{"id":101184,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101184"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/","title":{"rendered":"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Odoo pamatl\u012bmen\u012b nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i darba centru kalend\u0101ros pieejamajam laikam. Odoo Manufacturing poga <strong>Plan<\/strong> iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu attiec\u012bg\u0101 darba centra kalend\u0101ra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101, t\u0101p\u0113c divi iepl\u0101noti ra\u017eo\u0161anas pas\u016bt\u012bjumi vien\u0101 darba centr\u0101 nekad nep\u0101rkl\u0101jas. Ta\u010du t\u0101 vienlaikus pl\u0101no tikai vienu izgatavo\u0161anas pas\u016bt\u012bjumu, \u0146emot v\u0113r\u0101 vienu ierobe\u017eojumu. T\u0101 nep\u0101rk\u0101rto, neoptimiz\u0113 un nep\u0101rpl\u0101no pas\u016bt\u012bjumus kopum\u0101. Ra\u017eotnes, kur\u0101m visu pas\u016bt\u012bjumu sec\u012bba j\u0101nosaka p\u0113c izpildes termi\u0146iem un p\u0101rregul\u0113\u0161anas, l\u012bdz\u0101s Odoo izmanto SkyPlanner APS \u0161\u0101dai ra\u017eo\u0161anas pl\u0101no\u0161anai \u2014 grafika sast\u0101d\u012b\u0161anai atbilsto\u0161i re\u0101li pieejamajai iek\u0101rtu un darbasp\u0113ka jaudai.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo m\u0101rketinga materi\u0101los teikts, ka varat &#8220;plan resources with finite capacity planning&#8221; (pl\u0101not resursus, \u0146emot v\u0113r\u0101 to re\u0101lo jaudu) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). T\u0101l\u0101k, balstoties uz ofici\u0101lo dokument\u0101ciju un pirmkodu, skaidrojam, ko tas noz\u012bm\u0113 Odoo 19.0: k\u0101 darbojas Plan, k\u0101das ir t\u0101s iesp\u0113ju robe\u017eas un kad ar to piln\u012bb\u0101 pietiek.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Odoo pl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Iesp\u0113jojiet ra\u017eo\u0161anas pas\u016bt\u012bjumu funkciju un iestatiet darba centrus<\/h3>\n\n\n<p>Atveriet <strong>Manufacturing &gt; Configuration &gt; Settings<\/strong> un iesp\u0113jojiet <strong>Work Orders<\/strong>. P\u0113c tam sada\u013c\u0101 <strong>Configuration<\/strong> par\u0101d\u0101s <strong>Work Centers<\/strong>. Katram darba centram (<code>mrp.workcenter<\/code>) ir lauki, ko izmanto pl\u0101not\u0101js:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Lauks<\/th><th>Noz\u012bme pl\u0101no\u0161an\u0101<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>Resursu kalend\u0101rs, p\u0113c kura str\u0101d\u0101 darba centrs. Noklus\u0113juma kalend\u0101rs: \u201cStandard 40 hours\/week\u201d, no pirmdienas l\u012bdz piektdienai<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Procentu\u0101la v\u0113rt\u012bba, kas sa\u012bsina vai pagarina katra ra\u017eo\u0161anas pas\u016bt\u012bjuma izpildes laiku \u0161aj\u0101 darba centr\u0101<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Min\u016btes, ko pievieno pirms un p\u0113c katra ra\u017eo\u0161anas pas\u016bt\u012bjuma<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>Citi darba centri, kurus funkcija Plan var izmantot attiec\u012bg\u0101 darba centra viet\u0101<\/td><\/tr><tr><td>Cilne \u201cProduct Capacities\u201d<\/td><td>Vien\u012bbu skaits cikl\u0101 un katram produktam noteiktais p\u0101rregul\u0113\u0161anas un uzkop\u0161anas laiks min\u016bt\u0113s (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>Veiktsp\u0113jas m\u0113r\u0137is p\u0101rskatiem, nevis pl\u0101no\u0161anas ievaddati<\/td><\/tr><tr><td>Allowed Employees<\/td><td>Nosaka, kuri darbinieki \u0161eit dr\u012bkst str\u0101d\u0101t. Tas ir filtrs, nevis jaudas r\u0101d\u012bt\u0101js<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. Oper\u0101cijas materi\u0101lu specifik\u0101cij\u0101<\/h3>\n\n\n<p>Kop\u012bga tehnolo\u0123isko procesu pamatdatu saraksta nav. Oper\u0101cijas ir nor\u0101d\u012btas katra materi\u0101lu saraksta ciln\u0113 <strong>Operations<\/strong> (<code>mrp.routing.workcenter<\/code>). Katrai oper\u0101cijai ir lauki <strong>Work Center<\/strong> un <strong>Duration Computation<\/strong>: var ievad\u012bt fiks\u0113tu laiku vai apr\u0113\u0137in\u0101t to p\u0113c