{"id":101035,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101035"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracijas-rokasgramata","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/","title":{"rendered":"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">NetSuite integr\u0101cijas rokasgr\u0101mata <span class=\"hl\">ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 rokasgr\u0101mat\u0101 NetSuite partneriem, administratoriem un tehniskajiem iepirkumu speci\u0101listiem skaidrots, k\u0101 savienot SkyPlanner APS ar Oracle NetSuite ra\u017eo\u0161anas pl\u0101no\u0161anai, kur\u0101 grafiks atbilst faktiskajai iek\u0101rtu un darbinieku jaudai. SkyPlanner un NetSuite apmain\u0101s ar datiem abos virzienos, izmantojot REST t\u012bmek\u013ca pakalpojumus un SuiteQL:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus, darba centrus, nomenklat\u016bras vien\u012bbas un iepirkuma pas\u016bt\u012bjumus.<\/li>\n\n\n<li>Pl\u0101notos s\u0101kuma un beigu laikus ieraksta ra\u017eo\u0161anas oper\u0101ciju uzdevumos.<\/li>\n\n\n<li>Re\u0123istr\u0113t\u0101s stundas un sara\u017eotos daudzumus nos\u016bta atpaka\u013c k\u0101 Work Order Completions vai Assembly Builds.<\/li>\n\n\n<li>SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>NetSuite p\u0101rvalda nomenklat\u016bras vien\u012bbas, BOM, tehnolo\u0123iskos procesus, ra\u017eo\u0161anas pas\u016bt\u012bjumus, kr\u0101jumus un izmaksu apr\u0113\u0137inus. SkyPlanner veic ra\u017eo\u0161anas pl\u0101no\u0161anu ar Arcturus dzin\u0113ju, sast\u0101dot grafiku atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai. SkyPlanner komanda ievie\u0161anas laik\u0101 konfigur\u0113 integr\u0101ciju j\u016bsu kontam un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Integr\u0101cija izmanto NetSuite standarta ierakstus un nav atkar\u012bga no Advanced Manufacturing SuiteApp.<\/p>\n\n\n<p>SkyPlanner jau darbojas integr\u0101cij\u0101 ar NetSuite uz\u0146\u0113mum\u0101 <a href=\"\/lv\/customers\/utu\/\">UTU<\/a>, kas ra\u017eo elektrosadales pane\u013cus un sadaliek\u0101rtas Ulvil\u0101, Somij\u0101. UTU s\u0101ka lietot SkyPlanner 2025. gada septembr\u012b, integr\u0113jot to ar Oracle NetSuite un savu darba samaksas sist\u0113mu. Lai izv\u0113rt\u0113tu biznesa ieguvumus, s\u0101ciet ar <a href=\"\/lv\/integracija\/erp\/netsuite\/\">lapu par ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anu NetSuite lietot\u0101jiem<\/a> un rakstu <a href=\"\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/\">Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-one-decision-that-shapes-the-project-rest-an\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Iz\u0161\u0137iro\u0161ais l\u0113mums projekt\u0101: REST un OAuth 2.0<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_2104046421.html\">Oracle ir noteicis virzienu<\/a>. S\u0101kot ar 2026.1, jaunas integr\u0101cijas j\u0101veido ar SuiteTalk REST t\u012bmek\u013ca pakalpojumiem un OAuth 2.0. S\u0101kot ar 2027.1, vairs nevar\u0113s veidot jaunas integr\u0101cijas ar SOAP vai Token-Based Authentication (TBA). Versij\u0101 2028.2 SOAP galapunkti tiks atsp\u0113joti. Jebkura grafiku sast\u0101d\u012b\u0161anas integr\u0101cija, ko s\u0101k veidot \u0161odien, j\u0101balsta uz REST.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>NetSuite risin\u0101jums<\/th><th>Apraksts<\/th><th>Loma APS integr\u0101cij\u0101<\/th><\/tr><\/thead><tbody><tr><td>SuiteTalk REST record API<\/td><td><code>\/services\/rest\/record\/v1\/&lt;recordType&gt;<\/code>, versija atbilst NetSuite laidienam; <code>!transform<\/code> ra\u017eo\u0161anas pas\u016bt\u012bjumu izpildes, materi\u0101lu izsnieg\u0161anas un izstr\u0101d\u0101jumu mont\u0101\u017eas re\u0123istr\u0113\u0161anai<\/td><td>Datu ierakst\u012b\u0161ana: oper\u0101ciju uzdevumu un ra\u017eo\u0161anas pas\u016bt\u012bjumu datumi (PATCH), izpilde, materi\u0101lu izsnieg\u0161ana un izstr\u0101d\u0101jumu mont\u0101\u017ea (transform)<\/td><\/tr><tr><td>SuiteQL, izmantojot REST<\/td><td><code>POST \/services\/rest\/query\/v1\/suiteql<\/code> ar <code>Prefer: transient<\/code>, l\u012bdz 100 000 rezult\u0101tiem vien\u0101 vaic\u0101jum\u0101, dal\u012bjums lap\u0101s ar limit\/offset<\/td><td>Datu lielapjoma nolas\u012b\u0161ana: preces, tehnolo\u0123iskie procesi, darba centri, atv\u0113rtie ra\u017eo\u0161anas pas\u016bt\u012bjumi, kr\u0101jumi<\/td><\/tr><tr><td>SuiteScript 2.1 RESTlets<\/td><td>Piel\u0101goti <code>get\/post\/put\/delete<\/code> galapunkti<\/td><td>Funkcijas, ko