{"id":101124,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101124"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/","title":{"rendered":"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 t\u0101da grafika sast\u0101d\u012b\u0161anu, kas atbilst re\u0101li pieejamajai iek\u0101rtu un person\u0101la jaudai. SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu divos veidos: ar manu\u0101lu jaudas slodzes izl\u012bdzin\u0101\u0161anu pamatsist\u0113m\u0101 un automatiz\u0113tu grafiku sast\u0101d\u012b\u0161anu ieb\u016bv\u0113taj\u0101 PP\/DS. Standarta S\/4HANA izpildes laika pl\u0101no\u0161an\u0101 jaudas ierobe\u017eojumi netiek \u0146emti v\u0113r\u0101. Oper\u0101cijas tiek iepl\u0101notas atbilsto\u0161i pieejamajai jaudai tad, kad pl\u0101not\u0101js Fiori jaudas pl\u0101no\u0161anas lietotn\u0113s izl\u012bdzina slodzi oper\u0101cij\u0101m, kas veido \u0161aur\u0101s vietas. PP\/DS, ko p\u0101rdod ar nosaukumu SAP S\/4HANA Manufacturing for planning and scheduling, ir j\u0101aktiviz\u0113, tam j\u0101ieg\u0101d\u0101jas licence un j\u0101nodro\u0161ina person\u0101ls darbam ar to.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ra\u017eotnes, kur\u0101m vajadz\u012bga <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161ana<\/a>, iev\u0113rojot katra resursa pieejamo jaudu, bez PP\/DS ievie\u0161anas projekta, l\u012bdz\u0101s S\/4HANA izmanto SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sap-s-4hana-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 SAP S\/4HANA pl\u0101no ra\u017eo\u0161anu: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA ir divi ra\u017eo\u0161anas jaudas pl\u0101no\u0161anas l\u012bme\u0146i. Vairums ra\u017eot\u0146u izmanto tikai pirmo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. MRP un izpildes termi\u0146u pl\u0101no\u0161ana<\/h3>\n\n\n<p>MRP Live (MD01N) izveido pl\u0101notos pas\u016bt\u012bjumus. P\u0113c tam izpildes termi\u0146u pl\u0101no\u0161ana nosaka oper\u0101ciju datumus un apr\u0113\u0137ina jaudas vajadz\u012bbas, izmantojot darba centra sagatavo\u0161anas, apstr\u0101des un nosl\u0113guma darbu formulas. T\u0101 ne\u0146em v\u0113r\u0101 slodzi, ko \u0161im darba centram jau rada citi pas\u016bt\u012bjumi. SAP Learning to pasaka skaidri: &#8220;The operations are scheduled infinitely. The non-working times of the work centers are taken into account, but not the capacity requirements of other orders&#8221; (Oper\u0101cijas tiek pl\u0101notas bez jaudas ierobe\u017eojumiem. Darba centru nestr\u0101des laiks tiek \u0146emts v\u0113r\u0101, bet citu pas\u016bt\u012bjumu jaudas vajadz\u012bbas \u2014 ne.) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>). Rezult\u0101t\u0101 darba centri ir p\u0101rslogoti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Darba centra jaudas pamatdati<\/h3>\n\n\n<p>Jaudu defin\u0113 <strong>Work Center<\/strong> objekt\u0101, nevis pas\u016bt\u012bjum\u0101. Darba centram var b\u016bt vair\u0101kas jaudas kategorijas (SAP piem\u0113rs: 001 Machine un 002 Labor). Katrai ir formulas, kas tehnolo\u0123isk\u0101 procesa normat\u012bv\u0101s v\u0113rt\u012bbas p\u0101rv\u0113r\u0161 jaudas vajadz\u012bb\u0101s. <strong>Factory Calendar<\/strong> nosaka darbdienas, atsevi\u0161\u0137iem laika interv\u0101liem nor\u0101d\u012bt\u0101 jauda aizst\u0101j standarta pieejamo jaudu, savuk\u0101rt jaudas versijas (standarta, minim\u0101l\u0101, maksim\u0101l\u0101) \u013cauj model\u0113t alternat\u012bvus mai\u0146u grafikus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Jaudas nov\u0113rt\u0113\u0161ana<\/h3>\n\n\n<p>Pl\u0101not\u0101ji lietotn\u0113 <strong>Manage Work Center Capacity<\/strong> sal\u012bdzina vajadz\u012bgo un pieejamo jaudu. MRP atbild\u012bgie to var p\u0101rbaud\u012bt ar\u012b kr\u0101jumu un vajadz\u012bbu sarakst\u0101. Nov\u0113rt\u0113jums par\u0101da p\u0101rslodzi, bet nevienu oper\u0101ciju nep\u0101rce\u013c.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Pl\u0101not\u0101js izl\u012bdzina jaudu<\/h3>\n\n\n<p>Jaudas izl\u012bdzin\u0101\u0161anas laik\u0101 oper\u0101cijas tiek izvietotas atbilsto\u0161i pieejamajai jaudai, un \u0161o procesu vada pl\u0101not\u0101js. SAP Learning: &#8220;In capacity leveling, operations are scheduled finitely. They are dispatched to periods with free capacity.