p\u0113d\u0113jiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem (p\u0113c noklus\u0113juma \u2014 10). Paredzamo ilgumu veido p\u0101rregul\u0113\u0161anas laiks, uzkop\u0161anas laiks un ciklu skaita reizin\u0101jums ar cikla laiku; cikliem nepiecie\u0161amo laiku dala ar lauk\u0101 Time Efficiency nor\u0101d\u012bto koeficientu (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>Ja ir iesl\u0113gta funkcija <strong>Work Order Dependencies<\/strong>, vienas oper\u0101cijas izpildi var blo\u0137\u0113t cita oper\u0101cija, izmantojot <strong>Blocked By<\/strong>. Odoo dokument\u0101cij\u0101 teikts: &#8220;A blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.&#8221; (Blo\u0137\u0113tais ra\u017eo\u0161anas pas\u016bt\u012bjums tiek iepl\u0101nots p\u0113c tam, kad beidzies iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjuma lauk\u0101 Expected Duration nor\u0101d\u012btais laiks.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Apstipriniet izgatavo\u0161anas pas\u016bt\u012bjumu (MO), tad nospiediet Plan<\/h3>\n\n\n<p>Apstiprinot izgatavo\u0161anas pas\u016bt\u012bjumu (<code>mrp.production<\/code>), tiek izveidoti t\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumi (<code>mrp.workorder<\/code>). Izgatavo\u0161anas pas\u016bt\u012bjum\u0101 nospie\u017eot <strong>Plan<\/strong>, sist\u0113ma s\u0101k ar p\u0113d\u0113jiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem un rekurs\u012bvi vispirms iepl\u0101no katru pas\u016bt\u012bjumu, kas blo\u0137\u0113 n\u0101kamo. Katru ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no uz priek\u0161u laik\u0101, s\u0101kot p\u0113c t\u0101 priek\u0161g\u0101j\u0113ju pabeig\u0161anas. Katram ra\u017eo\u0161anas pas\u016bt\u012bjumam Odoo:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Izv\u0113las v\u0113l\u0101ko no \u0161iem laika punktiem: MO s\u0101kums, pa\u0161reiz\u0113jais br\u012bdis vai blo\u0137\u0113jo\u0161o ra\u017eo\u0161anas pas\u016bt\u012bjumu beigas.<\/li>\n\n\n<li>P\u0101rbauda prim\u0101ro darba centru un katru lauk\u0101 Alternative Workcenter nor\u0101d\u012bto darba centru.<\/li>\n\n\n<li>Katr\u0101 kalend\u0101r\u0101 mekl\u0113 tuv\u0101ko n\u0101kamo br\u012bvo interv\u0101lu, kas ir pietiekami ilgs paredz\u0113tajai izpildei.<\/li>\n\n\n<li>Izv\u0113las darba centru, kur\u0101 darbs tiks pabeigts visagr\u0101k, un rezerv\u0113 laika interv\u0101lu \u0161aj\u0101 kalend\u0101r\u0101 k\u0101 <code>resource.calendar.leaves<\/code> ierakstu.<\/li>\n\n<\/ol>\n\n\n<p>Versijas 19.0 pirmkod\u0101 noteikums ir formul\u0113ts skaidri: &#8220;The available interval is disjoinct with all other workorders planned on this workcenter&#8221; (Pieejamais interv\u0101ls nep\u0101rkl\u0101jas ne ar vienu citu \u0161aj\u0101 darba centr\u0101 iepl\u0101noto ra\u017eo\u0161anas pas\u016bt\u012bjumu) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Tie\u0161i \u0161\u0101di tiek iev\u0113rota ierobe\u017eot\u0101 jauda. Ja ra\u017eo\u0161anas pas\u016bt\u012bjuma izpilde sasniedz nestr\u0101d\u0101\u0161anas periodu, t\u0101 turpin\u0101s n\u0101kamaj\u0101 darba interv\u0101l\u0101. Ja 700 dienu laik\u0101 (noklus\u0113juma mekl\u0113\u0161anas period\u0101) piem\u0113rota interv\u0101la nav, Plan apst\u0101jas ar pazi\u0146ojumu &#8220;Impossible to plan the workorder.&#8221; (Ra\u017eo\u0161anas pas\u016bt\u012bjumu nav iesp\u0113jams iepl\u0101not.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Nestr\u0101d\u0101\u0161anas laiks un alternat\u012bvas<\/h3>\n\n\n<p>Ar lietotni <strong>Time Off<\/strong> izstr\u0101d\u0101t\u0101ja re\u017e\u012bm\u0101 varat blo\u0137\u0113t darba centru apkopes vai br\u012bvdienu laik\u0101. Tad Plan novirza ra\u017eo\u0161anas pas\u016bt\u012bjumus uz Alternative Workcenters nor\u0101d\u012btajiem alternat\u012bvajiem darba centriem. Ja alternat\u012bvas nav, Odoo dokument\u0101cij\u0101 teikts: &#8220;work orders begin to pile up at the work center until it is operational again&#8221; (ra\u017eo\u0161anas pas\u016bt\u012bjumi s\u0101k uzkr\u0101ties darba centr\u0101, l\u012bdz tas ats\u0101k darbu) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">avots<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. P\u0101rskatiet un kori\u0123\u0113jiet<\/h3>\n\n\n<p>Izv\u0113lnes <strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> un <strong>Planning by Workcenter<\/strong> atver ra\u017eo\u0161anas pas\u016bt\u012bjumu pl\u0101no\u0161anas skatus. Enterprise pied\u0101v\u0101 Gantt diagrammu ar vilk\u0161anas un nome\u0161anas iesp\u0113ju. Community pied\u0101v\u0101 saraksta, kalend\u0101ra, rakurstabulas un grafika skatus. Dokument\u0101cij\u0101 aprakst\u012bta manu\u0101la kori\u0123\u0113\u0161ana: &#8220;Times and planned work centers can be changed by clicking to access the individual work order.