{"id":101244,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101244"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/","title":{"rendered":"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Epicor Kinetic<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">J\u0101, Epicor Kinetic ir ieb\u016bv\u0113ta ra\u017eo\u0161anas pl\u0101no\u0161ana. Ar ra\u017eo\u0161anas pl\u0101no\u0161anu \u0161eit saprot grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101li pieejamajai iek\u0101rtu un darbinieku jaudai. Modulis Scheduling and Resource Management veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai. Atsevi\u0161\u0137ais modulis Advanced Planning and Scheduling (APS) \u013cauj \u0146emt v\u0113r\u0101 vair\u0101k nek\u0101 divus ierobe\u017eojumus, pl\u0101not p\u0113c resursu sp\u0113j\u0101m un izmantot optimiz\u0101cijas noteikumus.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ikdienas lieto\u0161an\u0101 ir tr\u012bs ierobe\u017eojumi. Jaudas ierobe\u017eojumu iev\u0113ro\u0161ana j\u0101iesl\u0113dz vair\u0101k\u0101s viet\u0101s, pamatmodulis katrai oper\u0101cijai \u0146em v\u0113r\u0101 ne vair\u0101k k\u0101 divus ierobe\u017eojumus, bet p\u0101rregul\u0113\u0161anas optimiz\u0101cija ir pieejama APS modul\u012b.<\/p>\n\n\n<p>SkyPlanner APS darbojas l\u012bdz\u0101s Kinetic un autom\u0101tiski iev\u0113ro katra darba centra jaudas ierobe\u017eojumus bez APS licences. Sast\u0101dot grafiku, tas \u0146em v\u0113r\u0101 operatoru brig\u0101des, koplietojamos instrumentus, noliktav\u0101 eso\u0161os materi\u0101lus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem, k\u0101 ar\u012b p\u0101rregul\u0113\u0161anu, kuras ilgums atkar\u012bgs no darbu sec\u012bbas. Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-epicor-kinetic-schedules-capacity-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Epicor Kinetic pl\u0101no jaudu: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kinetic ir tr\u012bs pl\u0101no\u0161anas l\u012bme\u0146i. <strong>MRP<\/strong> (ietverot Forecasting un MPS) pl\u0101no materi\u0101lu vajadz\u012bbas. <strong>Scheduling and Resource Management<\/strong> ir atsevi\u0161\u0137s modulis, kas sast\u0101da ra\u017eo\u0161anas uzdevumu grafikus atbilsto\u0161i resursiem. <strong>APS<\/strong> ir v\u0113l viens modulis, ko Epicor raksturo k\u0101 &#8220;an extension to Scheduling&#8221; (Scheduling papla\u0161in\u0101jumu). (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Epicor bro\u0161\u016bra<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Ra\u017eo\u0161anas uzdevumi un ra\u017eo\u0161anas metode<\/h3>\n\n\n<p>Epicor ra\u017eo\u0161anas pas\u016bt\u012bjumu sauc par <strong>Job<\/strong>. Katra ra\u017eo\u0161anas uzdevuma pamat\u0101 ir ra\u017eo\u0161anas metode: materi\u0101lu specifik\u0101cija (BOM) un tehnolo\u0123isk\u0101 procesa oper\u0101ciju saraksts. Katrai oper\u0101cijai ir nor\u0101d\u012bta <strong>Capability<\/strong>, <strong>Resource Group<\/strong> vai <strong>Resource<\/strong>. Epicor User Help forum\u0101 pieredz\u0113ju\u0161i lietot\u0101ji ir vienispr\u0101tis: izv\u0113loties Capability, abas p\u0101r\u0113j\u0101s iesp\u0113jas tiek izsl\u0113gtas, ta\u010du grup\u0101 joproj\u0101m var nor\u0101d\u012bt konkr\u0113tu resursu. Epicor bro\u0161\u016br\u0101 <strong>Automated Scheduling by Capability<\/strong>, kur pl\u0101no\u0161anas algoritms pats izv\u0113las konkr\u0113to resursu, ir nor\u0101d\u012bta k\u0101 APS funkcija. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forums<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Ierobe\u017eota vai neierobe\u017eota jauda: katram resursam atsevi\u0161\u0137i<\/h3>\n\n\n<p>Jaudu nosaka resursiem \u2014 iek\u0101rt\u0101m, cilv\u0113kiem un instrumentiem \u2014, kas apvienoti resursu grup\u0101s. Grup\u0101 var b\u016bt jebkur\u0161 resursu skaits, un sist\u0113ma pie\u0161\u0137ir konkr\u0113to resursu atbilsto\u0161i t\u0101 pieejam\u012bbai. Katram resursam ir savs kalend\u0101rs, jauda, gaid\u012b\u0161anas laiks rind\u0101 un p\u0101rvieto\u0161anas laiks.