{"id":101273,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101273"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/","title":{"rendered":"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Epicor Kinetic<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Epicor Kinetic integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 ce\u013cved\u012b Epicor partneriem, IT komand\u0101m un tehniskajiem iepirkumu speci\u0101listiem par\u0101d\u012bts, k\u0101 izmantot SkyPlanner APS ra\u017eo\u0161anas pl\u0101no\u0161anai l\u012bdztekus Epicor Kinetic, sast\u0101dot grafiku atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Epicor Kinetic, izmantojot pa\u0161as Kinetic REST pakalpojumus:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas uzdevumus, oper\u0101cijas, resursus un iepirkuma pas\u016bt\u012bjumu pieg\u0101\u017eu grafika rindas.<\/li>\n\n\n<li>Pl\u0101notie oper\u0101ciju datumi tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas uzdevumos.<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek nos\u016bt\u012bti atpaka\u013c uz Kinetic darba laika uzskaiti.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu Kinetic iestat\u012bjumiem un nodro\u0161ina atbalstu ar\u012b p\u0113c palai\u0161anas. \u0160is ce\u013cvedis ir paredz\u0113ts partneriem un izstr\u0101d\u0101t\u0101jiem, kuri v\u0113las piedal\u012bties \u0161aj\u0101 darb\u0101 vai pa\u0161i veidot risin\u0101jumu, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Ja v\u0113l neesat izl\u0113mu\u0161i, vai j\u016bsu vajadz\u012bb\u0101m pietiek ar Kinetic ieb\u016bv\u0113to Scheduling and Resource Management vai APS moduli, vispirms izlasiet <a href=\"\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/\">Vai Epicor Kinetic nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"kinetic-s-integration-surface\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kinetic integr\u0101cijas saskarnes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">Epicor nor\u0101da<\/a>: &#8220;All Kinetic services, including business objects, processes, reports, BAQs, and Epicor Functions, are accessible through REST endpoints.&#8221; (Visi Kinetic pakalpojumi, tostarp biznesa objekti, procesi, p\u0101rskati, BAQ un Epicor Functions, ir pieejami, izmantojot REST galapunktus.) Ra\u017eo\u0161anas grafiku integr\u0101cijas pamat\u0101 ir \u010detras Epicor tehnolo\u0123ijas:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kinetic REST API v2 (OData v4).<\/strong> Biznesa objekti ir pieejami k\u0101 pakalpojumi ar nosaukumu <code>Erp.BO.&lt;Name&gt;Svc<\/code>. Parastais ce\u013c\u0161 ir <code>\/api\/v2\/odata\/{Company}\/Erp.BO.{Svc}\/{EntitySet}<\/code>. REST v1 joproj\u0101m ir pieejams, ta\u010du tas ir novecojis, t\u0101p\u0113c integr\u0101ciju veidojiet uz v2 b\u0101zes. Savai versijai pieejam\u0101s ent\u012btiju kopas un metodes p\u0101rbaudiet REST Help sada\u013c\u0101 <code>\/api\/help\/v2\/<\/code>.<\/li>\n\n\n<li><strong>Business Activity Queries (BAQ), izmantojot REST.<\/strong> BAQ ir pieejams adres\u0113 <code>\/api\/v2\/odata\/{Company}\/BaqSvc\/{BAQ}\/Data<\/code>. Tas ir praktisks veids, k\u0101 nolas\u012bt pl\u0101no\u0161anai vajadz\u012bgos datus, vien\u0101 izsaukum\u0101 apvienojot <code>JobHead<\/code>, <code>JobOper<\/code>, <code>JobMtl<\/code>, <code>PartWhse<\/code> un <code>PORel<\/code> (<a href=\"https:\/\/www.epiusers.help\/t\/rest-efx-baq-examples-from-a-python-script\/115273\">kopienas piem\u0113rs<\/a>).<\/li>\n\n\n<li><strong>Epicor Functions (EFx).<\/strong> Servera puses funkcijas, ko var izsaukt adres\u0113 <code>\/api\/v2\/efx\/{Company}\/{Library}\/{Function}<\/code>. <a href=\"https:\/\/www.epicor.com\/en-us\/products\/enterprise-resource-planning-erp\/kinetic\/tools-and-technology\/epicor-functions\/\">Epicor nor\u0101da<\/a>, ka t\u0101s \u201ccan be triggered from multiple entry points, including BPMs, REST services, schedules, and application events.\u201d (t\u0101s var aktiviz\u0113t vair\u0101kos veidos, tostarp ar BPM, REST pakalpojumiem, p\u0113c grafika vai lietotnes notikumu rezult\u0101t\u0101).<\/li>\n\n\n<li><strong>BPM direkt\u012bvas.<\/strong> Method un Data Directives nostr\u0101d\u0101, kad main\u0101s ra\u017eo\u0161anas uzdevums vai oper\u0101cija, un var izsaukt funkciju, kas nos\u016bta datus uz \u0101r\u0113jo sist\u0113mu.<\/li>\n\n<\/ol>\n\n\n<p>Failu apmai\u0146\u0101 DMT nodro\u0161ina import\u0113\u0161anu, savuk\u0101rt BAQ eksports \u2014 datu izguvi nos\u016bt\u012b\u0161anai. Epicor pied\u0101v\u0101 ar\u012b Epicor Automation Studio, ko <a href=\"https:\/\/www.epicor.com\/en\/solutions\/technology\/integration\/\">raksturo<\/a> k\u0101 &#8220;a low-code app for integration-led automations&#8221; (mazkoda lietotni automatiz\u0101cijai, kuras pamat\u0101 ir integr\u0101cijas). Neizmantojiet tie\u0161u piek\u013cuvi datub\u0101zei: REST, BAQ un funkcijas darbojas vien\u0101di gan lok\u0101l\u0101 vid\u0113, gan Kinetic Cloud.