{"id":101065,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101065"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/","title":{"rendered":"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Resursi, MRP un SkyPlanner APS loma<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">N\u0113. SAP Business One standarta versij\u0101 ir MRP, resursi ar noteiktu dienas jaudu un logs Resource Capacity, kur\u0101 redzams, kad resurss ir p\u0101rslogots. Ta\u010du nav algoritma, kas noteiktu konkur\u0113jo\u0161o ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu, \u0146emot v\u0113r\u0101 \u0161o jaudu. T\u0101p\u0113c pl\u0101not\u0101js pas\u016bt\u012bjumu datumus p\u0101rb\u012bda manu\u0101li. Ra\u017eot\u0101ji, kuriem nepiecie\u0161ama visa ceha <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161ana<\/a>, kas \u0146em v\u0113r\u0101 gan iek\u0101rtu, gan darbinieku re\u0101lo pieejam\u012bbu, l\u012bdz\u0101s SAP Business One izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-sap-business-one-plans-production-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 SAP Business One pl\u0101no ra\u017eo\u0161anu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Preces pl\u0101no\u0161anas dati un MRP Wizard<\/h3>\n\n\n<p>MRP iestat\u012bjumi atrodas preces pamatdatu sada\u013cas Item Master Data ciln\u0113 <strong>Planning Data<\/strong>:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pl\u0101no\u0161anas metode Planning Method (MRP vai None) un sag\u0101des metode Procurement Method (Buy vai Make)<\/li>\n\n\n<li>Pas\u016bt\u012bjumu interv\u0101ls Order Interval, pas\u016bt\u0101m\u0101 daudzuma solis Order Multiple un minim\u0101lais pas\u016bt\u012bjuma daudzums Minimum Order Quantity<\/li>\n\n\n<li>Pas\u016bt\u012bjuma izpildes laiks Lead Time un pie\u013caujam\u0101s novirzes dien\u0101s Tolerance Days<\/li>\n\n<\/ul>\n\n\n<p><strong>MRP Wizard<\/strong> darbojas se\u0161os so\u013cos: scen\u0101rijs, pl\u0101no\u0161anas perioda un izpildes laika iestat\u012bjumi, preces, uz\u0146\u0113muma (Company) vai noliktavas (Warehouse) l\u012bmenis, datu avoti un ieteikumi. Rezult\u0101ti tiek par\u0101d\u012bti logos MRP Results un <strong>Order Recommendations<\/strong>. Log\u0101 Order Recommendations ieteikumus var p\u0101rv\u0113rst par iepirkuma pas\u016bt\u012bjumiem, ra\u017eo\u0161anas pas\u016bt\u012bjumiem vai kr\u0101jumu p\u0101rvieto\u0161anas piepras\u012bjumiem.<\/p>\n\n\n<p>Apr\u0113\u0137in\u0101 tiek p\u0101rbaud\u012bti materi\u0101li. SAP m\u0101c\u012bbu kurs\u0101 tas aprakst\u012bts \u0161\u0101di: &#8220;the system checks if all the components are available for making the item&#8221; (sist\u0113ma p\u0101rbauda, vai ir pieejamas visas preces izgatavo\u0161anai vajadz\u012bg\u0101s sast\u0101vda\u013cas) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>). Dokument\u0101cij\u0101 nor\u0101d\u012btie ievaddati ir piepras\u012bjums, pieg\u0101des, kr\u0101jumi un pas\u016bt\u012bjuma izpildes laiks. Resursu jaudas starp tiem nav.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Resursi un dienas jauda<\/h3>\n\n\n<p>Resursi ir pamatdati, kuru lauk\u0101 Resource Type nor\u0101da tipu <strong>Machine<\/strong>, <strong>Labor<\/strong> vai <strong>Other<\/strong>. Machine tipa resursu saista ar vienu vai vair\u0101kiem pamatl\u012bdzek\u013ciem, bet Labor tipa resursu \u2014 ar darbiniekiem. Resursus p\u0101rvalda p\u0113c jaudas, nevis daudzuma. Lai iek\u0101rtas saist\u012btu ar pamatl\u012bdzek\u013ciem, vispirms j\u0101iesp\u0113jo Fixed Assets funkcionalit\u0101te.