&#8221; (Izl\u012bdzinot jaudu, oper\u0101cijas pl\u0101no atbilsto\u0161i pieejamajai jaudai. T\u0101s izvieto periodos, kuros ir br\u012bva jauda.) Pieejamie r\u012bki:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>R\u012bks<\/th><th>Ko tas dara<\/th><\/tr><\/thead><tbody><tr><td>Pl\u0101no\u0161anas tabula<\/td><td>Izvieto oper\u0101cijas periodos ar br\u012bvu jaudu. SAP: &#8220;you cannot create a specific sequence for the dispatched operations within a period&#8221; (period\u0101 izvietotaj\u0101m oper\u0101cij\u0101m nevar noteikt konkr\u0113tu sec\u012bbu)<\/td><\/tr><tr><td><strong>Capacity Scheduling Table<\/strong> (iepriek\u0161 Schedule Production)<\/td><td>Izvieto \u0161auro vietu oper\u0101cijas grafik\u0101 un no\u0146em t\u0101s no grafika. &#8220;Only bottleneck operations that are assigned to a pacemaker work center are considered.&#8221; (Tiek \u0146emtas v\u0113r\u0101 tikai t\u0101s \u0161auro vietu oper\u0101cijas, kas piesaist\u012btas ra\u017eo\u0161anas ritmu noteico\u0161ajam darba centram.) P\u0101r\u0113jo pas\u016bt\u012bjuma oper\u0101ciju termi\u0146us piel\u0101go, pl\u0101nojot no \u0161\u012bs atskaites oper\u0101cijas<\/td><\/tr><tr><td><strong>Capacity Scheduling Board<\/strong><\/td><td>Grafisks r\u012bks atsevi\u0161\u0137u \u0161auro vietu oper\u0101ciju izvieto\u0161anai, p\u0101rpl\u0101no\u0161anai vai no\u0146em\u0161anai no grafika ra\u017eo\u0161anas ritmu noteico\u0161ajos darba centros<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Klasisk\u0101 Graphical Planning Table (CM21, CM22 un p\u0101r\u0113j\u0101s CM* transakcijas) ietilpst sader\u012bbas funkcionalit\u0101t\u0113. SAP Learning: &#8220;The use right for the Graphical Planning Table expires on Dec 31, 2025.&#8221; (Graphical Planning Table lieto\u0161anas ties\u012bbas beidzas nor\u0101d\u012btaj\u0101 datum\u0101.) \u0160is datums jau ir pag\u0101jis. Ja j\u016bsu pl\u0101not\u0101ji joproj\u0101m str\u0101d\u0101 CM* transakcij\u0101s, p\u0101reja uz Fiori lietotn\u0113m jau ir nokav\u0113ta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ieb\u016bv\u0113tais PP\/DS<\/h3>\n\n\n<p>PP\/DS ir SAP automatiz\u0113tais ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks, kas sast\u0101da grafikus atbilsto\u0161i pieejamajai jaudai. Agr\u0101k tas bija da\u013ca no SAP APO, bet kop\u0161 1610. versijas tas ir ieb\u016bv\u0113ts lok\u0101li izvietotaj\u0101 S\/4HANA. SAP to pied\u0101v\u0101 k\u0101 n\u0101kamo soli p\u0113c MRP: &#8220;Move beyond classic MRP with SAP S\/4HANA Manufacturing for planning and scheduling software&#8221; (Papla\u0161iniet klasisk\u0101 MRP iesp\u0113jas ar \u0161o ra\u017eo\u0161anas pl\u0101no\u0161anas un grafiku sast\u0101d\u012b\u0161anas programmat\u016bru.) (<a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP produkta lapa<\/a>).<\/p>\n\n\n<p>K\u0101das iesp\u0113jas tas pievieno:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Resursi<\/strong> ar paz\u012bmi Finite Scheduling: &#8220;You define whether a resource is finite or infinite in the scheduling parameters for the resource via the Finite Scheduling indicator&#8221; (Resursa pl\u0101no\u0161anas parametros ar paz\u012bmi Finite Scheduling nosaka, vai pl\u0101no\u0161an\u0101 iev\u0113rot t\u0101 pieejamo jaudu.) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">SAP pal\u012bdz\u012bba<\/a>). Optimiz\u0113t\u0101js katr\u0101 palai\u0161anas reiz\u0113 var \u0161o iestat\u012bjumu aizst\u0101t: optimiz\u0101cijas profil\u0101 ir opcija &#8220;Always Schedule as Finite&#8221; (Vienm\u0113r pl\u0101not atbilsto\u0161i pieejamajai jaudai), kas izvieto oper\u0101cijas resursos, iev\u0113rojot to pieejamo jaudu (<a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>).<\/li>\n\n\n<li>Grafiku sast\u0101d\u012b\u0161anas re\u017e\u012bmi: pl\u0101no\u0161ana bez jaudas ierobe\u017eojumiem, br\u012bva laika interv\u0101la mekl\u0113\u0161ana, oper\u0101cijas pievieno\u0161ana beig\u0101s, oper\u0101cijas ievieto\u0161ana, oper\u0101cijas ievieto\u0161ana ar br\u012bvo interv\u0101lu aizpild\u012b\u0161anu, oper\u0101cijas iesprau\u0161ana starp cit\u0101m.<\/li>\n\n\n<li>Heiristikas un optimiz\u0101cijas apr\u0113\u0137ini, kas samazina sagatavo\u0161anas laiku, sagatavo\u0161anas izmaksas un kav\u0113jumus.<\/li>\n\n\n<li>Sagatavo\u0161anas matrica p\u0101rregul\u0113\u0161anai, kuras ilgums atkar\u012bgs no oper\u0101ciju sec\u012bbas, minim\u0101lie un maksim\u0101lie interv\u0101li starp oper\u0101cij\u0101m un alternat\u012bvi re\u017e\u012bmi.