<\/p>\n\n\n<p>Katram resursam atsevi\u0161\u0137i izv\u0113las, vai t\u0101 jauda ir ierobe\u017eota. Mekl\u0113jot probl\u0113mas c\u0113loni, forum\u0101 vispirms iesaka p\u0101rbaud\u012bt resursa izv\u0113les r\u016bti\u0146u &#8220;Finite&#8221;. Epicor bro\u0161\u016br\u0101 teikts: &#8220;Define each resource with either finite or infinite capacity. When a piece of the schedule is moved, the resource is rescheduled according to its type.&#8221; (Katram resursam nor\u0101diet ierobe\u017eotu vai neierobe\u017eotu jaudu. P\u0101rvietojot grafika da\u013cu, resursu p\u0101rpl\u0101no atbilsto\u0161i t\u0101 tipam.) T\u0101 Kinetic atbalsta izplat\u012bto jaukto pieeju: jaudas ierobe\u017eojumus iev\u0113ro \u0161auraj\u0101s viet\u0101s, bet p\u0101r\u0113jiem resursiem jaudu uzskata par neierobe\u017eotu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Ra\u017eo\u0161anas pl\u0101no\u0161anas horizonts<\/h3>\n\n\n<p><strong>Finite Load Horizon<\/strong> ne\u013cauj kori\u0123\u0113t grafiku atbilsto\u0161i jaudas ierobe\u017eojumiem p\u0101r\u0101k t\u0101l\u0101 n\u0101kotn\u0113. Epicor to raksturo k\u0101 laika robe\u017eu jeb beigu datumu &#8220;for finitely scheduling load on the resource.&#8221; (resursa slodzes pl\u0101no\u0161anai, iev\u0113rojot t\u0101 faktisko jaudu). Aiz \u0161\u012bs robe\u017eas oper\u0101cijas pl\u0101no, neierobe\u017eojot jaudu. Foruma lietot\u0101ji iestata \u0161o horizontu resursam, resursu grupai un <strong>Site Maintenance<\/strong> ciln\u0113 <strong>Planning<\/strong>.<\/p>\n\n\n<p>Turkl\u0101t katram grafiku sast\u0101d\u012b\u0161anas r\u012bkam ir sava izv\u0113les r\u016bti\u0146a jaudas ierobe\u017eojumu iev\u0113ro\u0161anai. Ja to neiesl\u0113dz kaut vien\u0101 l\u012bmen\u012b, grafiks tiek sast\u0101d\u012bts, neierobe\u017eojot jaudu. Uz jaut\u0101jumu, k\u0101p\u0113c pl\u0101no\u0161an\u0101 netiek iev\u0113roti jaudas ierobe\u017eojumi, forum\u0101 atbild\u0113ts: &#8220;Be sure the site maintenance &gt; planning tab has a finite horizon value filled in also.&#8221; (P\u0101rliecinieties, ka ar\u012b Site Maintenance ciln\u0113 Planning ir ievad\u012bts horizonts, kur\u0101 j\u0101iev\u0113ro jaudas ierobe\u017eojumi.) (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forums<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduling Blocks, Setup Grouping un Dual Resource Constraints<\/h3>\n\n\n<p><strong>Scheduling Blocks<\/strong> model\u0113 periodisku p\u0101rregul\u0113\u0161anu, piem\u0113ram, instrumentu mai\u0146u. <strong>Setup Grouping<\/strong> grup\u0113 darbus p\u0113c j\u016bsu noteiktiem krit\u0113rijiem, lai vienk\u0101r\u0161otu p\u0101rregul\u0113\u0161anu.<\/p>\n\n\n<p><strong>Dual Resource Constraints<\/strong> \u013cauj ra\u017eo\u0161anas pl\u0101no\u0161an\u0101, iev\u0113rojot jaudas ierobe\u017eojumus, oper\u0101cijai l\u012bdz\u0101s galvenajam resursam rezerv\u0113t vienu papildu resursu \u2014 instrumentu vai darbinieku. Tipisks piem\u0113rs ir iek\u0101rta, kuras darbin\u0101\u0161anai vajadz\u012bgs sertific\u0113ts operators.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Global Scheduling<\/h3>\n\n\n<p><strong>Global Scheduling<\/strong> sast\u0101da grafiku visai ra\u017eotnei. Pal\u012bdz\u012bbas tekst\u0101 nor\u0101d\u012bts, ka tas veic &#8220;scheduling on all jobs that are eligible for Global Scheduling&#8221; (grafika sast\u0101d\u012b\u0161anu visiem ra\u017eo\u0161anas uzdevumiem, kas atbilst Global Scheduling nosac\u012bjumiem) un apr\u0113\u0137ina kav\u0113juma dienas no kop\u0113j\u0101 grafika s\u0101kuma datuma. Sec\u012bbu ietekm\u0113 ra\u017eo\u0161anas uzdevumu pl\u0101no\u0161anas priorit\u0101te. Varat ar\u012b sast\u0101d\u012bt grafiku atsevi\u0161\u0137am uzdevumam sada\u013c\u0101 <strong>Job Entry<\/strong>, \u013caut MRP iepl\u0101not t\u0101 izveidotos uzdevumus un pl\u0101not uz priek\u0161u vai atpaka\u013c. Foruma lietot\u0101ji ieg\u016bst iepl\u0101noto resursu sadal\u012bjumu no tabulas <strong>ResourceTimeUsed<\/strong>, atfiltr\u0113jot scen\u0101riju model\u0113\u0161anas ierakstus. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forums<\/a>, <a href=\"https:\/\/www.epiusers.help\/t\/query-scheduling-board-data\/79381\">forums<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Grafiku pl\u0101no\u0161anas pane\u013ci<\/h3>\n\n\n<p>Pl\u0101not\u0101ji str\u0101d\u0101 tr\u012bs pane\u013cos ar Gantt diagramm\u0101m un vilk\u0161anas un nome\u0161anas iesp\u0113ju:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Panelis<\/th><th>Lietojums<\/th><\/tr><\/thead><tbody><tr><td>Job Scheduling Board<\/td><td>Viena ra\u017eo\u0161anas uzdevuma oper\u0101ciju p\u0101rvieto\u0161ana un fiks\u0113\u0161ana<\/td><\/tr><tr><td>Resource Scheduling Board<\/td><td>Viena resursa vai grupas slodzes apskate un darbu sec\u012bbas mai\u0146a<\/td><\/tr><tr><td>Multi-Resource Scheduling Board<\/td><td>Vair\u0101ku resursu sal\u012bdzin\u0101\u0161ana un darbu p\u0101rvieto\u0161ana starp tiem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Papildu r\u012bki ietver <strong>scen\u0101riju model\u0113\u0161anas<\/strong> re\u017e\u012bmu, <strong>Change Impact Informer<\/strong>, <strong>Overload Informer<\/strong>, ra\u017eo\u0161anas uzdevumu fiks\u0113\u0161anu, k\u0101 ar\u012b br\u012bdin\u0101jumus par kav\u0113jumiem un materi\u0101lu pieejam\u012bbu. Tabul\u0101 <strong>Related Materials<\/strong> redzami materi\u0101li, kas ierobe\u017eo izpildi, ar to iepirkuma pas\u016bt\u012bjumu, ra\u017eo\u0161anas uzdevumu un pas\u016bt\u012bjuma izpildes laiku. Ra\u017eo\u0161anas ceh\u0101 operatori re\u0123istr\u0113 darbu, izmantojot <strong>Start Activity<\/strong> un <strong>Labor Entry<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Ko papildus pied\u0101v\u0101 APS<\/h3>\n\n\n<p>APS izmanto to pa\u0161u pl\u0101no\u0161anas algoritmu un papildina to ar \u0161\u0101d\u0101m iesp\u0113j\u0101m:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vair\u0101k nek\u0101 divi ierobe\u017eojumi.<\/strong> Epicor: &#8220;The Advanced Planning and Scheduling module provides the ability to use more than two resource constraints.&#8221; (Modulis Advanced Planning and Scheduling \u013cauj izmantot vair\u0101k nek\u0101 divus resursu ierobe\u017eojumus.)<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, izmantojot Capability un Dependent Capability.<\/strong><\/li>\n\n\n<li><strong>Minimum WIP scheduling<\/strong> un <strong>Balanced Optimization<\/strong>, \u0146emot v\u0113r\u0101 priorit\u0101ti, laika rezervi un p\u0101rregul\u0113\u0161anu.<\/li>\n\n\n<li><strong>Optimization Rules<\/strong> katram resursam, k\u0101 ar\u012b grafiku sast\u0101d\u012b\u0161ana p\u0113c ra\u017eo\u0161anas \u0101truma un izm\u0113riem.<\/li>\n\n\n<li><strong>Unlimited What-If<\/strong> un <strong>izpild\u0101ma pieg\u0101des termi\u0146a noteik\u0161ana<\/strong> modul\u012b Order Management.<\/li>\n\n\n<li><strong>Multi-Plant Communication<\/strong> un materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana k\u0101 oblig\u0101ts nosac\u012bjums, \u0146emot v\u0113r\u0101 pieg\u0101d\u0101t\u0101ju kalend\u0101rus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-kinetic-s-native-scheduling-leaves-work-to\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pl\u0101not\u0101jam joproj\u0101m j\u0101dara pa\u0161am, izmantojot Kinetic ieb\u016bv\u0113tos r\u012bkus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Bez APS \u2014 divi ierobe\u017eojumi.<\/strong> Pamatmodulis \u0146em v\u0113r\u0101 galveno resursu un vienu papildu resursu. Lai vienlaikus \u0146emtu v\u0113r\u0101 iek\u0101rtu, divus operatorus, pal\u012bgier\u012bci un materi\u0101lu, vajadz\u012bga APS licence. (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Epicor bro\u0161\u016bra<\/a>)<\/li>\n\n\n<li><strong>Jaudas ierobe\u017eojumu iev\u0113ro\u0161anu ir viegli iestat\u012bt nepareizi.<\/strong> Atz\u012bme un horizonts j\u0101iestata resursam, resursu grupai, sada\u013c\u0101 Site Maintenance un katr\u0101 r\u012bk\u0101. Kinetic datumi var b\u016bt apr\u0113\u0137in\u0101ti gan ar jaudas ierobe\u017eojumiem, gan bez tiem \u2014 atkar\u012bb\u0101 no t\u0101, kur\u0101 pl\u0101no\u0161anas reiz\u0113 tie ieg\u016bti. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forums<\/a>)<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anai \u2014 grup\u0113\u0161ana, optimiz\u0101cijai \u2014 APS.