<\/p>\n\n\n<p>Jaudu nosaka katrai dienai. Resursa ciln\u0113 Planning Data katrai ned\u0113\u013cas dienai iestata \u010detrus jaudas koeficientus, piem\u0113ram, stundas mai\u0146\u0101, mai\u0146as dien\u0101 un iek\u0101rtu skaitu. B1 tos sareizina, ieg\u016bstot kop\u0113jo Daily Capacity. P\u0113c tam log\u0101 <strong>Set Daily Internal Capacities<\/strong> \u0123ener\u0113 jaudas datus izv\u0113l\u0113tajam periodam. Ir divi jaudas veidi: <strong>Daily Internal Capacity<\/strong> un <strong>Single Run Capacity<\/strong>. Otro iesp\u0113jo ar atz\u012bmi Relevant for Single Run Capacity. SAP skaidri nor\u0101da detaliz\u0101cijas l\u012bmeni: &#8220;These capacities are defined on a daily basis&#8221; (\u0161\u012bs jaudas nosaka pa dien\u0101m) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Tehnolo\u0123iskais process k\u0101 Route Stages rindas BOM sast\u0101v\u0101<\/h3>\n\n\n<p>SAP Business One nav atsevi\u0161\u0137u tehnolo\u0123isk\u0101 procesa pamatdatu. Tehnolo\u0123isko procesu veido <strong>Route Stage<\/strong> rindas materi\u0101lu specifik\u0101cij\u0101 Bill of Materials (Product Tree). Katrai no t\u0101m manu\u0101li ievada sec\u012bbu lauk\u0101 Route Sequence un gaid\u012b\u0161anas dienas lauk\u0101 <strong>Waiting Days<\/strong>. Zem posmiem atrodas resursu rindas. Ra\u017eo\u0161anas pas\u016bt\u012bjumiem ar tehnolo\u0123isko procesu sist\u0113ma katram posmam apr\u0113\u0137ina <strong>Required Days<\/strong> un <strong>Total Days<\/strong>, kur Total Days = Required Days + Waiting Days.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas pas\u016bt\u012bjumi un resursu laika sadale<\/h3>\n\n\n<p>Katrai ra\u017eo\u0161anas pas\u016bt\u012bjuma resursa rindai pie\u0161\u0137ir vienu no \u010detr\u0101m laika sadales metod\u0113m:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Sadales metode<\/th><th>Darb\u012bba<\/th><\/tr><\/thead><tbody><tr><td>S\u0101kuma datum\u0101<\/td><td>Visu resursa laiku iepl\u0101no s\u0101kuma datum\u0101<\/td><\/tr><tr><td>Beigu datum\u0101<\/td><td>Visu resursa laiku iepl\u0101no beigu datum\u0101<\/td><\/tr><tr><td>Uz priek\u0161u no s\u0101kuma datuma<\/td><td>Resursa laiku sadala pa dien\u0101m uz priek\u0161u no s\u0101kuma datuma, katr\u0101 dien\u0101 nep\u0101rsniedzot Single Run Capacity<\/td><\/tr><tr><td>Atpaka\u013c no beigu datuma<\/td><td>Resursa laiku sadala pa dien\u0101m atpaka\u013c no beigu datuma, katr\u0101 dien\u0101 nep\u0101rsniedzot Single Run Capacity<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Katra metode sadala viena pas\u016bt\u012bjuma resursa laiku. Sadali uz priek\u0161u un atpaka\u013c ierobe\u017eo Single Run Capacity \u2014 stundu skaits, ko viens ra\u017eo\u0161anas pas\u016bt\u012bjums dr\u012bkst izmantot dien\u0101. Citu pas\u016bt\u012bjumu jau rezerv\u0113tais laiks \u0161aj\u0101 resurs\u0101 netiek \u0146emts v\u0113r\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Logs Resource Capacity<\/h3>\n\n\n<p>Log\u0101 <strong>Resource Capacity<\/strong> ir skati Internal, Available un Single Run. Ciln\u0113 Capacity Data apr\u0113\u0137ins ir \u0161\u0101ds: Available = Internal &#8211; Committed &#8211; Consumed. Committed ir ra\u017eo\u0161anas pas\u016bt\u012bjumiem pie\u0161\u0137irt\u0101, bet v\u0113l ra\u017eo\u0161anai nenorakst\u012bt\u0101 jauda; Consumed ir jauda, kas jau norakst\u012bta ra\u017eo\u0161anai. Ja pas\u016bt\u012bjumiem rezerv\u0113 vair\u0101k jaudas, nek\u0101 resursam ir, Available v\u0113rt\u012bba k\u013c\u016bst negat\u012bva.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. P\u0101rslodzes nov\u0113r\u0161ana manu\u0101li<\/h3>\n\n\n<p>Negat\u012bva Available v\u0113rt\u012bba ir br\u012bdin\u0101jums, nevis labojums. SAP 9.1 m\u0101c\u012bbu materi\u0101l\u0101 ir aprakst\u012bts resursu modulis, kas \u013cauj pl\u0101not\u0101jiem redz\u0113t, vai ra\u017eo\u0161ana var norit\u0113t p\u0113c pl\u0101na. Materi\u0101l\u0101 min\u0113ta ar\u012b alternat\u012bva: &#8220;manual scheduling adjustments need to be made to meet deadlines&#8221; (lai iev\u0113rotu termi\u0146us, grafiks j\u0101piel\u0101go manu\u0101li) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">SAP B1 9.1 ra\u017eo\u0161anas uzlabojumi<\/a>). Labojumi j\u0101veic pl\u0101not\u0101jam: j\u0101maina pas\u016bt\u012bjuma datumi vai laika sadale un tad logs j\u0101p\u0101rbauda v\u0113lreiz.