REST nenodro\u0161ina, un apvienotas datu pakotnes, piem\u0113ram, ra\u017eo\u0161anas pas\u016bt\u012bjums ar vis\u0101m t\u0101 oper\u0101cij\u0101m<\/td><\/tr><tr><td>SuiteScript User Event \/ Map-Reduce<\/td><td>Servera puses skripti NetSuite vid\u0113<\/td><td>Izejo\u0161i pazi\u0146ojumi par izmai\u0146\u0101m<\/td><\/tr><tr><td>CSV Import Assistant<\/td><td>Saglab\u0101tas importa lauku atbilst\u012bbas<\/td><td>Vienreiz\u0113jai datu iel\u0101dei; nav paredz\u0113ts past\u0101v\u012bgai sinhroniz\u0101cijai<\/td><\/tr><tr><td>SuiteTalk SOAP<\/td><td>Novecojis risin\u0101jums, tikai TBA<\/td><td>Neveidojiet jaunas integr\u0101cijas ar \u0161o risin\u0101jumu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">Autentifik\u0101cija<\/h3>\n\n\n<p>Grafiku sast\u0101d\u012b\u0161anas risin\u0101jumam, kur\u0101 sazin\u0101s serveri, izmantojiet OAuth 2.0 Client Credentials (machine-to-machine). <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_162686838198.html\">Administratora izv\u0113lnes ce\u013c\u0161<\/a> ir Setup &gt; Integration &gt; Manage Authentication &gt; OAuth 2.0 Client Credentials (M2M) Setup. Aug\u0161upiel\u0101d\u0113jiet publisko sertifik\u0101tu un piesaistiet to ent\u012btijai, lomai un integr\u0101cijas ierakstam. Katr\u0101 integr\u0101cijas ierakst\u0101 var b\u016bt ne vair\u0101k k\u0101 pieci akt\u012bvi sertifik\u0101ti.<\/p>\n\n\n<p>Izveidojiet integr\u0101cijai atsevi\u0161\u0137u lomu ar skat\u012b\u0161anas ties\u012bb\u0101m prec\u0113m, BOM versij\u0101m, tehnolo\u0123iskajiem procesiem un darba centriem, k\u0101 ar\u012b redi\u0123\u0113\u0161anas ties\u012bb\u0101m ra\u017eo\u0161anas pas\u016bt\u012bjumiem, izpildes ierakstiem un materi\u0101lu izsnieg\u0161anas ierakstiem. SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>) autentifik\u0101cijai izmanto API mar\u0137ieri, kas tiek nos\u016bt\u012bts galven\u0113 Authorization-Token, t\u0101p\u0113c starpprogrammat\u016bra glab\u0101 abu sist\u0113mu autentifik\u0101cijas datus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Notikumi: standarta t\u012bmek\u013ca aiz\u0137eres nav<\/h3>\n\n\n<p>Oracle dokument\u0101cij\u0101 nav aprakst\u012bts ieb\u016bv\u0113ts izejo\u0161ais webhook. Praktiski izmanto SuiteScript User Event skriptu Work Order ierakstam (<code>afterSubmit<\/code>), kas ar <code>N\/task<\/code> vai Map\/Reduce skriptu ievieto izejo\u0161o izsaukumu rind\u0101 un veic to ar <code>N\/https<\/code>. Nekad neveiciet sinhronu \u0101r\u0113jo izsaukumu no <code>afterSubmit<\/code>: tas notiek lietot\u0101ja saglab\u0101\u0161anas darb\u012bbas laik\u0101, t\u0101p\u0113c l\u0113ns galapunkts pal\u0113nina saglab\u0101\u0161anu vai izraisa t\u0101s k\u013c\u016bmi.<\/p>\n\n\n<p>User Event notikumi neaptver visus izmai\u0146u veik\u0161anas veidus. Masveida atjaunin\u0101jumi un CSV imports var tos apiet. Papildiniet notikuma skriptu ar regul\u0101ru SuiteQL sal\u012bdzin\u0101\u0161anas vaic\u0101jumu p\u0113c <code>lastmodifieddate<\/code>, lai nepalaistu gar\u0101m nevienu izmai\u0146u. Pret\u0113j\u0101 virzien\u0101 datu ierakst\u012b\u0161anu ierosina pa\u0161a SkyPlanner webhook pazi\u0146ojumi, t\u0101p\u0113c NetSuite sa\u0146em jaunos datumus, tikl\u012bdz main\u0101s pl\u0101ns.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-netsuite-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Datu kart\u0113\u0161ana no NetSuite uz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>NetSuite ieraksts (REST id)<\/th><th>SkyPlanner objekts<\/th><th>Virziens<\/th><th>Bie\u017eums<\/th><\/tr><\/thead><tbody><tr><td>Assembly Item (<code>assemblyItem<\/code>), Inventory Item (<code>inventoryItem<\/code>)<\/td><td>Produkts \/ materi\u0101ls<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de, p\u0113c tam katru dienu vai izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>BOM Revision (<code>bomRevision<\/code>), BOM komponenti<\/td><td>Daudzl\u012bme\u0146u produkta strukt\u016bra, materi\u0101lu vajadz\u012bbas<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>Izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Manufacturing Routing (<code>manufacturingRouting<\/code>, apak\u0161saraksti <code>routingStep<\/code>, <code>routingComponent<\/code>)<\/td><td>Tehnolo\u0123isk\u0101 procesa posmi: sec\u012bba, darba centrs, p\u0101rregul\u0113\u0161anas laiks, izpildes laiks<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>Izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Manufacturing