<\/strong> Global Scheduling balst\u0101s uz ra\u017eo\u0161anas uzdevumu priorit\u0101ti un kav\u0113juma dien\u0101m. Pamatmodul\u012b p\u0101rregul\u0113\u0161anu p\u0101rvalda Scheduling Blocks un Setup Grouping, savuk\u0101rt <strong>Balanced Optimization<\/strong>, kas vienlaikus \u0146em v\u0113r\u0101 priorit\u0101ti, laika rezervi un p\u0101rregul\u0113\u0161anas laiku, ir APS funkcija. Epicor partneris Bluesky ERP piebilst, ka rezult\u0101ti ir atkar\u012bgi no prec\u012bziem oper\u0101ciju ilgumiem, iepirkumu izpildes laikiem un ra\u017eo\u0161anas uzdevumu sl\u0113g\u0161anas. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161anai vajadz\u012bga cilv\u0113ka r\u012bc\u012bba vai pl\u0101no\u0161anas procesa izpilde.<\/strong> Pl\u0101ns main\u0101s, kad k\u0101ds palai\u017e Global Scheduling, p\u0101rpl\u0101no ra\u017eo\u0161anas uzdevumu sada\u013c\u0101 Job Entry vai p\u0101rvelk darbu panel\u012b. Ja iek\u0101rta apst\u0101jas, pl\u0101not\u0101jam j\u0101veic k\u0101da no \u0161\u012bm darb\u012bb\u0101m. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forums<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-epicor-kinetic-s-native-scheduling-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Epicor Kinetic ieb\u016bv\u0113tajiem pl\u0101no\u0161anas r\u012bkiem<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Turpiniet izmantot Kinetic Scheduling vai ieg\u0101d\u0101jieties APS licenci, ja liel\u0101k\u0101 da\u013ca \u0161o nosac\u012bjumu atbilst j\u016bsu situ\u0101cijai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Jums ir viena vai da\u017eas ra\u017eotnes, resursi ir apvienoti grup\u0101s, un kalend\u0101ri atbilst faktiskaj\u0101m mai\u0146\u0101m.<\/li>\n\n\n<li>P\u0101rsvar\u0101 izmantojat standarta tehnolo\u0123iskos procesus, un pl\u0101not\u0101jiem der Global Scheduling rezult\u0101ti, kas ieg\u016bti p\u0113c priorit\u0101\u0161u noteikumiem, ar papildu korekcij\u0101m panel\u012b Job Scheduling Board.<\/li>\n\n\n<li>Jaudas tr\u016bkst tikai da\u017e\u0101s \u0161auraj\u0101s viet\u0101s. Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 \u0146emiet v\u0113r\u0101 \u0161o resursu pieejamo jaudu, bet p\u0101r\u0113jo resursu jaudu atst\u0101jiet neierobe\u017eotu. Tie\u0161i to iesaka Bluesky ERP, kad pamata iestat\u012bjumi jau darbojas. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li>Jums jau ir APS licence, j\u016bs uzturat prec\u012bzus pas\u016bt\u012bjumu izpildes laikus un normat\u012bvus, laikus sl\u0113dzat ra\u017eo\u0161anas uzdevumus, un jums ir administrators, kur\u0161 p\u0101rzina pl\u0101no\u0161anas algoritmu.<\/li>\n\n\n<li>Jums vajadz\u012bga izpild\u0101ma pieg\u0101des termi\u0146a noteik\u0161ana modul\u012b Order Management.<\/li>\n\n<\/ul>\n\n\n<p>Ja t\u0101 ir j\u016bsu situ\u0101cija, pareizi iestatiet jaudas ierobe\u017eojumu iev\u0113ro\u0161anu visos l\u012bme\u0146os un uzturiet prec\u012bzus datus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs atsevi\u0161\u0137s ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Apsveriet citus risin\u0101jumus \u0101rpus ieb\u016bv\u0113tajiem r\u012bkiem, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Scheduling and Resource Management vai APS licence nav ieg\u0101d\u0101ta vai modulis nav konfigur\u0113ts, un pl\u0101not\u0101ji str\u0101d\u0101 Excel, balstoties uz MRP datumiem.<\/li>\n\n\n<li>Jums j\u0101\u0146em v\u0113r\u0101 vair\u0101k nek\u0101 divi ierobe\u017eojumi, bet nev\u0113laties uzs\u0101kt APS ievie\u0161anas projektu.<\/li>\n\n\n<li>Pl\u0101ns main\u0101s vair\u0101kas reizes mai\u0146\u0101, un j\u016bs v\u0113laties, lai tas p\u0101rpl\u0101notos autom\u0101tiski, negaidot, l\u012bdz atkal palaid\u012bs pl\u0101no\u0161anas procesu vai pl\u0101not\u0101js p\u0101rvietos darbu panel\u012b.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 veikt\u0101 darba, un j\u016bs v\u0113laties, lai darbu sec\u012bba tiktu izv\u0113l\u0113ta p\u0113c p\u0101rregul\u0113\u0161anas laiku matricas.<\/li>\n\n\n<li>Ra\u017eo\u0161anas uzdevumiem vajadz\u012bga operatoru brig\u0101de vai pal\u012bgier\u012bce, ko koplieto vair\u0101kas iek\u0101rtas.<\/li>\n\n\n<li>Operatoriem j\u0101redz sava darbu rinda plan\u0161etdator\u0101 un j\u0101apstiprina paveiktais, lai pl\u0101ns attiec\u012bgi atjaunotos.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u010cetri veidi, k\u0101 sast\u0101d\u012bt grafikus darb\u0101 ar Kinetic<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kinetic grafiku pl\u0101no\u0161anas pane\u013ci.