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-sap-business-one-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur beidzas SAP Business One iesp\u0113jas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Ierobe\u017eojums<\/th><th>Ko nor\u0101da SAP dokument\u0101cija<\/th><th>Ko tas noz\u012bm\u0113 ra\u017eo\u0161anas ceh\u0101<\/th><\/tr><\/thead><tbody><tr><td>Nav autom\u0101tiskas grafika p\u0101rpl\u0101no\u0161anas<\/td><td>Modulis par\u0101da, &#8220;if manual scheduling adjustments need to be made&#8221; (vai grafiks j\u0101piel\u0101go manu\u0101li) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">PDF<\/a>)<\/td><td>Katru p\u0101rslodzi nov\u0113r\u0161 cilv\u0113ks, p\u0101rb\u012bdot datumus<\/td><\/tr><tr><td>Viens pas\u016bt\u012bjums, viena iek\u0101rta<\/td><td>&#8220;The calculation algorithm of Required Days is set up based on the assumption that a single production order can be produced on a single machine.&#8221; (Required Days apr\u0113\u0137ina algoritma pamat\u0101 ir pie\u0146\u0113mums, ka vienu ra\u017eo\u0161anas pas\u016bt\u012bjumu var izpild\u012bt ar vienu iek\u0101rtu.) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Lieto\u0161anas rokasgr\u0101mata<\/a>)<\/td><td>Netiek noteikta sec\u012bba pas\u016bt\u012bjumiem, kuriem vajadz\u012bgs viens resurss, un pas\u016bt\u012bjumi netiek sadal\u012bti starp iek\u0101rt\u0101m<\/td><\/tr><tr><td>Jaudas sadal\u012bjums pa dien\u0101m<\/td><td>&#8220;These capacities are defined on a daily basis.&#8221; (\u0160\u012bs jaudas nosaka pa dien\u0101m.) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>)<\/td><td>Mai\u0146as ir tikai koeficients kop\u0113j\u0101s dienas jaudas apr\u0113\u0137in\u0101, t\u0101p\u0113c pl\u0101ns ir dien\u0101s, nevis stund\u0101s<\/td><\/tr><tr><td>MRP p\u0101rbauda materi\u0101lus<\/td><td>Apr\u0113\u0137ina laik\u0101 sist\u0113ma &#8220;checks if all the components are available&#8221; (p\u0101rbauda, vai ir pieejamas visas sast\u0101vda\u013cas) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>)<\/td><td>Ieteiktos datumus nosaka p\u0113c pas\u016bt\u012bjuma izpildes laika, nevis iek\u0101rtu noslodzes<\/td><\/tr><tr><td>Gaid\u012b\u0161anas laiku ievada manu\u0101li<\/td><td>Waiting Days ievada katram Route Stage posmam<\/td><td>Gaid\u012b\u0161anas laiks rind\u0101 ir fiks\u0113ts pie\u0146\u0113mums, nevis faktisk\u0101s noslodzes apr\u0113\u0137ina rezult\u0101ts<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku var nor\u0101d\u012bt vien\u0101 veid\u0101 \u2014 lauk\u0101 <strong>Additional Quantity<\/strong> BOM resursa rind\u0101. SAP to pieskaita pl\u0101notajam laikam &#8220;regardless of the quantity of the parent item produced&#8221; (neatkar\u012bgi no sara\u017eot\u0101 pamatizstr\u0101d\u0101juma daudzuma) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Lieto\u0161anas rokasgr\u0101mata<\/a>). Tas ir fiks\u0113ts laiks katram pas\u016bt\u012bjumam. Tas nemain\u0101s atkar\u012bb\u0101 no iepriek\u0161 ra\u017eot\u0101 produkta, t\u0101p\u0113c sec\u012bba, kas samazina p\u0101rregul\u0113\u0161anu, joproj\u0101m j\u0101izv\u0113las pl\u0101not\u0101jam. Instrumentus var izveidot k\u0101 Other tipa resursus ar noteiktu dienas jaudu. Ta\u010du netiek p\u0101rbaud\u012bts, vai \u0161tance vai pal\u012bgier\u012bce konkr\u0113taj\u0101 stund\u0101 ir br\u012bva. Ja pirm\u0101 iek\u0101rta ir piln\u012bb\u0101 noslogota, resursa rinda nep\u0101rsl\u0113dzas uz alternat\u012bvu iek\u0101rtu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sap-business-one-s-native-planning-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar SAP Business One ieb\u016bv\u0113to pl\u0101no\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar B1 standarta pl\u0101no\u0161anu pietiek \u0161\u0101dos gad\u012bjumos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Maz iek\u0101rtu un neliela produktu da\u017e\u0101d\u012bba.<\/strong> Ja resursu ir nedaudz un katram produktam ir viens vai divi tehnolo\u0123iskie procesi, pl\u0101not\u0101js katru r\u012btu p\u0101rskata logu Resource Capacity. Retu reizi par\u0101d\u012bju\u0161os negat\u012bvo v\u0113rt\u012bbu var nov\u0113rst da\u017eu min\u016b\u0161u laik\u0101.<\/li>\n\n\n<li><strong>Stabila ra\u017eo\u0161ana noliktavai.