{"id":101094,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101094"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracijas-celvedis","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/","title":{"rendered":"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business One integr\u0101cijas ce\u013cvedis <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 ce\u013cved\u012b SAP Business One partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot B1 ar SkyPlanner APS. Taj\u0101 apl\u016bkots, kuras API izmantot, k\u0101di objekti tiek p\u0101rs\u016bt\u012bti katr\u0101 virzien\u0101 un kur B1 projektos rodas probl\u0113mas. SkyPlanner integr\u0113jas ar SAP Business One abos virzienos, izmantojot Service Layer:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isko procesu posmus, resursus, artikulus un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notie s\u0101kuma datumi un izpildes termi\u0146i tiek ierakst\u012bti atpaka\u013c ra\u017eo\u0161anas pas\u016bt\u012bjumos.<\/li>\n\n\n<li>Operatoru darba laika ieraksti tiek iegr\u0101matoti k\u0101 Receipt and Issue for Production.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Artikuli, BOM, ra\u017eo\u0161anas pas\u016bt\u012bjumi, kr\u0101jumi un finanses paliek SAP Business One p\u0101rzi\u0146\u0101, un j\u016bsu ra\u017eo\u0161anas modulis nemain\u0101s. Ievie\u0161anas laik\u0101 SkyPlanner komanda konfigur\u0113 integr\u0101ciju ar B1 standarta objektiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Katr\u0101 uz\u0146\u0113muma datub\u0101z\u0113 at\u0161\u0137iras tehnolo\u0123isko procesu posmi, resursu grupas, lietot\u0101ja defin\u0113tie lauki un papildin\u0101jumi. Konfigur\u0101cij\u0101 tiek noteikta \u0161o datu atbilst\u012bba.<\/p>\n\n\n<p><a href=\"\/lv\/customers\/laboratory-allied\/\">Laboratory &amp; Allied<\/a> izmanto SkyPlanner kop\u0101 ar SAP Business One HANA vid\u0113. Par biznesa ieguvumiem lasiet <a href=\"\/lv\/integracija\/erp\/sap-business-one\/\">lap\u0101 par ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu ar SAP Business One<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-business-one-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">SAP Business One integr\u0101cijas iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SAP Business One pied\u0101v\u0101 tr\u012bs integr\u0101cijas saskarnes. M\u0101ko\u0146risin\u0101jumam grafiku sast\u0101d\u012b\u0161anai noklus\u0113juma izv\u0113le ir Service Layer.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Iesp\u0113ja<\/th><th>Apraksts<\/th><th>Piem\u0113rot\u012bba APS integr\u0101cijai<\/th><\/tr><\/thead><tbody><tr><td><strong>Service Layer<\/strong><\/td><td>REST\/OData API. <code>\/b1s\/v1<\/code> izmanto OData v3, bet <code>\/b1s\/v2<\/code> \u2014 OData v4. Darbojas SAP Business One versij\u0101, kas paredz\u0113ta SAP HANA, un kop\u0161 10.0 PL01 ar\u012b Microsoft SQL Server vid\u0113.<\/td><td>Galvenais integr\u0101cijas veids. Izmanto HTTP un JSON, pieejams no m\u0101ko\u0146pakalpojuma.<\/td><\/tr><tr><td><strong>DI API<\/strong><\/td><td>Windows COM bibliot\u0113ka. Ra\u017eo\u0161anas pas\u016bt\u012bjumiem atbilst objekts <code>ProductionOrders<\/code>, kura dati glab\u0101jas tabul\u0101 OWOR (objekta tips 202).<\/td><td>Mantotai vai lok\u0101li izvietotai starpprogrammat\u016brai. Nepiecie\u0161ams Windows serveris.<\/td><\/tr><tr><td><strong>Integration Framework (B1if)<\/strong><\/td><td>SAP starpprogrammat\u016bra dokumentu l\u012bme\u0146a integr\u0101cijas scen\u0101rijiem.<\/td><td>Noder, ja partneris jau izmanto B1if scen\u0101rijus.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">Autentifik\u0101cija<\/h3>\n\n\n<p>Service Layer izmanto sesijas autentifik\u0101ciju. Nos\u016btiet <code>POST \/b1s\/v1\/Login<\/code> piepras\u012bjumu ar <code>CompanyDB<\/code>, <code>UserName<\/code> un <code>Password<\/code>. Atbild\u0113 sa\u0146emsiet <code>B1SESSION<\/code> s\u012bkdatni; konfigur\u0101cij\u0101s ar slodzes balans\u0113\u0161anu atbild\u0113 var b\u016bt ar\u012b <code>ROUTEID<\/code>. Noklus\u0113juma <code>SessionTimeout<\/code> ir 30 min\u016btes bezdarb\u012bbas. Beidzoties sinhroniz\u0101cijas izpildei, veiciet atsevi\u0161\u0137u <code>Logout<\/code> izsaukumu. Izveidojiet atsevi\u0161\u0137u B1 lietot\u0101ju integr\u0101cijai, lai izmai\u0146u \u017eurn\u0101l\u0101 var\u0113tu izsekot katrai izmai\u0146ai, kas ierakst\u012bta no SkyPlanner.