&#8221; (Laikus un iepl\u0101notos darba centrus var main\u012bt, noklik\u0161\u0137inot un atverot atsevi\u0161\u0137o ra\u017eo\u0161anas pas\u016bt\u012bjumu.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">avots<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Odoo iesp\u0113ju robe\u017eas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kas pirmais iepl\u0101nots, tas pirmais tiek izpild\u012bts.<\/strong> Plan pl\u0101no katru MO atsevi\u0161\u0137i, un pirmais iepl\u0101notais pas\u016bt\u012bjums aiz\u0146em agr\u0101kos interv\u0101lus. Ja atlas\u0101t vair\u0101kus MO, tie tiek pl\u0101noti Odoo noklus\u0113juma sec\u012bb\u0101: vispirms p\u0113c priorit\u0101tes, tad p\u0113c s\u0101kuma datuma. Sist\u0113ma neizv\u0113rt\u0113 izpildes termi\u0146us attiec\u012bb\u0101 pret p\u0101rregul\u0113\u0161anu un nep\u0101rce\u013c jau iepl\u0101notu MO, lai atbr\u012bvotu vietu steidzam\u0101kam.<\/li>\n\n\n<li><strong>Sec\u012bba netiek piel\u0101gota p\u0101rregul\u0113\u0161anai.<\/strong> Setup Time katram ra\u017eo\u0161anas pas\u016bt\u012bjumam pievieno fiks\u0113tu laiku \u2014 vien\u0101du min\u016b\u0161u skaitu neatkar\u012bgi no t\u0101, kas ra\u017eots iepriek\u0161. Odoo nav p\u0101rregul\u0113\u0161anas matricas, un tas negrup\u0113 l\u012bdz\u012bgus ra\u017eo\u0161anas uzdevumus, lai izvair\u012btos no p\u0101rregul\u0113\u0161anas.<\/li>\n\n\n<li><strong>Viens ierobe\u017eojums.<\/strong> Pl\u0101nu ierobe\u017eo tikai darba centra kalend\u0101rs. Operatori tiek \u0146emti v\u0113r\u0101 tikai filtr\u0101 Allowed Employees. Kad Plan rezerv\u0113 interv\u0101lu, instrumentu un materi\u0101lu pieejam\u012bba netiek p\u0101rbaud\u012bta. Komponentu rezerv\u0101cijas un iepirkuma pas\u016bt\u012bjumu datumi tiek izmantoti tikai kr\u0101jumu papildin\u0101\u0161anai.<\/li>\n\n\n<li><strong>MRP ne\u0146em v\u0113r\u0101 jaudu.<\/strong> Atk\u0101rtotas pas\u016bt\u012b\u0161anas noteikumi un MTO veido MO, izmantojot materi\u0101lu specifik\u0101cijas lauku <strong>Manuf. Lead Time<\/strong> kalend\u0101raj\u0101s dien\u0101s. Dokument\u0101cij\u0101 teikts: &#8220;Lead times do not consider weekends, holidays, or work center capacity&#8221; (Izpildes laikos netiek \u0146emtas v\u0113r\u0101 ned\u0113\u013cas nogales, sv\u0113tku dienas vai darba centra jauda) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">avots<\/a>). MO termi\u0146i un sol\u012btie pieg\u0101des datumi tiek noteikti p\u0113c kalend\u0101raj\u0101m dien\u0101m, nevis faktisk\u0101s rindas.<\/li>\n\n\n<li><strong>MPS ir ieteikumu saraksts.<\/strong> Ar\u012b galvenais ra\u017eo\u0161anas pl\u0101ns (Master Production Schedule, Enterprise) ne\u0146em v\u0113r\u0101 noslodzi. &#8220;The MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.&#8221; (MPS tikai iesaka papildin\u0101mo produkta daudzumu; lietot\u0101jam pa\u0161am j\u0101izveido attiec\u012bgie iepirkuma vai izgatavo\u0161anas pas\u016bt\u012bjumi.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">avots<\/a>)<\/li>\n\n\n<li><strong>Nav autom\u0101tiskas p\u0101rpl\u0101no\u0161anas.<\/strong> Iek\u0101rtas boj\u0101jums vai steidzams pas\u016bt\u012bjums pats par sevi neko nep\u0101rvieto. Kad ra\u017eo\u0161anas pas\u016bt\u012bjuma izpilde ir s\u0101kta, Odoo ne\u013cauj atcelt MO iepl\u0101no\u0161anu: &#8220;Some work orders have already started, so you cannot unplan this manufacturing order.&#8221; (Da\u017eu ra\u017eo\u0161anas pas\u016bt\u012bjumu izpilde jau ir s\u0101kta, t\u0101p\u0113c \u0161\u012b izgatavo\u0161anas pas\u016bt\u012bjuma iepl\u0101no\u0161anu nevar atcelt.