Work Center (Group ar darba centra atz\u012bmi): Machine Resources, Labor Resources, Work Calendar<\/td><td>Darba centri, darba centru grupas, mai\u0146as<\/td><td>NetSuite \u2192 SkyPlanner, p\u0113c tam uztur SkyPlanner vid\u0113<\/td><td>S\u0101kotn\u0113j\u0101 iel\u0101de<\/td><\/tr><tr><td>Work Order (<code>workOrder<\/code>): prece, daudzums, atra\u0161an\u0101s vieta, Production Start\/End Date, statuss; termi\u0146u ieg\u016bst no saist\u012bt\u0101 Sales Order<\/td><td>Pas\u016bt\u012bjums \/ ra\u017eo\u0161anas uzdevums ar termi\u0146u un priorit\u0101ti<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>Gandr\u012bz re\u0101llaik\u0101 ar User Event, papildus veicot sal\u012bdzin\u0101\u0161anas vaic\u0101jumus<\/td><\/tr><tr><td>Manufacturing Operation Task (<code>manufacturingOperationTask<\/code>)<\/td><td>Grafik\u0101 iepl\u0101nota oper\u0101cija<\/td><td>NetSuite \u2192 SkyPlanner, datumi SkyPlanner \u2192 NetSuite<\/td><td>Gandr\u012bz re\u0101llaik\u0101<\/td><\/tr><tr><td>Faktiskie kr\u0101jumi katr\u0101 atra\u0161an\u0101s viet\u0101 (SuiteQL), Item Receipts (<code>itemReceipt<\/code>)<\/td><td>Kr\u0101jumu atlikumi grafiku sast\u0101d\u012b\u0161anai atbilsto\u0161i materi\u0101lu pieejam\u012bbai<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>Ik p\u0113c 15 l\u012bdz 60 min\u016bt\u0113m vai sa\u0146em\u0161anas br\u012bd\u012b<\/td><\/tr><tr><td>Purchase Order (<code>purchaseOrder<\/code>) rindas: prece, daudzums, paredzamais sa\u0146em\u0161anas datums, statuss<\/td><td>Iepirkuma pas\u016bt\u012bjumi \/ ien\u0101ko\u0161ie materi\u0101li (paredzamais pieg\u0101des datums). Tos uzskata par pieejamiem pieg\u0101des datum\u0101; kr\u0101jumi tiek atjaunin\u0101ti, kad iepirkuma pas\u016bt\u012bjumam pie\u0161\u0137ir statusu Delivered<\/td><td>NetSuite \u2192 SkyPlanner<\/td><td>Ik p\u0113c 15 l\u012bdz 60 min\u016bt\u0113m vai izmai\u0146u gad\u012bjum\u0101<\/td><\/tr><tr><td>Katras oper\u0101cijas pl\u0101notais s\u0101kums un beigas<\/td><td><code>PATCH manufacturingOperationTask\/{id}<\/code> (<code>startDate<\/code>, <code>endDate<\/code>) un <code>PATCH workOrder\/{id}<\/code> (Production Start\/End Date)<\/td><td>SkyPlanner \u2192 NetSuite<\/td><td>Grafika izmai\u0146u gad\u012bjum\u0101, izmantojot SkyPlanner webhook<\/td><\/tr><tr><td>Mobile Confirmations, darba laika ieraksti, Production Timer<\/td><td><code>POST workOrder\/{id}\/!transform\/workOrderCompletion<\/code>: <code>startOperation<\/code>\/<code>endOperation<\/code> diapazons, sara\u017eotais daudzums, darba laiks <code>operation<\/code> rind\u0101s, SkyPlanner darba laika ieraksta ID k\u0101 \u0101r\u0113jais ID<\/td><td>SkyPlanner \u2192 NetSuite<\/td><td>Par katru apstiprin\u0101jumu vai paket\u0113s<\/td><\/tr><tr><td>Materi\u0101lu pat\u0113ri\u0146\u0161<\/td><td><code>POST workOrder\/{id}\/!transform\/workOrderIssue<\/code> vai <code>isBackflush<\/code> izpildes ierakst\u0101<\/td><td>SkyPlanner \u2192 NetSuite<\/td><td>Par katru apstiprin\u0101jumu<\/td><\/tr><tr><td>Pabeigts pas\u016bt\u012bjums (kontos, kuros neizmanto WIP)<\/td><td><code>POST workOrder\/{id}\/!transform\/assemblyBuild<\/code><\/td><td>SkyPlanner \u2192 NetSuite<\/td><td>Pabeidzot pas\u016bt\u012bjumu<\/td><\/tr><tr><td>Pas\u016bt\u012bjums sl\u0113gts<\/td><td>Work Order Close (<code>workOrderClose<\/code>)<\/td><td>NetSuite vid\u0113, veic finan\u0161u noda\u013ca<\/td><td>P\u0113c noklus\u0113juma nav automatiz\u0113ts<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u0101cijas risin\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. S\u0101kotn\u0113j\u0101 pamatdatu iel\u0101de.<\/strong> Ar SuiteQL vispirms nolasiet darba centrus, p\u0113c tam nomenklat\u016bras vien\u012bbas, BOM redakcijas un tehnolo\u0123iskos procesus. Tehnolo\u0123iskie procesi atsaucas uz darba centriem, t\u0101p\u0113c sec\u012bba ir svar\u012bga. Izm\u0113\u0123in\u0101juma laik\u0101 eksport\u0113jiet tos pa\u0161us datus CSV form\u0101t\u0101 un import\u0113jiet SkyPlanner. Grafika atbilst\u012bbu p\u0101rbauda v\u0113l pirms koda rakst\u012b\u0161anas.<\/p>\n\n\n<p><strong>2. Pas\u016bt\u012bjumu sinhroniz\u0101cija.<\/strong> Ieg\u016bstiet ra\u017eo\u0161anas pas\u016bt\u012bjumus ar statusu Released un In Process. Jau s\u0101kum\u0101 izlemiet, vai iek\u013caut ar\u012b pas\u016bt\u012bjumus ar statusu Planned. Ja tos iek\u013caujat, uzskatiet tos par provizorisku piepras\u012bjumu. Taj\u0101 pa\u0161\u0101 cikl\u0101 sinhroniz\u0113jiet atv\u0113rtos iepirkuma pas\u016bt\u012bjumus, lai, sast\u0101dot grafiku, katram ra\u017eo\u0161anas uzdevumam p\u0101rbaud\u012btu gan kr\u0101jumus, gan gaid\u0101mos materi\u0101lus, nevis tikai kr\u0101jumus.