{"id":101303,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101303"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/","title":{"rendered":"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>J\u0101. \u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu jaudai un darbinieku pieejam\u012bbai. Infor CloudSuite Industrial (agr\u0101k SyteLine, bie\u017ei saukts par CSI) nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai div\u0101s viet\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li><strong>APS Planning ar licenci<\/strong> pl\u0101no piepras\u012bjuma izpildi atbilsto\u0161i resursu jaudai un ar Get CTP nosaka apsol\u0101mos termi\u0146us. Bez APS licences tas darbojas Infinite re\u017e\u012bm\u0101.<\/li>\n\n\n<li><strong>Scheduler<\/strong> nosaka tuv\u0101kaj\u0101 laik\u0101 veicamo oper\u0101ciju sec\u012bbu resursiem ar ierobe\u017eotu jaudu un att\u0113lo t\u0101s redi\u0123\u0113jam\u0101 Resource Gantt diagramm\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS darbojas l\u012bdz\u0101s CSI un p\u0113c katra trauc\u0113juma autom\u0101tiski p\u0101rpl\u0101no visa ra\u017eo\u0161anas ceha darbu. P\u0101rregul\u0113\u0161ana, instrumenti, brig\u0101des un gaid\u0101mie materi\u0101li tiek \u0146emti v\u0113r\u0101 vien\u0101 grafik\u0101.<\/p>\n\n\n<p>Infor M3, Infor LN un Infor Production Scheduling ir atsevi\u0161\u0137i produkti, un nekas no \u0161eit aprakst\u012bt\u0101 uz tiem neattiecas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-cloudsuite-industrial-plans-capacity-step-by\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 CloudSuite Industrial pl\u0101no jaudu: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CSI ir tr\u012bs pl\u0101no\u0161anas l\u012bme\u0146i, kurus bie\u017ei jauc: <strong>MRP<\/strong>, <strong>APS Planning<\/strong> un <strong>Scheduler<\/strong>. Katrs atbild uz citu jaut\u0101jumu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Jaudas modelis: resursi, nevis darba centri<\/h3>\n\n\n<p>Jaudu nosaka <strong>Resources<\/strong> un <strong>Resource Groups<\/strong>. Katrai oper\u0101cijai j\u0101nor\u0101da vismaz viena resursu grupa. Infor dokument\u0101cij\u0101 piebilsts: &#8220;You cannot use a resource group on an operation unless it has at least one resource assigned to it.&#8221; (Oper\u0101cijai nevar izmantot resursu grupu, ja tai nav pie\u0161\u0137irts vismaz viens resurss.) Pieejam\u012bbu nosaka <strong>Shifts<\/strong>.<\/p>\n\n\n<p>Darba centri joproj\u0101m past\u0101v, ta\u010du tikai izmaksu uzskaitei: &#8220;The work center now captures costs only and does not affect the actual planning or scheduling.&#8221; (Darba centr\u0101 tagad uzskaita tikai izmaksas; tas neietekm\u0113 pa\u0161u pl\u0101no\u0161anu vai grafiku sast\u0101d\u012b\u0161anu.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144439334.html\">avots<\/a>) Tas m\u0113dz samulsin\u0101t tos, kuri iepriek\u0161 str\u0101d\u0101ju\u0161i ar ERP, kur\u0101 grafiku sast\u0101da darba centru l\u012bmen\u012b.<\/p>\n\n\n<p>Resursu izv\u0113li un noslodzi nosaka divi iestat\u012bjumi. Cilnes Resources lauks <strong>Seq<\/strong> nosaka resursu pie\u0161\u0137ir\u0161anu p\u0113c Select in Sequence un Cyclic noteikumiem: tie &#8220;allocate the resource with the lower Seq value first.&#8221; (Vispirms pie\u0161\u0137ir resursu ar maz\u0101ko Seq v\u0113rt\u012bbu.) P\u0113c noklus\u0113juma resursu jauda ir ierobe\u017eota. Resursam vai visai resursu grupai nor\u0101da <strong>Infinite<\/strong>, ja tam vienlaikus j\u0101sp\u0113j apstr\u0101d\u0101t &#8220;an unlimited number of operations simultaneously, but only when on-shift.&#8221; (Neierobe\u017eotu skaitu oper\u0101ciju vienlaikus, ta\u010du tikai mai\u0146as laik\u0101.) (<a href=\"https:\/\/docs.infor.com\/csi\/2026.10\/en-us\/csbiolh\/inventory_user_cl_sl\/mergedprojects\/sl_invprod\/fields\/i\/infinite_scheduling_resources.html\">avots<\/a>) T\u0101d\u0113j\u0101di ra\u017eotne var \u0146emt v\u0113r\u0101 jaudas ierobe\u017eojumus \u0161auraj\u0101s viet\u0101s, bet p\u0101r\u0113jos resursus pl\u0101not ar neierobe\u017eotu jaudu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP: tikai materi\u0101li<\/h3>\n\n\n<p>MRP ir pamata funkcionalit\u0101te, kas pieejama ikvien\u0101 CSI instal\u0101cij\u0101. Tas pl\u0101no materi\u0101lus, ne\u0146emot v\u0113r\u0101 ra\u017eo\u0161anas ceha iesp\u0113jas: &#8220;Unlike APS, MRP does not consider routing times, resource capacity, or shifts.