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>Apak\u0161mezgli tiek pl\u0101noti atsevi\u0161\u0137i.<\/strong> Daudzl\u012bme\u0146u materi\u0101lu specifik\u0101cijas izveido atsevi\u0161\u0137us pak\u0101rtotus MO, un katrs tiek pl\u0101nots neatkar\u012bgi. Pl\u0101not\u0101jam tie j\u0101iepl\u0101no pareiz\u0101 sec\u012bb\u0101, lai apak\u0161mezgls b\u016btu gatavs br\u012bd\u012b, kad tas nepiecie\u0161ams augst\u0101ka l\u012bme\u0146a oper\u0101cijai.<\/li>\n\n\n<li><strong>Gantt un MPS ir pieejami Enterprise.<\/strong> Izdevumu sal\u012bdzin\u0101juma lap\u0101 Manufacturing funkcijas &#8220;Scheduling&#8221; (grafiku sast\u0101d\u012b\u0161ana) un &#8220;Shopfloor&#8221; (ra\u017eo\u0161anas cehs) ir atz\u012bm\u0113tas k\u0101 pieejamas tikai Enterprise (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). Community pl\u0101not\u0101ji str\u0101d\u0101 ar sarakstiem un kalend\u0101ru.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Odoo ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Odoo pogu Plan pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Katrai oper\u0101cijai ir viens skaidri piem\u0113rots darba centrs, un ra\u017eo\u0161anas apjomi ir m\u0113reni.<\/li>\n\n\n<li>Uz vienu un to pa\u0161u \u0161auro vietu pretend\u0113 maz pas\u016bt\u012bjumu, t\u0101p\u0113c pl\u0101no\u0161ana p\u0113c principa \u201cpirmais iepl\u0101nots \u2014 pirmais izpild\u012bts\u201d nodro\u0161ina pie\u0146emamus termi\u0146us.<\/li>\n\n\n<li>Alternat\u012bv\u0101s iek\u0101rtas ir identiskas, t\u0101p\u0113c ar Alternative Workcenters un Time Off var risin\u0101t liel\u0101ko da\u013cu trauc\u0113jumu.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana ir \u012bsa vai nav atkar\u012bga no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma.<\/li>\n\n\n<li>Pl\u0101not\u0101js reizi dien\u0101 var p\u0101rskat\u012bt Planning by Workcenter un manu\u0101li nov\u0113rst nedaudz\u0101s pl\u0101na pretrunas.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas raksturo j\u016bsu ra\u017eotni, koncentr\u0113jieties uz datu kvalit\u0101ti. Katram darba centram izveidojiet kalend\u0101ru un ievadiet re\u0101listiskas Setup un Cleanup Time v\u0113rt\u012bbas. Ja v\u0113sturiskie dati ir sv\u0101rst\u012bgi, izmantojiet fiks\u0113tus izpildes ilgumus. Iesl\u0113dziet atkar\u012bbas un pl\u0101nojiet MO priorit\u0101\u0161u sec\u012bb\u0101.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas risin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Plan vairs nepietiek, ja uz jums attiecas vair\u0101ki no \u0161iem apst\u0101k\u013ciem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Daudzi pas\u016bt\u012bjumi pretend\u0113 uz div\u0101m vai vair\u0101k\u0101m \u0161auraj\u0101m viet\u0101m, un sec\u012bba j\u0101nosaka p\u0113c izpildes termi\u0146iem.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161ana ir atkar\u012bga no iepriek\u0161 ra\u017eot\u0101, t\u0101p\u0113c ra\u017eo\u0161anas uzdevumu sec\u012bba ietekm\u0113 sara\u017eoto apjomu.<\/li>\n\n\n<li>Darbinieki un mai\u0146as ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas.<\/li>\n\n\n<li>Materi\u0101lu pien\u0101k\u0161anas laiks nosaka, kad var s\u0101kt ra\u017eo\u0161anas uzdevumu.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi, iek\u0101rtu boj\u0101jumi un pieg\u0101\u017eu kav\u0113jumi liek p\u0101rpl\u0101not ra\u017eo\u0161anu vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n\n<li>P\u0101rdo\u0161anas komandai vajadz\u012bgi pieg\u0101des datumi, kas balst\u012bti uz faktisko rindu, nevis Manuf. Lead Time.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ko mekl\u0113t risin\u0101jum\u0101<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i visu darba centru re\u0101lajai jaudai vienlaikus<\/strong>, \u0146emot v\u0113r\u0101 mai\u0146as, person\u0101lu un promb\u016btnes.