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Service Layer ent\u012btijas ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/h3>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dati<\/th><th>Service Layer ent\u012btija<\/th><\/tr><\/thead><tbody><tr><td>Preces un pl\u0101no\u0161anas dati<\/td><td><code>Items<\/code><\/td><\/tr><tr><td>Materi\u0101lu specifik\u0101cijas un tehnolo\u0123isk\u0101 procesa posmi<\/td><td><code>ProductTrees<\/code> (Lines, Stages)<\/td><\/tr><tr><td>Iek\u0101rtas, darbasp\u0113ks un citi resursi<\/td><td><code>Resources<\/code>, <code>ResourceGroups<\/code><\/td><\/tr><tr><td>Ra\u017eo\u0161anas pas\u016bt\u012bjumi<\/td><td><code>ProductionOrders<\/code> (Lines, Stages)<\/td><\/tr><tr><td>Kr\u0101jumi pa noliktav\u0101m<\/td><td><code>Items<\/code> kr\u0101jumu dati, <code>Warehouses<\/code><\/td><\/tr><tr><td>Atv\u0113rtie iepirkuma pas\u016bt\u012bjumi un pieg\u0101des datumi<\/td><td><code>PurchaseOrders<\/code> (DocumentLines: nepieg\u0101d\u0101tais daudzums, <code>ShipDate<\/code>)<\/td><\/tr><tr><td>Pre\u010du sa\u0146em\u0161ana uz iepirkuma pas\u016bt\u012bjumu pamata<\/td><td><code>PurchaseDeliveryNotes<\/code> (Goods Receipt PO, objekta tips 20)<\/td><\/tr><tr><td>Izsnieg\u0161ana ra\u017eo\u0161anai<\/td><td><code>InventoryGenExits<\/code><\/td><\/tr><tr><td>Sa\u0146em\u0161ana no ra\u017eo\u0161anas<\/td><td><code>InventoryGenEntries<\/code><\/td><\/tr><tr><td>T\u012bmek\u013ca aiz\u0137eru iestat\u012b\u0161ana<\/td><td><code>EventSubscriptions<\/code>, <code>EventNotifications<\/code><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Noklus\u0113juma lapas lielums ir 20 ieraksti. Palieliniet to ar galveni <code>Prefer: odata.maxpagesize<\/code> (vai <code>PageSize<\/code> fail\u0101 <code>b1s.conf<\/code>) un sekojiet <code>odata.nextLink<\/code>. Izmantojiet <code>$expand<\/code>, lai vien\u0101 izsaukum\u0101 ieg\u016btu ra\u017eo\u0161anas pas\u016bt\u012bjuma rindas un posmus, bet masveida datu ierakst\u012b\u0161anai atpaka\u013c izmantojiet pake\u0161u piepras\u012bjumus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Notikumi un t\u012bmek\u013ca aiz\u0137eres<\/h3>\n\n\n<p>S\u0101kot ar SAP Business One 10.0 FP 2602, Service Layer atbalsta t\u012bmek\u013ca aiz\u0137eres. P\u0113c noklus\u0113juma t\u0101s ir izsl\u0113gtas. Iesp\u0113jojiet t\u0101s katram uz\u0146\u0113mumam ar <code>CompanyService_UpdateAdminInfo<\/code> (<code>EnableWebhook = tYES<\/code>). P\u0113c tam nos\u016btiet <code>POST EventSubscriptions<\/code> piepras\u012bjumu ar trim da\u013c\u0101m:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>WebhookURL<\/code><\/li>\n\n\n<li><code>AuthenticationType<\/code>: None, Basic, HMAC vai OAuth; noklus\u0113juma v\u0113rt\u012bba ir HMAC<\/li>\n\n\n<li><code>EventCollection<\/code> ar biznesa objektiem un transakciju tipiem<\/li>\n\n<\/ul>\n\n\n<p><code>WebhookURL<\/code> j\u0101izmanto HTTPS ar sertifik\u0101tu, kas atbilst resursdatoram. <code>EventSubscriptionsService_GetEventCatalog<\/code> par\u0101da, kurus notikumus var abon\u0113t. J\u0101darbojas servisam Webhook Messenger Service.<\/p>\n\n\n<p>Vec\u0101k\u0101s versij\u0101s izmantojiet periodisku aptauju (skatiet t\u0101l\u0101k aprakst\u012bto <code>UpdateDate<\/code> \u012bpatn\u012bbu). <code>SBO_SP_TransactionNotification<\/code> ir valid\u0101cijas aiz\u0137ere datub\u0101zes l\u012bmen\u012b, nevis pazi\u0146ojumu pieg\u0101des kan\u0101ls.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-business-one-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana no SAP Business One uz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>SAP Business One (Service Layer)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td><code>Items<\/code> (ra\u017eojam\u0101s preces, Procurement Method)<\/td><td>Produkti<\/td><td>B1 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam periodiski<\/td><\/tr><tr><td><code>ProductTrees<\/code> Lines (pre\u010du rindas)<\/td><td>Produkta materi\u0101li<\/td><td>B1 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td><code>ProductTrees<\/code> Stages un resursu rindas<\/td><td>Procesa so\u013ci un izpildes laiki<\/td><td>B1 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam p\u0113c izmai\u0146\u0101m<\/td><\/tr><tr><td><code>Resources<\/code> (Machine, Labor, Other)<\/td><td>Darba centri un person\u0101ls<\/td><td>B1 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, izmai\u0146as reti<\/td><\/tr><tr><td><code>ResourceGroups<\/code><\/td><td>Darba centru grupas<\/td><td>B1 \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td><code>ProductionOrders<\/code> (Planned, Released)<\/td><td>Pas\u016bt\u012bjumi un ra\u017eo\u0161anas uzdevumi<\/td><td>B1 \u2192 SkyPlanner<\/td><td>T\u012bmek\u013ca aiz\u0137ere (FP 2602+) vai aptauja ik p\u0113c da\u017e\u0101m min\u016bt\u0113m<\/td><\/tr><tr><td><code>ProductionOrders<\/code> Stages<\/td><td>Ra\u017eo\u0161anas uzdevuma so\u013ci un to sec\u012bba<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Kop\u0101 