<\/strong> Pl\u0101not\u0101ji kori\u0123\u0113 Kinetic izveidoto grafiku. Piem\u0113roti ra\u017eotnei, kur\u0101 ir maz \u0161auro vietu un pl\u0101ns main\u0101s reti.<\/li>\n\n\n<li><strong>Kinetic Scheduling kop\u0101 ar APS.<\/strong> Global Scheduling tiek palaists periodiski. Piem\u0113rots ra\u017eotn\u0113m, kur\u0101m ir APS licence un administrators, kas piel\u0101go pl\u0101no\u0161anas algoritma iestat\u012bjumus.<\/li>\n\n\n<li><strong>APS risin\u0101jumu komplekti lieliem uz\u0146\u0113mumiem.<\/strong> Atsevi\u0161\u0137a pl\u0101no\u0161anas sist\u0113ma, kuras ievie\u0161ana ir ilgs projekts. Piem\u0113rota liel\u0101m pl\u0101no\u0161anas komand\u0101m, kas str\u0101d\u0101 vair\u0101k\u0101s ra\u017eotn\u0113s un kuru sast\u0101v\u0101 ir speci\u0101listi.<\/li>\n\n\n<li><strong>M\u0101ko\u0146pakalpojuma APS ar darbu izpildes uzskaiti ra\u017eo\u0161anas ceh\u0101.<\/strong> SkyPlanner APS autom\u0101tiski sast\u0101da grafiku katram resursam, iev\u0113rojot t\u0101 faktisko jaudu, pied\u0101v\u0101 p\u0101rpl\u0101no\u0161anu ar Autopilot un izpildes apstiprin\u0101jumus mobilaj\u0101s ier\u012bc\u0113s. Piem\u0113rots maz\u0101m un vid\u0113j\u0101m ra\u017eotn\u0113m, kas izmanto Kinetic un v\u0113las aktu\u0101lu grafiku, p\u0113c kura str\u0101d\u0101t ra\u017eo\u0161anas ceh\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kinetic atbilsto\u0161s datu modelis.<\/strong> Ra\u017eo\u0161anas uzdevumi, oper\u0101cijas, resursu grupas, resursi un to iesp\u0113jas. R\u012bks, kas ne\u0146em v\u0113r\u0101 lauku Capability, iepl\u0101no neatbilsto\u0161u resursu.<\/li>\n\n\n<li><strong>Detaliz\u0113ta ierobe\u017eojumu iev\u0113ro\u0161ana.<\/strong> Katra resursa mai\u0146as, promb\u016btnes un virsstundas; vair\u0101ki operatori vienam ra\u017eo\u0161anas uzdevumam; instrumenti, kas nevar vienlaikus atrasties div\u0101s viet\u0101s; no oper\u0101ciju sec\u012bbas atkar\u012bgs p\u0101rregul\u0113\u0161anas laiks; alternat\u012bvi resursi, ja galvenais nav pieejams.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana.<\/strong> Ra\u017eo\u0161anas uzdevumam vajadz\u012bgo materi\u0101lu, deta\u013cu daudzumu noliktav\u0101 un iepirkuma pas\u016bt\u012bjumu pieg\u0101\u017eu grafiku p\u0101rbaude attiec\u012bb\u0101 pret katras oper\u0101cijas s\u0101kuma laiku.<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana re\u0101llaik\u0101.<\/strong> Pl\u0101ns tiek atjaunin\u0101ts, tikl\u012bdz main\u0101s situ\u0101cija ra\u017eo\u0161an\u0101 vai pas\u016bt\u012bjumi, nevis n\u0101kamaj\u0101 pilnaj\u0101 pl\u0101no\u0161anas reiz\u0113.<\/li>\n\n\n<li><strong>Datu ierakst\u012b\u0161ana atpaka\u013c, izmantojot Kinetic pl\u0101no\u0161anas dzini.<\/strong> Oper\u0101ciju datumi j\u0101nodod, izmantojot <strong>Erp.BO.ScheduleEngineSvc<\/strong> (MoveJobItem, ChangeResource), p\u0113c tam blo\u0137\u0113jot ra\u017eo\u0161anas uzdevumu. Izpildes apstiprin\u0101jumi j\u0101re\u0123istr\u0113 k\u0101 darba uzskaites ieraksti, izmantojot <strong>Erp.BO.LaborSvc<\/strong>.<\/li>\n\n\n<li><strong>Skaidrs integr\u0101cijas ce\u013c\u0161.<\/strong> <a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">Kinetic REST API<\/a> kontrol\u0113 katru integr\u0101ciju ar API atsl\u0113g\u0101m un piek\u013cuves tv\u0113rumiem, t\u0101p\u0113c tv\u0113rum\u0101 j\u0101iek\u013cauj visi servisi un metodes, ko izsauc pl\u0101no\u0161anas r\u012bks. Datu nolas\u012b\u0161anai parasti izmanto <strong>Erp.BO.JobEntrySvc<\/strong>, <strong>Erp.BO.ResourceGroupSvc<\/strong> un Business Activity Queries (BAQs).<\/li>\n\n\n<li><strong>Atbild\u012bbas sadal\u012bjums.<\/strong> Nosakiet, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus, lai Global Scheduling nep\u0101rrakst\u012btu \u0101r\u0113j\u0101 sist\u0113m\u0101 izveidoto pl\u0101nu.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar j\u016bsu datiem<\/strong> pirms jebk\u0101diem integr\u0101cijas darbiem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad izv\u0113l\u0113ties SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS darbojas m\u0101kon\u012b l\u012bdz\u0101s Epicor Kinetic un nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus. MRP, ra\u017eo\u0161anas uzdevumi un izmaksu apr\u0113\u0137ini paliek Kinetic p\u0101rzi\u0146\u0101. SkyPlanner p\u0101r\u0146em detaliz\u0113ta oper\u0101ciju grafika sast\u0101d\u012b\u0161anu un uztur to aktu\u0101lu, t\u0101p\u0113c pl\u0101not\u0101jam vairs nav manu\u0101li j\u0101p\u0101rk\u0101rto darbu sec\u012bba.