<\/li>\n\n\n<li>Daudzl\u012bme\u0146u vajadz\u012bbu un pieg\u0101\u017eu sasaiste, ra\u017eo\u0161anas kampa\u0146u un bloku pl\u0101no\u0161ana, k\u0101 ar\u012b br\u012bdin\u0101jumi.<\/li>\n\n\n<li><strong>Production Scheduling Board<\/strong> (Fiori Gantt diagramma) un lietotne <strong>Monitor Capacity Utilization<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p>Lai \u0161\u012bs iesp\u0113jas izmantotu, ir j\u0101iegulda darbs. T\u0101s aktiviz\u0113 sada\u013c\u0101 Customizing (Advanced Planning &gt; Basic Settings &gt; Activate Advanced Planning and Scheduling), darbina HANA integr\u0113to liveCache un atz\u012bm\u0113 materi\u0101lus un darba centrus progres\u012bvajai pl\u0101no\u0161anai. Viss, kas nav atz\u012bm\u0113ts, paliek klasiskaj\u0101 MRP. K\u0101 SAP produktu eksperts raksta blog\u0101, optimiz\u0113t\u0101js &#8220;needs to be additionally installed preferably in a separate hardware&#8221; (j\u0101instal\u0113 papildus, v\u0113lams uz atsevi\u0161\u0137as aparat\u016bras) (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>). Taj\u0101 pa\u0161\u0101 blog\u0101: &#8220;A dedicated license, Manufacturing for Planning and Scheduling is required if this switch is set to Active.&#8221; (Ja \u0161is sl\u0113dzis ir iestat\u012bts uz Active, ir vajadz\u012bga atsevi\u0161\u0137a Manufacturing for Planning and Scheduling licence.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sap-s-4hana-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur beidzas SAP S\/4HANA iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Ierobe\u017eojums<\/th><th>Avots<\/th><th>Ko tas noz\u012bm\u0113 ra\u017eo\u0161anas ceh\u0101<\/th><\/tr><\/thead><tbody><tr><td>Izpildes termi\u0146us pl\u0101no bez jaudas ierobe\u017eojumiem<\/td><td>&#8220;The operations are scheduled infinitely&#8221; (Oper\u0101cijas pl\u0101no bez jaudas ierobe\u017eojumiem.) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Katrs pl\u0101no\u0161anas apr\u0113\u0137ins rada p\u0101rslodzi, kas k\u0101dam p\u0113c tam j\u0101nov\u0113r\u0161<\/td><\/tr><tr><td>Pamatsist\u0113m\u0101 jaudas izl\u012bdzin\u0101\u0161anu vada pl\u0101not\u0101js<\/td><td>&#8220;In capacity leveling, operations are scheduled finitely&#8221; (Izl\u012bdzinot jaudas noslodzi, ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 oper\u0101cijas iepl\u0101no atbilsto\u0161i pieejamajai jaudai.) (tas pats avots)<\/td><td>Pl\u0101ns atbilst pieejamajai jaudai tikai p\u0113c tam, kad pl\u0101not\u0101js ir izvietojis oper\u0101cijas. Steidzama pas\u016bt\u012bjuma vai iek\u0101rtas boj\u0101juma gad\u012bjum\u0101 t\u0101s j\u0101izvieto no jauna<\/td><\/tr><tr><td>Jaudas izl\u012bdzin\u0101\u0161ana tabul\u0101 nenosaka oper\u0101ciju sec\u012bbu<\/td><td>Period\u0101 izvietotaj\u0101m oper\u0101cij\u0101m nav noteiktas sec\u012bbas (tas pats avots)<\/td><td>J\u016bs zin\u0101t, ka ned\u0113\u013cas pl\u0101ns ir izpild\u0101ms, bet ne to, kur\u0161 ra\u017eo\u0161anas uzdevums otrdien j\u0101s\u0101k pirmais<\/td><\/tr><tr><td>Capacity Scheduling Table izl\u012bdzina \u0161auro vietu oper\u0101ciju slodzi ra\u017eo\u0161anas ritmu noteico\u0161ajos darba centros<\/td><td>&#8220;For an order, only the bottleneck operation is dispatched to the pacemaker work center&#8221; (No pas\u016bt\u012bjuma oper\u0101cij\u0101m ra\u017eo\u0161anas ritmu noteico\u0161aj\u0101 darba centr\u0101 izvieto tikai \u0161aur\u0101s vietas oper\u0101ciju.) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/capacity-leveling-using-the-capacity-scheduling-table\">SAP Learning<\/a>)<\/td><td>P\u0101r\u0113jo oper\u0101ciju datumus apr\u0113\u0137ina no atskaites oper\u0101cijas, nevis izvieto atbilsto\u0161i pieejamajai jaudai. Darba centri, kas nenosaka ra\u017eo\u0161anas ritmu, joproj\u0101m tiek p\u0101rslogoti<\/td><\/tr><tr><td>Sare\u017e\u0123\u012btiem gad\u012bjumiem paredz\u0113ts PP\/DS<\/td><td>SAP pied\u0101v\u0101 PP\/DS pas\u016bt\u012bjumu sinhroniz\u0113\u0161anai da\u017e\u0101dos BOM l\u012bme\u0146os, materi\u0101lu pieejam\u012bbas pl\u0101no\u0161anai un vair\u0101ku \u0161auro vietu resursu saska\u0146o\u0161anai (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Sagatavo\u0161anas darbu sec\u012bbas pl\u0101no\u0161anai un l\u012bnij\u0101m ar vair\u0101k\u0101m \u0161auraj\u0101m viet\u0101m vajadz\u012bgs otrs modulis<\/td><\/tr><tr><td>Jaudas ierobe\u017eojumu iev\u0113ro\u0161ana PP\/DS ir atkar\u012bga no model\u0113\u0161anas izv\u0113l\u0113m<\/td><td>Paz\u012bme Finite Scheduling