ar pas\u016bt\u012bjumu<\/td><\/tr><tr><td><code>Items<\/code> kr\u0101jumi katr\u0101 <code>Warehouses<\/code> noliktav\u0101<\/td><td>Materi\u0101lu kr\u0101jumi<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Periodiski, piem\u0113ram, reizi stund\u0101<\/td><\/tr><tr><td><code>PurchaseOrders<\/code> (objekta tips 22) atv\u0113rt\u0101s rindas ar pieg\u0101des datumu<\/td><td>Iepirkuma pas\u016bt\u012bjumi \/ gaid\u0101mie materi\u0101li ar paredzamo pieg\u0101des datumu<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Periodiski, piem\u0113ram, reizi stund\u0101<\/td><\/tr><tr><td><code>PurchaseDeliveryNotes<\/code> (Goods Receipt PO) rindas ar <code>BaseType<\/code> 22<\/td><td>Sa\u0146emtais daudzums iepirkuma pas\u016bt\u012bjuma rind\u0101, atjaunin\u0101ti kr\u0101jumi<\/td><td>B1 \u2192 SkyPlanner<\/td><td>Periodiski, piem\u0113ram, reizi stund\u0101<\/td><\/tr><tr><td>Grafik\u0101 paredz\u0113tais s\u0101kums un beigas<\/td><td><code>PATCH ProductionOrders({DocEntry})<\/code>: <code>StartDate<\/code>, <code>DueDate<\/code>, resursa rindas <code>StartDate<\/code> un <code>EndDate<\/code><\/td><td>SkyPlanner \u2192 B1<\/td><td>SkyPlanner t\u012bmek\u013ca aiz\u0137ere p\u0113c grafika izmai\u0146\u0101m<\/td><\/tr><tr><td>Re\u0123istr\u0113tie daudzumi<\/td><td><code>InventoryGenEntries<\/code> (sa\u0146em\u0161ana no ra\u017eo\u0161anas)<\/td><td>SkyPlanner \u2192 B1<\/td><td>P\u0113c apstiprin\u0101\u0161anas vai paket\u0113s<\/td><\/tr><tr><td>Re\u0123istr\u0113t\u0101s stundas un materi\u0101lu pat\u0113ri\u0146\u0161<\/td><td><code>InventoryGenExits<\/code> (izsnieg\u0161ana ra\u017eo\u0161anai)<\/td><td>SkyPlanner \u2192 B1<\/td><td>P\u0113c apstiprin\u0101\u0161anas vai paket\u0113s<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mai\u0146u kalend\u0101rus, person\u0101lu un promb\u016btnes p\u0101rvalda SkyPlanner. B1 dienas jaudas r\u0101d\u012bt\u0101ji netiek iek\u013cauti datu pl\u016bsm\u0101 (skatiet pirmo probl\u0113mu t\u0101l\u0101k).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas mode\u013ci<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ieg\u016bstiet <code>Resources<\/code>, <code>ResourceGroups<\/code>, <code>Items<\/code> ar Procurement Method v\u0113rt\u012bbu Make un attiec\u012bgos <code>ProductTrees<\/code> ar posmiem. Katram iek\u0101rtas resursam piesaistiet SkyPlanner darba centru. Pirms pirm\u0101s pas\u016bt\u012bjumu sinhroniz\u0101cijas p\u0101rskatiet sarakstu kop\u0101 ar pl\u0101not\u0101jiem.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Nolasiet <code>ProductionOrders<\/code> ar statusu Planned un Released, izmantojot <code>$expand<\/code> rind\u0101m un posmiem. B1 ra\u017eo\u0161anas pas\u016bt\u012bjumos ir tehnolo\u0123isk\u0101 procesa posmi, kas p\u0101r\u0146emti no BOM, un pl\u0101not\u0101ji var main\u012bt pas\u016bt\u012bjumu p\u0113c t\u0101 izveides. Izmantojiet pas\u016bt\u012bjuma, nevis BOM posmus. Viens ra\u017eo\u0161anas pas\u016bt\u012bjums ir paredz\u0113ts vienam produktam, t\u0101p\u0113c daudzl\u012bme\u0146u produktam katr\u0101 l\u012bmen\u012b ir atsevi\u0161\u0137s ra\u017eo\u0161anas pas\u016bt\u012bjums. Sasaistiet tos, lai SkyPlanner iepl\u0101notu apak\u0161produktus pirms augst\u0101k\u0101 l\u012bme\u0146a produkta.<\/p>\n\n\n<p>Sinhroniz\u0113jiet ar\u012b atv\u0113rt\u0101s <code>PurchaseOrders<\/code> rindas ar to nepieg\u0101d\u0101to daudzumu un pieg\u0101des datumu, izmantojot SkyPlanner iepirkuma pas\u016bt\u012bjumu galapunktus. SkyPlanner uzskata pas\u016bt\u012btos materi\u0101lus par pieejamiem iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101. B1 kr\u0101jumi main\u0101s, kad tiek iegr\u0101matots Goods Receipt PO (<code>PurchaseDeliveryNotes<\/code>). Integr\u0101cija nolasa \u0161os sa\u0146em\u0161anas dokumentus, atz\u012bm\u0113 sa\u0146emto daudzumu k\u0101 pieg\u0101d\u0101tu SkyPlanner un atst\u0101j atliku\u0161o daudzumu atv\u0113rtu. Da\u013c\u0113jas pieg\u0101des tiek uzskait\u012btas vienu reizi, un materi\u0101lu pieejam\u012bbas p\u0101rbaud\u0113s tiek \u0146emti v\u0113r\u0101 gan kr\u0101jumi, gan gaid\u0101m\u0101s pieg\u0101des.<\/p>\n\n\n<p><strong>3. Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> SkyPlanner t\u012bmek\u013ca aiz\u0137eres nostr\u0101d\u0101, kad main\u0101s grafiks. Integr\u0101cija nos\u016bta <code>PATCH \/b1s\/v1\/ProductionOrders({DocEntry})<\/code> ar jaunaj\u0101m <code>StartDate<\/code> un <code>DueDate<\/code> v\u0113rt\u012bb\u0101m, k\u0101 ar\u012b <code>StartDate<\/code> un <code>EndDate<\/code> pas\u016bt\u012bjuma resursu rind\u0101s (<code>ProductionOrderLines<\/code>), lai katram posmam b\u016btu nor\u0101d\u012bts grafik\u0101 paredz\u0113tais laika interv\u0101ls. Piepras\u012bjuma satur\u0101 iek\u013cauj tikai tos laukus, par kuriem atbild SkyPlanner, un vair\u0101kus pas\u016bt\u012bjumus apvieno vien\u0101 <code>$batch<\/code> piepras\u012bjum\u0101. B1 lietot\u0101ji p\u0113c tam redz grafik\u0101 paredz\u0113tos datumus ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 un log\u0101 Resource Capacity. Instal\u0101cij\u0101s, kur Service Layer nav pieejams, \u0161o pa\u0161u atjaunin\u0101jumu veic lok\u0101ls serviss, izmantojot DI API objektu <code>ProductionOrders<\/code> (<code>GetByKey<\/code>, datumu iestat\u012b\u0161ana, <code>Update<\/code>).<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eotn\u0113.<\/strong> Operatori re\u0123istr\u0113 darbu SkyPlanner, izmantojot <a href=\"\/lv\/funkcijas\/\">Mobile Confirmations vai Production Timer<\/a>. No katra darba laika ieraksta izveido <code>POST \/b1s\/v1\/InventoryGenEntries<\/code> piepras\u012bjumu gatav\u0101s produkcijas daudzumam (sa\u0146em\u0161ana no ra\u017eo\u0161anas) un <code>POST \/b1s\/v1\/InventoryGenExits<\/code> piepras\u012bjumu komponentiem un resursu laikam (izsnieg\u0161ana ra\u017eo\u0161anai).<\/p>\n\n\n<p>Katr\u0101 dokumenta rind\u0101 <code>BaseType<\/code> v\u0113rt\u012bba ir 202, bet <code>BaseEntry<\/code> v\u0113rt\u012bba ir ra\u017eo\u0161anas pas\u016bt\u012bjuma <code>DocEntry<\/code>; izsnieg\u0161anas rind\u0101s papildus nor\u0101da komponenta vai resursa rindas <code>BaseLine<\/code>. Da\u013c\u0113jos daudzumus iegr\u0101mato, tikl\u012bdz tie re\u0123istr\u0113ti. Prec\u0113m, kur\u0101m ir partiju vai s\u0113rijas numuru uzskaite, nor\u0101da attiec\u012bgos numurus, un pas\u016bt\u012bjumam j\u0101b\u016bt status\u0101 Released.<\/p>\n\n\n<p>SkyPlanner darba laika ieraksta ID tiek saglab\u0101ts B1 dokument\u0101, t\u0101p\u0113c atk\u0101rtoti apstr\u0101d\u0101ts notikums nekad netiek iegr\u0101matots divreiz. Ja iegr\u0101mato\u0161ana neizdodas, to m\u0113\u0123ina atk\u0101rtot un par k\u013c\u016bmi zi\u0146o, nevis ierakstu atmet.<\/p>\n\n\n<p><strong>5. Datu p\u0101rvald\u012bbas un konfliktu risin\u0101\u0161anas noteikumi.<\/strong> Vienojieties par tiem pirms programm\u0113\u0161anas:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>B1 p\u0101rvalda artikulus, BOM, daudzumus, noliktavas un pas\u016bt\u012bjumu izveidi.<\/li>\n\n\n<li>SkyPlanner p\u0101rvalda sec\u012bbu, s\u0101kuma un beigu laikus un darba centru pie\u0161\u0137ir\u0161anu.<\/li>\n\n\n<li>Ja pas\u016bt\u012bjuma datumi main\u012bti ab\u0101s sist\u0113m\u0101s, n\u0101kamaj\u0101 SkyPlanner pl\u0101no\u0161anas reiz\u0113 tiek piem\u0113roti SkyPlanner datumi, ja vien pl\u0101not\u0101ji nav blo\u0137\u0113ju\u0161i ra\u017eo\u0161anas uzdevumu SkyPlanner sist\u0113m\u0101.<\/li>\n\n\n<li>Ja pas\u016bt\u012bjumam B1 sist\u0113m\u0101 ir statuss Closed vai Cancelled, ra\u017eo\u0161anas uzdevums tiek iz\u0146emts no grafika.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas ietilpst projekt\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievadposma s\u0101kuma. Pirms tam 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 varat izmantot savus datus. Eksport\u0113jiet artikulus, resursus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus no B1 CSV vai Excel form\u0101t\u0101 un iel\u0101d\u0113jiet tos ar SkyPlanner datu importu. Pl\u0101not\u0101ji redz re\u0101lu grafiku, pirms ir uzrakst\u012bta kaut viena integr\u0101cijas koda rinda.<\/p>\n\n\n<p>Tipisk\u0101 SAP Business One projekt\u0101 ietilpst:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pamatdatu kart\u0113\u0161ana.<\/strong> B1 resursiem un resursu grup\u0101m atbilst darba centri, tehnolo\u0123isko procesu posmiem \u2014 procesa so\u013ci, bet Make artikuliem \u2014 produkti.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 datu iel\u0101de.<\/strong> Artikuli, Product Trees ar posmiem un artikulu rind\u0101m, resursi un kr\u0101jumi katr\u0101 noliktav\u0101.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Atv\u0113rtie ra\u017eo\u0161anas pas\u016bt\u012bjumi ar rind\u0101m un posmiem, k\u0101 ar\u012b atv\u0113rtie iepirkuma pas\u016bt\u012bjumi ar pieg\u0101des datumiem.<\/li>\n\n\n<li><strong>Grafika ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Grafik\u0101 paredz\u0113tie s\u0101kuma un izpildes termi\u0146a datumi tiek ierakst\u012bti <code>ProductionOrders<\/code>.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas izpildes apstiprin\u0101jumi.<\/strong> Receipt and Issue for Production iegr\u0101mato\u0161ana no SkyPlanner darba laika ierakstiem.<\/li>\n\n\n<li><strong>Test\u0113\u0161ana paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam.<\/strong> Pl\u0101not\u0101ji sal\u012bdzina SkyPlanner grafiku ar l\u012bdz\u0161in\u0113jo pl\u0101no\u0161anas praksi.