<\/p>\n\n\n<p><strong>3. Grafika datu ierakst\u012b\u0161ana atpaka\u013c.<\/strong> Mainoties grafikam, SkyPlanner webhook nos\u016bta jaunos oper\u0101ciju datumus starpprogrammat\u016brai. Par katru main\u012bto oper\u0101ciju starpprogrammat\u016bra nos\u016bta <code>PATCH \/services\/rest\/record\/v1\/manufacturingOperationTask\/{id}<\/code> (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_66202904244.html\">Oracle ierakstu uzzi\u0146a<\/a>) ar <code>startDate<\/code> un <code>endDate<\/code>. V\u0113l viens PATCH piepras\u012bjums <code>workOrder<\/code> galvenes ierakstam iestata laukus Production Start un End Date. Ierakstiet tikai datumus un piel\u0101gotu sec\u012bbas lauku, ja t\u0101du izmantojat. Nekad neierakstiet atpaka\u013c daudzumus vai BOM datus. Lai vien\u0101 transakcij\u0101 atjaunin\u0101tu daudzas oper\u0101cijas, neliels RESTlet skripts saglab\u0101 visu oper\u0101ciju sarakstu vien\u0101 izsaukum\u0101. Noklus\u0113juma risin\u0101jums paliek ierakstu API.<\/p>\n\n\n<p><strong>4. Izpildes apstiprin\u0101jumi ra\u017eo\u0161anas ceh\u0101.<\/strong> Operatori re\u0123istr\u0113 paveikto darbu SkyPlanner Mobile Confirmations. Starpprogrammat\u016bra nos\u016bta katru apstiprin\u0101jumu, izmantojot <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_47212826771.html\">Work Order transform\u0101cijas<\/a> ar <code>POST \/services\/rest\/record\/v1\/workOrder\/{id}\/!transform\/workOrderCompletion<\/code>, nododot <code>startOperation<\/code>, <code>endOperation<\/code>, sara\u017eoto daudzumu un oper\u0101ciju rind\u0101s re\u0123istr\u0113to laiku. Ra\u017eo\u0161anas pas\u016bt\u012bjumus bez WIP t\u0101 viet\u0101 nosl\u0113dz ar <code>!transform\/assemblyBuild<\/code>. Lai izmantotu <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_94213635853.html\">Work Order Completion ar REST<\/a>, ir nepiecie\u0161ama funkcija Manufacturing Work In Process. Kr\u0101jumu un izmaksu gr\u0101matojumi paliek NetSuite p\u0101rzi\u0146\u0101.<\/p>\n\n\n<p><strong>5. Idempotence un atk\u0101rtoti m\u0113\u0123in\u0101jumi.<\/strong> Katr\u0101 izpildes ierakst\u0101 SkyPlanner laika uzskaites ieraksta ID izmanto k\u0101 NetSuite \u0101r\u0113jo ID. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_156335203191.html\">\u0100r\u0113jie ID<\/a> ir unik\u0101li katram ieraksta tipam, t\u0101p\u0113c atk\u0101rtoti sa\u0146emtu t\u012bmek\u013ca aiz\u0137eres zi\u0146ojumu noraida k\u0101 dublik\u0101tu, nevis divreiz iegr\u0101mato daudzumus un izmaksas. Ierakst\u012b\u0161anas piepras\u012bjumus apstr\u0101d\u0101 rind\u0101. Neveiksm\u012bgu izsaukumu (vienlaic\u012bgo piepras\u012bjumu limita, blo\u0137\u0113ta ieraksta vai sertifik\u0101ta der\u012bguma termi\u0146a beig\u0161an\u0101s d\u0113\u013c) atk\u0101rto un re\u0123istr\u0113 \u017eurn\u0101l\u0101. Visas k\u013c\u016bmes, kas saglab\u0101jas, ir redzamas SkyPlanner komandai, kura nodro\u0161ina integr\u0101cijas atbalstu.<\/p>\n\n\n<p><strong>6. Datu p\u0101rvald\u012bbas noteikumi.<\/strong> NetSuite nosaka, ko ra\u017eo: nomenklat\u016bras vien\u012bbu, daudzumu, BOM, tehnolo\u0123isko procesu un atra\u0161an\u0101s vietu. SkyPlanner nosaka, kad un kur: oper\u0101ciju sec\u012bbu, darba centru, s\u0101kumu un beigas. NetSuite redi\u0123\u0113tie datumi n\u0101kamaj\u0101 atpaka\u013cieraksta reiz\u0113 tiek p\u0101rrakst\u012bti, t\u0101p\u0113c blo\u0137\u0113jiet Production Start\/End Date laukus ar veidlapas piel\u0101gojumu vai darbpl\u016bsmu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tipiskie projekta posmi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas procesa s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. NetSuite projekt\u0101 ietilpst:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izm\u0113\u0123in\u0101jums ar j\u016bsu datiem:<\/strong> no saglab\u0101tajiem mekl\u0113jumiem CSV form\u0101t\u0101 eksport\u0113 darba centrus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus un 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 import\u0113 tos SkyPlanner.<\/li>\n\n\n<li><strong>Pamatdatu kart\u0113\u0161ana:<\/strong> NetSuite ierakstu atbilst\u012bba SkyPlanner objektiem, piel\u0101gotie lauki, m\u0113rvien\u012bbas un WIP vai non-WIP modelis katrai nomenklat\u016bras vien\u012bbai.