katram resursam, opcija &#8220;Always Schedule as Finite&#8221; optimiz\u0101cijas profil\u0101 (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">SAP Help<\/a>, <a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>)<\/td><td>Pl\u0101not\u0101ji uztur resursu parametrus, heiristikas un optimiz\u0101cijas profilus. Pl\u0101no\u0161an\u0101 iek\u013cauj tikai tos materi\u0101lus un resursus, kas iestat\u012bti progres\u012bvajai pl\u0101no\u0161anai<\/td><\/tr><tr><td>PP\/DS vajadz\u012bga sava licence un tehnisk\u0101 infrastrukt\u016bra<\/td><td>Atsevi\u0161\u0137a licence, liveCache un atsevi\u0161\u0137i instal\u0113ts optimiz\u0113t\u0101js (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>)<\/td><td>Tas ir projekts, kur\u0101 j\u0101iesaista Basis speci\u0101listi, j\u0101nodro\u0161ina licences un apm\u0101c\u012bti pl\u0101not\u0101ji, nevis vienk\u0101r\u0161i j\u0101maina iestat\u012bjums<\/td><\/tr><tr><td>Planned Order API nenodod datus PP\/DS<\/td><td>&#8220;Automatic integration to PP\/DS is not enabled from this API&#8221; (No \u0161\u012bs API autom\u0101tisk\u0101 integr\u0101cija nav iesp\u0113jota.) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\">SAP Help<\/a>)<\/td><td>\u0100rpus SAP izveidotie pl\u0101notie pas\u016bt\u012bjumi autom\u0101tiski nenon\u0101k PP\/DS pl\u0101n\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sap-s-4hana-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar SAP S\/4HANA ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar S\/4HANA vien ra\u017eotnei pietiek \u0161\u0101dos gad\u012bjumos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jums ir viena \u0161aur\u0101 vieta un ilgs pas\u016bt\u012bjuma izpildes laiks.<\/strong> Pl\u0101no\u0161anas apr\u0113\u0137ini par\u0101da p\u0101rslodzi vair\u0101kas ned\u0113\u013cas iepriek\u0161, un pl\u0101not\u0101js reizi ned\u0113\u013c\u0101 izl\u012bdzina ra\u017eo\u0161anas ritmu noteico\u0161\u0101 darba centra slodzi r\u012bk\u0101 Capacity Scheduling Table.<\/li>\n\n\n<li><strong>J\u016bsu piepras\u012bjums ir stabils, un to galvenok\u0101rt pl\u0101no ar MRP.<\/strong> Ir maz steidzamu pas\u016bt\u012bjumu un maz p\u0101rregul\u0113\u0161anas rei\u017eu, kas b\u016btiski ietekm\u0113 pl\u0101nu.<\/li>\n\n\n<li><strong>Jums jau ir PP\/DS licence un person\u0101ls t\u0101 izmanto\u0161anai.<\/strong> J\u016bsu pl\u0101not\u0101ji ikdien\u0101 str\u0101d\u0101 r\u012bk\u0101 Production Scheduling Board, un visi b\u016btiskie materi\u0101li un darba centri ir atz\u012bm\u0113ti progres\u012bvajai pl\u0101no\u0161anai.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Par to liecina ikdienas situ\u0101cijas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>P\u0113c katra MRP apr\u0113\u0137ina pl\u0101not\u0101ji p\u0101rveido pl\u0101nu Excel, jo iepriek\u0161 noteiktie izpildes datumi vairs nav re\u0101li.<\/li>\n\n\n<li>Izlaidi ierobe\u017eo vair\u0101ki darba centri, nevis viens ra\u017eo\u0161anas ritmu noteico\u0161ais centrs.<\/li>\n\n\n<li>Pas\u016bt\u012bjumu sast\u0101vs main\u0101s katru dienu, un slodzes izl\u012bdzin\u0101\u0161ana reizi ned\u0113\u013c\u0101 vairs nesp\u0113j tam sekot.<\/li>\n\n\n<li>P\u0101rdo\u0161anas komanda sola pieg\u0101des datumus p\u0113c pas\u016bt\u012bjumu izpildes laikiem, un cie\u0161 savlaic\u012bga pieg\u0101de.<\/li>\n\n\n<li>PP\/DS ir izv\u0113rt\u0113ts un noraid\u012bts izmaksu, nepiecie\u0161am\u0101 darba vai prasmju d\u0113\u013c. Vai ar\u012b ra\u017eotne ir neliela da\u013ca no pla\u0161\u0101kas S\/4HANA vides, kur\u0101 tai nekad neb\u016bs sava PP\/DS projekta.<\/li>\n\n\n<li>Operatori str\u0101d\u0101 p\u0113c izdruk\u0101tiem pas\u016bt\u012bjumu sarakstiem un izpildi apstiprina nov\u0113loti, t\u0101p\u0113c pl\u0101ns vienm\u0113r atpaliek no faktisk\u0101s situ\u0101cijas.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Katra resursa pieejam\u0101s jaudas iev\u0113ro\u0161ana<\/strong>, \u0146emot v\u0113r\u0101 ar\u012b darbinieku un mai\u0146u jaudu, bez nepiecie\u0161am\u012bbas model\u0113t katru resursu atsevi\u0161\u0137i.<\/li>\n\n\n<li><strong>Oper\u0101ciju sec\u012bba dienas ietvaros<\/strong>, nevis tikai to sadal\u012bjums pa periodiem.<\/li>\n\n\n<li><strong>Re\u0101lie ierobe\u017eojumi<\/strong>: no produktu sec\u012bbas atkar\u012bgs p\u0101rregul\u0113\u0161anas laiks, instrumenti, kas vienlaikus var atrasties tikai vien\u0101 viet\u0101, oper\u0101cijas, kur\u0101m vajadz\u012bgi vair\u0101ki operatori, k\u0101 ar\u012b alternat\u012bvas iek\u0101rtas un darbinieki.