<\/li>\n\n\n<li><strong>Darb\u012bbas uzs\u0101k\u0161ana.<\/strong> SkyPlanner grafiks k\u013c\u016bst par ofici\u0101lo ra\u017eo\u0161anas pl\u0101nu.<\/li>\n\n<\/ul>\n\n\n<p>Sak\u0101rtoti resursi un tehnolo\u0123isko procesu posmi B1 sist\u0113m\u0101 samazina kart\u0113\u0161anai vajadz\u012bgo darbu. Uz\u0146\u0113mum\u0101 Laboratory &amp; Allied integr\u0101cija bija viena no vienk\u0101r\u0161\u0101kaj\u0101m projekta da\u013c\u0101m. Uz\u0146\u0113muma IT komanda liel\u0101koties patst\u0101v\u012bgi izveidoja integr\u0101ciju ar SAP Business One HANA vid\u0113. SkyPlanner komanda iesaist\u012bj\u0101s sare\u017e\u0123\u012bt\u0101kajos gad\u012bjumos, piem\u0113ram, kad produkti tiek apvienoti procesos ar vair\u0101kiem so\u013ciem.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-business-one-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k\u0101s probl\u0113mas ar SAP Business One<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Dienas jauda nav mai\u0146u modelis.<\/p>\n\n\n<p class=\"fx-pain__b\">B1 katram resursam glab\u0101 Daily Internal Capacity un Single Run Capacity v\u0113rt\u012bbas katrai dienai (&#8220;These capacities are defined on a daily basis,&#8221; (\u0161\u012bs jaudas tiek noteiktas katrai dienai), k\u0101 nor\u0101d\u012bts <a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>). SAP rokasgr\u0101mat\u0101 teikts, ka Required Days apr\u0113\u0137ins balst\u0101s uz pie\u0146\u0113mumu &#8220;a single production order can be produced on a single machine&#8221; (vienu ra\u017eo\u0161anas pas\u016bt\u012bjumu var izpild\u012bt ar vienu iek\u0101rtu) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">SAP praktisk\u0101 rokasgr\u0101mata<\/a>). Nep\u0101rkop\u0113jiet \u0161os r\u0101d\u012bt\u0101jus k\u0101 faktisko iek\u0101rtu un person\u0101la jaudu ra\u017eo\u0161anas pl\u0101no\u0161anai. Defin\u0113jiet mai\u0146as, person\u0101lu un darba centru efektivit\u0101ti SkyPlanner sist\u0113m\u0101.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Tehnolo\u0123iskais process ir da\u013ca no BOM.<\/p>\n\n\n<p class=\"fx-pain__b\">Atsevi\u0161\u0137u tehnolo\u0123isk\u0101 procesa pamatdatu nav. Sec\u012bbu nosaka Route Stage rindas objekt\u0101 Product Tree, bet Waiting Days ievada manu\u0101li. Nolasiet <code>ProductTrees<\/code> Stages un <code>ProductionOrders<\/code> Stages un p\u0101rbaudiet, vai katra resursa rinda ir piesaist\u012bta posmam. Pas\u016bt\u012bjumos bez posmiem grafika sast\u0101d\u012bt\u0101jam nav pieejama oper\u0101ciju sec\u012bba.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Resursu rindu daudzumi ir j\u0101p\u0101rr\u0113\u0137ina.<\/p>\n\n\n<p class=\"fx-pain__b\">BOM rindas Quantity nor\u0101da daudzumu, kas nepiecie\u0161ams BOM galven\u0113 nor\u0101d\u012bt\u0101 daudzuma, nevis vienas vien\u012bbas sara\u017eo\u0161anai. Additional Quantity tiek pieskait\u012bts pl\u0101notajam laikam &#8220;regardless of the quantity of the parent item produced&#8221; (neatkar\u012bgi no sara\u017eot\u0101 pamatartikula daudzuma) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">SAP praktisk\u0101 rokasgr\u0101mata<\/a>). Uztveriet to k\u0101 fiks\u0113tu laiku katram pas\u016bt\u012bjumam, l\u012bdz\u012bgi k\u0101 sagatavo\u0161anas laiku. Pirms apr\u0113\u0137in\u0101t izpildes laiku vienai vien\u012bbai, daliet ar galven\u0113 nor\u0101d\u012bto daudzumu. Pret\u0113j\u0101 gad\u012bjum\u0101 katra ra\u017eo\u0161anas uzdevuma laiks b\u016bs attiec\u012bgi vair\u0101kas reizes par lielu vai par mazu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Resursu pamatdati reti ir sak\u0101rtoti.<\/p>\n\n\n<p class=\"fx-pain__b\">Resursu veidi ir Machine, Labor vai Other. Iek\u0101rtas var b\u016bt piesaist\u012btas pamatl\u012bdzek\u013ciem, bet darbasp\u0113ks \u2014 darbiniekiem. Resursam var b\u016bt piesaist\u012bts ar\u012b artikuls, ko neuzskaita kr\u0101jumos un ko izmanto resursa iepirk\u0161anai vai p\u0101rdo\u0161anai. Nekas no t\u0101 nenor\u0101da, kuri resursi ir re\u0101las iek\u0101rtas, kur\u0101m var pl\u0101not darbu. Sak\u0101rtojiet resursu grupas un nov\u0113rsiet resursu dublik\u0101tus, pirms no tiem izveidojat darba centru sarakstu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kr\u0101jumu uzskaites noteikumi var blo\u0137\u0113t izpildes apstiprin\u0101jumus.<\/p>\n\n\n<p class=\"fx-pain__b\">Sa\u0146em\u0161ana un izsnieg\u0161ana ir kr\u0101jumu dokumenti. Bie\u017e\u0101k\u0101s k\u013c\u016bdas ir sajaukti <code>InventoryGenEntries<\/code> un <code>InventoryGenExits<\/code>, tr\u016bksto\u0161i partiju vai s\u0113rijas numuri prec\u0113m ar \u0161\u0101du uzskaiti vai gr\u0101mato\u0161ana uz pas\u016bt\u012bjuma pamata, kam ir statuss Planned.