<\/strong> Ja piepras\u012bjums ir vienm\u0113r\u012bgs, MRP nor\u0101d\u012btie pas\u016bt\u012bjuma izpildes laiki atbilst realit\u0101tei un \u0161aur\u0101 vieta paliek nemain\u012bga, p\u0113c izpildes laika apr\u0113\u0137in\u0101tie datumi ir der\u012bgi.<\/li>\n\n\n<li><strong>Pietiek ar precizit\u0101ti l\u012bdz dienai.<\/strong> Ja j\u016bsu klientiem svar\u012bga ir diena, nevis stunda, jaudas sadal\u012bjums pa dien\u0101m nodro\u0161ina vajadz\u012bgo detaliz\u0101ciju.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana ir \u012bsa, un instrumenti netiek koplietoti.<\/strong> Ja p\u0101rregul\u0113\u0161anas laiks nav atkar\u012bgs no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma un katrai iek\u0101rtai ir savi instrumenti, ar Additional Quantity nor\u0101d\u012btais fiks\u0113tais laiks katram pas\u016bt\u012bjumam ir pietiekami prec\u012bzs.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Par to liecina konkr\u0113tas paz\u012bmes:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Katru ned\u0113\u013cu vair\u0101kiem resursiem Available v\u0113rt\u012bba k\u013c\u016bst negat\u012bva, un p\u0101rslodzes nov\u0113r\u0161ana aiz\u0146em stundas.<\/li>\n\n\n<li>Vair\u0101kiem pas\u016bt\u012bjumiem vajadz\u012bga viena un t\u0101 pati iek\u0101rta, un izpildes sec\u012bba nosaka, kurus var\u0113s nos\u016bt\u012bt laik\u0101.<\/li>\n\n\n<li>Sagatavo\u0161ana vai p\u0101rregul\u0113\u0161ana pat\u0113r\u0113 b\u016btisku jaudas da\u013cu, un l\u012bdz\u012bgu ra\u017eo\u0161anas uzdevumu izpilde citu p\u0113c cita ietaup\u012btu stundas.<\/li>\n\n\n<li>Pl\u0101n\u0101 j\u0101\u0146em v\u0113r\u0101 mai\u0146as, virsstundas, promb\u016btnes vai operatoru pieejam\u012bba, nevis tikai viens dienas r\u0101d\u012bt\u0101js.<\/li>\n\n\n<li>Pien\u0101k steidzams pas\u016bt\u012bjums, un neviens nevar pateikt, kuru pas\u016bt\u012bjumu izpildi tas aizkav\u0113s.<\/li>\n\n\n<li>Faktiskais pl\u0101ns tiek uztur\u0113ts Excel l\u012bdz\u0101s B1, un jau tre\u0161dien abi vairs nesakr\u012bt.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Risin\u0101jums nolasa B1 standarta objektus.<\/strong> Ra\u017eo\u0161anas pas\u016bt\u012bjumus, Product Trees ar Route Stages, Resources un Items \u2014 t\u0101 ra\u017eo\u0161anas moduli varat atst\u0101t nemain\u012btu.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161ana atbilsto\u0161i re\u0101lajai jaudai.<\/strong> Katram darba centram, \u0146emot v\u0113r\u0101 mai\u0146as, person\u0101lu un promb\u016btnes, nevis tikai jaudas kopsummu pa dien\u0101m.<\/li>\n\n\n<li><strong>Darbu sec\u012bba un p\u0101rregul\u0113\u0161ana.<\/strong> P\u0101rregul\u0113\u0161anas laiks, p\u0101rejot no viena produkta uz citu, ir atkar\u012bgs no sec\u012bbas, nevis ir tikai fiks\u0113ts laiks katram pas\u016bt\u012bjumam.<\/li>\n\n\n<li><strong>Koplietojami resursi.<\/strong> Instrumenti ir ierobe\u017eoti resursi, kurus nevar vienlaikus izmantot div\u0101s iek\u0101rt\u0101s. Ra\u017eo\u0161anas uzdevumiem var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja pamata iek\u0101rta vai darbinieks ir aiz\u0146emts, tiek izmantotas alternat\u012bvas iek\u0101rtas vai darbinieki.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas iev\u0113ro\u0161ana.<\/strong> Ra\u017eo\u0161anas uzdevumu nevajadz\u0113tu s\u0101kt, kam\u0113r nav pieejamas t\u0101 sast\u0101vda\u013cas. J\u0101\u0146em v\u0113r\u0101 gan noliktavas kr\u0101jumi, gan v\u0113l neizpild\u012btie iepirkuma pas\u016bt\u012bjumi, kuru pieg\u0101de ir gaid\u0101ma.<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana, kad situ\u0101cija main\u0101s.<\/strong> Pl\u0101ns atjaunin\u0101s l\u012bdz ar ra\u017eo\u0161anas gaitu vai pas\u016bt\u012bjumu izmai\u0146\u0101m, un pl\u0101not\u0101jam tas nav j\u0101veido no jauna.<\/li>\n\n\n<li><strong>Datu apmai\u0146a abos virzienos.<\/strong> Pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c <code>ProductionOrders<\/code>, bet ra\u017eo\u0161anas ceh\u0101 re\u0123istr\u0113t\u0101 izlaide tiek iegr\u0101matota B1 ar Receipt un Issue for Production dokumentiem.