&#8221; (At\u0161\u0137ir\u012bb\u0101 no APS, MRP ne\u0146em v\u0113r\u0101 tehnolo\u0123isk\u0101 procesa laikus, resursu jaudu vai mai\u0146as.) Infor skaidri pasaka, kur\u0161 ir atbild\u012bgs par jaudas p\u0101rbaudi: &#8220;The responsibility rests with you, the planner, to make sure your shop floor has the available capacity to work the plan.&#8221; (Jums k\u0101 pl\u0101not\u0101jam ir j\u0101p\u0101rliecin\u0101s, ka ra\u017eo\u0161anas ceh\u0101 pietiek pieejam\u0101s jaudas pl\u0101na izpildei.) (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144401657.html\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. APS Planning: ierobe\u017eota jauda vai Infinite, pilns apr\u0113\u0137ins un Plan on Save<\/h3>\n\n\n<p>APS palai\u017e no formas <strong>APS Planning<\/strong> vien\u0101 no diviem re\u017e\u012bmiem:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Re\u017e\u012bms<\/th><th>Ko \u0146em v\u0113r\u0101<\/th><th>Pas\u016bt\u012bjumu termi\u0146u noteik\u0161ana<\/th><\/tr><\/thead><tbody><tr><td>APS (ierobe\u017eota jauda)<\/td><td>&#8220;whether the crew and machines are on-shift and not busy working on another demand&#8221; (vai brig\u0101de un iek\u0101rtas str\u0101d\u0101 mai\u0146\u0101 un nav aiz\u0146emtas ar cita piepras\u012bjuma izpildi)<\/td><td><strong>Get CTP<\/strong> form\u0101s Customer Order Lines un Job Orders<\/td><\/tr><tr><td>Infinite APS<\/td><td>Neierobe\u017eots uzdevumu skaits katram resursam mai\u0146as laik\u0101, izmantojot Move, Queue, Setup, Run un Finish laikus<\/td><td><strong>Get ATP<\/strong>, nevis Get CTP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Iz\u0161\u0137iro\u0161ais licences nosac\u012bjums: &#8220;If the APS module is unlicensed, APS Planning can only be run in Infinite mode.&#8221; (Ja APS modulim nav licences, APS Planning var palaist tikai Infinite re\u017e\u012bm\u0101.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">avots<\/a>)<\/p>\n\n\n<p>APS pl\u0101no katra piepras\u012bjuma izpildi &#8220;based on order priority and each demand&#8217;s due date.&#8221; (Atbilsto\u0161i pas\u016bt\u012bjuma priorit\u0101tei un katra piepras\u012bjuma izpildes termi\u0146am.) Tas pl\u0101no atpaka\u013c no izpildes termi\u0146a un, ja pas\u016bt\u012bjumu \u0161\u0101di nevar iek\u013caut pl\u0101n\u0101, pl\u0101no uz priek\u0161u no \u0161odienas. Priorit\u0101ti nosaka form\u0101 <strong>APS Order Priority<\/strong>: &#8220;Order types with lower priority numbers consume available capacity before order types with higher priority numbers.&#8221; (Pas\u016bt\u012bjumu veidi ar maz\u0101ku priorit\u0101tes skaitli izmanto pieejamo jaudu pirms pas\u016bt\u012bjumu veidiem ar liel\u0101ku priorit\u0101tes skaitli.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144404699.html\">avots<\/a>) Infor iesaka ilgu pl\u0101no\u0161anas periodu: &#8220;In most situations, you will run APS Planning for a long horizon, such as one or two months.&#8221; (Vairum\u0101 gad\u012bjumu APS Planning palai\u017e ilgam pl\u0101no\u0161anas periodam, piem\u0113ram, vienam vai diviem m\u0113ne\u0161iem.)<\/p>\n\n\n<p>Pilns apr\u0113\u0137ins s\u0101kas no nulles: &#8220;The system deletes all existing plan information and regenerates it using the latest data.&#8221; (Sist\u0113ma dz\u0113\u0161 visu eso\u0161o pl\u0101na inform\u0101ciju un izveido to no jauna, izmantojot jaun\u0101kos datus.) Infor iesaka to palaist p\u0113c grafika, piem\u0113ram, katru nakti. Starp pilnajiem apr\u0113\u0137iniem <strong>Plan on Save<\/strong> pievieno eso\u0161ajam pl\u0101nam tikko saglab\u0101tu klienta pas\u016bt\u012bjumu vai ra\u017eo\u0161anas uzdevumu. Tas izmanto tikai tos kr\u0101jumus, pieg\u0101des un jaudu, kas iepriek\u0161\u0113jos apr\u0113\u0137inos paliku\u0161i nepie\u0161\u0137irti. Pamatdatu izmai\u0146as un liel\u0101k\u0101 da\u013ca citu dar\u012bjumu gaida n\u0101kamo pilno