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sesijas un dal\u012b\u0161ana lap\u0101s.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja sesijas der\u012bguma termi\u0146\u0161 ir beidzies, tiek atgriezts zi\u0146ojums &#8220;Invalid session or session already timeout.&#8221; (Neder\u012bga sesija vai sesijas noildze jau iest\u0101jusies.) \u0160\u012bs k\u013c\u016bdas gad\u012bjum\u0101 piesakieties v\u0113lreiz. Noklus\u0113juma dal\u012bjums lap\u0101s pa 20 ierakstiem bez br\u012bdin\u0101juma nogrie\u017e sinhroniz\u0101cijas rezult\u0101tus, ja netiek izmantots <code>odata.nextLink<\/code>.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\"><code>UpdateDate<\/code> nesatur laiku.<\/p>\n\n\n<p class=\"fx-pain__b\">Tabul\u0101 OWOR <code>UpdateDate<\/code> ir datuma lauks; atjaunin\u0101juma laiks glab\u0101jas atsevi\u0161\u0137i lauk\u0101 <code>UpdateTS<\/code>. Aptauja, kas filtr\u0113 tikai p\u0113c <code>UpdateDate<\/code>, katr\u0101 izpildes reiz\u0113 ieg\u016bst visus \u0161odien main\u012btos pas\u016bt\u012bjumus. Izmantojiet abus laukus kop\u0101 vai nov\u0113rsiet dublik\u0101tus sav\u0101 pus\u0113.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">T\u012bmek\u013ca aiz\u0137eres tiek pieg\u0101d\u0101tas vismaz vienu reizi.<\/p>\n\n\n<p class=\"fx-pain__b\">Webhook Messenger neveiksm\u012bgu pieg\u0101di m\u0113\u0123ina atk\u0101rtot l\u012bdz piec\u0101m reiz\u0113m (p\u0113c 2, 4, 8, 16 un 32 sekund\u0113m), p\u0113c tam atz\u012bm\u0113 to k\u0101 neizdevu\u0161os. Atk\u0101rtotie m\u0113\u0123in\u0101jumi var rad\u012bt dublik\u0101tus, un sec\u012bba tiek garant\u0113ta tikai viena uz\u0146\u0113muma ietvaros. Izmantojiet notikuma ID, lai apstr\u0101d\u0101t\u0101ji b\u016btu idempotenti, un turpiniet katru nakti piepras\u012bt datus sal\u012bdzin\u0101\u0161anai.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-sap-business-one-integration-who-sets-it-up\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas izveido SAP Business One integr\u0101ciju<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver j\u016bsu tehnolo\u0123isko procesu posmu, resursu un B1 konfigur\u0101cijas kart\u0113\u0161anu, k\u0101 ar\u012b to ierobe\u017eojumu defin\u0113\u0161anu, kurus B1 grafiku sast\u0101d\u012b\u0161an\u0101 ne\u0146em v\u0113r\u0101: sagatavo\u0161anas laiku matricu, instrumentus, operatoru skaitu un alternat\u012bvos resursus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c darb\u012bbas uzs\u0101k\u0161anas.<\/strong> Katrs uz\u0146\u0113mums B1 izmanto at\u0161\u0137ir\u012bgi, un \u0161aj\u0101 darb\u0101 tiek liktas liet\u0101 zin\u0101\u0161anas par \u0161\u012bm at\u0161\u0137ir\u012bb\u0101m. Tas ir standarta risin\u0101jums.<\/li>\n\n\n<li><strong>Var iesaist\u012bties j\u016bsu SAP Business One partneris.<\/strong> Partneri, kas p\u0101rzina j\u016bsu uz\u0146\u0113muma datub\u0101zi, papildin\u0101jumus un lietot\u0101ja defin\u0113tos laukus, var veidot integr\u0101ciju, izmantojot Service Layer un SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/li>\n\n\n<li><strong>Integr\u0101ciju var izstr\u0101d\u0101t j\u016bsu pa\u0161u izstr\u0101d\u0101t\u0101ji.<\/strong> SkyPlanner REST API \u013cauj las\u012bt un rakst\u012bt pas\u016bt\u012bjumu, produktu, materi\u0101lu, tehnolo\u0123isk\u0101 procesa so\u013cu, iepirkuma pas\u016bt\u012bjumu un darba laika uzskaites datus. Autentifik\u0101cijai tiek izmantots API piek\u013cuves tokens, ko nos\u016bta galven\u0113 Authorization-Token. API ir dokument\u0113ts Swagger\/OpenAPI form\u0101t\u0101, un publisk\u0101 dokument\u0101cija ir pieejama <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cijas sada\u013c\u0101<\/a>. T\u012bmek\u013ca aiz\u0137eres re\u0101llaik\u0101 nos\u016bta pazi\u0146ojumus par grafika un statusa izmai\u0146\u0101m. Lai s\u0101ktu izstr\u0101di, nepiecie\u0161ama tikai SkyPlanner API atsl\u0113ga (<a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bba<\/a>), un vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz SkyPlanner komanda. \u0160o pieeju izv\u0113l\u0113j\u0101s Laboratory &amp; Allied iek\u0161\u0113j\u0101 IT komanda.<\/li>\n\n<\/ol>\n\n\n<p>Vispirms p\u0101rbaudiet grafiku 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101, lai integr\u0101ciju s\u0101ktu ar grafiku, kas jau atbilst ra\u017eotnes vajadz\u012bb\u0101m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0101p\u0113c tehnisk\u0101s komandas izv\u0113las SkyPlanner darbam ar B1<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties nelielu integr\u0101ciju ar skaidri noteiktu apjomu.