<\/li>\n\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar saviem datiem.<\/strong> Jums vajadz\u0113tu redz\u0113t grafiku ar saviem pas\u016bt\u012bjumiem v\u0113l pirms integr\u0101cijas izstr\u0101des.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">\u010cetru veidu risin\u0101jumi B1 ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>B1 ieb\u016bv\u0113t\u0101 pl\u0101no\u0161ana.<\/strong> MRP Wizard, Resource Capacity un \u010detras resursu pie\u0161\u0137ir\u0161anas metodes. Ar to pietiek, kam\u0113r p\u0101rslodzes ir retas.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anas d\u0113\u013ci un ra\u017eo\u0161anas papildmodu\u013ci B1 klientprogramm\u0101.<\/strong> Pl\u0101no\u0161anas d\u0113lis vizu\u0101li att\u0113lo pas\u016bt\u012bjumus, un pl\u0101not\u0101js vada to izpildes sec\u012bbu. Ra\u017eo\u0161anas papildmodulis ievie\u0161 savus darba uzdevumu objektus, t\u0101p\u0113c ra\u017eo\u0161anas vad\u012bba p\u0101riet uz jaunu datu modeli.<\/li>\n\n\n<li><strong>Lieliem uz\u0146\u0113mumiem paredz\u0113ti APS risin\u0101jumu kompleksi.<\/strong> Tie paredz\u0113ti atsevi\u0161\u0137ai pl\u0101no\u0161anas komandai, kas model\u0113 un piel\u0101go sist\u0113mu. Ievie\u0161ana notiek konsult\u0101ciju projekta ietvaros.<\/li>\n\n\n<li><strong>M\u0101ko\u0146a APS ar darba izpildi ra\u017eo\u0161anas ceh\u0101.<\/strong> Sast\u0101da standarta B1 ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, iev\u0113rojot iek\u0101rtu un person\u0101la re\u0101lo jaudu, un operatoriem r\u0101da darbu rindu t\u0101lrun\u012b vai plan\u0161etdator\u0101. \u0160\u0101ds risin\u0101jums ir SkyPlanner.<\/li>\n\n<\/ul>\n\n\n<p>Ja tr\u016bkst tie\u0161i grafika sast\u0101d\u012b\u0161anas standarta ra\u017eo\u0161anas pas\u016bt\u012bjumiem, m\u0101ko\u0146a APS prasa vismaz\u0101k p\u0101rmai\u0146u, jo B1 paliek nemain\u012bts.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ir m\u0101ko\u0146risin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas veido grafiku atbilsto\u0161i iek\u0101rtu un person\u0101la re\u0101lajai jaudai. Tas paredz\u0113ts ra\u017eot\u0101jiem, kuri izmanto B1, v\u0113las saglab\u0101t standarta ra\u017eo\u0161anas pas\u016bt\u012bjumus un vairs manu\u0101li nelabot negat\u012bvas Available v\u0113rt\u012bbas. Tas nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dienas jaudas kopsummu viet\u0101 \u2014 re\u0101ls jaudas modelis.<\/strong> Ra\u017eo\u0161anu pl\u0101no atbilsto\u0161i katra darba centra re\u0101lajai jaudai, \u0146emot v\u0113r\u0101 mai\u0146as, person\u0101lu, atva\u013cin\u0101jumus, promb\u016btni un virsstundu mai\u0146as.<\/li>\n\n\n<li><strong>Ierobe\u017eojuma \u201cviens pas\u016bt\u012bjums, viena iek\u0101rta\u201d viet\u0101 \u2014 piln\u012bga darbu sec\u012bbas pl\u0101no\u0161ana.<\/strong> Arcturus dzin\u0113js sekund\u0113s nosaka visu ra\u017eo\u0161anas uzdevumu sec\u012bbu visos darba centros, \u0146emot v\u0113r\u0101 alternat\u012bvus darba centrus un uzdevumu sadal\u012b\u0161anu starp iek\u0101rt\u0101m. Pl\u0101not\u0101ji redi\u0123\u0113 grafiku interakt\u012bv\u0101 Gantt laika skal\u0101, bet dzin\u0113js nodro\u0161ina grafika saska\u0146ot\u012bbu.<\/li>\n\n\n<li><strong>Fiks\u0113ta p\u0101rregul\u0113\u0161anas laika viet\u0101 \u2014 p\u0101rregul\u0113\u0161anas matrica.<\/strong> Taj\u0101 glab\u0101jas no produktu sec\u012bbas atkar\u012bgie p\u0101rregul\u0113\u0161anas laiki (no zila uz sarkanu \u2014 30 min\u016btes, no sarkana uz zilu \u2014 60), un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Sagatavo\u0161anas un nosl\u0113guma darbu laiku model\u0113 katram ra\u017eo\u0161anas uzdevumam.<\/li>\n\n\n<li><strong>Instrumenti un brig\u0101des \u2014 ierobe\u017eoti resursi.<\/strong> Instrumenti ir ierobe\u017eoti resursi, kurus nevar iepl\u0101not divos darba centros vienlaikus. Vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori reiz\u0113. Ja pamata resurss nav pieejams, dzin\u0113js p\u0101rce\u013c darbu uz alternat\u012bv\u0101m iek\u0101rt\u0101m vai pie\u0161\u0137ir to citiem darbiniekiem.