{"id":101154,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101154"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/","title":{"rendered":"SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP S\/4HANA integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 ce\u013cved\u012b SAP partneriem, IT komand\u0101m un tehnisko risin\u0101jumu pirc\u0113jiem skaidrots, k\u0101 SkyPlanner APS savieno ar SAP S\/4HANA. SkyPlanner apmain\u0101s ar datiem ar S\/4HANA abos virzienos, izmantojot SAP ofici\u0101li public\u0113t\u0101s OData API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, darba centru jaudu, kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma datumi tiek nos\u016bt\u012bti atpaka\u013c katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma oper\u0101cijai.<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek iegr\u0101matoti k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumu apstiprin\u0101jumi.<\/li>\n\n\n<li>SkyPlanner webhooks nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem darbiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Materi\u0101li, BOM, tehnolo\u0123iskie procesi, ra\u017eo\u0161anas pas\u016bt\u012bjumi, kr\u0101jumi un pa\u0161izmaksas apr\u0113\u0137ini paliek S\/4HANA p\u0101rzi\u0146\u0101. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu S\/4HANA konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Par ieguvumiem uz\u0146\u0113mumam lasiet <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/\">lap\u0101 par ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu ar SAP S\/4HANA<\/a>. Lai uzzin\u0101tu, k\u0101dus grafikus S\/4HANA sast\u0101da patst\u0101v\u012bgi, lasiet <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/\">Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot re\u0101lo iek\u0101rtu un person\u0101la jaudu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA integr\u0101cijas iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA integr\u0101cijai pied\u0101v\u0101 ofici\u0101li public\u0113tus OData servisus, kas uzskait\u012bti SAP Business Accelerator Hub (api.sap.com). Ra\u017eo\u0161anas grafiku integr\u0101cija izmanto OData V2 servisus. IDoc un BAPI joproj\u0101m ir pieejami, ta\u010du \u0161aj\u0101 ce\u013cved\u012b tiek izmantotas ofici\u0101li public\u0113t\u0101s OData API.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentifik\u0101cija atkar\u012bb\u0101 no izdevuma<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Lok\u0101l\u0101 instal\u0101cija un Private Edition.<\/strong> Pakalpojumus aktiviz\u0113 SAP Gateway ar transakciju <code>\/IWFND\/MAINT_SERVICE<\/code>. Integr\u0101cijas lietot\u0101jam vajadz\u012bgi atbilsto\u0161ie autoriz\u0101cijas objekti, piem\u0113ram, <code>C_AFRU_AWK<\/code> apstiprin\u0101jumiem, <code>C_AFKO_AWK<\/code> kop\u0101 ar tiem iegr\u0101matotaj\u0101m pre\u010du kust\u012bbas poz\u012bcij\u0101m un <code>M_PLAF_ORG<\/code> pl\u0101notajiem pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Pakalpojumi ir pieejami tikai ar sazi\u0146as konfigur\u0101cij\u0101m. Iev\u0113rojot <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">SAP nor\u0101d\u012bjumus par ien\u0101ko\u0161\u0101s sazi\u0146as iestat\u012b\u0161anu<\/a>, lietotn\u0113 <strong>Communication Arrangements<\/strong> izveidojiet sazi\u0146as lietot\u0101ju, sazi\u0146as sist\u0113mu un sazi\u0146as konfigur\u0101ciju, pamatojoties uz SAP sazi\u0146as scen\u0101riju (<code>SAP_COM_xxxx<\/code>). Scen\u0101rijs nosaka, kuri pakalpojumi ir pieejami un k\u0101das autentifik\u0101cijas metodes var izmantot:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; ar pilnvar\u0101m: OAuth, SAML vai OpenID Connect bearer pl\u016bsmas ar identit\u0101tes t\u0101l\u0101knodo\u0161anu biznesa lietot\u0101jam &#8211; ar klienta sertifik\u0101tu &#8211; pamata autentifik\u0101cija ar tehnisko sazi\u0146as lietot\u0101ju<\/p>\n\n\n<p>SAP iesaka autentifik\u0101cijai izmantot pilnvaras vai sertifik\u0101tus.<\/p>\n\n\n<p>SkyPlanner pus\u0113 ir REST API ar API pilnvaras autentifik\u0101ciju, kas aprakst\u012bta Swagger\/OpenAPI dokument\u0101cij\u0101 (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). T\u0101d\u0113j\u0101di starpprogrammat\u016bra vien\u0101 pus\u0113 nodro\u0161ina SAP autentifik\u0101ciju, bet otr\u0101 izmanto SkyPlanner API pilnvaru.