<\/p>\n\n\n<p>Izv\u0113lieties SkyPlanner, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums trauc\u0113 divu ierobe\u017eojumu limits.<\/strong> Arcturus dzinis da\u017eu sekun\u017eu laik\u0101 izveido vienotu grafiku darba centriem, cilv\u0113kiem, instrumentiem un materi\u0101liem, iev\u0113rojot faktisko jaudu. Instruments, ko izmanto vien\u0101 darba centr\u0101, \u0161aj\u0101 laik\u0101 nav pieejams nevien\u0101 cit\u0101.<\/li>\n\n\n<li><strong>Jaudas ierobe\u017eojumu iestat\u012bjumi da\u017e\u0101dos l\u012bme\u0146os past\u0101v\u012bgi nesaskan.<\/strong> SkyPlanner katra darba centra jaudu ierobe\u017eo t\u0101 mai\u0146u grafiks. Nav j\u0101saska\u0146o atsevi\u0161\u0137u r\u012bku izv\u0113les r\u016bti\u0146as vai pl\u0101no\u0161anas horizonti.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumam vajadz\u012bga komanda.<\/strong> Pie viena ra\u017eo\u0161anas uzdevuma vien\u0101 darba centr\u0101 var vienlaikus str\u0101d\u0101t vair\u0101ki operatori, iev\u0113rojot katra faktisk\u0101s mai\u0146as, atva\u013cin\u0101jumus, promb\u016btnes un virsstundas. Ja darbinieks vai iek\u0101rta nav pieejama, dzinis p\u0101rce\u013c darbu uz alternat\u012bviem darba centriem un nor\u012bko citus darbiniekus.<\/li>\n\n\n<li><strong>Steidzami pas\u016bt\u012bjumi j\u0101p\u0101rvieto rindas priek\u0161gal\u0101.<\/strong> Fast Track, Dynamic Priorities un klienta priorit\u0101te \u013cauj steidzamos darbus iepl\u0101not agr\u0101k. Running Time Lock notur ies\u0101kto ra\u017eo\u0161anas uzdevumu t\u0101 viet\u0101, bet Bulldozer p\u0101rb\u012bda turpm\u0101kos uzdevumus. Pl\u0101not\u0101ji joproj\u0101m var p\u0101rvietot ra\u017eo\u0161anas uzdevumus interakt\u012bv\u0101 Gantt laika skal\u0101, un dzinis saglab\u0101 p\u0101r\u0113j\u0101 grafika saska\u0146ot\u012bbu.<\/li>\n\n\n<li><strong>Pl\u0101na atjaunin\u0101\u0161ana nevar gaid\u012bt n\u0101kamo pl\u0101no\u0161anas reizi.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, un dara to tikai tad, kad nepiecie\u0161ams. J\u016bsu noteikumi, blo\u0137\u0113jumi un priorit\u0101tes joproj\u0101m nosaka pl\u0101no\u0161anas robe\u017eas.<\/li>\n\n\n<li><strong>Iep\u0113rkam\u0101s deta\u013cas nosaka s\u0101kuma datumu.<\/strong> Sast\u0101dot grafiku, tiek p\u0101rbaud\u012bti kr\u0101jumi un gaid\u0101mie iepirkuma pas\u016bt\u012bjumi. Materi\u0101ls no atv\u0113rta Kinetic iepirkuma pas\u016bt\u012bjuma tiek uzskat\u012bts par pieejamu t\u0101 paredz\u0113taj\u0101 pieg\u0101des datum\u0101, un kr\u0101jumi tiek atjaunin\u0101ti, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana ir atkar\u012bga no sec\u012bbas.<\/strong> P\u0101rregul\u0113\u0161anas laika matric\u0101 glab\u0101jas laiks, kas vajadz\u012bgs p\u0101rejai starp produktu p\u0101riem; vajadz\u012bbas gad\u012bjum\u0101 tas katr\u0101 virzien\u0101 at\u0161\u0137iras (no zila uz sarkanu \u2014 30 min\u016btes, no sarkana uz zilu \u2014 60). Pl\u0101no\u0161anas r\u012bks izv\u0113las sec\u012bbu ar maz\u0101ko p\u0101rregul\u0113\u0161anas laiku, un tam nav vajadz\u012bgs atsevi\u0161\u0137s APS optimiz\u0101cijas projekts.<\/li>\n\n\n<li><strong>Pl\u0101nam j\u0101non\u0101k ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori redz savu darbu rindu un re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161et\u0113, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode. Re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bts atpaka\u013c uz Kinetic darbasp\u0113ka uzskaitei.<\/li>\n\n\n<li><strong>V\u0113laties s\u0101kt darbu da\u017eu ned\u0113\u013cu laik\u0101.<\/strong> Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p>S\u0101ciet <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jumu<\/a>, import\u0113jot savu ra\u017eo\u0161anas uzdevumu un resursu CSV eksportu (l\u012bdz 20 darba centriem, kred\u012btkarte nav vajadz\u012bga). J\u016bs redz\u0113siet savu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 faktisk\u0101 jauda, v\u0113l pirms jebk\u0101diem integr\u0101cijas darbiem. P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus. Nor\u0113\u0137ini notiek katru m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Kinetic. Ra\u017eo\u0161anas uzdevumi, oper\u0101cijas, resursi un iepirkuma pas\u016bt\u012bjumu pieg\u0101des grafika rindas tiek sa\u0146emtas, izmantojot Kinetic REST API un BAQ vaic\u0101jumus. Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c, izmantojot Kinetic grafiku sast\u0101d\u012b\u0161anas dzini (<code>ScheduleEngineSvc.MoveJobItem<\/code>), bet re\u0123istr\u0113tais darba laiks \u2014 izmantojot <code>LaborSvc<\/code>. T\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Katr\u0101 ra\u017eotn\u0113 Kinetic tiek izmantots at\u0161\u0137ir\u012bgi \u2014 no tehnolo\u0123iskajiem procesiem, kuros \u0146emtas v\u0113r\u0101 resursu sp\u0113jas, l\u012bdz BPM piel\u0101gojumiem. T\u0101p\u0113c SkyPlanner komanda ievie\u0161anas laik\u0101 piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Ar\u012b j\u016bsu Epicor partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>); tam nepiecie\u0161ama tikai API atsl\u0113ga. Produkta dokument\u0101cija ir publiski pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/p>\n\n\n<p>Lasiet, k\u0101 risin\u0101jumi savienojas, <a href=\"\/lv\/integracija\/erp\/epicor-kinetic\/\">Epicor Kinetic lap\u0101<\/a> vai uzreiz iepaz\u012bstieties ar tehnisko risin\u0101jumu <a href=\"\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/\">integr\u0101cijas rokasgr\u0101mat\u0101<\/a>. Lai kop\u0101 ar mums apskat\u012btu j\u016bsu Kinetic resursus un ra\u017eo\u0161anas uzdevumus, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties demonstr\u0101cijai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes ra\u017eotn\u0113\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, sal\u012bdzinot ar aptuveni 50% iepriek\u0161<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la deta\u013cu izgatavo\u0161ana un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, blakus robotiz\u0113tai palet\u0113\u0161anas \u0161\u016bnai Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai un padara to uzticamu.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 P\u0101rtikas iepako\u0161anai piem\u0113rots pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kuru izskat\u012b\u0161ana agr\u0101k aiz\u0146\u0113ma stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Epicor Kinetic pied\u0101v\u0101 ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Modulis Scheduling and Resource Management sast\u0101da grafiku, iev\u0113rojot katra resursa ierobe\u017eoto jaudu noteikt\u0101 pl\u0101no\u0161anas horizont\u0101. APS ir atsevi\u0161\u0137s papla\u0161in\u0101jums vair\u0101k nek\u0101 divu ierobe\u017eojumu iev\u0113ro\u0161anai un optimiz\u0101cijai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas pl\u0101no\u0161anai Kinetic sist\u0113m\u0101 vajadz\u012bgs APS modulis?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Ra\u017eo\u0161anas pl\u0101no\u0161ana ar vienu papildu ierobe\u017eojumu, iev\u0113rojot faktisko jaudu, darbojas modul\u012b Scheduling and Resource Management. APS ir vajadz\u012bgs vair\u0101k nek\u0101 divu ierobe\u017eojumu iev\u0113ro\u0161anai, uz resursu iesp\u0113j\u0101m balst\u012btai grafiku sast\u0101d\u012b\u0161anai, Minimum WIP un pieg\u0101des iesp\u0113ju apstiprin\u0101\u0161anai, \u0146emot v\u0113r\u0101 jaudu un materi\u0101lus. Epicor nepublic\u0113 cenr\u0101\u017ea cenu nevienam no \u0161iem modu\u013ciem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101p\u0113c Kinetic pl\u0101no bez jaudas ierobe\u017eojumiem, lai gan ir iestat\u012bta ierobe\u017eota jauda?<\/summary>\n<p class=\"sp-faq__a\">Parasti k\u0101d\u0101 no iestat\u012bjumu l\u012bme\u0146iem nav iesl\u0113gta jaudas ierobe\u017eojumu iev\u0113ro\u0161ana. P\u0101rbaudiet resursa atz\u012bmi Finite un izv\u0113les r\u016bti\u0146u jaudas ierobe\u017eojumu iev\u0113ro\u0161anai izmantotaj\u0101 r\u012bk\u0101. P\u0113c tam p\u0101rbaudiet resursam, resursu grupai un Site Maintenance ciln\u0113 Planning iestat\u012bto horizontu, kur\u0101 j\u0101iev\u0113ro faktisk\u0101 jauda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Epicor Kinetic ir Gantt diagramma grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Job, Resource un Multi-Resource Scheduling Boards pied\u0101v\u0101 Gantt tipa skatu ar vilk\u0161anu un nome\u0161anu, scen\u0101riju p\u0101rbaudes re\u017e\u012bmu un ra\u017eo\u0161anas uzdevumu blo\u0137\u0113\u0161anu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101dus ierobe\u017eojumus SkyPlanner var pievienot papildus Kinetic diviem ierobe\u017eojumiem?