<\/li>\n\n\n<li><strong>Datumus nosaka materi\u0101lu pieejam\u012bba, nevis tikai izpildes laiks.<\/strong> Katram ra\u017eo\u0161anas uzdevumam p\u0101rbauda noliktavas kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des no B1 iepirkuma pas\u016bt\u012bjumiem. V\u0113l neizpild\u012bt\u0101 iepirkuma pas\u016bt\u012bjuma daudzums tiek uzskat\u012bts par pieejamu attiec\u012bg\u0101s rindas pieg\u0101des datum\u0101. B1 dokuments Goods Receipt PO p\u0101rvieto \u0161o daudzumu uz SkyPlanner noliktavas kr\u0101jumiem, ar\u012b da\u013c\u0113jas sa\u0146em\u0161anas gad\u012bjum\u0101.<\/li>\n\n\n<li><strong>Izpildes termi\u0146i k\u013c\u016bst par re\u0101l\u0101m priorit\u0101t\u0113m.<\/strong> To, kuru ra\u017eo\u0161anas uzdevumu izpild\u012bt vispirms, nosaka uzdevuma priorit\u0101te, prioritiz\u0113\u0161ana p\u0113c pabeig\u0161anas datuma, klienta priorit\u0101te, Fast Track un Dynamic Priorities.<\/li>\n\n\n<li><strong>Manu\u0101las korekcijas k\u013c\u016bst autom\u0101tiskas.<\/strong> Mainoties situ\u0101cijai ra\u017eo\u0161an\u0101, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu noteiktos fiks\u0113jumus un priorit\u0101tes.<\/li>\n\n\n<li><strong>Grafika sast\u0101d\u012b\u0161ana un darba izpilde ceh\u0101 \u2014 vien\u0101 r\u012bk\u0101.<\/strong> Operatori redz savu darbu rindu un re\u0123istr\u0113 paveikto t\u0101lrun\u012b vai plan\u0161etdator\u0101, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> Resource Capacity log\u0101 katru ned\u0113\u013cu redzamas p\u0101rslodzes un to nov\u0113r\u0161ana aiz\u0146em stundas.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana ir atkar\u012bga no sec\u012bbas vai to, ko var izpild\u012bt n\u0101kamo, nosaka koplietojami instrumenti un uzdevumi, kam vajadz\u012bgi vair\u0101ki operatori.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> v\u0113laties pl\u0101not standarta B1 ra\u017eo\u0161anas pas\u016bt\u012bjumus atbilsto\u0161i re\u0101lajai jaudai, nevis ieviest jaunu ra\u017eo\u0161anas moduli.<\/p>\n\n\n<p>Pilns funkciju saraksts ir pieejams <a href=\"\/lv\/funkcijas\/\">funkciju lap\u0101<\/a>.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar SAP Business One. Ra\u017eo\u0161anas pas\u016bt\u012bjumi, tehnolo\u0123isk\u0101 procesa posmi, resursi un atv\u0113rtie iepirkuma pas\u016bt\u012bjumi tiek sa\u0146emti caur Service Layer. Pl\u0101notie datumi tiek ierakst\u012bti atpaka\u013c <code>ProductionOrders<\/code>, bet re\u0123istr\u0113t\u0101 izlaide un nostr\u0101d\u0101t\u0101s stundas tiek iegr\u0101matotas ar Receipt un Issue for Production dokumentiem. SkyPlanner ar webhook pazi\u0146ojumiem nos\u016bta katru grafika izmai\u0146u uzreiz p\u0113c t\u0101s veik\u0161anas.<\/p>\n\n\n<p>Katr\u0101 r\u016bpn\u012bc\u0101 B1 izmanto cit\u0101di \u2014 s\u0101kot ar tehnolo\u0123isk\u0101 procesa posmiem BOM un beidzot ar resursu grup\u0101m un papildmodu\u013ciem. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Integr\u0101ciju var izstr\u0101d\u0101t ar\u012b j\u016bsu B1 partneris vai izstr\u0101d\u0101t\u0101ji, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>); tam pietiek ar API atsl\u0113gu. Produkta un API dokument\u0101cija ir publiski pieejama vietn\u0113 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/p>\n\n\n<p>Nairobi farm\u0101cijas ra\u017eot\u0101js Laboratory &amp; Allied izmanto SAP Business One uz HANA kop\u0101 ar Power BI. Uz\u0146\u0113mum\u0101 str\u0101d\u0101 aptuveni 1 000 cilv\u0113ku, no tiem ap 800 \u2014 ra\u017eo\u0161an\u0101, un SkyPlanner tas izmanto kop\u0161 2025. gada. Uz\u0146\u0113muma iek\u0161\u0113j\u0101 IT komanda SAP integr\u0101ciju liel\u0101koties izstr\u0101d\u0101ja pati ar SkyPlanner pal\u012bdz\u012bbu. Uz\u0146\u0113mums zi\u0146o, ka savlaic\u012bgas pieg\u0101des un savlaic\u012bga atskai\u0161u snieg\u0161ana klientiem ir uzlaboju\u0161\u0101s par 50%.