<\/strong> Ien\u0101ko\u0161aj\u0101 pl\u016bsm\u0101 ir B1 standarta objekti (ra\u017eo\u0161anas pas\u016bt\u012bjumi, Product Trees, Resources, Items), bet izejo\u0161aj\u0101 \u2014 datumi un Issue and Receipt from Production. B1 ra\u017eo\u0161anas modulis nav j\u0101maina, un datu migr\u0101cija nav vajadz\u012bga.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja projektam savs lietder\u012bgums j\u0101pier\u0101da jau s\u0101kum\u0101.<\/strong> 30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101 var izmantot CSV eksportu un l\u012bdz 20 darba centriem, un kred\u012btkarte nav nepiecie\u0161ama. Uz\u0146\u0113mums redz savu grafiku v\u0113l pirms integr\u0101cijas s\u0101kuma.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja grafik\u0101 j\u0101iev\u0113ro re\u0101lie ierobe\u017eojumi.<\/strong> SkyPlanner model\u0113 p\u0101rregul\u0113\u0161anas laikus, koplietojamus instrumentus, uzdevumus ar vair\u0101kiem operatoriem, alternat\u012bvos resursus, kr\u0101jumus un atv\u0113rtos iepirkuma pas\u016bt\u012bjumus. Integr\u0101cija tikai pieg\u0101d\u0101 B1 datus.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties vienu sist\u0113mu pl\u0101not\u0101jiem un operatoriem.<\/strong> Arcturus dzinis izveido grafiku da\u017eu sekun\u017eu laik\u0101, un Autopilot to autom\u0101tiski p\u0101rpl\u0101no, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. Operatori re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101, un integr\u0101cija ieraksta \u0161os izpildes apstiprin\u0101jumus atpaka\u013c B1.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja izmaks\u0101m j\u0101b\u016bt paredzam\u0101m.<\/strong> <a href=\"\/lv\/cenu-noteiksana\/\">Cena<\/a> ir no 199 \u20ac m\u0113nes\u012b, ietverot 5 darba centrus. Nor\u0113\u0137ini ir ik m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu apr\u0113\u0137ina iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101kuma.<\/li>\n\n<\/ul>\n\n\n<p>Par pl\u0101no\u0161anas nepiln\u012bb\u0101m lasiet <a href=\"\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/\">skaidrojum\u0101 par ra\u017eo\u0161anas pl\u0101no\u0161anu SAP Business One kontekst\u0101<\/a>. \u0160eit ar ra\u017eo\u0161anas pl\u0101no\u0161anu saprot grafika sast\u0101d\u012b\u0161anu atbilsto\u0161i re\u0101li pieejamajai iek\u0101rtu un darbinieku jaudai. Par cit\u0101m ERP sist\u0113m\u0101m lasiet <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101ciju sada\u013c\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas ra\u017eotn\u0113 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales skapju ra\u017eotn\u0113 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner m\u016bsu ra\u017eo\u0161anas pl\u0101no\u0161ana ir p\u0101rg\u0101jusi no Excel izkl\u0101jlap\u0101m uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda sasniedz ra\u017eo\u0161anas l\u012bniju da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir uzticams pamats visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 P\u0101rtikai dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un atbildes uz grafika izmai\u0146u piepras\u012bjumiem, kas agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad sa\u0146em da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumtu dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bca Kauhav\u0101, skats no gaisa\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner ir viegl\u0101k saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas, un ra\u017eo\u0161anas vad\u012bba ir k\u013cuvusi p\u0101rskat\u0101m\u0101ka.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumtu dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas izveido integr\u0101ciju ar SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123isk\u0101 procesa posmus, resursus, iepirkuma pas\u016bt\u012bjumus un pre\u010du sa\u0146em\u0161anas datus. Atpaka\u013c tiek nos\u016bt\u012bti iepl\u0101notie datumi un Issue and Receipt from Production dati. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu B1 partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji, izmantojot Service Layer un SkyPlanner REST API. Lai s\u0101ktu, pietiek ar API atsl\u0113gu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgs laiks vajadz\u012bgs SkyPlanner un SAP Business One ievie\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c t\u0101s s\u0101kuma. Komanda izveido resursu un tehnolo\u0123isk\u0101 procesa posmu atbilst\u012bbas, piesl\u0113dz ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un pirms darb\u012bbas uzs\u0101k\u0161anas p\u0101rbauda grafiku, sal\u012bdzinot to ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Service Layer vai DI API?