<\/summary>\n<p class=\"sp-faq__a\">Vair\u0101kus operatorus vienam ra\u017eo\u0161anas uzdevumam, instrumentus k\u0101 koplietojamus resursus ar ierobe\u017eotu pieejam\u012bbu un materi\u0101lus no kr\u0101jumiem un gaid\u0101majiem iepirkuma pas\u016bt\u012bjumiem. Tas izmanto ar\u012b alternat\u012bvus darba centrus un darbiniekus, k\u0101 ar\u012b p\u0101rregul\u0113\u0161anas laika matricu no sec\u012bbas atkar\u012bgai p\u0101rregul\u0113\u0161anai. Tas viss tiek \u0146emts v\u0113r\u0101 vien\u0101 grafik\u0101, iev\u0113rojot faktisko jaudu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner APS var darboties kop\u0101 ar Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Kinetic: tas sa\u0146em ra\u017eo\u0161anas uzdevumus, oper\u0101cijas un resursus, bet pl\u0101notos datumus nos\u016bta atpaka\u013c, izmantojot <code>ScheduleEngineSvc<\/code>, un darba laika datus \u2014 izmantojot <code>LaborSvc<\/code>. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go REST v2 integr\u0101ciju j\u016bsu Kinetic konfigur\u0101cijai. Skatiet <a href=\"\/lv\/integracija\/erp\/epicor-kinetic\/integracijas-celvedis\/\">integr\u0101cijas rokasgr\u0101matu<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilg\u0101 laik\u0101 var s\u0101kt izmantot SkyPlanner APS kop\u0101 ar Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadprocesa s\u0101kuma. Pirms tam 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat sast\u0101d\u012bt grafiku saviem faktiskajiem ra\u017eo\u0161anas uzdevumiem, izmantojot CSV vai Excel eksportu. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Epicor Kinetic Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS J\u0101, Epicor Kinetic ir ieb\u016bv\u0113ta ra\u017eo\u0161anas pl\u0101no\u0161ana. Ar ra\u017eo\u0161anas pl\u0101no\u0161anu \u0161eit saprot grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101li pieejamajai iek\u0101rtu un darbinieku jaudai. Modulis Scheduling and Resource Management veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai. Atsevi\u0161\u0137ais modulis &#8230; <a title=\"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/\" aria-label=\"Read more about Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100856,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101244","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/razosanas-planosana\\\/\",\"name\":\"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/epicor-kinetic\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS","og_description":"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/","name":"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"J\u0101. Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana modul\u012b Scheduling and Resource Management; APS \u2014 atsevi\u0161\u0137s papla\u0161in\u0101jums. Darb\u012bba, ierobe\u017eojumi, kad pietiek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Epicor Kinetic: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/epicor-kinetic\/"},{"@type":"ListItem","position":5,"name":"Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Epicor Kinetic Vai Epicor Kinetic atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Sist\u0113mas pl\u0101no\u0161anas iesp\u0113jas, APS un SkyPlanner APS J\u0101, Epicor Kinetic ir ieb\u016bv\u0113ta ra\u017eo\u0161anas pl\u0101no\u0161ana. Ar ra\u017eo\u0161anas pl\u0101no\u0161anu \u0161eit saprot grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101li pieejamajai iek\u0101rtu un darbinieku jaudai. Modulis Scheduling and Resource Management veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiski pieejamajai resursu jaudai. Atsevi\u0161\u0137ais modulis&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101244"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101244\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100856"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}