apr\u0113\u0137inu. (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144402967.html\">avots<\/a>) Rezult\u0101ts ir pl\u0101notie pas\u016bt\u012bjumi un iz\u0146\u0113mumu zi\u0146ojumi, kurus p\u0101rskata form\u0101 <strong>Planning Detail APS<\/strong>. Pl\u0101notos pas\u016bt\u012bjumus apstiprina, p\u0101rv\u0113r\u0161ot tos par ra\u017eo\u0161anas pas\u016bt\u012bjumiem, iepirkuma pas\u016bt\u012bjumiem, piepras\u012bjumiem, ra\u017eo\u0161anas grafikiem vai p\u0101rvieto\u0161anas pas\u016bt\u012bjumiem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduler un Resource Gantt<\/h3>\n\n\n<p><strong>Scheduler<\/strong> ir atsevi\u0161\u0137a <strong>Scheduling<\/strong> darb\u012bba, kuru parasti ievieto Background Queue rind\u0101. Infor nor\u0101da, ka grafiku var apr\u0113\u0137in\u0101t &#8220;over any horizon&#8221; (jebkuram pl\u0101no\u0161anas periodam): mai\u0146ai, dienai, ned\u0113\u013cai vai m\u0113nesim. Praks\u0113 &#8220;you will usually run it for a one-day horizon, and you will usually run it each day.&#8221; (Parasti to palai\u017e vienas dienas pl\u0101no\u0161anas periodam un dara to katru dienu.) (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144439334.html\">avots<\/a>)<\/p>\n\n\n<p>Tas nosaka oper\u0101ciju s\u0101kuma un beigu laikus resursiem ar ierobe\u017eotu jaudu un iesaka oper\u0101ciju sec\u012bbu. Tas \u0146em v\u0113r\u0101 iek\u0101rtu sagatavo\u0161anai paredz\u0113t\u0101s resursu grupas un sagatavo\u0161anas laiku uzzi\u0146u tabulas, k\u0101 ar\u012b izdruk\u0101 <strong>Resource Group Dispatch List<\/strong> darba izpildei ra\u017eo\u0161anas ceh\u0101. Sec\u012bbas noteikumus, piem\u0113ram, Due Date vai Critical Ratio, nor\u0101da form\u0101 <strong>Global Priority Settings<\/strong>.<\/p>\n\n\n<p>Pl\u0101not\u0101ji kori\u0123\u0113 rezult\u0101tu form\u0101 <strong>Resource Gantt Chart &#8211; Scheduler<\/strong>. P\u0101rvietojot joslu, atveras <strong>Gantt Edit Operation<\/strong>, kur var main\u012bt oper\u0101cijas s\u0101kuma un beigu datumus, p\u0101rcelt to uz citu resursu vai fiks\u0113t ra\u017eo\u0161anas uzdevumu vai oper\u0101ciju. CSI p\u0101rbauda katru izmai\u0146u un br\u012bdina, ja t\u0101 p\u0101rk\u0101pj sec\u012bbas vai resursu noteikumus; pl\u0101not\u0101js var izmai\u0146u tom\u0113r apstiprin\u0101t vai atcelt. (<a href=\"https:\/\/docs.infor.com\/csi\/10.x\/en-us\/csbiolh\/inventory_user_cl_sl\/lsm1454144446183.html\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. K\u0101 APS un Scheduler mijiedarbojas<\/h3>\n\n\n<p>Ja form\u0101 <strong>Shop Floor Control Parameters<\/strong> ir iesl\u0113gts pl\u0101noto pas\u016bt\u012bjumu iestat\u012bjums, Scheduler uzskata APS pl\u0101notos pas\u016bt\u012bjumus par piepras\u012bjumiem, kas pat\u0113r\u0113 resursus. N\u0101kamaj\u0101 APS apr\u0113\u0137in\u0101 grafik\u0101 iek\u013caut\u0101s oper\u0101cijas tiek uzskat\u012btas par fiks\u0113t\u0101m. N\u0101kamais Scheduler apr\u0113\u0137ins t\u0101s atkal var p\u0101rvietot. Praks\u0113 cikls ir \u0161\u0101ds: palaist Scheduling, p\u0101rskat\u012bt Gantt diagrammu un noslodzes p\u0101rskatus, nov\u0113rst p\u0101rslodzi ar virsstund\u0101m, priorit\u0101\u0161u mai\u0146u vai manu\u0101liem labojumiem Gantt diagramm\u0101, atk\u0101rtot apr\u0113\u0137inu un izdruk\u0101t darbu izpildes sarakstu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-cloudsuite-industrial-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">CloudSuite Industrial iesp\u0113ju robe\u017eas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pl\u0101no\u0161anai ar APS, iev\u0113rojot pieejamo jaudu, ir vajadz\u012bga licence.<\/strong> Bez APS modu\u013ca APS Planning darbojas tikai Infinite re\u017e\u012bm\u0101, un Get CTP nav pieejams. Scheduler joproj\u0101m nosaka tuv\u0101k\u0101 laika oper\u0101ciju sec\u012bbu resursiem ar ierobe\u017eotu jaudu. (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Trauc\u0113jumu sekas nov\u0113r\u0161 pl\u0101not\u0101js.<\/strong> Plan on Save ievieto jaunu piepras\u012bjumu br\u012bvaj\u0101 jaud\u0101, ta\u010du nemaina jau iepl\u0101noto darbu sec\u012bbu. P\u0113c iek\u0101rtas boj\u0101juma p\u0101r\u0113jais grafiks paliek nemain\u012bgs, l\u012bdz pl\u0101not\u0101js kori\u0123\u0113 oper\u0101cijas Gantt diagramm\u0101 vai palai\u017e n\u0101kamo Scheduler apr\u0113\u0137inu.