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana<\/strong>: oper\u0101cijai nevajadz\u0113tu s\u0101kties, pirms ir pieejamas t\u0101s sast\u0101vda\u013cas, \u0146emot v\u0113r\u0101 gan kr\u0101jumus, gan v\u0113l neizpild\u012btos iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li><strong>Autom\u0101tiska grafika p\u0101rpl\u0101no\u0161ana<\/strong>, kad main\u0101s pas\u016bt\u012bjums vai apst\u0101jas iek\u0101rta.<\/li>\n\n\n<li><strong>Skaidrs atbild\u012bbas sadal\u012bjums ar S\/4HANA<\/strong>: S\/4HANA p\u0101rvalda pamatdatus, pas\u016bt\u012bjumus un kr\u0101jumus, bet grafiku sast\u0101d\u012b\u0161anas r\u012bks \u2014 sec\u012bbu un datumus. Dati tiek ierakst\u012bti atpaka\u013c, izmantojot ofici\u0101li pieejam\u0101s API saskarnes, nevis tie\u0161i atjauninot tabulas.<\/li>\n\n\n<li><strong>Atgriezenisk\u0101 saite no ra\u017eo\u0161anas ceha<\/strong>, kas non\u0101k S\/4HANA k\u0101 izpildes apstiprin\u0101jumi.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar j\u016bsu pa\u0161u ra\u017eo\u0161anas pas\u016bt\u012bjumiem, kas eksport\u0113ti CSV form\u0101t\u0101<\/strong>, pirms s\u0101k darbu ar OData pakalpojumiem.<\/li>\n\n<\/ol>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pl\u0101no\u0161anas pane\u013ci SAP klient\u0101<\/strong>: pamata lietotnes jaudas pl\u0101no\u0161anai un papildu pane\u013ci SAP GUI vai Fiori vid\u0113, kuros darbu vada pl\u0101not\u0101js. Tie ir piem\u0113roti situ\u0101cijai ar vienu ra\u017eo\u0161anas ritmu noteico\u0161u darba centru un stabilu, MRP noteiktu piepras\u012bjumu.<\/li>\n\n\n<li><strong>SAP progres\u012bv\u0101 pl\u0101no\u0161ana<\/strong>: iegultais PP\/DS ra\u017eotn\u0113m, kas ieg\u0101d\u0101jas t\u0101 licenci, aktiviz\u0113 to un nodro\u0161ina darbam vajadz\u012bgos speci\u0101listus.<\/li>\n\n\n<li><strong>Pla\u0161as APS sist\u0113mas lieliem uz\u0146\u0113mumiem<\/strong>: atsevi\u0161\u0137as platformas, kuras savieno ievie\u0161anas projekta gait\u0101 un kuru darb\u012bbu nodro\u0161ina \u012bpa\u0161a pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146vides APS ar darba izpildes funkcij\u0101m ra\u017eo\u0161anas ceham<\/strong> \u2014 \u0161aj\u0101 grup\u0101 ietilpst SkyPlanner. Tas autom\u0101tiski sast\u0101da grafiku atbilsto\u0161i katra resursa pieejamajai jaudai, nodro\u0161ina p\u0101rpl\u0101no\u0161anu ar Autopilot un \u013cauj operatoriem str\u0101d\u0101t t\u0101lrun\u012b vai plan\u0161etdator\u0101. Risin\u0101jums ir lieto\u0161an\u0101 da\u017eu ned\u0113\u013cu laik\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Sarun\u0101s par S\/4HANA tiek piemin\u0113tas ar\u012b pieg\u0101des \u0137\u0113des pl\u0101no\u0161anas platformas, tostarp SAP IBP. T\u0101s pl\u0101no pieg\u0101des t\u012bklu, nevis oper\u0101ciju sec\u012bbu uz iek\u0101rtas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur iederas SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ir m\u0101ko\u0146vides grafiku sast\u0101d\u012b\u0161anas r\u012bks ar m\u0101ksl\u012bgo intelektu, kas darbojas l\u012bdz\u0101s SAP S\/4HANA un \u013cauj no MRP rezult\u0101tiem p\u0101riet uz ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai. MRP paliek SAP sist\u0113m\u0101, bet SkyPlanner p\u0101r\u0146em slodzes izl\u012bdzin\u0101\u0161anu, ko j\u016bsu pl\u0101not\u0101ji pa\u0161laik veic manu\u0101li:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Katra resursa pieejam\u0101s jaudas iev\u0113ro\u0161ana \u2014 autom\u0101tiski.<\/strong> Arcturus dzinis sekund\u0113s sast\u0101da ra\u017eo\u0161anas pl\u0101nu atbilsto\u0161i pieejamajai jaudai, \u0146emot v\u0113r\u0101 pas\u016bt\u012bjumus, priorit\u0101tes, ierobe\u017eojumus, jaudas, materi\u0101lus un noteikumus. Katr\u0101 apr\u0113\u0137in\u0101 tiek iev\u0113rota katra darba centra, mai\u0146as un darbinieka pieejam\u0101 jauda. Pl\u0101no\u0161ana neaprobe\u017eojas ar vienu ritmu noteico\u0161u darba centru, un nav j\u0101piel\u0101go optimiz\u0101cijas profils.<\/li>\n\n\n<li><strong>Konkr\u0113ta sec\u012bba, nevis sadal\u012bjums pa periodiem.<\/strong> Interakt\u012bv\u0101 Gantt laika skal\u0101 pl\u0101not\u0101ji redz, kur\u0161 ra\u017eo\u0161anas uzdevums otrdien tiks veikts pirmais. Ja uzdevumu p\u0101rvieto ar peli, dzinis saglab\u0101 pl\u0101na saska\u0146ot\u012bbu.