<\/li>\n\n\n<li><strong>S\u0101kotn\u0113j\u0101 iel\u0101de:<\/strong> ar SuiteQL iel\u0101d\u0113 nomenklat\u016bras vien\u012bbas, BOM redakcijas, tehnolo\u0123iskos procesus un darba centrus, p\u0113c tam SkyPlanner iestata mai\u0146as, operatorus un alternat\u012bvos darba centrus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumu sinhroniz\u0101cija:<\/strong> ra\u017eo\u0161anas pas\u016bt\u012bjumus ar statusu Released un In Process, k\u0101 ar\u012b atv\u0113rtos iepirkuma pas\u016bt\u012bjumus ar paredzamajiem sa\u0146em\u0161anas datumiem sinhroniz\u0113 ar User Event skriptiem un regul\u0101ru datu sal\u012bdzin\u0101\u0161anas aptauju.<\/li>\n\n\n<li><strong>Grafika atpaka\u013cieraksts:<\/strong> pl\u0101notos oper\u0101ciju datumus ieraksta ra\u017eo\u0161anas pas\u016bt\u012bjumos un oper\u0101ciju uzdevumos, konfigur\u0113jot OAuth 2.0 M2M gan smil\u0161kastes, gan produkcijas vid\u0113.<\/li>\n\n\n<li><strong>Apstiprin\u0101jumi no ra\u017eo\u0161anas ceha:<\/strong> Work Order Completions, materi\u0101lu izsnieg\u0161anas ierakstus vai Assembly Builds veido no Mobile Confirmations un laika uzskaites ierakstiem.<\/li>\n\n\n<li><strong>Test\u0113\u0161ana paral\u0113li pa\u0161reiz\u0113jam pl\u0101nam:<\/strong> izmantojiet SkyPlanner grafiku l\u012bdztekus pa\u0161reiz\u0113jam pas\u016bt\u012bjumu nodo\u0161anas procesam ra\u017eo\u0161an\u0101 un sal\u012bdziniet rezult\u0101tus.<\/li>\n\n\n<li><strong>Palai\u0161ana:<\/strong> p\u0101rejiet uz pl\u0101no\u0161anu SkyPlanner un blo\u0137\u0113jiet datumu laukus NetSuite.<\/li>\n\n<\/ul>\n\n\n<p>Sak\u0101rtoti tehnolo\u0123iskie procesi un viens meitasuz\u0146\u0113mums pal\u012bdz saglab\u0101t nelielu projekta tv\u0113rumu. Vair\u0101ki meitasuz\u0146\u0113mumi, WIP materi\u0101lu autom\u0101tiska norakst\u012b\u0161ana p\u0113c izlaides un piel\u0101gotas veidlapas palielina kart\u0113\u0161anas darbu apjomu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"netsuite-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu NetSuite<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pas\u016bt\u012bjumi bez tehnolo\u0123isk\u0101 procesa.<\/strong> Ja ra\u017eo\u0161anas pas\u016bt\u012bjumam nav Manufacturing Routing, tam nav oper\u0101ciju, ko iepl\u0101not. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle saka to pa\u0161u<\/a> par savu ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bku: &#8220;Work orders not associated with a NetSuite routing should not be scheduled.&#8221; (Ra\u017eo\u0161anas pas\u016bt\u012bjumus, kas nav saist\u012bti ar NetSuite tehnolo\u0123isko procesu, nevajadz\u0113tu iepl\u0101not.) Atrodiet tos ar SuiteQL pirms palai\u0161anas.<\/li>\n\n\n<li><strong>Darba centru dati ir ierobe\u017eoti.<\/strong> NetSuite darba centrs ir Group ar diviem skaita laukiem \u2014 Machine Resources un Labor Resources (abiem noklus\u0113juma v\u0113rt\u012bba ir 0) \u2014 un vienu Work Calendar, parasti &#8220;Default Work Calendar&#8221;. Iel\u0101d\u0113jiet darba centrus vienu reizi, p\u0113c tam atsevi\u0161\u0137us darba centrus, katra darbinieka mai\u0146as, instrumentus, p\u0101rregul\u0113\u0161anas laiku matricu un alternat\u012bvos darba centrus uzturiet SkyPlanner.<\/li>\n\n\n<li><strong>Setup Time un Run Rate datu kvalit\u0101te.<\/strong> NetSuite pl\u0101no\u0161an\u0101 bez jaudas ierobe\u017eojumiem izmanto \u0161os laukus, ta\u010du nepareizas v\u0113rt\u012bbas paliek nepaman\u012btas, jo jauda netiek \u0146emta v\u0113r\u0101. Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101, kur grafiks atbilst faktiskajai iek\u0101rtu un darbinieku jaudai, \u0161\u012bs k\u013c\u016bdas atkl\u0101jas jau pirmaj\u0101 dien\u0101.<\/li>\n\n\n<li><strong>WIP vai non-WIP.<\/strong> Izmantojot Manufacturing WIP, izlaidi iegr\u0101mato ar Work Order Issue, Work Order Completion un Work Order Close. Bez WIP izmanto Assembly Build. WIP nomenklat\u016bras vien\u012bb\u0101m integr\u0101cija iegr\u0101mato izpildes ierakstus, bet p\u0101r\u0113j\u0101m \u2014 mont\u0101\u017eas ierakstus, t\u0101p\u0113c katras vien\u012bbas modelis ir j\u0101iek\u013cauj kart\u0113\u0161an\u0101.<\/li>\n\n\n<li><strong>Advanced Manufacturing taj\u0101 pa\u0161\u0101 kont\u0101.<\/strong> Ja kont\u0101 izmanto ar\u012b Advanced Manufacturing SuiteApp, t\u0101 Manufacturing Work Bench ierakstiem prec\u012bzi j\u0101atbilst tehnolo\u0123iskajam procesam: oper\u0101ciju sec\u012bbai, oper\u0101cijas nosaukumam un darba centram. Izlemiet, kura sist\u0113ma nosaka oper\u0101ciju datumus. Divi pl\u0101not\u0101ji vieniem un tiem pa\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumiem noz\u012bm\u0113 divus konkur\u0113jo\u0161us pl\u0101nus.