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access-scopes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u0101cija un piek\u013cuves tv\u0113rumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kinetic REST v2 kontrol\u0113 piek\u013cuvi katrai integr\u0101cijai atsevi\u0161\u0137i. Katra integr\u0101cija sa\u0146em <strong>API atsl\u0113gu<\/strong>, kas piesaist\u012bta <strong>piek\u013cuves tv\u0113rumam<\/strong> \u2014 at\u013cauto pakalpojumu un meto\u017eu sarakstam. <a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">Epicor to formul\u0113 \u0161\u0101di<\/a>: &#8220;API keys, access scopes, and standard authentication methods control which services and methods are available to each integration.&#8221; (API atsl\u0113gas, piek\u013cuves tv\u0113rumi un standarta autentifik\u0101cijas metodes nosaka, kuri pakalpojumi un metodes ir pieejami katrai integr\u0101cijai.)<\/p>\n\n\n<p>Papildus API atsl\u0113gai izsauc\u0113jam j\u0101pierakst\u0101s k\u0101 Kinetic lietot\u0101jam. Izmantojiet atsevi\u0161\u0137u integr\u0101cijas lietot\u0101ju, kuram pie\u0161\u0137irtas tikai integr\u0101cijai nepiecie\u0161am\u0101s ties\u012bbas. SkyPlanner pus\u0113 REST API autentifik\u0101cijai izmanto API mar\u0137ieri, ko nos\u016bta galven\u0113 Authorization-Token. API dokument\u0101cija ir pieejama Swagger\/OpenAPI form\u0101t\u0101.<\/p>\n\n\n<p>SkyPlanner integr\u0101cijas piek\u013cuves tv\u0113rum\u0101 parasti iek\u013cauj:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>Erp.BO.JobEntrySvc<\/code> (JobEntries, JobOpers, GetDatasetForTree)<\/li>\n\n\n<li><code>Erp.BO.ResourceGroupSvc<\/code> un <code>Erp.BO.ResourceSvc<\/code><\/li>\n\n\n<li><code>Erp.BO.CapabilitySvc<\/code><\/li>\n\n\n<li><code>Erp.BO.PartSvc<\/code> (Parts, PartWhses)<\/li>\n\n\n<li><code>Erp.BO.EmpBasicSvc<\/code><\/li>\n\n\n<li><code>Erp.BO.ScheduleEngineSvc<\/code> (GetNewParamsForJob, MoveJobItem, ChangeResource)<\/li>\n\n\n<li><code>Erp.BO.LaborSvc<\/code> (Labors, LaborDtls, StartActivity, EndActivityByEmp)<\/li>\n\n\n<li>BAQ vaic\u0101jumus un EFx bibliot\u0113kas, ko public\u0113jat integr\u0101cijai<\/li>\n\n<\/ul>\n\n\n<p>Ja metode nav iek\u013cauta piek\u013cuves tv\u0113rum\u0101, k\u013c\u016bda rodas izpildes, nevis iestat\u012b\u0161anas laik\u0101. Iek\u013caujiet sarakst\u0101 visas izsaucam\u0101s metodes, uzraugiet API atsl\u0113gas der\u012bguma termi\u0146u un iestatiet br\u012bdin\u0101jumus par HTTP k\u013c\u016bd\u0101m, ne tikai par tuk\u0161iem rezult\u0101tiem.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-bpm-directives-functions-or-pol\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Izmai\u0146u noteik\u0161ana: BPM direkt\u012bvas, funkcijas vai periodiska aptauja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Epicor dokument\u0101cij\u0101 nav aprakst\u012bts univers\u0101ls API izejo\u0161ajiem t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumiem, t\u0101p\u0113c izmai\u0146as no Kinetic non\u0101k SkyPlanner vien\u0101 no diviem veidiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Notikumu vad\u012bta datu nos\u016bt\u012b\u0161ana.<\/strong> BPM Data Directive objektam <code>JobHead<\/code> vai <code>JobOper<\/code> izsauc Epicor Function, kas nos\u016bta main\u012bt\u0101 ra\u017eo\u0161anas uzdevuma datus uz SkyPlanner REST API.<\/li>\n\n\n<li><strong>Periodiska aptauja.<\/strong> BAQ vaic\u0101jums ar filtru p\u0113c izmai\u0146u datuma tiek izpild\u012bts ik p\u0113c da\u017e\u0101m min\u016bt\u0113m vai reizi stund\u0101. \u0160\u0101du risin\u0101jumu ir vienk\u0101r\u0161\u0101k uztur\u0113t un atjaunot p\u0113c k\u013c\u016bmes.<\/li>\n\n<\/ul>\n\n\n<p>Pret\u0113j\u0101 virzien\u0101 SkyPlanner nos\u016bta statusa un grafika izmai\u0146as, izmantojot t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumus. J\u016bsu starpprogrammat\u016bra vai EFx galapunkts tos sa\u0146em un ieraksta datus Kinetic.