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161ana p\u0113c materi\u0101lu pieejam\u012bbas.<\/strong> Katram ra\u017eo\u0161anas uzdevumam tiek p\u0101rbaud\u012bti kr\u0101jumi un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101, bet kr\u0101jumi tiek atjaunin\u0101ti, kad pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered. T\u0101d\u0113j\u0101di oper\u0101cija nes\u0101kas, pirms ir pieejamas t\u0101s sast\u0101vda\u013cas.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana atbilsto\u0161i sec\u012bbai.<\/strong> Sagatavo\u0161anas laiku matric\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki katram produktu p\u0101rim, un tie var at\u0161\u0137irties atkar\u012bb\u0101 no p\u0101rejas virziena (no zilas kr\u0101sas uz sarkanu \u2014 30 min\u016btes, no sarkanas uz zilu \u2014 60). Dzinis izmanto \u0161o matricu, lai izv\u0113l\u0113tos sec\u012bbu ar \u012bs\u0101ko sagatavo\u0161anas laiku, savuk\u0101rt noteikums &#8220;Allow similarity&#8221; grup\u0113 uzdevumus ar kop\u012bgu \u012bpa\u0161\u012bbu, piem\u0113ram, vienu un to pa\u0161u instrumentu.<\/li>\n\n\n<li><strong>Instrumenti un darbinieku grupas k\u0101 ierobe\u017eojumi.<\/strong> Instrumentu, ko izmanto vien\u0101 darba centr\u0101, taj\u0101 pa\u0161\u0101 laik\u0101 neiepl\u0101no cit\u0101. Uzdevumam, kam vajadz\u012bgi tr\u012bs operatori, tiek pie\u0161\u0137irti tr\u012bs. Ja galven\u0101 iek\u0101rta vai darbinieks nav pieejams, dzinis izv\u0113rt\u0113 alternat\u012bvas.<\/li>\n\n\n<li><strong>Vienm\u0113r aktu\u0101ls pl\u0101ns.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Ikned\u0113\u013cas slodzes izl\u012bdzin\u0101\u0161anas viet\u0101 ieg\u016bstat ikdienas pl\u0101nu, kas seko situ\u0101cijai ra\u017eo\u0161anas ceh\u0101.<\/li>\n\n\n<li><strong>Izpildes apstiprin\u0101jumi no ceha.<\/strong> Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode. Integr\u0101cija nos\u016bta \u0161os darba laika ierakstus uz S\/4HANA k\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumu izpildes apstiprin\u0101jumus.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> izlaidi ierobe\u017eo vair\u0101ki darba centri un ar viena ritmu noteico\u0161\u0101 centra slodzes izl\u012bdzin\u0101\u0161anu vairs nepietiek, lai pl\u0101nu var\u0113tu izpild\u012bt.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana ir atkar\u012bga no sec\u012bbas vai koplietojamie instrumenti un uzdevumi, kuriem vajadz\u012bgi vair\u0101ki operatori, nosaka, ko var veikt t\u0101l\u0101k.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> j\u016bsu ra\u017eotnei ar manu\u0101lu slodzes izl\u012bdzin\u0101\u0161anu vairs nepietiek, PP\/DS projekts b\u016btu nesam\u0113r\u012bgi apjom\u012bgs risin\u0101jums un j\u016bs v\u0113laties da\u017eu ned\u0113\u013cu laik\u0101 ieg\u016bt savas ra\u017eo\u0161anas grafiku, kas atbilst re\u0101li pieejamajai jaudai.<\/p>\n\n\n<p>Materi\u0101li, materi\u0101lu specifik\u0101cijas (BOM), tehnolo\u0123iskie procesi, darba centri, ra\u017eo\u0161anas pas\u016bt\u012bjumi un kr\u0101jumi paliek S\/4HANA. SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ra\u017eo\u0161anas pas\u016bt\u012bjumi un oper\u0101cijas tiek sa\u0146emti no API_PRODUCTION_ORDER_2_SRV, bet darba centri \u2014 no API_WORK_CENTERS.<\/li>\n\n\n<li>Katra oper\u0101cija tiek iepl\u0101nota izpildei S\/4HANA ar darb\u012bbu ScheduleProductionOrderOperation, izmantojot pl\u0101no\u0161anu uz priek\u0161u, pie\u0161\u0137irot izpildes pl\u0101no\u0161anas statusu un SkyPlanner noteikto s\u0101kuma datumu un laiku.<\/li>\n\n\n<li>Re\u0123istr\u0113t\u0101s darba stundas tiek nos\u016bt\u012btas, izmantojot API_PROD_ORDER_CONFIRMATION_2_SRV.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta katru grafika izmai\u0146u, tikl\u012bdz t\u0101 notiek.<\/li>\n\n<\/ul>\n\n\n<p>Katr\u0101 ra\u017eotn\u0113 darba centri, jaudas kategorijas un tehnolo\u0123iskie procesi ir konfigur\u0113ti cit\u0101di. T\u0101p\u0113c lieto\u0161anas uzs\u0101k\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu S\/4HANA konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Ar\u012b j\u016bsu SAP partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>). Lai s\u0101ktu, pietiek ar API atsl\u0113gu.