<\/li>\n\n\n<li><strong>Vienlaic\u012bgo piepras\u012bjumu limiti.<\/strong> T\u012bmek\u013ca pakalpojumiem un RESTlet izsaukumiem ir kop\u012bgs <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N3448861.html\">konta vienlaic\u012bgo piepras\u012bjumu limits<\/a>, ko nosaka pakalpojuma l\u012bmenis, pieskaitot 10 par katru SuiteCloud Plus licenci. Paral\u0113li aptauj\u0101jot katru ierakstu atsevi\u0161\u0137i, \u0161o limitu \u0101tri sasniedz. Las\u012b\u0161anai izmantojiet SuiteQL ar lapo\u0161anu, bet ierakst\u012b\u0161anas piepras\u012bjumus ievietojiet rind\u0101.<\/li>\n\n\n<li><strong>Smil\u0161kastes atsvaidzin\u0101\u0161ana dz\u0113\u0161 M2M iestat\u012bjumus.<\/strong> Atsvaidzinot smil\u0161kasti, OAuth 2.0 Client Credentials piesaistes tiek dz\u0113stas, un t\u0101s netiek kop\u0113tas starp kontiem. Sertifik\u0101ts ar beigu\u0161os der\u012bguma termi\u0146u vai atsaukts sertifik\u0101ts aptur sinhroniz\u0101ciju, l\u012bdz izveido jaunu piesaisti. Iestatiet br\u012bdin\u0101jumus par autentifik\u0101cijas k\u013c\u016bm\u0113m.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-netsuite-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">NetSuite integr\u0101cija: kas to konfigur\u0113 un nodro\u0161ina atbalstu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbs ietver j\u016bsu ierakstu, tehnolo\u0123isko procesu un darba centru kart\u0113\u0161anu, k\u0101 ar\u012b to ierobe\u017eojumu iestat\u012b\u0161anu, kurus NetSuite neglab\u0101 k\u0101 grafiku sast\u0101d\u012b\u0161anai izmantojamus datus: p\u0101rregul\u0113\u0161anas laiku matricu, instrumentus, operatoru skaitu un alternat\u012bvos resursus. SkyPlanner t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as atpaka\u013c, tikl\u012bdz t\u0101s notiek, ar\u012b tad, ja t\u0101s veic Autopilot.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina atbalstu p\u0113c palai\u0161anas.<\/strong> Katr\u0101 r\u016bpn\u012bc\u0101 NetSuite izmanto at\u0161\u0137ir\u012bgi: WIP vai non-WIP, piel\u0101gotas veidlapas, skripti un tehnolo\u0123isko procesu aprakst\u012b\u0161anas principi. Komanda kart\u0113 j\u016bsu ierakstus un savieno SkyPlanner REST API un t\u012bmek\u013ca aiz\u0137eres ar NetSuite REST, SuiteQL un RESTlets. Atbalsts aptver User Event skriptu un starpprogrammat\u016bru, \u0146emot v\u0113r\u0101 ar\u012b izmai\u0146as j\u016bsu NetSuite konfigur\u0101cij\u0101.<\/li>\n\n\n<li><strong>Var piedal\u012bties ar\u012b j\u016bsu NetSuite partneris.<\/strong> Partneri p\u0101rzina j\u016bsu piel\u0101got\u0101s veidlapas, skriptus un lomas. Vi\u0146i izmanto SkyPlanner REST API, kas \u013cauj str\u0101d\u0101t ar pas\u016bt\u012bjumiem, produktiem, materi\u0101liem, iepirkuma pas\u016bt\u012bjumiem, tehnolo\u0123isk\u0101 procesa so\u013ciem un darba laika uzskaites ierakstiem. \u0160ai saskarnei ir Swagger\/OpenAPI dokument\u0101cija, un autentifik\u0101cijai tiek izmantots API mar\u0137ieris. Publiski pieejam\u0101 dokument\u0101cija: <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/li>\n\n\n<li><strong>J\u016bsu izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumu uz t\u0101 pamata.<\/strong> Bie\u017ei izmanto \u0161\u0101du sadal\u012bjumu: User Event skripts NetSuite iek\u0161ien\u0113 un neliels starpprogrammat\u016bras pakalpojums \u0101rpus t\u0101. Lai s\u0101ktu, pietiek ar API atsl\u0113gu (<a href=\"\/lv\/docs\/integracijas-pamaciba\/\">integr\u0101cijas pam\u0101c\u012bba<\/a>), un SkyPlanner komanda vajadz\u012bbas gad\u012bjum\u0101 pal\u012bdz.<\/li>\n\n<\/ol>\n\n\n<p>Vispirms p\u0101rbaudiet grafika atbilst\u012bbu <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> ar CSV datiem un l\u012bdz 20 darba centriem, bez kred\u012btkartes. Tad integr\u0101ciju var s\u0101kt ar grafiku, kas jau atbilst r\u016bpn\u012bcas vajadz\u012bb\u0101m.