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu sasaiste<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Kinetic ent\u012btija \/ pakalpojums<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td><code>Part<\/code>, <code>PartRev<\/code> (<code>Erp.BO.PartSvc\/Parts<\/code>)<\/td><td>Produkts<\/td><td>No Kinetic uz SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c grafika<\/td><\/tr><tr><td><code>PartMtl<\/code> (ra\u017eo\u0161anas metode), <code>JobMtl<\/code> (ra\u017eo\u0161anas uzdevums)<\/td><td>Produkta un pas\u016bt\u012bjuma materi\u0101li<\/td><td>No Kinetic uz SkyPlanner<\/td><td>Kop\u0101 ar ra\u017eo\u0161anas uzdevumu<\/td><\/tr><tr><td><code>PartOpr<\/code> (ra\u017eo\u0161anas metode), <code>JobOper<\/code> (ra\u017eo\u0161anas uzdevums)<\/td><td>Procesa so\u013ci<\/td><td>No Kinetic uz SkyPlanner<\/td><td>Kop\u0101 ar ra\u017eo\u0161anas uzdevumu<\/td><\/tr><tr><td><code>ResourceGroup<\/code>, <code>Resource<\/code> (<code>ResourceGroupSvc<\/code>, <code>ResourceSvc<\/code>)<\/td><td>Darba centru grupas, darba centri<\/td><td>No Kinetic uz SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de un izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td><code>Capability<\/code> (<code>CapabilitySvc<\/code>)<\/td><td>Alternat\u012bvie darba centri<\/td><td>No Kinetic uz SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de un izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Resursu un resursu grupu kalend\u0101ri<\/td><td>Mai\u0146as un iz\u0146\u0113mumi<\/td><td>No Kinetic uz SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam reizi ned\u0113\u013c\u0101 vai izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td><code>EmpBasic<\/code> (<code>EmpBasicSvc<\/code>)<\/td><td>Person\u0101ls<\/td><td>No Kinetic uz SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de un izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td><code>JobHead<\/code> (<code>JobEntrySvc\/JobEntries<\/code>)<\/td><td>Pas\u016bt\u012bjums<\/td><td>No Kinetic uz SkyPlanner<\/td><td>Re\u0101llaik\u0101, izmantojot BPM + EFx, vai ar periodiskiem BAQ piepras\u012bjumiem<\/td><\/tr><tr><td><code>PartWhse<\/code>, izmantojot BAQ<\/td><td>Kr\u0101jumi<\/td><td>No Kinetic uz SkyPlanner<\/td><td>P\u0113c grafika<\/td><\/tr><tr><td>Iepirkuma pas\u016bt\u012bjumi: <code>POHeader<\/code>, <code>PODetail<\/code>, <code>PORel<\/code>, izmantojot BAQ<\/td><td>Iepirkuma pas\u016bt\u012bjumi \/ gaid\u0101mie materi\u0101li (paredzamais pieg\u0101des datums)<\/td><td>No Kinetic uz SkyPlanner<\/td><td>P\u0113c grafika vai iepirkuma pas\u016bt\u012bjuma izmai\u0146u gad\u012bjum\u0101, izmantojot BPM + EFx<\/td><\/tr><tr><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td><code>JobOper<\/code> datumi, izmantojot <code>ScheduleEngineSvc<\/code> (MoveJobItem, ChangeResource) EFx funkcij\u0101<\/td><td>No SkyPlanner uz Kinetic<\/td><td>Grafika izmai\u0146u gad\u012bjum\u0101, izmantojot t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><tr><td>Darba laika ieraksti, daudzumi, oper\u0101ciju izpildes gaita, iemesli<\/td><td><code>Labors<\/code> \/ <code>LaborDtls<\/code>, izmantojot <code>LaborSvc<\/code>; iemeslu kodi, izmantojot <code>Erp.BO.ReasonSvc<\/code><\/td><td>No SkyPlanner uz Kinetic<\/td><td>Re\u0101llaik\u0101, izmantojot t\u012bmek\u013ca aiz\u0137eri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Epicor ra\u017eo\u0161anas pas\u016bt\u012bjumu sauc par <strong>Job<\/strong>. Katru <code>JobHead<\/code> sasaistiet ar vienu SkyPlanner pas\u016bt\u012bjumu un katru <code>JobOper<\/code> \u2014 ar procesa soli. K\u0101 \u0101r\u0113jo atsl\u0113gu saglab\u0101jiet ra\u017eo\u0161anas uzdevuma numuru, mont\u0101\u017eas mezgla k\u0101rtas numuru un oper\u0101cijas k\u0101rtas numuru.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Nolasiet datus par deta\u013c\u0101m, resursu grup\u0101m, resursiem, to iesp\u0113j\u0101m, kalend\u0101riem un darbiniekiem. No Kinetic resursiem izveidojiet SkyPlanner darba centrus, bet no resursu grup\u0101m \u2014 darba centru grupas. Lielus datu apjomus nolasiet pa lap\u0101m, izmantojot <code>$top<\/code> un <code>$skip<\/code>, vai ieg\u016bstiet tos ar BAQ.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nos\u016btiet izpildei nodotos un apstiprin\u0101tos ra\u017eo\u0161anas uzdevumus kop\u0101 ar to oper\u0101cij\u0101m un materi\u0101liem. Visu ra\u017eo\u0161anas uzdevuma koku ieg\u016bstiet ar <code>GetDatasetForTree<\/code> vai BAQ, nevis nolasiet katru ent\u012btiju atsevi\u0161\u0137i. Neapstiprin\u0101tos MRP ra\u017eo\u0161anas uzdevumus atst\u0101jiet Kinetic, l\u012bdz tie ir apstiprin\u0101ti. Kop\u0101 ar kr\u0101jumu nolas\u012b\u0161anu sinhroniz\u0113jiet atv\u0113rt\u0101s iepirkuma pas\u016bt\u012bjumu pieg\u0101des da\u013cas un to termi\u0146us. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem pieg\u0101des datum\u0101 un atjaunina kr\u0101jumus, kad iepirkuma pas\u016bt\u012bjumam ir iestat\u012bts statuss Delivered. T\u0101d\u0113j\u0101di, sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti gan kr\u0101jumi, gan gaid\u0101m\u0101s pieg\u0101des.