<\/p>\n\n\n<h3 class=\"wp-block-heading\">API ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Pakalpojums<\/th><th>Izmantot\u0101s ent\u012btijas un darb\u012bbas<\/th><th>Pielietojums<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; darb\u012bbas <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Pas\u016bt\u012bjumi, oper\u0101cijas, komponenti, ra\u017eo\u0161anas resursi un instrumenti (PRT), statuss, grafika datu ierakst\u012b\u0161ana avota sist\u0113m\u0101<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Darba centri, jaudas kategorijas, interv\u0101li un mai\u0146as<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Standarta tehnolo\u0123iskie procesi pl\u0101no\u0161anai pirms pas\u016bt\u012bjuma izveides<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Daudzl\u012bme\u0146u produkta strukt\u016bra<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Materi\u0101li (API tos sauc par Product). Liel\u0101kajai da\u013cai produktu ent\u012btiju SAP tagad iesaka Product (Version 2) API<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>MRP Live rezult\u0101ti pirms p\u0101rveido\u0161anas<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Kr\u0101jumi pa ra\u017eotn\u0113m un uzglab\u0101\u0161anas viet\u0101m materi\u0101lu pieejam\u012bbas noteik\u0161anai<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Atv\u0113rtie iepirkuma pas\u016bt\u012bjumi gaid\u0101majiem materi\u0101liem<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; darb\u012bbas <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Apstiprin\u0101jumi un pre\u010du kust\u012bbas no ra\u017eo\u0161anas ceha<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ra\u017eo\u0161anas pas\u016bt\u012bjumu API oper\u0101cijas identific\u0113 p\u0113c <code>OrderInternalBillOfOperations<\/code> un <code>OrderIntBillOfOperationsItem<\/code> kombin\u0101cijas, nevis p\u0113c pl\u0101not\u0101jam redzam\u0101 oper\u0101cijas numura. Apstiprin\u0101jumu API darb\u012bba <code>GetConfProposal<\/code> to pa\u0161u oper\u0101ciju identific\u0113 p\u0113c <code>OrderID<\/code> un <code>OrderOperation<\/code>. Jau no pirm\u0101s iel\u0101des saglab\u0101jiet SkyPlanner gan iek\u0161\u0113j\u0101s atsl\u0113gas, gan oper\u0101cijas numuru.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Notikumi<\/h3>\n\n\n<p>S\/4HANA \u0123ener\u0113 <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">biznesa notikumus<\/a> <strong>Production Order Created<\/strong> un <strong>Production Order Changed<\/strong>, kuru datu satur\u0101 ir <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> un <code>ProductionPlant<\/code>. Notikuma dati satur tikai atsl\u0113gas, t\u0101p\u0113c integr\u0101cija atk\u0101rtoti nolasa pas\u016bt\u012bjumu un t\u0101 oper\u0101cijas. Notikums Changed tiek \u0123ener\u0113ts pie katras pas\u016bt\u012bjuma izmai\u0146as, t\u0101p\u0113c ieviesiet apstr\u0101des aizturi, kas apvieno strauji sekojo\u0161us notikumus. Pret\u0113j\u0101 virzien\u0101 SkyPlanner ar webhook pal\u012bdz\u012bbu re\u0101llaik\u0101 nos\u016bta pazi\u0146ojumus, kad main\u0101s grafiks vai ra\u017eo\u0161anas uzdevuma st\u0101voklis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S\u0101ciet ar failiem<\/h3>\n\n\n<p>Izm\u0113\u0123in\u0101jumam eksport\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus un darba centrus no S\/4HANA sarakstu p\u0101rskatiem Excel vai CSV form\u0101t\u0101 un import\u0113jiet tos SkyPlanner. T\u0101 var p\u0101rbaud\u012bt grafiku, pirms \u0137erties pie Gateway vai sazi\u0146as konfigur\u0101cijas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana no SAP S\/4HANA uz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>S\/4HANA ent\u012btija \/ galapunkts<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (materi\u0101ls)<\/td><td>Produkts vai materi\u0101ls<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam izmai\u0146u iel\u0101de p\u0113c grafika<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Produkta strukt\u016bra, apak\u0161produkti<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c grafika<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Darba centrs<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de un izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Jauda