<\/summary>\n<p class=\"sp-faq__a\">Jaun\u0101m integr\u0101cij\u0101m izv\u0113lieties Service Layer. Tas izmanto HTTP, darbojas ar HANA un SQL Server un ir piem\u0113rots m\u0101ko\u0146risin\u0101jumam ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai. DI API izmantojiet tikai tad, ja eso\u0161\u0101 starpprogrammat\u016bra jau ir no t\u0101 atkar\u012bga.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ir nepiecie\u0161ams SAP Business One 10.0 FP 2602?<\/summary>\n<p class=\"sp-faq__a\">Tikai t\u012bmek\u013ca aiz\u0137eru izmanto\u0161anai. Ar agr\u0101k\u0101m 10.0 versij\u0101m integr\u0101cija darbojas, periodiski pieprasot datus p\u0113c noteikta grafika.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 iepl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">Ar <code>PATCH \/b1s\/v1\/ProductionOrders({DocEntry})<\/code>, pas\u016bt\u012bjum\u0101 iestatot <code>StartDate<\/code> un <code>DueDate<\/code>, bet t\u0101 resursu rind\u0101s \u2014 <code>StartDate<\/code> un <code>EndDate<\/code>. \u0160o darb\u012bbu ierosina SkyPlanner t\u012bmek\u013ca aiz\u0137ere, kad main\u0101s grafiks. Sara\u017eotais daudzums un laiks tiek nos\u016bt\u012bti atpaka\u013c k\u0101 <code>InventoryGenEntries<\/code> un <code>InventoryGenExits<\/code>, kas piesaist\u012bti pas\u016bt\u012bjumam ar <code>BaseType<\/code> 202 un <code>BaseEntry<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai B1 sist\u0113m\u0101 ir nepiecie\u0161ams ra\u017eo\u0161anas papildmodulis?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Integr\u0101cija izmanto tikai B1 standarta objektus: ra\u017eo\u0161anas pas\u016bt\u012bjumus, Product Trees, Resources, Items, iepirkuma pas\u016bt\u012bjumus un kr\u0101jumu dokumentus. Nek\u0101di dati netiek migr\u0113ti uz jaunu ra\u017eo\u0161anas datu modeli.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai pirms integr\u0101cijas varam izm\u0113\u0123in\u0101t SkyPlanner ar saviem B1 datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 var izmantot l\u012bdz 20 darba centriem un import\u0113t datus no CSV vai Excel. Kred\u012btkarte nav nepiecie\u0161ama. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai p\u0101rrun\u0101tu j\u016bsu B1 konfigur\u0101ciju.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP Business One SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b SAP Business One partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot B1 ar SkyPlanner APS. Taj\u0101 apl\u016bkots, kuras API izmantot, k\u0101di objekti tiek p\u0101rs\u016bt\u012bti katr\u0101 virzien\u0101 un kur B1 projektos rodas probl\u0113mas. SkyPlanner integr\u0113jas ar SAP &#8230; <a title=\"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/\" aria-label=\"Read more about SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100767,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101094","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP Business One integr\u0101cija ar APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/integracijas-celvedis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/integracijas-celvedis\\\/\",\"name\":\"SAP Business One integr\u0101cija ar APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/integracijas-celvedis\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/integracijas-celvedis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/integracijas-celvedis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP Business One: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP Business One integr\u0101cija ar APS | SkyPlanner","description":"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/","og_locale":"lv_LV","og_type":"article","og_title":"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/","name":"SAP Business One integr\u0101cija ar APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS un SAP Business One integr\u0101cija: Service Layer ent\u012btijas, autentifik\u0101cija, webhooks, datu kart\u0113\u0161ana un ra\u017eo\u0161anas pl\u0101no\u0161anas riski.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP Business One: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/"},{"@type":"ListItem","position":5,"name":"SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP Business One SAP Business One integr\u0101cijas ce\u013cvedis ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 ce\u013cved\u012b SAP Business One partneriem un IT komand\u0101m par\u0101d\u012bts, k\u0101 savienot B1 ar SkyPlanner APS. Taj\u0101 apl\u016bkots, kuras API izmantot, k\u0101di objekti tiek p\u0101rs\u016bt\u012bti katr\u0101 virzien\u0101 un kur B1 projektos rodas probl\u0113mas. SkyPlanner integr\u0113jas ar SAP&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101094"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101094\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100767"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}