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c Kinetic.<\/strong> SkyPlanner t\u012bmek\u013ca aiz\u0137ere nos\u016bta katras oper\u0101cijas pl\u0101noto s\u0101kumu, beigas un darba centru uz EFx galapunktu (<code>\/api\/v2\/efx\/{Company}\/{Library}\/{Function}<\/code>). Funkcija ieraksta datus, izmantojot Kinetic grafiku pl\u0101no\u0161anas dzini \u2014 to pa\u0161u biznesa objektu, ko izmanto Job Entry grafiku sast\u0101d\u012b\u0161ana un pl\u0101no\u0161anas pane\u013ci (<a href=\"https:\/\/www.epiusers.help\/t\/job-reschedule-function-via-api-via-excel\/132000\">kopienas piem\u0113rs<\/a>):<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><code>ScheduleEngine.GetNewParamsForJob<\/code> izveido grafiku pl\u0101no\u0161anas dzinim vajadz\u012bgo ra\u017eo\u0161anas uzdevuma datu kopu.<\/li>\n\n\n<li>Funkcija iestata ra\u017eo\u0161anas uzdevuma numuru, mont\u0101\u017eas mezgla un oper\u0101cijas k\u0101rtas numuru, k\u0101 ar\u012b pl\u0101noto s\u0101kuma datumu un laiku, p\u0113c tam izsauc <code>ScheduleEngine.MoveJobItem<\/code>.<\/li>\n\n\n<li>Ja SkyPlanner oper\u0101cijai ir pie\u0161\u0137\u012bris citu grupas resursu, <code>ScheduleEngine.ChangeResource<\/code> <a href=\"https:\/\/www.epiusers.help\/t\/rescheduling-to-resource-in-scheduleengine-adapter-e10-2-400\/58669\">p\u0101rvieto to uz \u0161o resursu<\/a>. Izmantojot tikai <code>MoveJobItem<\/code>, saglab\u0101jas grupas noklus\u0113juma resurss.<\/li>\n\n\n<li>Funkcija blo\u0137\u0113 ra\u017eo\u0161anas uzdevuma grafiku (<code>JobHead.SchedLocked<\/code>, opcija Lock sada\u013c\u0101 Job Entry), lai <a href=\"https:\/\/www.epiusers.help\/t\/adjust-global-scheduling-order-locked-column-vs-jobhead-schedlocked\/46672\">Global Scheduling saglab\u0101tu<\/a> SkyPlanner noteiktos datumus.<\/li>\n\n<\/ol>\n\n\n<p>Apvienojot \u0161os izsaukumus vien\u0101 Epicor Function, katra ra\u017eo\u0161anas uzdevuma dati tiek ierakst\u012bti atom\u0101ri, un varat pievienot savas valid\u0101cijas p\u0101rbaudes. Ja uz\u0146\u0113mums nev\u0113las izmantot piel\u0101gotu funkciju, to pa\u0161u sec\u012bbu var izpild\u012bt ar tie\u0161iem REST izsaukumiem uz <code>Erp.BO.ScheduleEngineSvc<\/code>. Nekad neierakstiet datus tie\u0161i <code>ResourceTimeUsed<\/code> vai <code>JobOper<\/code> datumu laukos: t\u0101 tiek apiets dzinis, un resursu pie\u0161\u0137\u012brumi pl\u0101no\u0161anas pane\u013cos vairs nesaskan ar grafiku.<\/p>\n\n\n<p><strong>4. Darba izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu SkyPlanner, izmantojot Mobile Confirmations, Production Timer vai Quick Log Mode. Katrs nosl\u0113gtais darba laika ieraksts ar <code>Erp.BO.LaborSvc<\/code> starpniec\u012bbu k\u013c\u016bst par darba uzskaites ierakstu Kinetic: pa\u0161reiz\u0113j\u0101s darb\u012bbas re\u0123istr\u0113\u0161anai izmanto <code>StartActivity<\/code> un <code>EndActivityByEmp<\/code>, bet ierakstiem p\u0113c darba izpildes \u2014 <code>Labors<\/code> ar <code>Update<\/code>. Ja uz\u0146\u0113mum\u0101 ir nepiecie\u0161ama apstiprin\u0101\u0161ana, iek\u013caujiet <code>submitForApproval<\/code> gan datu pl\u016bsm\u0101, gan piek\u013cuves ties\u012bbu tv\u0113rum\u0101.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Dokument\u0113jiet tos pirms palai\u0161anas:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Atbild\u012bg\u0101 sist\u0113ma<\/th><\/tr><\/thead><tbody><tr><td>Artikuli, tehnolo\u0123iskie procesi, resursi, kalend\u0101ri, ra\u017eo\u0161anas uzdevumi, MRP, kr\u0101jumi, pa\u0161izmaksas apr\u0113\u0137ini<\/td><td>Kinetic<\/td><\/tr><tr><td>Daudzumi un ra\u017eo\u0161anas uzdevumu statuss<\/td><td>Kinetic<\/td><\/tr><tr><td>Oper\u0101ciju sec\u012bba, pl\u0101notie datumi, resurss grupas ietvaros<\/td><td>SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>SkyPlanner pl\u0101notajiem ra\u017eo\u0161anas uzdevumiem ir iesl\u0113gta grafika blo\u0137\u0113\u0161ana, t\u0101p\u0113c Global Scheduling nemaina to datumus. Resursiem, kurus SkyPlanner nepl\u0101no, turpiniet izmantot Kinetic grafiku sast\u0101d\u012b\u0161anu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"keys-retries-and-reconciliation\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Atsl\u0113gas, atk\u0101rtoti m\u0113\u0123in\u0101jumi un datu saska\u0146o\u0161ana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Stabilas atsl\u0113gas.<\/strong> Katram ierakstam ir t\u0101 Kinetic atsl\u0113ga: oper\u0101cij\u0101m \u2014 ra\u017eo\u0161anas uzdevuma numurs, mont\u0101\u017eas mezgla k\u0101rtas numurs un oper\u0101cijas k\u0101rtas numurs; darba laika uzskaitei \u2014 galvenes un detaliz\u0113t\u0101 ieraksta atsl\u0113gas. Ierakst\u012b\u0161ana p\u0113c \u0161\u012bs atsl\u0113gas veido jaunu ierakstu vai atjaunina eso\u0161o, t\u0101p\u0113c atk\u0101rtots zi\u0146ojums atjaunina datus, nevis rada dublik\u0101tu.