un mai\u0146as<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c grafika<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Procesa so\u013ci un laika normas<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c grafika<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (izlaists izpildei vai izveidots)<\/td><td>Pas\u016bt\u012bjums ar izpildes termi\u0146u<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Gandr\u012bz re\u0101llaik\u0101 p\u0113c Created\/Changed notikuma vai ar aptauju p\u0113c grafika<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Ra\u017eo\u0161anas uzdevums (procesa solis darba centr\u0101)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kop\u0101 ar pas\u016bt\u012bjumu<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (ra\u017eo\u0161anas resursi\/instrumenti)<\/td><td>Instrumenti, kuru izmanto\u0161anu pl\u0101no k\u0101 ierobe\u017eotus koplietojamus resursus<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kop\u0101 ar pas\u016bt\u012bjumu<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Materi\u0101lu vajadz\u012bbas un kr\u0101jumi<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>P\u0113c grafika; interv\u0101lu saska\u0146o tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): nepieg\u0101d\u0101tais daudzums un pieg\u0101des grafika rindas pieg\u0101des datums<\/td><td>Iepirkuma pas\u016bt\u012bjumi \/ gaid\u0101mie materi\u0101li ar paredzamo pieg\u0101des datumu<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>P\u0113c grafika; interv\u0101lu saska\u0146o tv\u0113ruma noteik\u0161anas laik\u0101<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (p\u0113c izv\u0113les)<\/td><td>Pas\u016bt\u012bjumi, kas iepl\u0101noti pirms p\u0101rveido\u0161anas<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>P\u0113c katras MRP Live izpildes<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (oper\u0101cijas s\u0101kums, pl\u0101no\u0161ana uz priek\u0161u)<\/td><td>Grafiks<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Mainoties grafikam, izmantojot webhook<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (der\u012bg\u0101s produkcijas daudzums, br\u0101\u0137is, darb\u012bbas)<\/td><td>Laika uzskaites ieraksti un daudzumi<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>P\u0113c katra laika uzskaites notikuma vai paket\u0113s<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pamatdatu iel\u0101de.<\/strong> Iel\u0101d\u0113jiet materi\u0101lus, BOM, darba centrus ar to jaudas interv\u0101liem un mai\u0146\u0101m, k\u0101 ar\u012b tehnolo\u0123iskos procesus. \u0160aj\u0101 posm\u0101 izlemiet, kura sist\u0113ma p\u0101rvald\u012bs mai\u0146as. Praks\u0113 darbojas \u0161\u0101ds sadal\u012bjums: r\u016bpn\u012bcas kalend\u0101rs paliek S\/4HANA, savuk\u0101rt detaliz\u0113ti mai\u0146u grafiki, promb\u016btnes un virsstundas tiek uztur\u0113tas SkyPlanner, kur pl\u0101not\u0101ji t\u0101s maina ik dienu.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Abon\u0113jiet Production Order Created\/Changed notikumus vai, ja biznesa notikumi nav iestat\u012bti, periodiski nolasiet <code>A_ProductionOrder_2<\/code> p\u0113c izmai\u0146u laika z\u012bmoga. Filtr\u0113jiet p\u0113c ra\u017eotnes, pas\u016bt\u012bjuma veida un statusa. Nos\u016btiet pas\u016bt\u012bjumus uzreiz p\u0113c izveides, lai SkyPlanner var\u0113tu pl\u0101not uz priek\u0161u, un izlaidiet tos izpildei S\/4HANA sist\u0113m\u0101 (<code>ReleaseOrder<\/code> vai <code>ReleaseOperation<\/code>), kad SkyPlanner tos ir iepl\u0101nojis.<\/p>\n\n\n<p><strong>3. Grafika datu ierakst\u012b\u0161ana avota sist\u0113m\u0101.<\/strong> Kad SkyPlanner webhook zi\u0146o par grafika izmai\u0146\u0101m, integr\u0101cija katrai main\u012btajai oper\u0101cijai izsauc <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> pakalpojum\u0101 <code>API_PRODUCTION_ORDER_2_SRV<\/code>. T\u0101 nos\u016bta:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> un <code>OrderIntBillOfOperationsItem<\/code> k\u0101 atsl\u0113gas<\/li>\n\n\n<li><code>OpSchedulingMode<\/code> v\u0113rt\u012bbu F (uz priek\u0161u), nor\u0101dot SkyPlanner noteikto s\u0101kumu laukos <code>OpSchedldStartDate<\/code> un <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> v\u0113rt\u012bbu DISP (nor\u012bko\u0161ana izpildei) un oblig\u0101to <code>OpSchedulingStrategy<\/code> v\u0113rt\u012bbu M<\/li>\n\n\n<li>ETag lauk\u0101 <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>Visas viena pas\u016bt\u012bjuma oper\u0101cijas tiek nos\u016bt\u012btas vien\u0101 izmai\u0146u kop\u0101 SkyPlanner noteiktaj\u0101 sec\u012bb\u0101, lai S\/4HANA ar vienu izsaukumu iepl\u0101notu visu pas\u016bt\u012bjumu. Re\u017e\u012bms K netiek izmantots nekad: tas saglab\u0101 s\u0101kotn\u0113jos oper\u0101ciju datumus un ignor\u0113 nos\u016bt\u012btos datumus.