<\/p>\n\n\n<p>S\u0101ciet ar CSV vai Excel eksportu no B1 <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> \u2014 l\u012bdz 20 darba centriem, bez kred\u012btkartes. J\u016bs redz\u0113siet grafiku ar saviem pas\u016bt\u012bjumiem v\u0113l pirms jebk\u0101diem integr\u0101cijas darbiem. P\u0113c tam <a href=\"\/lv\/cenu-noteiksana\/\">cena<\/a> ir no 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem. Nor\u0113\u0137ini ir ik m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m nor\u0101d\u0101m iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas v\u0113l pirms darba s\u0101k\u0161anas. Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma.<\/p>\n\n\n<p>Izlasiet p\u0101rskatu lap\u0101 <a href=\"\/lv\/integracija\/erp\/sap-business-one\/\">SkyPlanner risin\u0101jums SAP Business One lietot\u0101jiem<\/a> vai uzziniet, k\u0101di dati tiek p\u0101rs\u016bt\u012bti starp sist\u0113m\u0101m, <a href=\"\/lv\/integracija\/erp\/sap-business-one\/integracijas-celvedis\/\">SAP Business One integr\u0101cijas rokasgr\u0101mat\u0101<\/a>. Citas ERP sist\u0113mas ir nor\u0101d\u012btas sada\u013c\u0101 <a href=\"\/lv\/integracija\/erp\/\">ERP integr\u0101cijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farm\u0101cijas ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki sadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektriskie sadales skapji un sadalietaises<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jauna darbu rinda l\u012bdz l\u012bnijai non\u0101k sekund\u0113s.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermas r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, pieaudzis no aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a noz\u012bme m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la izstr\u0101d\u0101jumi un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un grafiku sast\u0101d\u012b\u0161anai tagad vajadz\u012bgs viens meistars, nevis divi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidr\u0101k saskat\u012bt \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz pat \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SAP Business One ir ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anas r\u012bks?<\/summary>\n<p class=\"sp-faq__a\">Taj\u0101 ir ra\u017eo\u0161anas pas\u016bt\u012bjumi ar \u010detr\u0101m resursu pie\u0161\u0137ir\u0161anas metod\u0113m un Resource Capacity logs, kas par\u0101da jaudas p\u0101rsniegumu. Tas nenosaka pas\u016bt\u012bjumu sec\u012bbu, iev\u0113rojot pieejam\u0101s jaudas ierobe\u017eojumus. P\u0101rslodzes nov\u0113r\u0161, manu\u0101li mainot ra\u017eo\u0161anas pas\u016bt\u012bjumu datumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SAP Business One MRP \u0146em v\u0113r\u0101 resursu jaudu?<\/summary>\n<p class=\"sp-faq__a\">Saska\u0146\u0101 ar SAP dokument\u0101ciju \u2014 n\u0113. Taj\u0101 aprakst\u012bts, ka MRP apr\u0113\u0137in\u0101 p\u0101rbauda piepras\u012bjumu, pieg\u0101des, kr\u0101jumus, sast\u0101vda\u013cu pieejam\u012bbu un pas\u016bt\u012bjuma izpildes laiku. Resursu jauda nav starp \u0161iem ievaddatiem, t\u0101p\u0113c MRP ieteikumi neatspogu\u013co iek\u0101rtu noslodzi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101da ir at\u0161\u0137ir\u012bba starp Daily Internal Capacity un Single Run Capacity?<\/summary>\n<p class=\"sp-faq__a\">Daily Internal Capacity ir kop\u0113jais resursa pieejamais laiks dien\u0101. Single Run Capacity ir laiks, ko viens ra\u017eo\u0161anas pas\u016bt\u012bjums \u0161aj\u0101 resurs\u0101 var izmantot dien\u0101. \u0160\u012b v\u0113rt\u012bba nosaka Required Days apr\u0113\u0137inu pas\u016bt\u012bjumiem ar tehnolo\u0123isko procesu; SAP apr\u0113\u0137ina pamat\u0101 ir viens pas\u016bt\u012bjums, ko izpilda uz vienas iek\u0101rtas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SAP Business One atbalsta no sec\u012bbas atkar\u012bgus p\u0101rregul\u0113\u0161anas laikus?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Lauks Additional Quantity BOM resursa rind\u0101 pievieno fiks\u0113tu laiku katram pas\u016bt\u012bjumam neatkar\u012bgi no t\u0101, kas ra\u017eots pirms tam. SkyPlanner p\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas laiki p\u0101rejai starp produktiem abos virzienos, un uzdevumu sec\u012bba tiek veidota t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu mazs.