<\/p>\n\n\n<p>S\u0101ciet ar CSV vai Excel eksportiem no S\/4HANA 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 (l\u012bdz 20 darba centriem, bez kred\u012btkartes). J\u016bs redz\u0113siet savu grafiku, pirms k\u0101ds \u0137ersies pie API. P\u0113c tam <a href=\"\/lv\/cenu-noteiksana\/\">cena<\/a> ir no 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem. Nor\u0113\u0137ini ir ik m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar abon\u0113\u0161anas pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c lieto\u0161anas uzs\u0101k\u0161anas procesa s\u0101kuma.<\/p>\n\n\n<p>Lap\u0101 <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/\">SkyPlanner risin\u0101jums SAP S\/4HANA<\/a> uzzin\u0101siet, k\u0101di dati tiek p\u0101rs\u016bt\u012bti starp sist\u0113m\u0101m, bet <a href=\"\/lv\/integracija\/erp\/sap-s4hana\/integracijas-celvedis\/\">S\/4HANA integr\u0101cijas rokasgr\u0101mat\u0101<\/a> \u2014 k\u0101 integr\u0101ciju \u012bstenot tehniski. S\u012bk\u0101ka inform\u0101cija par grafiku sast\u0101d\u012b\u0161anu ir pieejama sada\u013c\u0101 <a href=\"\/lv\/funkcijas\/\">Funkcijas<\/a> un <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cij\u0101<\/a>, bet citas ERP sist\u0113mas atrad\u012bsiet sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel tabul\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna uzdevumu rinda non\u0101k l\u012bdz l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu darba pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem darba pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visai organiz\u0101cijai ir pieejams p\u0101rskats par ra\u017eo\u0161anu re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas \u0161\u016bnas produkcijas krau\u0161anai uz palet\u0113m Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir uzticams pamats visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 P\u0101rtikai dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz piepras\u012bjumiem main\u012bt grafiku, kuru izskat\u012b\u0161ana agr\u0101k aiz\u0146\u0113ma stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SAP S\/4HANA ir r\u012bks ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, divi. Ra\u017eo\u0161anas pl\u0101no\u0161anas pamatfunkcijas ietver jaudas nov\u0113rt\u0113\u0161anu un slodzes izl\u012bdzin\u0101\u0161anu, ko pl\u0101not\u0101js veic ar Capacity Scheduling Table un grafisko Capacity Scheduling Board. Savuk\u0101rt ieb\u016bv\u0113tais PP\/DS nodro\u0161ina automatiz\u0113tu ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i pieejamajai jaudai, izmantojot heiristikas, optimiz\u0101ciju, p\u0101rregul\u0113\u0161anas matricu un Production Scheduling Board. Tas tiek p\u0101rdots k\u0101 SAP S\/4HANA Manufacturing for planning and scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai MRP sist\u0113m\u0101 S\/4HANA \u0146em v\u0113r\u0101 jaudas ierobe\u017eojumus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Grafika sast\u0101d\u012b\u0161ana p\u0113c pas\u016bt\u012bjuma izpildes laika \u0146em v\u0113r\u0101 r\u016bpn\u012bcas darba kalend\u0101ru un nestr\u0101d\u0101\u0161anas periodus, bet ne\u0146em v\u0113r\u0101 slodzi, ko darba centram rada citi pas\u016bt\u012bjumi. Jaudas ierobe\u017eojumus \u0146em v\u0113r\u0101 v\u0113l\u0101k, izvietojot darbus grafik\u0101 slodzes izl\u012bdzin\u0101\u0161anas laik\u0101 vai PP\/DS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp SAP PP un PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">PP pamatfunkcijas aptver MRP, ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus un ra\u017eo\u0161anas jaudas pl\u0101no\u0161anu. PP\/DS papildus nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, iev\u0113rojot pieejamo jaudu un oper\u0101ciju sec\u012bbu, tiem materi\u0101liem un resursiem, kuriem konfigur\u0113ta progres\u012bv\u0101 pl\u0101no\u0161ana. Tam ir savas heiristikas, optimiz\u0113t\u0101js, liveCache un Production Scheduling Board.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai PP\/DS ir iek\u013cauts S\/4HANA licenc\u0113?<\/summary>\n<p class=\"sp-faq__a\">SAP uz\u0146\u0113muma arhitekt\u016bras vadl\u012bnij\u0101s MRP un CRP ir nor\u0101d\u012btas k\u0101 S\/4HANA Enterprise pamatfunkcijas, bet Manufacturing for planning and scheduling \u2014 k\u0101 atsevi\u0161\u0137a iesp\u0113ja. SAP produktu eksperta emu\u0101r\u0101 par progres\u012bv\u0101s pl\u0101no\u0161anas funkcij\u0101m teikts: &#8220;are not part of the standard SAP S\/4HANA Enterprise license.&#8221; (nav iek\u013cautas standarta licenc\u0113). P\u0101rbaudiet sava l\u012bguma ar SAP nosac\u012bjumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas sist\u0113m\u0101 S\/4HANA aizst\u0101j CM21 un Graphical Planning Table?