<\/p>\n\n\n<p>SkyPlanner apr\u0113\u0137ina oper\u0101ciju ilgumu, izmantojot t\u0101s pa\u0161as tehnolo\u0123isko procesu standartv\u0113rt\u012bbas un darba centru jaudas formulas, ko izmanto S\/4HANA. T\u0101d\u0113\u013c beigu datums, ko S\/4HANA apr\u0113\u0137ina no nos\u016bt\u012bt\u0101 s\u0101kuma datuma, atbilst SkyPlanner pl\u0101nam. P\u0113c katras izmai\u0146u kopas integr\u0101cija atk\u0101rtoti nolasa oper\u0101cijas un atz\u012bm\u0113 katru datumu, kas at\u0161\u0137iras, lai pl\u0101not\u0101js to redz\u0113tu pirms n\u0101kam\u0101s mai\u0146as.<\/p>\n\n\n<p><strong>4. Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha.<\/strong> Katrs Mobile Confirmations vai Production Timer laika uzskaites ieraksts k\u013c\u016bst par S\/4HANA apstiprin\u0101jumu. SkyPlanner ar webhook pal\u012bdz\u012bbu ierosina <code>ProdnOrdConf2<\/code> ieraksta nos\u016bt\u012b\u0161anu ar der\u012bg\u0101s produkcijas daudzumu, br\u0101\u0137i un darb\u012bbu laikiem. Vispirms integr\u0101cija izsauc <code>GetConfProposal<\/code>, lai S\/4HANA pied\u0101v\u0101tu daudzumus, darb\u012bbas, datumus un person\u0101la datus. <code>GetGdsMvtProposal<\/code> pied\u0101v\u0101 pre\u010du kust\u012bbas.<\/p>\n\n\n<p><strong>Ien\u0101ko\u0161ie materi\u0101li.<\/strong> Atv\u0113rtie iepirkuma pas\u016bt\u012bjumi ir da\u013ca no ien\u0101ko\u0161o datu sinhroniz\u0101cijas. SkyPlanner uzskata pas\u016bt\u012bto materi\u0101lu par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 paredzamaj\u0101 pieg\u0101des datum\u0101. Darbi, kas gaida iepirkt\u0101s komponentes, tiek iepl\u0101noti materi\u0101la sa\u0146em\u0161anas dien\u0101, nevis blo\u0137\u0113ti pa\u0161reiz\u0113j\u0101 kr\u0101jumu atlikuma d\u0113\u013c.<\/p>\n\n\n<p>S\/4HANA paliek noteico\u0161ais pre\u010du sa\u0146em\u0161anas datu avots: iegr\u0101matojot pre\u010du sa\u0146em\u0161anu, kr\u0101jumi palielin\u0101s un iepirkuma pas\u016bt\u012bjuma poz\u012bcijas nesa\u0146emtais daudzums samazin\u0101s. N\u0101kam\u0101 sinhroniz\u0101cija atjaunina kr\u0101jumus SkyPlanner un piln\u012bb\u0101 sa\u0146emtam iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. P\u0113c da\u013c\u0113jas sa\u0146em\u0161anas atliku\u0161ais daudzums joproj\u0101m tiek uzskat\u012bts par ien\u0101ko\u0161u pieg\u0101des grafika rind\u0101 nor\u0101d\u012btaj\u0101 datum\u0101. Iepirkuma pas\u016bt\u012bjumu apstr\u0101de ir aprakst\u012bta <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas noteikumi.<\/strong> S\/4HANA p\u0101rvalda daudzumus, BOM, tehnolo\u0123iskos procesus, pa\u0161izmaksas apr\u0113\u0137inus un statusus. SkyPlanner p\u0101rvalda sec\u012bbu, darba centru pie\u0161\u0137ir\u0161anu un oper\u0101ciju datumus. Nekad ne\u013caujiet ab\u0101m sist\u0113m\u0101m rakst\u012bt vien\u0101 un taj\u0101 pa\u0161\u0101 lauk\u0101. Ja pl\u0101not\u0101ji joproj\u0101m p\u0101rvieto oper\u0101cijas r\u012bk\u0101 Capacity Scheduling Board, nosakiet, kur\u0101m izmai\u0146\u0101m ir priek\u0161roka. Vai nu n\u0101kam\u0101 pas\u016bt\u012bjumu sinhroniz\u0101cija p\u0101rnes vi\u0146u izmai\u0146as uz SkyPlanner, vai ar\u012b attiec\u012bgais darba centrs paliek \u0101rpus SkyPlanner tv\u0113ruma.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas ietilpst projekt\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. Vairums r\u016bpn\u012bcu s\u0101k ar 30 dienu bezmaksas izm\u0113\u0123in\u0101jumu, izmantojot CSV vai Excel eksportus. T\u0101 grafiku p\u0101rbauda ar saviem datiem, pirms s\u0101k darbu ar API. P\u0113c tam S\/4HANA projekt\u0101 ietilpst:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tv\u0113ruma noteik\u0161ana:<\/strong> r\u016bpn\u012bcas, pas\u016bt\u012bjumu veidi, izdevums un autentifik\u0101cijas modelis, k\u0101 ar\u012b sist\u0113ma, kas p\u0101rvalda katru lauku.