<\/li>\n\n\n<li><strong>Atk\u0101rtoti m\u0113\u0123in\u0101jumi.<\/strong> Ja ierakst\u012b\u0161ana k\u0101d\u0101 no sist\u0113m\u0101m neizdodas, t\u0101 tiek m\u0113\u0123in\u0101ta atk\u0101rtoti. Darba laiks tiek iegr\u0101matots vienu reizi katram SkyPlanner darba laika ieraksta ID, t\u0101p\u0113c atk\u0101rtots m\u0113\u0123in\u0101jums nevar uzskait\u012bt stundas divreiz.<\/li>\n\n\n<li><strong>Datu saska\u0146o\u0161ana.<\/strong> Periodiski izpild\u012bts BAQ vaic\u0101jums sal\u012bdzina atv\u0113rtos ra\u017eo\u0161anas uzdevumus, oper\u0101ciju statusus un daudzumus ar SkyPlanner datiem un nov\u0113r\u0161 neatbilst\u012bbas, piem\u0113ram, ja zi\u0146ojuma p\u0101rs\u016bt\u012b\u0161anas laik\u0101 ra\u017eo\u0161anas uzdevums Kinetic sist\u0113m\u0101 ir sl\u0113gts.<\/li>\n\n\n<li><strong>Daudzuma izmai\u0146as un atcel\u0161ana.<\/strong> Mainot daudzumu Kinetic sist\u0113m\u0101, tiek atjaunin\u0101ts pas\u016bt\u012bjums un t\u0101 procesa so\u013ci SkyPlanner sist\u0113m\u0101. Da\u013c\u0113ja izpilde samazina atliku\u0161o izpildes laiku. Kinetic sist\u0113m\u0101 sl\u0113gts vai dz\u0113sts ra\u017eo\u0161anas uzdevums n\u0101kamaj\u0101 sinhroniz\u0101cijas reiz\u0113 tiek iz\u0146emts no grafika.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas ietilpst projekt\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma. Kinetic projekt\u0101 ietilpst:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>30 dienu izm\u0113\u0123in\u0101jums ar ra\u017eo\u0161anas uzdevumu, oper\u0101ciju un resursu datiem, kas eksport\u0113ti CSV vai Excel form\u0101t\u0101, pirms jebk\u0101das izstr\u0101des.<\/li>\n\n\n<li>API atsl\u0113ga, piek\u013cuves tv\u0113rums, atsevi\u0161\u0137s integr\u0101cijas lietot\u0101js un BAQ vaic\u0101jumi, no kuriem integr\u0101cija nolasa datus.<\/li>\n\n\n<li>Pamatdatu atbilst\u012bbas noteik\u0161ana: sp\u0113ju, resursu grupu, resursu, kalend\u0101ru un darbinieku sasaiste ar SkyPlanner darbstacij\u0101m, grup\u0101m, mai\u0146\u0101m un person\u0101lu.<\/li>\n\n\n<li>Artikulu, tehnolo\u0123isko procesu (BOM un oper\u0101ciju) un resursu s\u0101kotn\u0113j\u0101 iel\u0101de.<\/li>\n\n\n<li>Ra\u017eo\u0161anas uzdevumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija (<code>PORel<\/code> pieg\u0101des termi\u0146i), k\u0101 ar\u012b <code>PartWhse<\/code> kr\u0101jumu dati.<\/li>\n\n\n<li>Pl\u0101noto oper\u0101ciju datumu ierakst\u012b\u0161ana atpaka\u013c Kinetic ar <code>ScheduleEngineSvc<\/code> (MoveJobItem, ChangeResource) Epicor Function ietvaros, blo\u0137\u0113jot ra\u017eo\u0161anas uzdevuma grafiku.<\/li>\n\n\n<li>Ra\u017eotn\u0113 sniegto darba izpildes apstiprin\u0101jumu nos\u016bt\u012b\u0161ana darba uzskaites ierakstu veid\u0101, izmantojot <code>LaborSvc<\/code>.<\/li>\n\n\n<li>Test\u0113\u0161ana paral\u0113li pa\u0161reiz\u0113jam Kinetic grafikam un p\u0113c tam palai\u0161ana.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"kinetic-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu Kinetic sist\u0113m\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pl\u0101no\u0161anai jaudas ierobe\u017eojumi j\u0101iestata vair\u0101k\u0101s viet\u0101s.<\/strong> <a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">Izv\u0113les r\u016bti\u0146a Finite<\/a> atrodas resursa iestat\u012bjumos. Horizontu, kur\u0101 pl\u0101nojot \u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus, nosaka resursa un resursu grupas iestat\u012bjumos, k\u0101 ar\u012b Site Maintenance ciln\u0113 Planning. Katram grafiku sast\u0101d\u012b\u0161anas r\u012bkam ir ar\u012b sava izv\u0113les r\u016bti\u0146a Finite. Pirms import\u0113jat Kinetic datumus k\u0101 atskaites punktu, p\u0101rbaudiet, vai tie visp\u0101r ir pl\u0101noti, \u0146emot v\u0113r\u0101 jaudas ierobe\u017eojumus.<\/li>\n\n\n<li><strong>Capability vai Resource Group un Resource.<\/strong> Ja oper\u0101cijai ir nor\u0101d\u012bta sp\u0113ja, t\u0101s resursu grupas un resursa lauki paliek tuk\u0161i. Pret\u0113j\u0101 gad\u012bjum\u0101 tiek nor\u0101d\u012bta resursu grupa, da\u017ek\u0101rt ar\u012b konkr\u0113ts resurss. Integr\u0101cijai j\u0101nolasa \u0161ie pa\u0161i lauki un pa\u0161ai j\u0101nosaka, kuri resursi atbilst nor\u0101d\u012btajai sp\u0113jai.<\/li>\n\n\n<li><strong>Kalend\u0101ros atspogu\u013cojas iepriek\u0161\u0113jie piel\u0101gojumi.