<\/li>\n\n\n<li><strong>Gantt diagramm\u0101 vienlaikus labo tikai vienu oper\u0101ciju.<\/strong> Gantt Edit Operation p\u0101rbauda katru p\u0101rvieto\u0161anu. Ja p\u0101rvieto\u0161ana izjauc oper\u0101ciju sec\u012bbu, CSI par to br\u012bdina, un pl\u0101not\u0101js vai nu apstiprina izmai\u0146u par sp\u012bti br\u012bdin\u0101jumam, vai manu\u0101li kori\u0123\u0113 turpm\u0101k\u0101s oper\u0101cijas.<\/li>\n\n\n<li><strong>Pag\u0101tn\u0113 neko nepl\u0101no.<\/strong> &#8220;APS never plans into the past (unlike MRP, which allows start dates in the past).&#8221; (APS nekad nepl\u0101no pag\u0101tn\u0113 \u2014 at\u0161\u0137ir\u012bb\u0101 no MRP, kas pie\u013cauj s\u0101kuma datumus pag\u0101tn\u0113.) Infor dokument\u0101cij\u0101 ar\u012b nor\u0101d\u012bts, ka APS ne vienm\u0113r p\u0101rce\u013c eso\u0161u ra\u017eo\u0161anas uzdevumu uz agr\u0101ku laiku, lai izpild\u012btu piepras\u012bjumu; t\u0101 viet\u0101 tas var izveidot jaunu pl\u0101noto pas\u016bt\u012bjumu ar agr\u0101ku izpildes termi\u0146u. (<a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Autom\u0101tiskas apvieno\u0161anas nav.<\/strong> &#8220;APS does not automatically combine planned orders for items that are needed within the same period of time.&#8221; (APS autom\u0101tiski neapvieno pl\u0101notos pas\u016bt\u012bjumus prec\u0113m, kas vajadz\u012bgas vien\u0101 un taj\u0101 pa\u0161\u0101 period\u0101.) To konfigur\u0113 form\u0101 Planning Parameters.<\/li>\n\n\n<li><strong>P\u0101rbaudes br\u012bd\u012b CTP datumam ir zem\u0101k\u0101 priorit\u0101te.<\/strong> Infor partneris Visual South skaidro, ka, \u0146emot v\u0113r\u0101 ierobe\u017eotu jaudu, CTP datums &#8220;is considered the lowest priority at the time you check the CTP date.&#8221; (CTP datuma p\u0101rbaudes br\u012bd\u012b tiek uzskat\u012bts par zem\u0101k\u0101s priorit\u0101tes datumu.) Pas\u016bt\u012bjuma priorit\u0101ti p\u0101rskata n\u0101kamaj\u0101 pilnaj\u0101 APS apr\u0113\u0137in\u0101. (<a href=\"https:\/\/www.visualsouth.com\/blog\/advanced-planning-and-scheduling\">avots<\/a>)<\/li>\n\n\n<li><strong>J\u0101saska\u0146o divu pl\u0101no\u0161anas meh\u0101nismu rezult\u0101ti.<\/strong> APS fiks\u0113 to, ko Scheduler ir iepl\u0101nojis, bet Scheduler to atkal var p\u0101rvietot. Pl\u0101not\u0101jiem j\u0101zina, kur\u0101 apr\u0113\u0137in\u0101 ieg\u016bts katrs datums.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-cloudsuite-industrial-s-native-scheduling-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar CloudSuite Industrial ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Palieciet pie APS un Scheduler, ja uz jums attiecas liel\u0101k\u0101 da\u013ca \u0161o nosac\u012bjumu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>APS modulis ir licenc\u0113ts un konfigur\u0113ts, un taj\u0101 ir prec\u012bzi tehnolo\u0123iskie procesi, resursu grupas, mai\u0146as un iek\u0101rtu sagatavo\u0161anas laiki.<\/li>\n\n\n<li>Starp Scheduler apr\u0113\u0137iniem ra\u017eo\u0161anas ceh\u0101 maz kas main\u0101s, un darbs notiek p\u0113c darbu izpildes saraksta.<\/li>\n\n\n<li>Pl\u0101not\u0101ji pie\u0146em Scheduler ieteikto sec\u012bbu un mai\u0146as laik\u0101 tikai retumis veic manu\u0101lus labojumus Gantt diagramm\u0101.<\/li>\n\n\n<li>Jaudas tr\u016bkums skar tikai vienu vai divas \u0161aur\u0101s vietas. Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146emiet v\u0113r\u0101 \u0161o \u0161auro vietu faktisko jaudu, bet p\u0101r\u0113jos resursus atst\u0101jiet ar neierobe\u017eotu jaudu \u2014 Visual South to raksturo k\u0101 izplat\u012btu pieeju.<\/li>\n\n\n<li>Galven\u0101 vajadz\u012bba ir noteikt apsol\u0101mos pas\u016bt\u012bjumu termi\u0146us, izmantojot Get CTP klienta pas\u016bt\u012bjuma rind\u0101s.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas raksturo j\u016bsu ra\u017eotni, vispirms piel\u0101gojiet ieb\u016bv\u0113to APS un Scheduler.