<\/li>\n\n\n<li><strong>Vienota izpildes sec\u012bba visiem pas\u016bt\u012bjumiem<\/strong> p\u0113c izpildes termi\u0146a un priorit\u0101tes, nevis katram MO atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong> no sec\u012bbas atkar\u012bgai p\u0101rregul\u0113\u0161anai, lai pl\u0101no\u0161anas algoritms izv\u0113l\u0113tos ra\u017eo\u0161anas uzdevumu sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti un brig\u0101des k\u0101 ierobe\u017eojumi:<\/strong> koplietojams instruments, ko izmanto vien\u0101 iek\u0101rt\u0101, nav pieejams citai, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, \u0146emot v\u0113r\u0101 materi\u0101lus<\/strong> un p\u0101rbaudot kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Alternat\u012bvi darba centri<\/strong>, ko pl\u0101no\u0161anas algoritms izv\u0113las visa pl\u0101na kontekst\u0101, nevis katram ra\u017eo\u0161anas pas\u016bt\u012bjumam atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>Daudzl\u012bme\u0146u produktu pl\u0101no\u0161ana<\/strong>, lai apak\u0161mezgli b\u016btu gatavi, pirms tie vajadz\u012bgi augst\u0101ka l\u012bme\u0146a izstr\u0101d\u0101jumam.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, kad ra\u017eo\u0161ana virz\u0101s uz priek\u0161u vai main\u0101s pas\u016bt\u012bjumi.<\/li>\n\n\n<li><strong>Gantt diagramma pl\u0101not\u0101jiem un ra\u017eo\u0161anas uzdevumu rinda operatoriem<\/strong>, ar\u012b Community lietot\u0101jiem.<\/li>\n\n\n<li><strong>Skaidri sadal\u012bta atbild\u012bba starp pl\u0101no\u0161anas sist\u0113mu un Odoo.<\/strong> Odoo ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus apr\u0113\u0137ina no kalend\u0101ra rezerv\u0101cij\u0101m, un, atk\u0101rtoti nospie\u017eot \u201cPlan\u201d, tie tiek p\u0101rrakst\u012bti. Vienojieties, ka darbu sec\u012bbu nosaka grafiku sast\u0101d\u012b\u0161anas sist\u0113ma. Datumus un darba centrus ierakstiet atpaka\u013c, izmantojot <code>mrp.workorder<\/code>, bet jau uzs\u0101ktos ra\u017eo\u0161anas pas\u016bt\u012bjumus izlaidiet.<\/li>\n\n\n<li><strong>J\u016bsu versijai un abon\u0113\u0161anas pl\u0101nam piem\u0113rots API.<\/strong> Odoo 19 ir pieejams External JSON-2 API. XML-RPC un JSON-RPC <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">pl\u0101nots iz\u0146emt<\/a> no Odoo 22 (Odoo Online 21.1). Piek\u013cuve \u0101r\u0113jam API ir pieejama tikai Custom abon\u0113\u0161anas pl\u0101nos, nevis One App Free vai Standard (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">\u0101r\u0113j\u0101 API dokument\u0101cija<\/a>). Piel\u0101gotiem modu\u013ciem nepiecie\u0161ams Odoo.sh vai mitin\u0101\u0161ana sav\u0101 infrastrukt\u016br\u0101 (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">Odoo cenas<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Pieejamos risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Odoo ieb\u016bv\u0113t\u0101 pl\u0101no\u0161ana<\/strong> ietver pogu Plan un Enterprise izdevum\u0101 ar\u012b Gantt skatu.<\/li>\n\n\n<li><strong>Papildu modu\u013ci Odoo klient\u0101<\/strong> uzlabo pl\u0101no\u0161anas paneli vai laika interv\u0101lu pie\u0161\u0137ir\u0161anas lo\u0123iku. Tos uztur Odoo partneris.<\/li>\n\n\n<li><strong>Pieg\u0101des \u0137\u0113des pl\u0101no\u0161anas sist\u0113mas un lieluz\u0146\u0113mumu APS risin\u0101jumu kompleksi<\/strong> tiek savienoti ievie\u0161anas projekta gait\u0101, un ar tiem str\u0101d\u0101 atsevi\u0161\u0137a pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146pakalpojuma APS ar izpildes vad\u012bbu ra\u017eo\u0161anas ceh\u0101<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner \u2014 l\u012bdz\u0101s Odoo autom\u0101tiski sast\u0101da grafiku katram resursam. Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, tas past\u0101v\u012bgi p\u0101rpl\u0101no darbu un nodod grafiku operatoru r\u012bc\u012bb\u0101.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 katru no iepriek\u0161 min\u0113tajiem ierobe\u017eojumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101no\u0161anu p\u0113c pas\u016bt\u012bjumu sa\u0146em\u0161anas sec\u012bbas aizst\u0101j p\u0101rdom\u0101ta izpildes sec\u012bba.<\/strong> Arcturus AI dzin\u0113js da\u017eu sekun\u017eu laik\u0101 iepl\u0101no visus atv\u0113rtos pas\u016bt\u012bjumus vienot\u0101 grafik\u0101, \u0146emot v\u0113r\u0101 re\u0101lo ra\u017eo\u0161anas jaudu. Sec\u012bbu nosaka pabeig\u0161anas datums, priorit\u0101te, klienta priorit\u0101te, Fast Track un Dynamic Priorities.<\/li>\n\n\n<li><strong>\u012as\u0101ka p\u0101rregul\u0113\u0161ana fiks\u0113tu laiku viet\u0101.