<\/p>\n\n\n<p>P\u0113c savieno\u0161anas Arcturus dzin\u0113js sast\u0101da grafiku no aktu\u0101lajiem NetSuite ra\u017eo\u0161anas pas\u016bt\u012bjumiem un p\u0101rbauda materi\u0101lus gan kr\u0101jumos, gan gaid\u0101majos iepirkuma pas\u016bt\u012bjumos. Operatori re\u0123istr\u0113 darbu ar Mobile Confirmations, Production Timer un Quick Log Mode, un NetSuite atspogu\u013co situ\u0101ciju ra\u017eo\u0161anas ceh\u0101 bez manu\u0101las datu ievades. SkyPlanner cena ir no 199 \u20ac m\u0113nes\u012b, iek\u013caujot 5 darba centrus; nor\u0113\u0137ini ir ik m\u0113nesi, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu nosaka iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu redzamas pirms darba s\u0101k\u0161anas. <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazinieties ar p\u0101rdo\u0161anas komandu<\/a>, lai noteiktu sava NetSuite integr\u0101cijas projekta tv\u0113rumu, vai apskatiet <a href=\"\/lv\/funkcijas\/\">funkcijas<\/a> un <a href=\"\/lv\/klientu-stasti\/\">klientus<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrosadales pane\u013cu ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel izkl\u0101jlap\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektriskie sadales skapji un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda non\u0101k l\u012bdz ra\u017eo\u0161anas l\u012bnijai da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu ap\u0123\u0113rb\u0101 pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no aug\u0161as uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidr\u0101k saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161an\u0101 ik dienu tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja Anu J\u00e4rvinen pie robotiz\u0113tas pale\u0161u krau\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us uz priek\u0161u<\/b><span>p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku dro\u0161s iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u. Atbildes uz piepras\u012bjumiem main\u012bt grafiku tagad tiek sniegtas da\u017eu sekun\u017eu laik\u0101, nevis stundas vai ilg\u0101k\u0101 laik\u0101 k\u0101 iepriek\u0161.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savieno ar NetSuite?<\/summary>\n<p class=\"sp-faq__a\">Datu apmai\u0146a notiek abos virzienos, izmantojot NetSuite REST ierakstu API, SuiteQL un, kur nepiecie\u0161ams, RESTlets. Oper\u0101ciju datumus ieraksta ar <code>PATCH<\/code> piepras\u012bjumu <code>manufacturingOperationTask<\/code> ierakstam. Darba laiku un sara\u017eoto daudzumu re\u0123istr\u0113 ar <code>workOrderCompletion<\/code> vai <code>assemblyBuild<\/code> transform\u0101ciju. SkyPlanner komanda konfigur\u0113 integr\u0101ciju ievie\u0161anas laik\u0101 un nodro\u0161ina t\u0101s atbalstu p\u0113c palai\u0161anas. J\u016bsu NetSuite partneris vai pa\u0161u izstr\u0101d\u0101t\u0101ji var veidot risin\u0101jumus, izmantojot dokument\u0113to REST API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner lieto\u0161anai ir nepiecie\u0161ams Advanced Manufacturing SuiteApp?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner pats veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i faktiskajai iek\u0101rtu un darbinieku jaudai, izmantojot standarta Work Orders, Manufacturing Routings un Work Centers. Ja kont\u0101 tiek izmantots ar\u012b Advanced Manufacturing, tv\u0113ruma noteik\u0161anas laik\u0101 vienojas, kura sist\u0113ma nosaka oper\u0101ciju datumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 tiek nov\u0113rsta atk\u0101rtota gr\u0101mato\u0161ana, ja notikums tiek nos\u016bt\u012bts divreiz?<\/summary>\n<p class=\"sp-faq__a\">Katram Work Order Completion k\u0101 \u0101r\u0113jais ID tiek pievienots SkyPlanner laika uzskaites ieraksta ID. NetSuite nodro\u0161ina \u0101r\u0113jo ID unikalit\u0101ti katram ierakstu tipam, t\u0101p\u0113c atk\u0101rtoti nos\u016bt\u012bts notikums tiek noraid\u012bts. T\u0101d\u0113j\u0101di daudzums un izmaksas netiek iegr\u0101matoti v\u0113lreiz. Neveiksm\u012bgie ierakst\u012b\u0161anas piepras\u012bjumi tiek ievietoti rind\u0101, atk\u0101rtoti izpild\u012bti un re\u0123istr\u0113ti \u017eurn\u0101l\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai REST un OAuth 2.0 viet\u0101 varam izmantot TBA vai SOAP?<\/summary>\n<p class=\"sp-faq__a\">Jaun\u0101m integr\u0101cij\u0101m paredziet REST ar OAuth 2.0. S\u0101kot ar versiju 2027.1, Oracle vairs neat\u013caus jaunas TBA un SOAP integr\u0101cijas, bet versij\u0101 2028.2 atsp\u0113jos visus SOAP galapunktus. SkyPlanner integr\u0101cija, kas veidota ar REST un OAuth 2.0, turpin\u0101s darboties ar\u012b p\u0113c ab\u0101m \u0161\u012bm izmai\u0146\u0101m.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner sa\u0146em inform\u0101ciju par jauniem NetSuite ra\u017eo\u0161anas pas\u016bt\u012bjumiem?