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Apsveriet citus r\u012bkus papildus ieb\u016bv\u0113tajiem, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Jums nav APS licences, un pl\u0101no\u0161anas komanda ikdien\u0101 str\u0101d\u0101 izkl\u0101jlap\u0101s, papildinot Infinite re\u017e\u012bm\u0101 izveidotos pl\u0101nus.<\/li>\n\n\n<li>Grafiks main\u0101s vair\u0101kas reizes mai\u0146\u0101 steidzamu pas\u016bt\u012bjumu, iek\u0101rtu boj\u0101jumu, materi\u0101lu tr\u016bkuma vai darbinieku promb\u016btnes d\u0113\u013c. Pl\u0101not\u0101ji stund\u0101m ilgi manu\u0101li labo Gantt diagrammu un atk\u0101rto apr\u0113\u0137inus.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no t\u0101, kur\u0161 produkts ra\u017eots iepriek\u0161, un darbu sec\u012bba nosaka ra\u017eo\u0161anas caurlaidsp\u0113ju.<\/li>\n\n\n<li>Koplietojami instrumenti un ra\u017eo\u0161anas uzdevumi, kuriem vienlaikus vajadz\u012bgi vair\u0101ki operatori, ierobe\u017eo izlaidi tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>Operatoriem j\u0101sp\u0113j apstiprin\u0101t paveikto darbu ra\u017eo\u0161anas ceh\u0101, un pl\u0101nam attiec\u012bgi j\u0101main\u0101s.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana.<\/strong> Visam grafikam j\u0101atjaunin\u0101s, kad ra\u017eo\u0161ana virz\u0101s uz priek\u0161u vai main\u0101s pas\u016bt\u012bjumi, lai pl\u0101not\u0101jam neb\u016btu j\u0101p\u0101rvieto katra oper\u0101cija atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>CSI atbilsto\u0161s modelis.<\/strong> Resursi un resursu grupas, mai\u0146as un sv\u0113tku dienas, alternat\u012bvie resursi. R\u012bks, kas nolasa tikai darba centrus (SLWcs), neaptver faktisko grafiku sast\u0101d\u012b\u0161anas modeli.<\/li>\n\n\n<li><strong>Detaliz\u0113ta ierobe\u017eojumu uzskaite.<\/strong> No sec\u012bbas atkar\u012bgi p\u0101rregul\u0113\u0161anas laiki matric\u0101, instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu jaudu, vair\u0101ku operatoru brig\u0101des, k\u0101 ar\u012b alternat\u012bvas iek\u0101rtas un darbinieki.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas uzskaite.<\/strong> Sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti ra\u017eo\u0161anas uzdevumiem nepiecie\u0161amie materi\u0101li, kr\u0101jumi un iepirkuma pas\u016bt\u012bjumi.<\/li>\n\n\n<li><strong>Atgriezenisk\u0101 saite no ra\u017eo\u0161anas ceha.<\/strong> Darba izpildes apstiprin\u0101jumi, kas maina pl\u0101nu un tiek ierakst\u012bti atpaka\u013c sist\u0113m\u0101 k\u0101 ra\u017eo\u0161anas uzdevumu transakcijas.<\/li>\n\n\n<li><strong>Skaidrs integr\u0101cijas risin\u0101jums.<\/strong> Infor Cloud vid\u0113: Mongoose IDO REST API caur ION API Gateway, savienojumam izmantojot Automation licenci. ProductionOrder BOD zi\u0146ojumi signaliz\u0113 par izmai\u0146\u0101m, savuk\u0101rt grafiks tiek ierakst\u012bts atpaka\u013c sist\u0113m\u0101 ar IDO atjaunin\u0101jumiem.<\/li>\n\n\n<li><strong>Skaidrs atbild\u012bbas sadal\u012bjums.<\/strong> Izlemiet, kura sist\u0113ma nosaka detaliz\u0113to oper\u0101ciju sec\u012bbu, un izsl\u0113dziet \u0161os resursus no ieb\u016bv\u0113t\u0101 Scheduler un t\u0101 pl\u0101noto pas\u016bt\u012bjumu iestat\u012bjuma darb\u012bbas tv\u0113ruma.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar zemu risku.<\/strong> P\u0101rbaudiet risin\u0101jumu ar saviem datiem, pirms uz\u0146ematies saist\u012bbas integr\u0101cijas projekt\u0101.<\/li>\n\n<\/ol>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CSI ieb\u016bv\u0113tie APS un Scheduler<\/strong> \u013cauj noteikt pas\u016bt\u012bjumu izpildes termi\u0146us ar Get CTP un sast\u0101d\u012bt tuv\u0101k\u0101 laika oper\u0101ciju sec\u012bbu, ko manu\u0101li kori\u0123\u0113 Resource Gantt skat\u0101.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anas pane\u013ci ERP klient\u0101<\/strong> par\u0101da CSI datus cit\u0101 skat\u0101 komand\u0101m, kas pl\u0101no manu\u0101li. \u0160os risin\u0101jumus parasti uztur partneris.<\/li>\n\n\n<li><strong>Lieluz\u0146\u0113mumiem paredz\u0113tus APS risin\u0101jumus<\/strong> piesl\u0113dz ievie\u0161anas projekt\u0101, un ar tiem str\u0101d\u0101 atsevi\u0161\u0137a pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar darba izpildes uzskaiti ra\u017eo\u0161anas ceh\u0101<\/strong> \u2014 pie \u0161\u012bs grupas pieder SkyPlanner \u2014 autom\u0101tiski sast\u0101da katra resursa grafiku l\u012bdz\u0101s CSI. Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, tas past\u0101v\u012bgi p\u0101rpl\u0101no darbu un nodro\u0161ina operatoriem piek\u013cuvi grafikam.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS izmanto CSI jau eso\u0161os ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un resursus un izvieto tos interakt\u012bv\u0101 Gantt laika skal\u0101. Katram iepriek\u0161 min\u0113tajam punktam ir konkr\u0113ts risin\u0101jums:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Pa\u0161reiz\u0113j\u0101s iesp\u0113jas CSI<\/th><th>Ko nodro\u0161ina SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Ra\u017eo\u0161anas pl\u0101no\u0161anai ar APS, iev\u0113rojot pieejamo jaudu, vajadz\u012bga licence<\/td><td>Ra\u017eo\u0161anas pl\u0101no\u0161ana, iev\u0113rojot katra darba centra, mai\u0146as un darbinieka pieejamo jaudu un \u0146emot v\u0113r\u0101 promb\u016btni, no 199 \u20ac m\u0113nes\u012b ar 5 darba centriem<\/td><\/tr><tr><td>Pilni APS apr\u0113\u0137ini, Plan on Save un Scheduler palai\u0161ana p\u0113c piepras\u012bjuma<\/td><td>Arcturus da\u017eu sekun\u017eu laik\u0101 sast\u0101da ra\u017eo\u0161anas grafiku, iev\u0113rojot pieejamo jaudu. Autopilot autom\u0101tiski p\u0101rpl\u0101no darbu, kad situ\u0101cija ra\u017eo\u0161an\u0101 main\u0101s<\/td><\/tr><tr><td>Manu\u0101las izmai\u0146as Gantt diagramm\u0101, pa vienai oper\u0101cijai<\/td><td>Pl\u0101not\u0101ji p\u0101rvieto ra\u017eo\u0161anas uzdevumus Gantt diagramm\u0101, un pl\u0101no\u0161anas dzin\u0113js saglab\u0101 visa grafika saska\u0146ot\u012bbu. Bulldozer p\u0101rb\u012bda turpm\u0101kos ra\u017eo\u0161anas uzdevumus<\/td><\/tr><tr><td>Resursu grupas sagatavo\u0161anas darbiem un sagatavo\u0161anas laiku uzmekl\u0113\u0161anas tabulas<\/td><td>Sagatavo\u0161anas laiku matrica, kur\u0101 p\u0101rregul\u0113\u0161anas laiki starp produktiem ir asimetriski un atkar\u012bgi no sec\u012bbas, \u013cauj izv\u0113l\u0113ties sec\u012bbu ar vismaz\u0101ko sagatavo\u0161anas laiku<\/td><\/tr><tr><td>Resursu grupas katrai oper\u0101cijai<\/td><td>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, vair\u0101ki operatori vien\u0101 darba centr\u0101 vienlaikus, alternat\u012bvas iek\u0101rtas un darbinieki, kad prim\u0101rais resurss ir aiz\u0146emts<\/td><\/tr><tr><td>J\u0101saska\u0146o divu pl\u0101no\u0161anas dzin\u0113ju rezult\u0101ti<\/td><td>Vienots grafiks SkyPlanner p\u0101rzi\u0146\u0101 eso\u0161ajiem resursiem, pl\u0101notos oper\u0101ciju datumus ierakstot atpaka\u013c CSI<\/td><\/tr><tr><td>Apg\u0101des pl\u0101no\u0161ana ar MRP bez jaudas p\u0101rskata<\/td><td>Katram ra\u017eo\u0161anas uzdevumam p\u0101rbauda kr\u0101jumus un CSI iepirkuma pas\u016bt\u012bjumos paredz\u0113t\u0101s pieg\u0101des; pas\u016bt\u012bto materi\u0101lu uzskata par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101<\/td><\/tr><tr><td>Darbu izpildes saraksts ra\u017eo\u0161anas ceham<\/td><td>Operatori redz savu darbu rindu un re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Model\u012b tiek \u0146emtas v\u0113r\u0101 darba centru grupas un efektivit\u0101te, un vienu ra\u017eo\u0161anas uzdevumu var sadal\u012bt starp vair\u0101kiem darba centriem. Priorit\u0101tes nosaka ra\u017eo\u0161anas uzdevuma priorit\u0101te, pabeig\u0161anas datums, klienta priorit\u0101te, Fast Track un Dynamic Priorities.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> pl\u0101not\u0101ji p\u0113c katra iek\u0101rtas boj\u0101juma manu\u0101li p\u0101rveido dienas pl\u0101nu. Autopilot p\u0101rpl\u0101no visus atv\u0113rtos ra\u017eo\u0161anas uzdevumus, bet Running Time Lock saglab\u0101 ies\u0101kto darbu vietu grafik\u0101.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana nosaka j\u016bsu ra\u017eo\u0161anas jaudu. P\u0101reja no zil\u0101 uz sarkano var aiz\u0146emt 30 min\u016btes, bet no sarkan\u0101 uz zilo \u2014 60, un pl\u0101no\u0161anas dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko kop\u0113jo sagatavo\u0161anas laiku.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> izmantojat CSI bez APS licences un pl\u0101nojat izkl\u0101jlap\u0101s, balstoties uz Infinite re\u017e\u012bm\u0101 veidotajiem pl\u0101niem. MRP turpina pl\u0101not materi\u0101lus CSI, un ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma.<\/p>\n\n\n<p>SkyPlanner integr\u0101cija ar CloudSuite Industrial darbojas abos virzienos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eo\u0161anas uzdevumi, oper\u0101cijas, resursi un iepirkuma pas\u016bt\u012bjumi tiek sa\u0146emti caur IDO REST API.<\/li>\n\n\n<li>Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c ar IDO atjaunin\u0101jumiem, bet re\u0123istr\u0113tais darba laiks \u2014 k\u0101 SLJobtrans rindas, ko CSI iegr\u0101mato.<\/li>\n\n\n<li>T\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n\n<p>Ievadprocesa laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu CSI konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c t\u0101s palai\u0161anas darb\u0101. Integr\u0101cijas cenu apr\u0113\u0137ina iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un nor\u0101da kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Integr\u0101ciju var izveidot ar\u012b j\u016bsu Infor partneris vai izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>).<\/p>\n\n\n<p>30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav vajadz\u012bga, un darbam pietiek ar CSV vai Excel eksporta failiem. J\u016bs redzat savus ra\u017eo\u0161anas uzdevumus grafik\u0101, kas iev\u0113ro pieejamo jaudu, v\u0113l pirms k\u0101ds s\u0101k str\u0101d\u0101t ar IDO. Nor\u0113\u0137ini notiek reizi m\u0113nes\u012b, un abonementu var atcelt jebkur\u0101 laik\u0101.<\/p>\n\n\n<p>Pla\u0161\u0101ku p\u0101rskatu lasiet <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/\">Infor CloudSuite Industrial lap\u0101<\/a>, tehnisko risin\u0101jumu izp\u0113tiet <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\">integr\u0101cijas ce\u013cved\u012b<\/a> un <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a> vai <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a>. Lai kop\u0101 ar mums p\u0101rrun\u0101tu j\u016bsu CSI konfigur\u0101ciju, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties demonstr\u0101cijai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna uzdevumu rinda non\u0101k l\u012bdz l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Lasiet Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Vair\u0101ki 1 000<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu autom\u0101tiski iek\u013cauti grafik\u0101<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek autom\u0101tiski iek\u013cauti grafik\u0101, un visa organiz\u0101cija redz ra\u017eo\u0161anas situ\u0101ciju re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Lasiet Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SyteLine APS pl\u0101no ar ierobe\u017eotu vai neierobe\u017eotu jaudu?<\/summary>\n<p class=\"sp-faq__a\">Ab\u0113j\u0101di. APS re\u017e\u012bms iev\u0113ro jaudas ierobe\u017eojumus un p\u0101rbauda, vai darbinieki un iek\u0101rtas attiec\u012bgaj\u0101 mai\u0146\u0101 str\u0101d\u0101 un ir br\u012bvi. Infinite APS \u013cauj mai\u0146as laik\u0101 katram resursam pie\u0161\u0137irt neierobe\u017eotu uzdevumu skaitu. Bez APS licences darbojas tikai Infinite re\u017e\u012bms.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai CloudSuite Industrial ir Gantt diagramma?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Resource Gantt Chart &#8211; Scheduler r\u0101da iepl\u0101not\u0101s oper\u0101cijas pa resursiem. P\u0101rvietojot joslu, atveras Gantt Edit Operation, kur var main\u012bt datumus, nomain\u012bt resursu vai fiks\u0113t oper\u0101ciju. SkyPlanner Gantt diagramma at\u0161\u0137iras ar to, kas notiek t\u0101l\u0101k: pl\u0101no\u0161anas dzin\u0113js autom\u0101tiski p\u0101rpl\u0101no skartos ra\u017eo\u0161anas uzdevumus, nevis atst\u0101j turpm\u0101k\u0101s p\u0101rb\u012bdes pl\u0101not\u0101ja zi\u0146\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp APS un Scheduler sist\u0113m\u0101 CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">APS Planning pl\u0101no piepras\u012bjumu, apg\u0101di un jaudu ilg\u0101k\u0101 period\u0101, parasti vienam vai diviem m\u0113ne\u0161iem, izveido pl\u0101notos pas\u016bt\u012bjumus un ar Plan on Save iek\u013cauj jaunu piepras\u012bjumu. Scheduler nosaka tuv\u0101k\u0101 laika oper\u0101ciju sec\u012bbu resursiem ar ierobe\u017eotu jaudu, parasti vienas dienas ietvaros, un izdruk\u0101 Resource Group Dispatch List.