<\/strong> Resursu kalend\u0101ri un darbinieku skaits bie\u017ei ir piel\u0101goti, lai ieb\u016bv\u0113tais pl\u0101not\u0101js dotu vajadz\u012bgo rezult\u0101tu. P\u0101rnesiet uz SkyPlanner faktiskos mai\u0146u grafikus un re\u0101los darbiniekus un \u013caujiet tam pie\u0161\u0137irt vair\u0101kus operatorus ra\u017eo\u0161anas uzdevumam, kuram vajadz\u012bga brig\u0101de.<\/li>\n\n\n<li><strong>Datumi j\u0101maina ar dzini, nevis CRUD.<\/strong> Vienk\u0101r\u0161i atjauninot oper\u0101ciju datumus ar <code>JobEntrySvc<\/code>, grafiks netiek p\u0101rpl\u0101nots; k\u0101d\u0101 <a href=\"https:\/\/www.epiusers.help\/t\/epicorrest-api-swagger-issue-with-reschedulign-a-job-with-a-rest-call\/107778\">foruma ierakst\u0101<\/a> aprakst\u012bts, ka <code>JobScheduling<\/code> izsaukums atgrie\u017e 200 OK, ta\u010du ra\u017eo\u0161anas uzdevums paliek nemain\u012bts. Izmantojiet iepriek\u0161 aprakst\u012bto <code>ScheduleEngine<\/code> izsaukumu sec\u012bbu.<\/li>\n\n\n<li><strong>Datu uztur\u0113\u0161anas discipl\u012bna nosaka rezult\u0101tu.<\/strong> P\u0101r\u0101k optimistiski oper\u0101ciju laiki, nenor\u0101d\u012bti iepirkumu pieg\u0101des termi\u0146i, atv\u0113rti atst\u0101ti ra\u017eo\u0161anas uzdevumi un kalend\u0101ros neiek\u013cautas d\u012bkst\u0101ves pasliktina jebkuru grafiku \u2014 gan ieb\u016bv\u0113t\u0101, gan \u0101r\u0113j\u0101 sist\u0113m\u0101 veidotu (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-kinetic-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 Kinetic integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katr\u0101 ra\u017eotn\u0113 Kinetic izmanto at\u0161\u0137ir\u012bgi. Tehnolo\u0123iskie procesi ar sp\u0113ju pras\u012bb\u0101m, resursu grupu kalend\u0101ri, BAQ uzb\u016bve, BPM direkt\u012bvas un konkr\u0113t\u0101s versijas datu atpaka\u013cierakstes metodes da\u017e\u0101d\u0101s ra\u017eotn\u0113s at\u0161\u0137iras. Pareizi iestat\u012bjumi nosaka, vai pl\u0101not\u0101ji grafikam uztic\u0113sies vai to p\u0101rstr\u0101d\u0101s.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong> Komanda nosaka j\u016bsu resursu, ra\u017eo\u0161anas uzdevumu un iepirkuma pas\u016bt\u012bjumu pieg\u0101\u017eu grafika rindu atbilst\u012bbu un iestata BAQ datu nolas\u012b\u0161anu, BPM trigerus un atpaka\u013cierakstes funkciju. T\u0101 savieno SkyPlanner REST API un t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumus ar Kinetic REST v2. Atbalsts turpin\u0101s ar\u012b tad, kad main\u0101s j\u016bsu BAQ, BPM vai Kinetic versija.<\/li>\n\n\n<li><strong>J\u016bsu Epicor partneris.<\/strong> Partneri, kuri jau izstr\u0101d\u0101 BAQ, BPM un Epicor Functions, var izmantot to pa\u0161u dokument\u0113to SkyPlanner REST API, kas \u013cauj nolas\u012bt un ierakst\u012bt pas\u016bt\u012bjumus, produktus, materi\u0101lus, procesa so\u013cus un darba laika ierakstus.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji.<\/strong> Uz\u0146\u0113muma komandas ar Kinetic REST pieredzi var veidot integr\u0101ciju tie\u0161i vai izmantot Automation Studio, ja tas ir j\u016bsu r\u012bc\u012bb\u0101. Lai s\u0101ktu, pietiek ar SkyPlanner API atsl\u0113gu (<a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bba<\/a>), un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. Produkta dokument\u0101cija ir publiski pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cijas sada\u013c\u0101<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Tas pats API un t\u012bmek\u013ca aiz\u0137eres pazi\u0146ojumu risin\u0101jums jau darbojas ra\u017eo\u0161an\u0101 ar cit\u0101m ERP sist\u0113m\u0101m, piem\u0113ram, uz\u0146\u0113mum\u0101 <a href=\"\/lv\/customers\/utu\/\">UTU<\/a>. Uz\u0146\u0113mum\u0101 <a href=\"\/lv\/customers\/laboratory-allied\/\">Laboratory &amp; Allied<\/a> iek\u0161\u0113j\u0101 IT komanda ar SkyPlanner pal\u012bdz\u012bbu liel\u0101koties pati izveidoja SAP Business One integr\u0101ciju.<\/p>\n\n\n<p>Visi varianti s\u0101kas vien\u0101di: vispirms izmantojiet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a> ar CSV importu, p\u0101rbaudiet grafiku un p\u0113c tam veidojiet integr\u0101ciju. Cena ir <a href=\"\/lv\/cenu-noteiksana\/\">no 199 \u20ac m\u0113nes\u012b<\/a> par 5 darbstacij\u0101m, ar ikm\u0113ne\u0161a nor\u0113\u0137iniem un iesp\u0113ju atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-this-setup-instead-of-licensing-kinetic-aps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c izv\u0113l\u0113ties \u0161o risin\u0101jumu, nevis Kinetic APS licenci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tehniskajiem iepirkumu speci\u0101listiem j\u0101sal\u012bdzina projekta apjoms un laiks l\u012bdz ieguvumam. Izv\u0113lieties SkyPlanner, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Integr\u0101cijas apjomam j\u0101paliek nelielam.