<\/summary>\n<p class=\"sp-faq__a\">NetSuite nav dokument\u0113ta standarta risin\u0101juma izejo\u0161u webhook pazi\u0146ojumu s\u016bt\u012b\u0161anai. Work Order piesaist\u012bts User Event skripts saglab\u0101\u0161anas br\u012bd\u012b ievieto pazi\u0146ojumu rind\u0101. Periodiska SuiteQL aptauja uztver izmai\u0146as, kuras skripts nepamana, piem\u0113ram, CSV importus un masveida atjaunin\u0101jumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai pirms integr\u0101cijas izveides varam izm\u0113\u0123in\u0101t SkyPlanner ar NetSuite datiem?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet darba centrus, tehnolo\u0123iskos procesus un atv\u0113rtos ra\u017eo\u0161anas pas\u016bt\u012bjumus CSV form\u0101t\u0101 un import\u0113jiet tos SkyPlanner 30 dienu izm\u0113\u0123in\u0101juma laik\u0101. Sal\u012bdziniet ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 ieg\u016bto grafiku, kas atbilst faktiskajai iek\u0101rtu un darbinieku jaudai, ar savu pa\u0161reiz\u0113jo pl\u0101nu. <a href=\"\/lv\/izmeginajums\/\">S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">piesakieties demonstr\u0101cijai<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilgs ir NetSuite integr\u0101cijas projekts?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c s\u0101kotn\u0113j\u0101s sagatavo\u0161anas s\u0101kuma, ar\u012b lielos uz\u0146\u0113mumos. Jau izm\u0113\u0123in\u0101juma laik\u0101 grafiku veido, izmantojot CSV datus, un UTU jau \u0161obr\u012bd izmanto SkyPlanner kop\u0101 ar NetSuite (<a href=\"\/lv\/customers\/utu\/\">UTU atsauksme<\/a>).<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Oracle NetSuite NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 rokasgr\u0101mat\u0101 NetSuite partneriem, administratoriem un tehniskajiem iepirkumu speci\u0101listiem skaidrots, k\u0101 savienot SkyPlanner APS ar Oracle NetSuite ra\u017eo\u0161anas pl\u0101no\u0161anai, kur\u0101 grafiks atbilst faktiskajai iek\u0101rtu un darbinieku jaudai. SkyPlanner un NetSuite apmain\u0101s ar datiem abos virzienos, izmantojot REST t\u012bmek\u013ca pakalpojumus un &#8230; <a title=\"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/\" aria-label=\"Read more about NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100738,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101035","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NetSuite integr\u0101cijas ce\u013cvedis APS pl\u0101no\u0161anai | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/integracijas-rokasgramata\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/integracijas-rokasgramata\\\/\",\"name\":\"NetSuite integr\u0101cijas ce\u013cvedis APS pl\u0101no\u0161anai | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/integracijas-rokasgramata\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/integracijas-rokasgramata\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/integracijas-rokasgramata\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Oracle NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NetSuite integr\u0101cijas ce\u013cvedis APS pl\u0101no\u0161anai | SkyPlanner","description":"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/","og_locale":"lv_LV","og_type":"article","og_title":"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS","og_description":"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/","name":"NetSuite integr\u0101cijas ce\u013cvedis APS pl\u0101no\u0161anai | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS un Oracle NetSuite: REST record API, SuiteQL, OAuth 2.0 M2M, ra\u017eo\u0161anas pas\u016bt\u012bjumu kart\u0113\u0161ana, datu atpaka\u013cieraksts un NetSuite riski.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Oracle NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/"},{"@type":"ListItem","position":5,"name":"NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Oracle NetSuite NetSuite integr\u0101cijas rokasgr\u0101mata ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ar SkyPlanner APS \u0160aj\u0101 rokasgr\u0101mat\u0101 NetSuite partneriem, administratoriem un tehniskajiem iepirkumu speci\u0101listiem skaidrots, k\u0101 savienot SkyPlanner APS ar Oracle NetSuite ra\u017eo\u0161anas pl\u0101no\u0161anai, kur\u0101 grafiks atbilst faktiskajai iek\u0101rtu un darbinieku jaudai. SkyPlanner un NetSuite apmain\u0101s ar datiem abos virzienos, izmantojot REST t\u012bmek\u013ca pakalpojumus un&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101035"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101035\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100738"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}