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas pl\u0101no\u0161anai atbilsto\u0161i pieejamajai jaudai sist\u0113m\u0101 CloudSuite Industrial vajadz\u012bga papildu licence?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, lai APS Planning \u0146emtu v\u0113r\u0101 pieejamo jaudu un var\u0113tu izmantot Get CTP, ir vajadz\u012bgs APS modulis. SkyPlanner APS var sast\u0101d\u012bt ra\u017eo\u0161anas grafiku, iev\u0113rojot pieejamo jaudu un izmantojot CSI ra\u017eo\u0161anas uzdevumus un resursus, ar\u012b bez t\u0101. \u0100r\u0113jai lietotnei, kas piesl\u0113dzas caur IDO sl\u0101ni, tiek izmantota Automation licence.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner \u0146em v\u0113r\u0101 no sec\u012bbas atkar\u012bgu sagatavo\u0161anu, instrumentus un brig\u0101des?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Sagatavo\u0161anas laiku matric\u0101 ir nor\u0101d\u012bti asimetriski p\u0101rregul\u0113\u0161anas laiki starp produktiem. Instrumenti ir ierobe\u017eoti resursi, kurus nevar vienlaikus izmantot divos darba centros. Savuk\u0101rt ra\u017eo\u0161anas uzdevumiem, kuriem vajadz\u012bga brig\u0101de, vienam darba centram var pie\u0161\u0137irt vair\u0101kus operatorus. Kad prim\u0101rais resurss ir aiz\u0146emts, tiek izmantotas alternat\u012bvas iek\u0101rtas un darbinieki.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101p\u0113c CSI ne\u0146em v\u0113r\u0101 mana darba centra jaudu?<\/summary>\n<p class=\"sp-faq__a\">Jo CloudSuite Industrial darba centrus izmanto tikai izmaksu uzskaitei. Jaudu defin\u0113 resursiem, resursu grup\u0101m un mai\u0146\u0101m.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner APS var savienot ar CloudSuite Industrial vai SyteLine?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, abos virzienos. Ra\u017eo\u0161anas pas\u016bt\u012bjumi, oper\u0101cijas un resursi tiek sa\u0146emti caur IDO REST API; pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c ar IDO atjaunin\u0101jumiem, bet darba laiks \u2014 k\u0101 SLJobtrans rindas. Ievadprocesa laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c t\u0101s palai\u0161anas darb\u0101. Integr\u0101ciju var izveidot ar\u012b j\u016bsu Infor partneris vai izstr\u0101d\u0101t\u0101ji, izmantojot dokument\u0113to REST API. Skatiet <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\">integr\u0101cijas ce\u013cvedi<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS J\u0101. \u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu jaudai un darbinieku pieejam\u012bbai. Infor CloudSuite Industrial (agr\u0101k SyteLine, bie\u017ei saukts par CSI) nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai div\u0101s viet\u0101s: skyplanner.ai \u00b7 &#8230; <a title=\"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/\" aria-label=\"Read more about Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100886,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101303","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/razosanas-planosana\\\/\",\"name\":\"Vai CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS","og_description":"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/","name":"Vai CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"J\u0101: CloudSuite Industrial (SyteLine) ir licenc\u0113ts APS un Scheduler ar jaudas ierobe\u017eojumiem un Resource Gantt. Darb\u012bba, robe\u017eas un kad pievienot SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113tais APS, Scheduler un SkyPlanner APS J\u0101. \u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu jaudai un darbinieku pieejam\u012bbai. Infor CloudSuite Industrial (agr\u0101k SyteLine, bie\u017ei saukts par CSI) nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai div\u0101s viet\u0101s: skyplanner.ai \u00b7&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101303"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101303\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100886"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}