<\/li>\n\n\n<li><strong>Piek\u013cuve SAP:<\/strong> Gateway servisa aktiviz\u0113\u0161ana vai sazi\u0146as konfigur\u0101cija, k\u0101 ar\u012b tehniskie lietot\u0101ji un autoriz\u0101cijas objekti.<\/li>\n\n\n<li><strong>Pamatdatu kart\u0113\u0161ana:<\/strong> darba centru jaudas kategorijas, interv\u0101li un mai\u0146as, tehnolo\u0123isko procesu standartv\u0113rt\u012bbu piesaiste oper\u0101ciju ilgumam SkyPlanner sist\u0113m\u0101, m\u0113rvien\u012bbas.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de:<\/strong> materi\u0101li, BOM, tehnolo\u0123iskie procesi un darba centri ar to jaudu.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija:<\/strong> ra\u017eo\u0161anas pas\u016bt\u012bjumi un oper\u0101cijas \u2014 p\u0113c Created\/Changed notikumiem vai periodiskas aptaujas; kr\u0101jumi un atv\u0113rtie iepirkuma pas\u016bt\u012bjumi \u2014 p\u0113c grafika.<\/li>\n\n\n<li><strong>Grafika datu ierakst\u012b\u0161ana avota sist\u0113m\u0101:<\/strong> <code>ScheduleProductionOrderOperation<\/code> ar ETag apstr\u0101di un atk\u0101rtotu m\u0113\u0123in\u0101jumu rindu.<\/li>\n\n\n<li><strong>Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha:<\/strong> laika uzskaites ierakstus nos\u016bta k\u0101 <code>ProdnOrdConf2<\/code> apstiprin\u0101jumus.<\/li>\n\n\n<li><strong>P\u0101rbaude paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam:<\/strong> SkyPlanner grafiku p\u0101rbauda paral\u0113li eso\u0161ajam jaudas izl\u012bdzin\u0101\u0161anas pl\u0101nam, l\u012bdz pl\u0101not\u0101ji tam uzticas.<\/li>\n\n\n<li><strong>Darb\u012bbas uzs\u0101k\u0161ana.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP S\/4HANA riski, kam piev\u0113rst uzman\u012bbu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Datus ieraksta avota sist\u0113m\u0101, izsaucot darb\u012bbu un izmantojot ETag.<\/strong> Dokument\u0101cij\u0101 paredz\u0113tais oper\u0101cijas iepl\u0101no\u0161anas veids ir <code>ScheduleProductionOrderOperation<\/code>, nevis PATCH piepras\u012bjums ent\u012btijai <code>A_ProductionOrderOperation_2<\/code>. Re\u017e\u012bms F pl\u0101no uz priek\u0161u no s\u0101kuma, bet B \u2014 atpaka\u013c no beig\u0101m; savuk\u0101rt K un S saglab\u0101 eso\u0161os datumus un ignor\u0113 j\u016bsu nor\u0101d\u012btos. ETag lauk\u0101 <code>if-match<\/code> veido no pas\u016bt\u012bjuma <code>LastChangeDateTime<\/code> (YYYYMMDDHHMMSS), t\u0101p\u0113c jebkura pas\u016bt\u012bjuma izmai\u0146a padara to novecoju\u0161u. Ieviesiet nolas\u012b\u0161anu pirms ierakst\u012b\u0161anas un atk\u0101rtotu m\u0113\u0123in\u0101jumu rindu.<\/li>\n\n\n<li><strong>Jauda nav nor\u0101d\u012bta darba centra galven\u0113.<\/strong> Pieejamo jaudu nosaka jaudas kategorija (001 iek\u0101rtas, 002 darbasp\u0113ks), ra\u017eotnes kalend\u0101rs un interv\u0101li un mai\u0146as, kas aizst\u0101j t\u0101 iestat\u012bjumus. Jaudas formulas p\u0101rv\u0113r\u0161 tehnolo\u0123isk\u0101 procesa standarta v\u0113rt\u012bbas par sagatavo\u0161anas, apstr\u0101des un nosl\u0113guma darbu jaudas vajadz\u012bb\u0101m. Nolasiet <code>A_WorkCenterCapacityInterval_2<\/code> un mai\u0146u ent\u012btijas un vienojieties, k\u0101 ar \u0161\u012bm formul\u0101m apr\u0113\u0137in\u0101t SkyPlanner izmantojamos oper\u0101ciju ilgumus.<\/li>\n\n\n<li><strong>Standartv\u0113rt\u012bbas ir j\u0101sak\u0101rto.<\/strong> Pa\u0161izmaksas apr\u0113\u0137iniem uztur\u0113tos tehnolo\u0123iskajos procesos bie\u017ei ir nor\u0101d\u012bti vid\u0113jie iestat\u012b\u0161anas laiki vai iestat\u012b\u0161ana ir piesaist\u012bta nepareizai jaudas kategorijai.<\/li>\n\n\n<li><strong>Apstiprin\u0101jumu noteikumi ir stingri.<\/strong> Masveida iegr\u0101mato\u0161anai SAP iesaka pake\u0161u izsaukumus. Izmai\u0146u kopa tiek izpild\u012bta piln\u012bb\u0101 vai netiek izpild\u012bta visp\u0101r, t\u0101p\u0113c viens k\u013c\u016bdains darba laika ieraksts blo\u0137\u0113 visu p\u0101r\u0113jo kopu. Atcel\u0161ana paket\u0113 j\u0101veic apgriezt\u0101 <code>ConfirmationCount<\/code> sec\u012bb\u0101. Vien\u0101 pas\u016bt\u012bjum\u0101 nedr\u012bkst apvienot da\u017e\u0101dus apstiprin\u0101jumu veidus, iegr\u0101matot pre\u010du kust\u012bbas bez apstiprin\u0101juma vai apstiprin\u0101t oper\u0101cijas, kuru palaides punktiem vajadz\u012bgs dialoglodzi\u0146\u0161.