<\/strong> Uz \u0101r\u0113jo sist\u0113mu tiek nos\u016bt\u012bti ra\u017eo\u0161anas uzdevumi, oper\u0101cijas, resursi un materi\u0101li. Atpaka\u013c tiek sa\u0146emti pl\u0101notie datumi un darba laika dati. Iepriek\u0161 aprakst\u012bt\u0101 datu sasaiste aptver visu integr\u0101cijas apjomu.<\/li>\n\n\n<li><strong>Grafikam j\u0101rea\u0123\u0113 starp pl\u0101no\u0161anas reiz\u0113m.<\/strong> Arcturus da\u017eu sekun\u017eu laik\u0101 veic ra\u017eo\u0161anas pl\u0101no\u0161anu un izveido grafiku atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai, un Autopilot to autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. SkyPlanner ar t\u012bmek\u013ca aiz\u0137er\u0113m nos\u016bta pazi\u0146ojumu par katru izmai\u0146u, t\u0101p\u0113c Kinetic sa\u0146em jaunos datumus bez Global Scheduling palai\u0161anas.<\/li>\n\n\n<li><strong>Ra\u017eotnes atskait\u0113m j\u0101papildina Kinetic darba uzskaite.<\/strong> Operatori re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode, un datu nos\u016bt\u012b\u0161ana ar <code>LaborSvc<\/code> ir t\u0101s pa\u0161as integr\u0101cijas da\u013ca.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumu s\u0101kums ir atkar\u012bgs no iepirktajiem materi\u0101liem.<\/strong> Grafika sast\u0101d\u012b\u0161an\u0101 tiek \u0146emti v\u0113r\u0101 gan kr\u0101jumi, gan atv\u0113rt\u0101s iepirkuma pas\u016bt\u012bjumu pieg\u0101\u017eu grafika rindas, lai oper\u0101cijas s\u0101ktos tad, kad materi\u0101li patie\u0161\u0101m gaid\u0101mi.<\/li>\n\n\n<li><strong>Jums j\u0101\u0146em v\u0113r\u0101 vair\u0101k nek\u0101 divi ierobe\u017eojumi.<\/strong> Vair\u0101ki operatori vienam ra\u017eo\u0161anas uzdevumam, instrumenti, kas nav pieejami, kam\u0113r tos izmanto citur, k\u0101 ar\u012b alternat\u012bvas darbstacijas un darbinieki \u2014 tas viss ir iek\u013cauts vien\u0101 grafik\u0101. P\u0101rregul\u0113\u0161anas laiku matrica nosaka p\u0101rregul\u0113\u0161anas sec\u012bbu, un integr\u0101cija ieraksta rezult\u0101tu atpaka\u013c.<\/li>\n\n\n<li><strong>V\u0113laties p\u0101rliecin\u0101ties pirms projekta un ieviest \u0101tri.<\/strong> Izm\u0113\u0123in\u0101jum\u0101 varat izmantot BAQ eksportu, lai redz\u0113tu savu grafiku l\u012bdz 20 darbstacij\u0101m. Kred\u012btkarte nav nepiecie\u0161ama. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p>Apskatiet <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a>, lasiet <a href=\"\/lv\/klientu-stasti\/\">klientu atsauksmes<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties demonstr\u0101cijai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosada\u013c\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales pane\u013ci un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 ik ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir palielin\u0101jusies par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir palielin\u0101jusies par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana vis\u0101m darba viet\u0101m aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski grafik\u0101 iek\u013cautu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par ra\u017eo\u0161anas jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek autom\u0101tiski iek\u013cauti grafik\u0101, un vis\u0101 uz\u0146\u0113mum\u0101 ir pieejams p\u0101rskats par ra\u017eo\u0161anu re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedzis 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS tiek integr\u0113ts ar Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Integr\u0101cija darbojas abos virzienos, izmantojot Kinetic REST v2, BAQ un Epicor Functions. SkyPlanner sa\u0146em ra\u017eo\u0161anas uzdevumus, oper\u0101cijas, resursus un iepirkuma pas\u016bt\u012bjumu pieg\u0101des da\u013cas. Pl\u0101notie oper\u0101ciju datumi un darbasp\u0113ka dati tiek nos\u016bt\u012bti atpaka\u013c, savuk\u0101rt t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Kinetic konfigur\u0101cijai, un j\u016bsu Epicor partneris vai izstr\u0101d\u0101t\u0101ji var izmantot to pa\u0161u REST API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuru Kinetic API izmantot, integr\u0113jot ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas sist\u0113mu?<\/summary>\n<p class=\"sp-faq__a\">REST v2. Ra\u017eo\u0161anas uzdevumiem un oper\u0101cij\u0101m izmantojiet <code>JobEntrySvc<\/code>, jaudas datiem \u2014 <code>ResourceGroupSvc<\/code>, <code>ResourceSvc<\/code> un <code>CapabilitySvc<\/code>, lielu datu apjomu nolas\u012b\u0161anai \u2014 BAQ, bet darba uzskaites datu nos\u016bt\u012b\u0161anai atpaka\u013c \u2014 <code>LaborSvc<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Epicor Kinetic atbalsta t\u012bmek\u013ca aiz\u0137eres?