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri, un tas var at\u0161\u0137irties atkar\u012bb\u0101 no virziena: no zila uz sarkanu 30 min\u016btes, no sarkana uz zilu 60. Pl\u0101not\u0101js izv\u0113las sec\u012bbu ar \u012bs\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku un l\u012bdz\u012bgus ra\u017eo\u0161anas uzdevumus iepl\u0101no citu p\u0113c cita.<\/li>\n\n\n<li><strong>Viena ierobe\u017eojuma viet\u0101 \u2014 visi.<\/strong> Darba centru, mai\u0146u, person\u0101la, promb\u016btnes, instrumentu un materi\u0101lu pieejam\u012bba tiek p\u0101rbaud\u012bta vien\u0101 un taj\u0101 pa\u0161\u0101 grafik\u0101. Instrumentu skaits ir ierobe\u017eots, t\u0101p\u0113c stiprin\u0101\u0161anas ier\u012bci, ko izmanto vien\u0101 iek\u0101rt\u0101, taj\u0101 pa\u0161\u0101 laik\u0101 nerezerv\u0113 citai. Ra\u017eo\u0161anas uzdevumam vienlaikus var b\u016bt vajadz\u012bgi vair\u0101ki operatori, un, ja prim\u0101rais resurss nav pieejams, pl\u0101no\u0161anas dzinis izv\u0113las alternat\u012bvas iek\u0101rtas vai darbiniekus. Tas pats modelis aptver darba centru grupas, efektivit\u0101tes r\u0101d\u012bt\u0101jus un viena ra\u017eo\u0161anas uzdevuma sadal\u012b\u0161anu starp darba centriem. Materi\u0101lu p\u0101rbaud\u0113 \u0146em v\u0113r\u0101 gan kr\u0101jumu atlikumus, gan atv\u0113rt\u0101s <code>purchase.order<\/code> rindas: pas\u016bt\u012bt\u0101s sast\u0101vda\u013cas uzskata par pieejam\u0101m pirkuma pas\u016bt\u012bjuma pieg\u0101des datum\u0101, un kr\u0101jumi tiek atjaunin\u0101ti, kad pirkuma pas\u016bt\u012bjumam pie\u0161\u0137ir statusu \u201cPieg\u0101d\u0101ts\u201d.<\/li>\n\n\n<li><strong>Saska\u0146ota mezglu izgatavo\u0161ana.<\/strong> Apak\u0161produktu un daudzl\u012bme\u0146u produktu ra\u017eo\u0161ana tiek iepl\u0101nota t\u0101, lai deta\u013cas b\u016btu gatavas, kad t\u0101s vajadz\u012bgas mont\u0101\u017eai.<\/li>\n\n\n<li><strong>Autopilot manu\u0101las p\u0101rpl\u0101no\u0161anas viet\u0101.<\/strong> Kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu iestat\u012btos blo\u0137\u0113jumus, Running Time Lock un priorit\u0101tes.<\/li>\n\n\n<li><strong>Community ieg\u016bst Gantt diagrammu un r\u012bkus ra\u017eo\u0161anas ceham.<\/strong> Pl\u0101not\u0101ji redi\u0123\u0113 interakt\u012bvu Gantt laika skalu. Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu darbu rindu un re\u0123istr\u0113 darbu ar Mobile Confirmations, Production Timer un Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p>Odoo joproj\u0101m ir galven\u0101 produktu, materi\u0101lu specifik\u0101ciju, kr\u0101jumu, iepirkumu un gr\u0101matved\u012bbas datu uzskaites sist\u0113ma. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Odoo, izmantojot External JSON-2 API, bet vec\u0101k\u0101s versij\u0101s \u2014 XML-RPC un JSON-RPC:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ien\u0101ko\u0161ie dati:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> un atv\u0113rt\u0101s <code>purchase.order<\/code> rindas.<\/li>\n\n\n<li><strong>Atpaka\u013c uz Odoo:<\/strong> pl\u0101notais s\u0101kums, beigas un izv\u0113l\u0113tais darba centrs, izmantojot <code>write<\/code> katram <code>mrp.workorder<\/code> (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). T\u0101d\u0113j\u0101di tiek p\u0101rcelta ar\u012b pa\u0161a Odoo kalend\u0101ra rezerv\u0101cija, t\u0101p\u0113c Odoo pl\u0101no\u0161anas skatos redzami SkyPlanner noteiktie datumi.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas cehs:<\/strong> operatoru apstiprin\u0101jumi tiek veidoti k\u0101 <code>mrp.workcenter.productivity<\/code> ieraksti funkcij\u0101 Time Logs.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner webhook pazi\u0146ojumi nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Katr\u0101 r\u016bpn\u012bc\u0101 Odoo izmanto cit\u0101di \u2014 ar sav\u0101m oper\u0101cij\u0101m, kalend\u0101riem un piel\u0101gotiem modu\u013ciem. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju atbilsto\u0161i j\u016bsu sist\u0113mai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Ar\u012b j\u016bsu Odoo partneris vai izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot dokument\u0113to SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). Lai s\u0101ktu, pietiek ar API atsl\u0113gu. Pla\u0161\u0101ka inform\u0101cija par API un funkcij\u0101m ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> daudzi pas\u016bt\u012bjumi konkur\u0113 par vien\u0101m un t\u0101m pa\u0161\u0101m ra\u017eo\u0161anas \u0161auraj\u0101m viet\u0101m un visu pas\u016bt\u012bjumu izpildes sec\u012bba j\u0101nosaka p\u0113c termi\u0146iem.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana ir atkar\u012bga no darbu sec\u012bbas vai koplietojami instrumenti un uzdevumi, kuros vajadz\u012bgi vair\u0101ki operatori, nosaka, ko var izpild\u012bt n\u0101kamo.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rpl\u0101nojat vair\u0101kas reizes ned\u0113\u013c\u0101 un v\u0113laties ieg\u016bt darbam gatavu savas ra\u017eotnes grafiku da\u017eu ned\u0113\u013cu laik\u0101, nevis p\u0113c ilga projekta.<\/p>\n\n\n<p>S\u0101ciet ar CSV vai XLSX eksportu <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, bez kred\u012btkartes) un sal\u012bdziniet SkyPlanner grafiku ar pogas Plan rezult\u0101tiem. P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus. Nor\u0113\u0137ini notiek katru m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu nosak\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un pied\u0101v\u0101jam kop\u0101 ar abonementu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma. Skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a> un <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a>.<\/p>\n\n\n<p>Uzziniet vair\u0101k par <a href=\"\/lv\/integracija\/erp\/odoo\/\">SkyPlanner izmanto\u0161anu ar Odoo<\/a>, lasiet <a href=\"\/lv\/integracija\/erp\/odoo\/integracijas-celvedis\/\">Odoo integr\u0101cijas ce\u013cvedi<\/a> un iepaz\u012bstiet citas <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda l\u012bdz ra\u017eo\u0161anas l\u012bnijai non\u0101k da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Z\u0101\u013cu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, blakus robotiz\u0113tai palet\u0113\u0161anas \u0161\u016bnai Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina stabilu un uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Pap\u012brs p\u0101rtikas iepakojumam<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad ir gatavas da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums sal\u012bdzin\u0101jum\u0101 ar aptuveni 50% iepriek\u0161<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darbu vad\u012bt\u0101js divu viet\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo Community \u013cauj sast\u0101d\u012bt ra\u017eo\u0161anas grafikus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, pamatl\u012bmen\u012b. Community ir izgatavo\u0161anas pas\u016bt\u012bjumi, ra\u017eo\u0161anas pas\u016bt\u012bjumi, darba centri un poga Plan; dati ir pieejami sarakstu, kalend\u0101ra, rakurstabulas un diagrammas skatos. Gantt pl\u0101no\u0161anas skats, Shop Floor un Master Production Schedule ir Enterprise funkcijas. SkyPlanner nodro\u0161ina Gantt diagrammu un operatoru darbu rindu ra\u017eotn\u0113m, kas izmanto Community.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo MRP \u0146em v\u0113r\u0101 darba centru jaudu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Kr\u0101jumu papildin\u0101\u0161an\u0101 izmanto izpildes laikus kalend\u0101raj\u0101s dien\u0101s, un Odoo dokument\u0101cij\u0101 par tiem teikts: &#8220;do not consider weekends, holidays, or work center capacity&#8221; (netiek \u0146emtas v\u0113r\u0101 ned\u0113\u013cas nogales, sv\u0113tku dienas vai darba centru jauda). Jauda tiek \u0146emta v\u0113r\u0101 tikai tad, kad izgatavo\u0161anas pas\u016bt\u012bjum\u0101 (MO) nospie\u017eat Plan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo vien\u0101 darba centr\u0101 var vienlaikus izpild\u012bt vair\u0101kus ra\u017eo\u0161anas uzdevumus?<\/summary>\n<p class=\"sp-faq__a\">Pl\u0101not\u0101j\u0101 \u2014 n\u0113. Versijas 19.0 kods katram ra\u017eo\u0161anas pas\u016bt\u012bjumam rezerv\u0113 laika interv\u0101lu, kas nep\u0101rkl\u0101jas ar nevienu citu \u0161\u012b darba centra ra\u017eo\u0161anas pas\u016bt\u012bjumu. Ciln\u0113 Product Capacities nosaka gabalu skaitu vien\u0101 cikl\u0101 viena ra\u017eo\u0161anas pas\u016bt\u012bjuma ietvaros, nevis paral\u0113lus ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo atbalsta p\u0101rregul\u0113\u0161anas laikus, kas atkar\u012bgi no darbu sec\u012bbas?