<\/li>\n\n\n<li><strong>P\u0101rbaudiet, vai PP\/DS ir akt\u012bvs.<\/strong> Iegultajam PP\/DS ir nepiecie\u0161ama Customizing darb\u012bba <strong>Activate Advanced Planning and Scheduling<\/strong> un SAP HANA integr\u0113tais liveCache. SAP to p\u0101rdod k\u0101 atsevi\u0161\u0137u produktu \u2014 <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Ja tas ir akt\u012bvs, katram materi\u0101lam nosakiet, kura sist\u0113ma sast\u0101da grafiku: materi\u0101li, kam atz\u012bm\u0113ta progres\u012bv\u0101 pl\u0101no\u0161ana, ir PP\/DS p\u0101rzi\u0146\u0101. Par pl\u0101noto pas\u016bt\u012bjumu API SAP ar\u012b nor\u0101da: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (\u0160\u012b API nenodro\u0161ina autom\u0101tisku integr\u0101ciju ar min\u0113to sist\u0113mu.)<\/li>\n\n\n<li><strong>M\u0113rvien\u012bbas.<\/strong> Oper\u0101ciju daudzumu, tehnolo\u0123isko procesu b\u0101zes daudzumu un apstiprin\u0101jumu m\u0113rvien\u012bbas var at\u0161\u0137irties. Veiciet skaidri noteiktu p\u0101rr\u0113\u0137inu, izmantojot oper\u0101cijas m\u0113rvien\u012bbu, nevis materi\u0101la b\u0101zes m\u0113rvien\u012bbu.<\/li>\n\n\n<li><strong>At\u0161\u0137ir\u012bbas starp izdevumiem.<\/strong> <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> par\u0101da, ka klasisko CM21\/CM22 pl\u0101no\u0161anas tabulu aizst\u0101j Manage Work Center Capacity, Capacity Scheduling Table un Capacity Scheduling Board. Public Edition nodro\u0161ina piek\u013cuvi API tikai ar sazi\u0146as scen\u0101rijiem, un taj\u0101 pied\u0101v\u0101t\u0101s servisu versijas var at\u0161\u0137irties no lok\u0101li izvietot\u0101s sist\u0113mas versij\u0101m. Tehnolo\u0123isko procesu API nevar dz\u0113st tehnolo\u0123iskos procesus vai atjaunin\u0101t materi\u0101lu piesaistes. Tv\u0113ruma noteik\u0161anas laik\u0101 SkyPlanner komanda katra klienta sist\u0113mai fiks\u0113 servisu versijas, izmantojot attiec\u012bg\u0101 laidiena ierakstu API Business Accelerator Hub.<\/li>\n\n\n<li><strong>Ierobe\u017eojumi, ko tehnolo\u0123iskie procesi neietver.<\/strong> No sec\u012bbas atkar\u012bgo p\u0101rregul\u0113\u0161anu, instrumentu pieejam\u012bbas konfliktus un oper\u0101cijas ar vair\u0101kiem operatoriem uzturiet SkyPlanner, nevis tehnolo\u0123isko procesu standartv\u0113rt\u012bb\u0101s. Iestat\u012b\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki katram produktu p\u0101rim. Pas\u016bt\u012bjuma PRT nor\u0101d\u012btie instrumenti ir ierobe\u017eoti resursi \u2014 tos vienlaikus var izmantot tikai vien\u0101 darba centr\u0101, savuk\u0101rt oper\u0101cijai var b\u016bt vajadz\u012bgi vair\u0101ki cilv\u0113ki vienlaikus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfigur\u0113 integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Iepriek\u0161 min\u0113to risku d\u0113\u013c tie\u0161i konfigur\u0113\u0161ana ir galvenais darbs. Katra r\u016bpn\u012bca S\/4HANA izmanto cit\u0101di: pas\u016bt\u012bjumu veidi, jaudas kategorijas, tehnolo\u0123isko procesu standartv\u0113rt\u012bbas, user exits un izdevums ietekm\u0113 datu kart\u0113\u0161anu.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju<\/strong> ievie\u0161anas laik\u0101 atbilsto\u0161i j\u016bsu S\/4HANA konfigur\u0101cijai, izmantojot ofici\u0101li public\u0113t\u0101s S\/4HANA API, k\u0101 ar\u012b SkyPlanner REST API un webhooks. Komanda nodro\u0161ina integr\u0101cijas atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Tas ir standarta risin\u0101jums, kas jums nodro\u0161ina vienu atbild\u012bgo gan par grafiku sast\u0101d\u012b\u0161anas r\u012bku, gan savienojumu ar S\/4HANA.<\/li>\n\n\n<li><strong>J\u016bsu SAP partneris<\/strong> var izveidot integr\u0101ciju, izmantojot SkyPlanner Swagger\/OpenAPI dokument\u0101ciju un savas zin\u0101\u0161anas par j\u016bsu pas\u016bt\u012bjumu veidiem un Basis konfigur\u0101ciju.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji<\/strong> var izveidot integr\u0101ciju tie\u0161i vai izmantot SAP Integration Suite vai SAP BTP, izmantojot dokument\u0113to REST API, autentifik\u0101ciju ar API pilnvaru un t\u012bmek\u013ca aiz\u0137eres (<a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bba<\/a>). Lai s\u0101ktu, pietiek ar API atsl\u0113gu, un SkyPlanner komanda iesaist\u0101s, kad izstr\u0101d\u0101t\u0101jiem nepiecie\u0161ama pal\u012bdz\u012bba.