<\/summary>\n<p class=\"sp-faq__a\">Ne k\u0101 visp\u0101r\u0113jas noz\u012bmes API izejo\u0161aj\u0101m t\u012bmek\u013ca aiz\u0137er\u0113m. Notikumu izrais\u012bta datu nos\u016bt\u012b\u0161ana notiek ar BPM direkt\u012bv\u0101m, kas izsauc Epicor Functions. Alternat\u012bva ir regul\u0101ri izpild\u012bt BAQ vaic\u0101jumu p\u0113c grafika.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner var ierakst\u012bt pl\u0101notos datumus atpaka\u013c Kinetic ra\u017eo\u0161anas uzdevumos?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Epicor Function izsauc <code>ScheduleEngine.GetNewParamsForJob<\/code>, katrai oper\u0101cijai \u2014 <code>MoveJobItem<\/code>, bet resursa mai\u0146as gad\u012bjum\u0101 \u2014 <code>ChangeResource<\/code>. P\u0113c tam t\u0101 blo\u0137\u0113 ra\u017eo\u0161anas uzdevuma grafiku, lai Global Scheduling saglab\u0101tu datumus. Tos pa\u0161us izsaukumus var veikt ar\u012b tie\u0161i ar REST, izmantojot <code>Erp.BO.ScheduleEngineSvc<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas uztur integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas, ar\u012b tad, ja main\u0101s j\u016bsu BAQ, BPM vai Kinetic versija.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar lok\u0101li izvietotu Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. REST API, BAQ, BPM un Epicor Functions darbojas vien\u0101di gan lok\u0101l\u0101 vid\u0113, gan Kinetic m\u0101kon\u012b, t\u0101p\u0113c viens integr\u0101cijas risin\u0101jums der abiem izvietojuma veidiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgs laiks vajadz\u012bgs SkyPlanner APS un Epicor Kinetic integr\u0101cijai?<\/summary>\n<p class=\"sp-faq__a\">Integr\u0101ciju parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas s\u0101kuma. Darbu apjoms ietver iepriek\u0161 min\u0113to datu lauku atbilst\u012bbas noteik\u0161anu, s\u0101kotn\u0113jo datu iel\u0101di, ra\u017eo\u0161anas uzdevumu un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101ciju, grafika datu ierakst\u012b\u0161anu atpaka\u013c un darbasp\u0113ka datu re\u0123istr\u0113\u0161anu. To visu p\u0101rbauda paral\u0113li darbam p\u0113c j\u016bsu pa\u0161reiz\u0113j\u0101 ra\u017eo\u0161anas grafika.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Epicor Kinetic Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b Epicor partneriem, IT komand\u0101m un tehniskajiem iepirkumu speci\u0101listiem par\u0101d\u012bts, k\u0101 izmantot SkyPlanner APS ra\u017eo\u0161anas pl\u0101no\u0161anai l\u012bdztekus Epicor Kinetic, sast\u0101dot grafiku atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Epicor Kinetic, izmantojot pa\u0161as Kinetic REST &#8230; <a title=\"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/\" aria-label=\"Read more about Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100856,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101273","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Epicor Kinetic: grafiku integr\u0101cijas ce\u013cvedis | SkyPlanner<\/title>\n<meta name=\"description\" content=\"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/integracijas-celvedis\\\/\",\"name\":\"Epicor Kinetic: grafiku integr\u0101cijas ce\u013cvedis | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Epicor Kinetic: grafiku integr\u0101cijas ce\u013cvedis | SkyPlanner","description":"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/","name":"Epicor Kinetic: grafiku integr\u0101cijas ce\u013cvedis | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Savienojiet Epicor Kinetic ar SkyPlanner APS: REST v2, BAQ, JobEntrySvc dati iek\u0161\u0101; ScheduleEngineSvc datumi, LaborSvc darba laiks atpaka\u013c; lauku sasaiste un riski.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/"},{"@type":"ListItem","position":5,"name":"Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Epicor Kinetic Epicor Kinetic integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b Epicor partneriem, IT komand\u0101m un tehniskajiem iepirkumu speci\u0101listiem par\u0101d\u012bts, k\u0101 izmantot SkyPlanner APS ra\u017eo\u0161anas pl\u0101no\u0161anai l\u012bdztekus Epicor Kinetic, sast\u0101dot grafiku atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai jaudai. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Epicor Kinetic, izmantojot pa\u0161as Kinetic REST&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101273"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101273\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100856"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}