u0113lu darb\u012bbu un ekspluat\u0101cijas s\u0101k\u0161anu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner, pirms s\u0101kam kaut ko izstr\u0101d\u0101t?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jums ietver l\u012bdz 20 darba centriem un visas Basic funkcijas, un kred\u012btkarte nav nepiecie\u0161ama. S\u0101ciet ar CSV vai Excel failiem, kas eksport\u0113ti no CSI. <a href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a>, lai p\u0101rrun\u0101tu j\u016bsu nomnieka vidi.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160is ce\u013cvedis pal\u012bdz Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine) partneriem un IT komand\u0101m savienot CSI ar SkyPlanner APS. SkyPlanner integr\u0101cija ar CSI darbojas abos virzienos, izmantojot Infor OS: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda &#8230; <a title=\"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\" aria-label=\"Read more about Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100886,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101333","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor CloudSuite Industrial: integr\u0101cija grafiku sast\u0101d\u012b\u0161anai<\/title>\n<meta name=\"description\" content=\"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/integracijas-celvedis\\\/\",\"name\":\"Infor CloudSuite Industrial: integr\u0101cija grafiku sast\u0101d\u012b\u0161anai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor CloudSuite Industrial: integr\u0101cija grafiku sast\u0101d\u012b\u0161anai","description":"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/","name":"Infor CloudSuite Industrial: integr\u0101cija grafiku sast\u0101d\u012b\u0161anai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Saistiet Infor CloudSuite Industrial (SyteLine) ar SkyPlanner APS: IDO REST caur ION, ProductionOrder BOD, grafiku ierakste CSI, SLJobtrans darba dati un riski.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160is ce\u013cvedis pal\u012bdz Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine) partneriem un IT komand\u0101m savienot CSI ar SkyPlanner APS. SkyPlanner integr\u0101cija ar CSI darbojas abos virzienos, izmantojot Infor OS: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Ievie\u0161anas laik\u0101 SkyPlanner komanda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101333"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101333\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100886"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}