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner jau darbojas l\u012bdz\u0101s SAP: uz\u0146\u0113muma Laboratory &amp; Allied iek\u0161\u0113j\u0101 IT komanda ar SkyPlanner pal\u012bdz\u012bbu savienoja SAP Business One on HANA ar SkyPlanner. Funkciju dokument\u0101cija ir publiski pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cijas vietn\u0113<\/a>.<\/p>\n\n\n<p>Neatkar\u012bgi no izv\u0113l\u0113t\u0101 ce\u013ca vispirms p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 (l\u012bdz 20 darba centriem, bez maks\u0101jumu kartes). P\u0113c tam integr\u0101cija tiek veidota pl\u0101nam, kuram j\u016bsu pl\u0101not\u0101ji jau uzticas. P\u0113c izm\u0113\u0123in\u0101juma cena ir no 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un ikm\u0113ne\u0161a nor\u0113\u0137iniem. Integr\u0101cijas cenas pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai pirms darba s\u0101k\u0161anas j\u016bs redz\u0113tu piln\u0101s izmaksas.<\/p>\n\n\n<p>Pla\u0161\u0101kai inform\u0101cijai skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un <a href=\"\/lv\/klientu-stasti\/\">klientu atsauksmes<\/a>.<\/p>\n\n\n<p><a href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a> <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta pl\u0101na izveide trim m\u0113ne\u0161iem visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner ir viegl\u0101k paman\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas, un ra\u017eo\u0161anas vad\u012bba ir k\u013cuvusi p\u0101rskat\u0101m\u0101ka.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 ap 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens darbu vad\u012bt\u0101js, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savienojas ar SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integr\u0113jas ar SAP S\/4HANA abos virzienos. Ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, tehnolo\u0123iskos procesus, darba centrus, kr\u0101jumus un iepirkuma pas\u016bt\u012bjumus sa\u0146em caur SAP ofici\u0101li public\u0113taj\u0101m OData API. Oper\u0101ciju datumus nos\u016bta atpaka\u013c ar <code>ScheduleProductionOrderOperation<\/code>, bet uzskait\u012bt\u0101s stundas \u2014 k\u0101 <code>ProdnOrdConf2<\/code> apstiprin\u0101jumus. Nos\u016bt\u012b\u0161anu ierosina SkyPlanner, izmantojot webhook.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izstr\u0101d\u0101 un uztur integr\u0101ciju?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu S\/4HANA konfigur\u0101cijai un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jums tiek sagatavots iepriek\u0161, \u0146emot v\u0113r\u0101 j\u016bsu procesus un vajadz\u012bbas. Ja integr\u0101ciju ar REST API izstr\u0101d\u0101 j\u016bsu SAP partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, par to atbild vi\u0146i, un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 oper\u0101ciju datumi tiek ierakst\u012bti atpaka\u013c S\/4HANA, un vai sist\u0113ma saglab\u0101 oper\u0101ciju sec\u012bbu?<\/summary>\n<p class=\"sp-faq__a\">Ar darb\u012bbu <code>ScheduleProductionOrderOperation<\/code> pakalpojum\u0101 <code>API_PRODUCTION_ORDER_2_SRV<\/code>, izmantojot pl\u0101no\u0161anu uz priek\u0161u, nor\u012bko\u0161anas izpildei statusu un SkyPlanner noteikto s\u0101kuma datumu un laiku. Katra pas\u016bt\u012bjuma oper\u0101cijas nos\u016bta vien\u0101 izmai\u0146u kop\u0101 SkyPlanner noteiktaj\u0101 sec\u012bb\u0101. Ilgumus ieg\u016bst no t\u0101m pa\u0161\u0101m tehnolo\u0123isk\u0101 procesa standarta v\u0113rt\u012bb\u0101m, ko izmanto S\/4HANA. Integr\u0101cija atk\u0101rtoti nolasa katru oper\u0101ciju un atz\u012bm\u0113 jebk\u0101das at\u0161\u0137ir\u012bbas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 apstiprin\u0101jumi non\u0101k S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Operatori re\u0123istr\u0113 darbu SkyPlanner, un SkyPlanner nos\u016bta webhook pazi\u0146ojumu. P\u0113c tam integr\u0101cija caur <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> nos\u016bta apstiprin\u0101jumu ar der\u012bg\u0101s produkcijas daudzumu, br\u0101\u0137i un darb\u012bbu laikiem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai integr\u0101cija darbojas ar S\/4HANA Cloud Public Edition?