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Setup Time un Cleanup Time ir fiks\u0113ts min\u016b\u0161u skaits katram darba centram vai katram produktam ciln\u0113 Product Capacities. Odoo tos pieskaita katram ra\u017eo\u0161anas pas\u016bt\u012bjumam neatkar\u012bgi no t\u0101, k\u0101ds uzdevums izpild\u012bts iepriek\u0161. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101 p\u0101rejas laiku katram produktu p\u0101rim un virzienam un sak\u0101rto uzdevumus t\u0101, lai p\u0101rregul\u0113\u0161ana aiz\u0146emtu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savieno ar Odoo?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Odoo, izmantojot \u0101r\u0113jo JSON-2 API vai versij\u0101s no 16.0 l\u012bdz 18.0 \u2014 <code>execute_kw<\/code> caur XML-RPC vai JSON-RPC. Pl\u0101notos datumus un darba centrus ieraksta katr\u0101 <code>mrp.workorder<\/code>, bet re\u0123istr\u0113tais laiks non\u0101k Odoo funkcij\u0101 Time Logs. SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. S\u012bk\u0101ka inform\u0101cija ir pieejama <a href=\"\/lv\/integracija\/erp\/odoo\/integracijas-celvedis\/\">Odoo integr\u0101cijas ce\u013cved\u012b<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Odoo?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot no Odoo sarakstu skatiem eksport\u0113tus CSV vai XLSX failus un l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama. Pirms sist\u0113mu savieno\u0161anas varat sal\u012bdzin\u0101t SkyPlanner grafiku ar pogas Plan rezult\u0101tiem. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Odoo Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS Odoo pamatl\u012bmen\u012b nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i darba centru kalend\u0101ros pieejamajam laikam. Odoo Manufacturing poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu attiec\u012bg\u0101 darba centra kalend\u0101ra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101, t\u0101p\u0113c divi iepl\u0101noti ra\u017eo\u0161anas pas\u016bt\u012bjumi vien\u0101 darba centr\u0101 nekad nep\u0101rkl\u0101jas. &#8230; <a title=\"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/\" aria-label=\"Read more about Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100827,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101184","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo: ra\u017eo\u0161anas pl\u0101no\u0161ana un poga Plan<\/title>\n<meta name=\"description\" content=\"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/razosanas-planosana\\\/\",\"name\":\"Odoo: ra\u017eo\u0161anas pl\u0101no\u0161ana un poga Plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo: ra\u017eo\u0161anas pl\u0101no\u0161ana un poga Plan","description":"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS","og_description":"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/","name":"Odoo: ra\u017eo\u0161anas pl\u0101no\u0161ana un poga Plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu darba centra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101. K\u0101 t\u0101 darbojas, k\u0101di ir ierobe\u017eojumi un kad vajadz\u012bga APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Odoo Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? K\u0101 darbojas poga Plan un kad pievienot SkyPlanner APS Odoo pamatl\u012bmen\u012b nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i darba centru kalend\u0101ros pieejamajam laikam. Odoo Manufacturing poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu attiec\u012bg\u0101 darba centra kalend\u0101ra pirmaj\u0101 br\u012bvaj\u0101 interv\u0101l\u0101, t\u0101p\u0113c divi iepl\u0101noti ra\u017eo\u0161anas pas\u016bt\u012bjumi vien\u0101 darba centr\u0101 nekad nep\u0101rkl\u0101jas.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101184","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101184"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101184\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100827"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}