<\/summary>\n<p class=\"sp-faq__a\">T\u0101s aizst\u0101j Fiori lietotnes Manage Work Center Capacity, Capacity Scheduling Table un Capacity Scheduling Board. Graphical Planning Table lieto\u0161anas ties\u012bbas beidz\u0101s 2025. gada 31. decembr\u012b.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101di ierobe\u017eojumi j\u0101\u0146em v\u0113r\u0101 S\/4HANA grafiku sast\u0101d\u012b\u0161anas r\u012bkam?<\/summary>\n<p class=\"sp-faq__a\">J\u0101\u0146em v\u0113r\u0101 vismaz katras iek\u0101rtas, darbinieka un mai\u0146as pieejam\u0101 jauda; p\u0101rregul\u0113\u0161ana, kas atkar\u012bga no darbu sec\u012bbas; instrumenti, ko koplieto vair\u0101ki darba centri; oper\u0101cijas, kur\u0101m vajadz\u012bgi vair\u0101ki operatori; alternat\u012bvi resursi; un materi\u0101lu pieejam\u012bba, tostarp v\u0113l neizpild\u012btie iepirkuma pas\u016bt\u012bjumi. SkyPlanner APS to visu autom\u0101tiski \u0146em v\u0113r\u0101 katr\u0101 grafika sast\u0101d\u012b\u0161anas reiz\u0113.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner APS var darboties ar SAP S\/4HANA bez PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. SkyPlanner APS pats sast\u0101da grafiku atbilsto\u0161i pieejamajai jaudai, izmantojot S\/4HANA ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, darba centrus un materi\u0101lus. Oper\u0101ciju datumi un izpildes apstiprin\u0101jumi tiek nos\u016bt\u012bti atpaka\u013c uz S\/4HANA, un SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 integr\u0101ciju. Izm\u0113\u0123in\u0101jumu s\u0101k ar datu importu no CSV vai Excel failiem. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP S\/4HANA Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS \u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 t\u0101da grafika sast\u0101d\u012b\u0161anu, kas atbilst re\u0101li pieejamajai iek\u0101rtu un person\u0101la jaudai. SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu divos veidos: ar manu\u0101lu jaudas slodzes izl\u012bdzin\u0101\u0161anu pamatsist\u0113m\u0101 un automatiz\u0113tu grafiku sast\u0101d\u012b\u0161anu ieb\u016bv\u0113taj\u0101 PP\/DS. Standarta S\/4HANA izpildes &#8230; <a title=\"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/\" aria-label=\"Read more about Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100797,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101124","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"S\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"S\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"22 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/razosanas-planosana\\\/\",\"name\":\"Vai SAP S\\\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"S\\\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\\\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP S\\\/4HANA: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai SAP S\\\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\\\/DS un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"S\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS","og_description":"S\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"22 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/","name":"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"S\/4HANA pl\u0101no termi\u0146us bez jaudas limita; pl\u0101not\u0101ji izl\u012bdzina noteico\u0161o centru slodzi, PP\/DS autom\u0101tiski iev\u0113ro jaudu. Darb\u012bba un SkyPlanner APS loma.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP S\/4HANA: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP S\/4HANA Vai SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Jaudas izl\u012bdzin\u0101\u0161ana, PP\/DS un SkyPlanner APS \u0160eit ra\u017eo\u0161anas pl\u0101no\u0161ana noz\u012bm\u0113 t\u0101da grafika sast\u0101d\u012b\u0161anu, kas atbilst re\u0101li pieejamajai iek\u0101rtu un person\u0101la jaudai. SAP S\/4HANA nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu divos veidos: ar manu\u0101lu jaudas slodzes izl\u012bdzin\u0101\u0161anu pamatsist\u0113m\u0101 un automatiz\u0113tu grafiku sast\u0101d\u012b\u0161anu ieb\u016bv\u0113taj\u0101 PP\/DS. Standarta S\/4HANA izpildes&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101124"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101124\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100797"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}