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Piek\u013cuvei izmanto attiec\u012bgajiem komunik\u0101cijas scen\u0101rijiem izveidotu komunik\u0101cijas konfigur\u0101ciju. Tv\u0113ruma noteik\u0161anas laik\u0101 SkyPlanner komanda izv\u0113las ra\u017eo\u0161anas pas\u016bt\u012bjumu API versiju, kas atbilst j\u016bsu Public Edition laidienam. Lok\u0101li izvietot\u0101s sist\u0113m\u0101s un Private Edition t\u0101 viet\u0101 aktiviz\u0113 Gateway servisu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mums jau ir PP\/DS. Vai mums ir vajadz\u012bgs SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nodro\u0161ina pl\u0101no\u0161anu r\u016bpn\u012bc\u0101s un ra\u017eotn\u0113s, kur\u0101m nav PP\/DS licences vai person\u0101la darbam ar to. Nav vajadz\u012bgs ne Customizing sl\u0113dzis, ne liveCache, ne optimiz\u0101cijas serveris \u2014 SAP pus\u0113 nepiecie\u0161amas tikai lieto\u0161anai apstiprin\u0101tas OData API. Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 sapl\u0101no ra\u017eo\u0161anu, izveidojot grafiku, kas iev\u0113ro re\u0101lo iek\u0101rtu un person\u0101la jaudu, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t sist\u0113mu pirms integr\u0101cijas darbu s\u0101k\u0161anas, un cik ilgs ir projekts?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101juma laik\u0101 import\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus un darba centrus no S\/4HANA eksport\u0113tajiem datiem. Kad grafiks darbojas, varat izveidot API integr\u0101ciju. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101k\u0161anas. Lai noteiktu integr\u0101cijas tv\u0113rumu j\u016bsu sist\u0113mu vid\u0113, <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a> vai <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP S\/4HANA SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b SAP partneriem, IT komand\u0101m un tehnisko risin\u0101jumu pirc\u0113jiem skaidrots, k\u0101 SkyPlanner APS savieno ar SAP S\/4HANA. SkyPlanner apmain\u0101s ar datiem ar S\/4HANA abos virzienos, izmantojot SAP ofici\u0101li public\u0113t\u0101s OData API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Materi\u0101li, BOM, &#8230; <a title=\"SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/\" aria-label=\"Read more about SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100797,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101154","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP S\/4HANA integr\u0101cija APS pl\u0101no\u0161anai | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS un SAP S\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS un SAP S\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/integracijas-celvedis\\\/\",\"name\":\"SAP S\\\/4HANA integr\u0101cija APS pl\u0101no\u0161anai | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS un SAP S\\\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP S\\\/4HANA: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP S\\\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP S\/4HANA integr\u0101cija APS pl\u0101no\u0161anai | SkyPlanner","description":"SkyPlanner APS un SAP S\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"SkyPlanner APS un SAP S\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/","name":"SAP S\/4HANA integr\u0101cija APS pl\u0101no\u0161anai | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS un SAP S\/4HANA integr\u0101cija: OData API, sazi\u0146as konfigur\u0101cija, ScheduleProductionOrderOperation atpaka\u013cierakste, datu kart\u0113\u0161ana un riski.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP S\/4HANA: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP S\/4HANA SAP S\/4HANA integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b SAP partneriem, IT komand\u0101m un tehnisko risin\u0101jumu pirc\u0113jiem skaidrots, k\u0101 SkyPlanner APS savieno ar SAP S\/4HANA. SkyPlanner apmain\u0101s ar datiem ar S\/4HANA abos virzienos, izmantojot SAP ofici\u0101li public\u0113t\u0101s OData API: skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana Materi\u0101li, BOM,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101154"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101154\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100797"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}