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ra\u017eo\u0161anas pl\u0101no\u0161anai ir vajadz\u012bgs ra\u017eo\u0161anas papildmodulis B1 sist\u0113m\u0101?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner sast\u0101da standarta B1 ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, iev\u0113rojot iek\u0101rtu un person\u0101la re\u0101lo jaudu, un papildina to ar darba laika re\u0123istr\u0113\u0161anu ra\u017eo\u0161anas ceh\u0101. BOM un pas\u016bt\u012bjumi nav j\u0101p\u0101rnes uz jaunu datu modeli.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savienojas ar SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">Datu apmai\u0146a notiek abos virzienos, izmantojot B1 Service Layer, SkyPlanner REST API un t\u012bmek\u013ca aiz\u0137eres. SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, materi\u0101lu specifik\u0101cijas (BOM), resursus un iepirkuma pas\u016bt\u012bjumus. Atpaka\u013c uz B1 tiek nos\u016bt\u012bti iepl\u0101notie datumi, re\u0123istr\u0113tais sara\u017eotais apjoms un nostr\u0101d\u0101t\u0101s stundas. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu B1 konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darb\u012bbas uzs\u0101k\u0161anas. Ar\u012b j\u016bsu B1 partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot dokument\u0113to REST API. Lai s\u0101ktu, pietiek ar API atsl\u0113gu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu bezmaksas izm\u0113\u0123in\u0101jums ietver l\u012bdz 20 darba centriem, un kred\u012btkarte nav nepiecie\u0161ama. Eksport\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus un resursus no B1, import\u0113jiet tos CSV vai Excel form\u0101t\u0101 un vispirms apskatiet savu ra\u017eo\u0161anas grafiku. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ SAP Business One Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma N\u0113. SAP Business One standarta versij\u0101 ir MRP, resursi ar noteiktu dienas jaudu un logs Resource Capacity, kur\u0101 redzams, kad resurss ir p\u0101rslogots. Ta\u010du nav algoritma, kas noteiktu konkur\u0113jo\u0161o ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu, \u0146emot v\u0113r\u0101 \u0161o &#8230; <a title=\"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/\" aria-label=\"Read more about Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100767,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101065","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma\" \/>\n<meta property=\"og:description\" content=\"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/razosanas-planosana\\\/\",\"name\":\"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai SAP Business One: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/sap-business-one\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma","og_description":"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/","name":"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SAP Business One ir MRP, resursu dienas jauda un \u010detras sadales metodes, bet nav pl\u0101not\u0101ja, kas iev\u0113ro jaudu. Ko tas sp\u0113j, kur ir robe\u017eas un kad ar to pietiek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai SAP Business One: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/sap-business-one\/"},{"@type":"ListItem","position":5,"name":"Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ SAP Business One Vai SAP Business One nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Resursi, MRP un SkyPlanner APS loma N\u0113. SAP Business One standarta versij\u0101 ir MRP, resursi ar noteiktu dienas jaudu un logs Resource Capacity, kur\u0101 redzams, kad resurss ir p\u0101rslogots. Ta\u010du nav algoritma, kas noteiktu konkur\u0113jo\u0161o ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu, \u0146emot v\u0113r\u0101 \u0161o&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101065"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101065\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100767"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}